Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Initial SVS Integrated Technology Evaluation Flight Test Requirements and Hardware Architecture

This document presents the flight test requirements for the Initial Synthetic Vision Systems Integrated Technology Evaluation flight Test to be flown aboard NASA Langley's ARIES aircraft and the final hardware architecture implemented to meet these requirements. Part I of this document contains the hardware, software, simulator, and flight operations requirements for this light test as they were defined in August 2002. The contents of this section are the actual requirements document that was signed for this flight test. Part II of this document contains information pertaining to the hardware architecture that was realized to meet these requirements as presented to and approved by a Critical Design Review Panel prior to installation on the B-757 Airborne Research Integrated Experiments Systems (ARIES) airplane. This information includes a description of the equipment, block diagrams of the architecture, layouts of the workstations, and pictures of the actual installations.

Harrison, Stella V.↗

Data Acquisition and Control Systems Laboratory

The Data Acquisition and Control Systems (DACS) Laboratory is a facility at Stennis Space Center that provides an off test-stand capability to develop data-acquisition and control systems for rocket-engine test stands. It is also used to train new employees in state-of-the-art systems, and provides a controlled environment for troubleshooting existing systems, as well as the ability to evaluate the application of new technologies and process improvements. With the SSC propulsion testing schedules, without the DACS Laboratory, it would have been necessary to perform most of the development work on actual test systems, thereby subjecting both the rocket-engine testing and development programs to substantial interference in the form of delays, restrictions on modifications of equipment, and potentially compromising software configuration control. The DACS Laboratory contains a versatile assortment of computer hardware and software, digital and analog electronic control and data-acquisition equipment, and standard electronic bench test equipment and tools. Recently completed Control System development and software verification projects include support to the joint NASA/Air Force Integrated Powerhead Demonstration (IPD) LOX & LH2 PreBurner and Turbopump ground testing programs. In other recent activities, the DACS Laboratory equipment and expertise have supported the off-stand operation of high-pressure control valves to correct valve leak problems prior to installation on the test stand. Future plans include expanding the Laboratory's capabilities to provide cryogenic control valve characterization prior to installation, thereby reducing test stand activation time.

Holland, Randy↗

Amateur Radio on the International Space Station - Phase 2 Hardware System

The International Space Station (ISS) ham radio system has been on-orbit for over 3 years. Since its first use in November 2000, the first seven expedition crews and three Soyuz taxi crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early on, the Amateur Radio on the International Space Station (ARISS) international team devised a multi-phased hardware development approach for the ISS ham radio station. Three internal development Phases. Initial Phase 1, Mobile Radio Phase 2 and Permanently Mounted Phase 3 plus an externally mounted system, were proposed and agreed to by the ARISS team. The Phase 1 system hardware development which was started in 1996 has since been delivered to ISS. It is currently operational on 2 meters. The 70 cm system is expected to be installed and operated later this year. Since 2001, the ARISS international team have worked to bring the second generation ham system, called Phase 2, to flight qualification status. At this time, major portions of the Phase 2 hardware system have been delivered to ISS and will soon be installed and checked out. This paper intends to provide an overview of the Phase 1 system for background and then describe the capabilities of the Phase 2 radio system. It will also describe the current plans to finalize the Phase 1 and Phase 2 testing in Russia and outlines the plans to bring the Phase 2 hardware system to full operation.

Bauer, F.↗

Small Engine Technology Investigation

The primary objective of the small engine technology study task is to identify key, enabling jet engine component technologies for improved performance, primarily for commercial, regional subsonic aircraft. The study involved two regional engine applications: the CF34 turbofan engine, which is installed on a regional jet application and the CT7-9 turboprop, which is installed on regional turboprop applications. Technologies to improve the performance of these applications were identified. Estimates of the benefits and development costs for each technology were made. Performance sensitivities were calculated for each of the technology items identified. The technology improvements were then translated into component improvements and their impact on the aircraft economics was evaluated. A factor of merit based on sfc was calculated as the percent improvement in sfc times the probability of improvement divided by the development evaluation costs associated with that technology item. The technologies were ranked for both the turbofan and turboprop applications.

Gregory, Brent B.↗

Practical Remote Sensing Application for Agriculture

Aerial surveys of plant health in row crops are converted into crucial farm management information plots for each field. These plots are delivered overnight to subscribing farmers. After review, the plots are converted to machinery control discs and installed on farm equipment to manage the appropriate applications of seed, chemicals and water when and where needed. The process is repeated throughout the crop planting, growing and harvesting season. This entire operation has been installed and tested on four Mississippi Delta farms. Its use demonstrated operational cost savings of more than fifty dollars per acre and increased cotton production by ten percent on average.

Source record↗

Experimental Study of Arcing on High-Voltage Solar Arrays

The main obstacle to the implementation of a high-voltage solar array in space is arcing on the conductor-dielectric junctions exposed to the surrounding plasma. One obvious solution to this problem would be the installation of fully encapsulated solar arrays which were not having exposed conductors at all. However, there are many technological difficulties that must be overcome before the employment of fully encapsulated arrays will turn into reality. An alternative solution to raise arc threshold by modifications of conventionally designed solar arrays looks more appealing, at least in the nearest future. A comprehensive study of arc inception mechanism suggests that such modifications can be done in the following directions: 1) To insulate conductor-dielectric junction from a plasma environment (wrapthrough interconnects); 2) To change a coverglass geometry (overhang); 3) To increase a coverglass thickness; 4) To outgas areas of conductor-dielectric junctions. The operation of high-voltage array in LEO produces also the parasitic current power drain on the electrical system. Moreover, the current collected from space plasma by solar arrays determines the spacecraft floating potential that is very important for the design of spacecraft and its scientific apparatus. In order to verify the validity of suggested modifications and to measure current collection five different solar array samples have been tested in a large vacuum chamber. Each sample (36 silicon based cells) consists of three strings containing 12 cells connected in series. Thus, arc rate and current collection can be measured on every string independently, or on a whole sample when strings are connected in parallel. The heater installed in the chamber provides the possibility to test samples under temperature as high as 80 C that stimulates the LEO operational temperature. The experimental setup is described below.

Vayner, Boris↗

Status and Performance of HST Wide Field Camera 3

The HST Wide Field Camera 3 is a panchromatic UV-visible-near infrared camera whose development is currently nearing completion, for a planned installation into the Hubble Space Telescope during Servicing Mission 4. WFC3 provides two imaging channels. The UVIS channel features a 4096 x 4096 pixel CCD focal plane with sensitivity from 200 to 1000 nm and a 160 x 160 arcsec field of view. The UVIS channel provides unprecedented sensitivity and field of view in the near ultraviolet for HST. The IR channel features a 1014 x 1014 pixel HgCdTe focal plane covering 850 to 1700 nm with a 135 x 135 arcsec field of view, providing a substantial advance in IR survey efficiency for HST. The construction of WFC3 is nearly complete, and the instrument is well into its integration and test program. We present the current status of the instrument and its projected scientific performance when installed into HST.

Kimble, Randy↗

Estimates Of The Orbiter RSI Thermal Protection System Thermal Reliability

In support of the Space Shuttle Orbiter post-flight inspection, structure temperatures are recorded at selected positions on the windward, leeward, starboard and port surfaces. Statistical analysis of this flight data and a non-dimensional load interference (NDLI) method are used to estimate the thermal reliability at positions were reusable surface insulation (RSI) is installed. In this analysis, structure temperatures that exceed the design limit define the critical failure mode. At thirty-three positions the RSI thermal reliability is greater than 0.999999 for the missions studied. This is not the overall system level reliability of the thermal protection system installed on an Orbiter. The results from two Orbiters, OV-102 and OV-105, are in good agreement. The original RSI designs on the OV-102 Orbital Maneuvering System pods, which had low reliability, were significantly improved on OV-105. The NDLI method was also used to estimate thermal reliability from an assessment of TPS uncertainties that was completed shortly before the first Orbiter flight. Results fiom the flight data analysis and the pre-flight assessment agree at several positions near each other. The NDLI method is also effective for optimizing RSI designs to provide uniform thermal reliability on the acreage surface of reusable launch vehicles.

Kolodziej, P.↗

An X-Band Radar Terrain Feature Detection Method for Low-Altitude SVS Operations and Calibration Using LiDAR

To enable safe use of Synthetic Vision Systems at low altitudes, real-time range-to-terrain measurements may be required to ensure the integrity of terrain models stored in the system. This paper reviews and extends previous work describing the application of x-band radar to terrain model integrity monitoring. A method of terrain feature extraction and a transformation of the features to a common reference domain are proposed. Expected error distributions for the extracted features are required to establish appropriate thresholds whereby a consistency-checking function can trigger an alert. A calibration-based approach is presented that can be used to obtain these distributions. To verify the approach, NASA's DC-8 airborne science platform was used to collect data from two mapping sensors. An Airborne Laser Terrain Mapping (ALTM) sensor was installed in the cargo bay of the DC-8. After processing, the ALTM produced a reference terrain model with a vertical accuracy of less than one meter. Also installed was a commercial-off-the-shelf x-band radar in the nose radome of the DC-8. Although primarily designed to measure precipitation, the radar also provides estimates of terrain reflectivity at low altitudes. Using the ALTM data as the reference, errors in features extracted from the radar are estimated. A method to estimate errors in features extracted from the terrain model is also presented.

Young, Steve↗

Supersonic Inlet with Pylons Set and Star-Shaped Forebody for Mixing, Combustion and Thrust Enhancement

Two new approaches are discussed in this paper for application in the Scramjet inlet of an air-breathing propulsion system: 1) In the first approach, the pylon set is installed in the rectangular inlet near the cowl front edge. For a quasi-axisymmetric inlet, a similar set is installed along the Star-shaped forebody axis. This set contains 3 - 4 airfoil-shaped strips or cross-sectional rings depending on the type of inlet. The inlets: rectangular, axisymmetric or star-shaped, are located at different distances from the forebody. Fuel injection takes place through these pylons, which provides for uniform mixing downstream. The locations, sizes and angles of these pylons are very important for efficient application. Optimal values of geometrical parameters were determined from multi-parametric NSE-based numerical simulations of the laminar and turbulent external/internal flows. These simulations have shown significant benefits for mixing, combustion and thrust of the proposed approach by comparison with traditional well-known designs. Experimental tests will be conducted soon at the NASA LaRC and Institute of Mechanics at Moscow State University. Preliminary estimates are very promising.

Gilinsky, M.↗

COR1 Engineering Test Unit Measurements at the NCAR/HAO Vacuum Tunnel Facility, October-November 2002

The Engineering Test Unit (ETU) of COR1 was made in two configurations. The first configuration, ETU-1, was for vibration testing, while the second, ETU-2, was for optical testing. This is a report on the optical testing performed on ETU-2 at the NCAR/HAO Vacuum Tunnel Facility during the months of October and November, 2002. This was the same facility used to test the two previous breadboard models. In both configurations, the first two tube sections were complete, with all optical elements aligned. The vibration model ETU-1 had the remaining tube sections attached, with mass models for the remaining optics, for the various mechanisms, and for the focal plane assembly. It was then converted into the optical model ETU-2 by removing tube sections 3 to 5, and mounting the remaining optics on commercial mounts. (The bandpass filter was also installed into tube 2, which had been replaced in ETU-1 by a mass model, so that pre- and post-vibration optical measurements could be made.) Doublet 2 was installed in a Newport LP-2 carrier, and aligned to the other optics in the first two tube sections. The LP-2 adjustment screws were then uralened so that the alignment could be maintained during shipping. Because neither the flight polarizer nor Hollow Core Motor were available, they were simulated by a commercial polarizer and rotational mount, both from Oriel corporation. The Oriel rotational stage was not designed for vacuum use, but it was determined after consultation with the company, and lab testing, that the stage could be used in the moderate vacuum conditions at the NCAR/HAO facility. The shutter and focal plane assembly were simulated with the same camera used for the previous two breadboard tests. The focal plane mask was simulated with a plane of BK7 glass with a mask glued on, using the same procedure as for the Lyot spot on Doublet 1, and mounted in an adjustable LP-2 carrier. Two masks were made, one made to the precise specifications of the optical design, the other slightly bigger to make alignment easier.

Thompson, William↗

Life Extension Activities for the Hubble Space Telescope

With the cancellation of the Hubble Space Telescope (HST) Servicing Mission 4 (SM4), the HST Project will face numerous challenges to keep the Telescope operating during the remainder of the decade. As part of the SM4, the HST Project had planned to install various upgrades to the Telescope including the installation of new batteries and new rate integrating gyros. Without these upgrades, reliability analysis indicates that the spacecraft will lose the capability to conduct science operations later this decade. The HST team will be severely challenged to maximize the Telescope's remaining operational lifetime, while still trying to maximize - its science output and quality. Two of the biggest areas of concern are the age and condition of the batteries and gyros. Together they offer the largest potential extension in Telescope lifetime and present the biggest challenges to the HST team. The six Ni-H batteries on HST are the original batteries from launch. With fourteen years of operational life, these batteries have collectively lasted longer than any other comparable mission. Yet as with all batteries, their capacity has been declining. Engineers are examining various methods to prolong the life of these mission critical batteries, and retard the rate of degradation. This paper will focus on these and other efforts to prolong the life of the HST, thus enabling it to remain a world-class observatory for as long as possible.

Walyus, Keith D.↗

SLI Complex Curvature Friction Stir Weld Risk Reduction Program

The Space Launch Initiative Program (SLI) in conjunction with the National Center for Advanced Manufacturing (NCAM) will demonstrate the ability to produce large-scale complex curvature hardware using the self-reacting friction stir welding process. This multi-phased risk reduction program includes friction stir welding process development and manufacture of a 22-ft diameter quarter dome using a conventional tooling approach; it culminates in a 27.5-ft diameter quarter dome demonstration performed on a 5-axis Universal Weld System. The design, fabrication, and installation of the Universal Weld System is made possible through a collaboration between the State of Louisiana, NASA, and the University of New Orleans. The Universal Weld System, manufactured by MTS Systems Corporation, will be installed at the Michoud Assembly Facility in New Orleans, Louisiana, and will be capable of manufacturing domes up to 30 ft in diameter. All welding will be accomplished using the Adaptable Adjustable Pin Tool (AdAPT) weld head and controller manufactured by MTS. Weld parameters will be developed for an aluminum alloy in gauges ranging from 0.320 to 0.400 in. thick. Weld quality will be verified through radiography, mechanical property testing at ambient and LN2 temperatures, and metallurgical analysis. The AdAPT weld head will then be mounted on a 22-ft diameter dome tool, which will be modified to include a welding track and drive system for moving the AdAPT weld head along the weld joint. This tool will then be used to manufacture a 22-ft diameter dome of an aluminum alloy, with 0.320-in. constant thickness joints, consisting of three individual gore panels. Finally, the 27.5-ft diameter quarter dome will be welded on the Universal Weld System. The quarter dome will consist of three individual gore panels with weld lands tapering from 0.320 to 0.360 in. in thickness. With the demonstration of these welds, the ability to manufacture large diameter domes using the friction stir weld process in conjunction with a universal weld system provides a low risk approach to the fabrication of aluminum tanks for future launch vehicle applications.

Hartley, Paula J.↗

Comparison of Origin 2000 and Origin 3000 Using NAS Parallel Benchmarks

This report describes results of benchmark tests on the Origin 3000 system currently being installed at the NASA Ames National Advanced Supercomputing facility. This machine will ultimately contain 1024 R14K processors. The first part of the system, installed in November, 2000 and named mendel, is an Origin 3000 with 128 R12K processors. For comparison purposes, the tests were also run on lomax, an Origin 2000 with R12K processors. The BT, LU, and SP application benchmarks in the NAS Parallel Benchmark Suite and the kernel benchmark FT were chosen to determine system performance and measure the impact of changes on the machine as it evolves. Having been written to measure performance on Computational Fluid Dynamics applications, these benchmarks are assumed appropriate to represent the NAS workload. Since the NAS runs both message passing (MPI) and shared-memory, compiler directive type codes, both MPI and OpenMP versions of the benchmarks were used. The MPI versions used were the latest official release of the NAS Parallel Benchmarks, version 2.3. The OpenMP versiqns used were PBN3b2, a beta version that is in the process of being released. NPB 2.3 and PBN 3b2 are technically different benchmarks, and NPB results are not directly comparable to PBN results.

Turney, Raymond D.↗

Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

Ross, Richard W.↗

Electromagnetic Detection of Fatigue Cracks under Protruding Head Ferromagnetic Fasteners

The detection of fatigue cracks under installed fasteners has been a major goal of the aging aircraft NDE community. The Sliding Probe, Magneto-Optic Imager, Rotating Self-Nulling Probe, Low Frequency Eddy Current Array, and Eddyscan systems are among the instruments developed for this inspection. It has been verified that the detection of fatigue cracks under flush head aluminum and titanium fasteners can be accomplished with a high resolution by the above techniques. The detection of fatigue cracks under ferromagnetic and protruding head fasteners, however, has been found to be much more difficult. For the present work, the inspection for fatigue cracks under SAE 4340 Steel Hi-Lok fasteners is explored. Modifications to the Rotating Self-Nulling Eddy Current Probe System are presented which enable the detection of fatigue cracks hidden under the protruding head of the ferromagnetic fastener. Inspection results for samples with varying length EDM notches are shown, as well as a comparison between the signature from an EDM notch and an actual fatigue crack. Finite Element Modeling is used to investigate the effect of the ferromagnetic fastener on the induced eddy current distribution in order to help explain the detection characteristics of the system. This paper will also introduce a modification to the Rotating Probe System designed specifically for the detection of deeply buried flaws in multilayer conductors. The design change incorporates a giant magnetoresistive (GMR) sensor as the pickup device to improve the low frequency performance of the probe. The flaw detection capabilities of the GMR based Self- Nulling Probe are presented along with the status of the GMR based Rotating Probe System for detection of deeply buried flaws under installed fasteners.

Wincheski, Buzz↗

RF Coupling into the Fuel Tank of a Large Transport Aircraft from Intentionally Transmitting Peds in the Passenger Cabin

An investigation was performed to study the potential for radio frequency (RF) power radiated from Portable Electronic Devices (PEDs) to create an arcing/sparking event within the fuel tank of a large transport aircraft. This paper describes the experimental methods used for measuring RF coupling to the fuel tank and Fuel Quantity Indication System (FQIS) wiring from PED sources located in the passenger cabin. To allow comparison of voltage/current data obtained in a laboratory chamber FQIS installation to an actual aircraft FQIS installation, aircraft fuel tank RF reverberation characteristics were also measured. Results from the measurements, along with a survey of threats from typical intentional transmitting PEDs are presented. The resulting worst-case power coupled onto fuel tank FQIS wiring is derived. The same approach can be applied to measure RF coupling into various other aircraft systems.

Nguyen, Truong X.↗

Parametric Study of a Mach 2.4 Transport Engine with Supersonic Through-Flow Rotor and Supersonic Counter-Rotating Diffuser (SSTR/SSCRD)

A parametric study is conducted to evaluate a mixed-flow turbofan equipped with a supersonic through-flow rotor and a supersonic counter-rotating diffuser (SSTR/SSCRD) for a Mach 2.4 civil transport. Engine cycle, weight, and mission analyses are performed to obtain a minimum takeoff gross weight aircraft. With the presence of SSTR/SSCRD, the inlet can be shortened to provide better pressure recovery. For the same engine airflow, the inlet, nacelle, and pylon weights are estimated to be 73 percent lighter than those of a conventional inlet. The fan weight is 31 percent heavier, but overall the installed engine pod weight is 11 percent lighter than the current high-speed civil transport baseline conventional mixed-flow turbofan. The installed specific fuel consumption of the supersonic fan engine is 2 percent higher than that of the baseline turbofan at supersonic cruise. Finally, the optimum SSTR/SSCRD airplane meets the FAR36 Stage 3 noise limit and is within 7 percent of the baseline turbofan airplane takeoff gross weight over a 5000-n mi mission.

Tran, Donald H.↗