Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “delays”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Simulation system for testing a radar system

A simulation system for use in testing a radar system comprises a coarse delay module, a fine delay module, and a doppler shift module. The coarse delay module is configured to receive a first stream of digital data samples that are sampled from a radar signal at a sample time period or a second stream of digital data samples that are processed by another simulation system component and delay the digital data samples by a selectable first delay time that is greater than or equal to the sample time period. The fine delay module is configured to receive the digital data samples and filter the digital data samples to represent delay by a selectable second delay time that is less than the sample time period. The doppler shift module is configured to receive the digital data samples and adjust a value of a frequency content of the fine delayed samples.

Chritton, Audrey L.↗

Pedestal formation via different trajectories in the stability space in response to the timing scan of neutral beam heating in DIII-D

The frequency of type-I ELMs decreases as the initiation of the neutral beam injection (NBI) heating is delayed with respect to the time when plasma current (I p ) reaches flat-top in the ITER Baseline Scenario discharges in DIII-D. Henceforth, the time gap between the NBI initiation and I p flat-top will be referred to as “heating delay.” As the heating delay is modified, pedestal formation follows different trajectories in the edge current density–pedestal pressure gradient (j edge -∇p e ped ) space from the L-H transition toward the first ELM event. During the stationary phase after the first ELM, the ELM frequency (f ELM ) decreases by a factor of ~2 as the heating delay is increased. A longer pedestal recovery time in the inter-ELM period is observed for the low f ELM discharges as compared to the high f ELM discharges. Both low and high f ELM discharges show nearly identical profiles of electron density and temperature and have a similar MHD stability just before an ELM crash. However, a marked difference is observed in the magnetic spectrogram of the high and low f ELM discharges in response to the variation in the heating delay. The main difference is in the 200–400 kHz range of the magnetic spectra. A quasi-coherent mode (QCM) at 220 kHz and weaker broadband fluctuations are observed in the high f ELM discharges, while only strong broadband fluctuations are prevalent in the low f ELM discharges. ELM-synchronized analysis shows that the time evolution of these modes is different for the high and low f ELM discharges. The localization of both these modes is confirmed at the maximum gradient region of the pedestal. We hypothesize that these modes cause important pedestal transport and that the difference in the pedestal recovery of the high and low f ELM discharges is a result of the difference in transport driven by these modes, as they change with changes in the heating delay. It is demonstrated experimentally for the first time that discharges with similar pedestal parameters can carry the history of the heating delay into the stationary phase and that changes in turbulent-driven transport are a likely cause of changes in f ELM observed with variations of heating delay.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The effect of the dynamic wet troposphere on VLBI measurements

Calculations using a statistical model of water vapor fluctuations yield the effect of the dynamic wet troposphere on Very Long Baseline Interferometry (VLBI) measurements. The statistical model arises from two primary assumptions: (1) the spatial structure of refractivity fluctuations can be closely approximated by elementary (Kolmogorov) turbulence theory, and (2) temporal fluctuations are caused by spatial patterns which are moved over a site by the wind. The consequences of these assumptions are outlined for the VLBI delay and delay rate observables. For example, wet troposphere induced rms delays for Deep Space Network (DSN) VLBI at 20-deg elevation are about 3 cm of delay per observation, which is smaller, on the average, than other known error sources in the current DSN VLBI data set. At 20-deg elevation for 200-s time intervals, water vapor induces approximately 1.5 x 10 to the minus 13th power s/s in the Allan standard deviation of interferometric delay, which is a measure of the delay rate observable error. In contrast to the delay error, the delay rate measurement error is dominated by water vapor fluctuations. Water vapor induced VLBI parameter errors and correlations are calculated. For the DSN, baseline length parameter errors due to water vapor fluctuations are in the range of 3 to 5 cm. The above physical assumptions also lead to a method for including the water vapor fluctuations in the parameter estimation procedure, which is used to extract baseline and source information from the VLBI observables.

Treuhaft, R. N.↗

Radio metric errors due to mismatch and offset between a DSN antenna beam and the beam of a troposphere calibration instrument

Two components of the error of a troposphere calibration measurement were quantified by theoretical calculations. The first component is a beam mismatch error, which occurs when the calibration instrument senses a conical volume different from the cylindrical volume sampled by a Deep Space Network (DSN) antenna. The second component is a beam offset error, which occurs if the calibration instrument is not mounted on the axis of the DSN antenna. These two error sources were calculated for both delay (e.g., VLBI) and delay rate (e.g., Doppler) measurements. The beam mismatch error for both delay and delay rate drops rapidly as the beamwidth of the troposphere calibration instrument (e.g., a water vapor radiometer or an infrared Fourier transform spectrometer) is reduced. At a 10-deg elevation angle, the instantaneous beam mismatch error is 1.0 mm for a 6-deg beamwidth and 0.09 mm for a 0.5-deg beam (these are the full angular widths of a circular beam with uniform gain out to a sharp cutoff). Time averaging for 60-100 sec will reduce these errors by factors of 1.2-2.2. At a 20-deg elevation angle, the lower limit for current Doppler observations, the beam-mismatch delay rate error is an Allan standard deviation over 100 sec of 1.1 x 10(exp -14) with a 4-deg beam and 1.3 x 10(exp -l5) for a 0.5-deg beam. A 50-m beam offset would result in a fairly modest (compared to other expected error sources) delay error (less than or equal to 0.3 mm for 60-sec integrations at any elevation angle is greater than or equal to 6 deg). However, the same offset would cause a large error in delay rate measurements (e.g., an Allan standard deviation of 1.2 x 10(exp -14) over 100 sec at a 20-deg elevation angle), which would dominate over other known error sources if the beamwidth is 2 deg or smaller. An on-axis location is essential for accurate troposphere calibration of delay rate measurements. A half-power beamwidth (for a beam with a tapered gain profile) of 1.2 deg or smaller is desired for calibration of all types of radio metrics. A water-vapor radiometer calibration beam of this size with very low sidelobes would require a clear aperture antenna with a diameter of at least 1.5 m if the primary water vapor sensing channel were in the 20-22 GHz range.

R P Linfield↗

Wheels-Off Time Uncertainty Impact on Benefits of Early Call for Release Scheduling

Arrival traffic scenarios with 808 flights from 173 airports to Houston George Bush International airport are simulated to determine if Call For Release flights can receive a benefit in terms of less delay over other flights by scheduling prior to gate pushback (look-ahead in time) as opposed to at gate pushback. Call for Release flights are departures that require approval from Air Route Traffic Control Center prior to release. Realism is brought to the study by including gate departure delay and taxi-out delay uncertainties for the 77 major U. S. airports. Gate departure delay uncertainty is assumed to increase as a function of look-ahead time. Results show that Call For Release flights from an airport within the freeze horizon (a region surrounding the arrival airport) can get an advantage over other flights to a capacity constrained airport by scheduling prior to gate pushback, provided the wheels-off time uncertainty with respect to schedule is controlled to a small value, such as within a three-minute window. Another finding of the study is that system delay, measured as the sum of arrival delays, is smaller when flights are scheduled in the order of arrival compared to in the order of departure. Because flights from airports within the freeze horizon are scheduled in the order of departure, an increase in the number of internal airports with a larger freeze horizon increases system delay. Delay in the given scenario was found to increase by 126% (from 13.8 hours to 31.2 hours) as freeze horizon was increased from 30-minutes to 2-hours in the baseline scenario.

wheels-off time uncertainty↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

Airspace Technology Demonstration 2 (ATD-2): Analysis of APREQ Flights at CLT

5/22/2019 National Aeronautics and Space Administration 1 Airspace Technology Demonstration 2 (ATD-2) Analysis of APREQ Flights at CLT May 22, 2019 5/22/2019 Objective 2 Quantify impact of IADS Phase 1 & 2 capabilities on APREQ flights at CLT with respect to: • Compliance to the Controlled Take Off Time (CTOT) • Benefits for APREQ flights that use IDAC to renegotiate for an earlier CTOT • Benefits of pre-scheduling APREQ flights using the Earliest Off Block Time (EOBT) • Relationship between EOBT compliance and rescheduling CTOT 5/22/2019 CLT APREQ Daily Compliance(Compliance Improvement Since ATD-2 Start) 3 Steady increase of APREQ compliance over the life of the project. Reduced variation in compliance leading to improved predictability. In addition to overall improved compliance into TBM systems, the predictability is increasing 5/22/2019 APREQ Compliance 10K Rolling Window 4 The most substantial APREQ compliance improvements started with Phase 2 capability (AEFS integration, ZTL IDAC, pre-scheduling and scheduler updates). 5/22/2019 IADS Phase 1 & 2 Benefit Mechanisms 5 1. Collaborative surface metering •Reduced engine run time •Reduced fuel consumption and emissions 2. Overhead stream operational integration a.Scheduling controlled flights at the gate •Reduced engine run time •Reduced fuel consumption and emissions b.APREQ renegotiating for an earlier slot •Reduced total delay •Passenger value of time and crew costs •Reduced engine run time •Reduced fuel consumption and emissions Benefits (1) and (2a) achieved through tactical gate holds Benefit (2b) achieved through APREQ renegotiation process described below Step 1: APREQ flight has a release time but is capable of taking off earlier Step 2: FAA TMC uses the IDAC green space / red space to identify and request an earlierslot in the overhead stream Step 3: Aircraft receives earlierrelease time and the difference between the release times is the reduction in delay 5/22/2019 Benefits for APREQ flights using IDAC to renegotiate for earlierCTOT 6 LBS Fuel 270.7 hours of delay saved by electronically renegotiating a better overhead stream time for 2,071 flights. • The benefits described here are associated with better use of existing capacity in the overhead stream, and technology to reduce surface delay. •These benefits are in addition to (distinct from) surface metering savings. 5/22/2019 APREQ Delay For Pre-Scheduled Flights into KATL Have Been Reduced and are More Predictable For the Last Five Months 7 Substantial Improvements in predictability of delay for the last 5 months 5/22/2019 EOBT Compliance / CTOT Reschedulefor Pre-Scheduled Flights into KATL 8 5/22/2019 Wrap-up 9 • Compliance to the CTOT has improved throughout the lifecycle of ATD-2 with biggest improvements following the introduction of Phase 2 capabilities • Rescheduling APREQ flights using IDAC has reduced 270.7 hours of delay at CLT • Predictability of local surface delay for APREQ flights is substantially improved via pre-scheduling with the IADS system • Pre-scheduled flights that reschedule for later times tend to call ready later with respect to EOBT

CLT↗

Gated ring oscillator with constant dynamic power consumption

A pure digital ring oscillator with constant power consumption as oscillation frequency is adjusted. Circuit topology includes a multiplexer implemented in NAND gates and a delay element positioned after a path selection NAND gate of that multiplexer such that delay element transistors may not toggle if the non-delaying signal path is selected. Assuming a delay element oscillation frequency f and a total capacitance C, and also assuming a plurality N of delay gates each characterized by a propagation delay t1 and a capacitance C1 such that C=C1*N, the ring oscillator of the present invention is characterized by a C value that is proportional to N and an f value that is inversely proportional to N. Furthermore, each of the N delay gates as well as the input and output gates of the multiplexer are characterized by a common capacitance-to-propagation delay ratio=C1/t1.

Wu, Jinyuan↗

Gated ring oscillator with constant dynamic power consumption

A pure digital ring oscillator with constant power consumption as oscillation frequency is adjusted. Circuit topology includes a multiplexer implemented in NAND gates and a delay element positioned after a path selection NAND gate of that multiplexer such that delay element transistors may not toggle if the non-delaying signal path is selected. Assuming a delay element oscillation frequency f and a total capacitance C, and also assuming a plurality N of delay gates each characterized by a propagation delay t1 and a capacitance C1 such that C=C1*N, the ring oscillator of the present invention is characterized by a C value that is proportional to N and an f value that is inversely proportional to N. Furthermore, each of the N delay gates as well as the input and output gates of the multiplexer are characterized by a common capacitance-to-propagation delay ratio=C1/t1.

Wu, Jinyuan↗

An Investigation of the Effects of the Time Lag Due to Long Transmission Distance upon Remote Control. Phase II - Vehicle Experiments. Phase III - Conclusions

An experimental program is undertaken to define the effects upon remote control of long transmission delays. Investigation centers around remote control of a ground vehicle, which is considered to be a representative remote control task. A series of pursuit tracking tests is performed with transport lags ranging from 0 to 6 seconds between the control and the controlled quantity. Various target speeds are tracked with both velocity and acceleration controls. Two types of tracking are performed in an attempt to bracket the actual vehicle situation. In the first the operator attempts to follow the target with his controlled quantity in real time, using the delayed position and rates as feedback. In the second he attempts to follow the target with the delayed controlled quantity. In addition, tests are performed substituting simple electronic models for the human in an attempt to gain an understanding of human response with time delays in the control loop. A series of tests with an actual vehicle are performed with the intent of relating the tracking tests to the actual situation of interest. Time delays of from 0 to 3 seconds are included in the control loop. Performance is scored at various speeds over both continuous and obstacle courses. Both two and four-wheel steering are investigated. In the experiments the effects of all variables except delay magnitude and target complexity are minimized. Curves are obtained showing performance as a function of time delay and target complexity. These curves are discussed. Correlation of the tracking and vehicle experiments is discussed. Comments are made concerning the design of a minimum control system for a remotely controlled lunar roving vehicle.

REMOTE CONTROL↗

Autonomous Mission Operations

NASA's Advanced Exploration Systems Autonomous Mission Operations (AMO) project conducted an empirical investigation of the impact of time-delay on todays mission operations, and of the effect of processes and mission support tools designed to mitigate time-delay related impacts. Mission operation scenarios were designed for NASA's Deep Space Habitat (DSH), an analog spacecraft habitat, covering a range of activities including nominal objectives, DSH system failures, and crew medical emergencies. The scenarios were simulated at time-delay values representative of Lunar (1.2-5 sec), Near Earth Object (NEO) (50 sec) and Mars (300 sec) missions. Each combination of operational scenario and time-delay was tested in a Baseline configuration, designed to reflect present-day operations of the International Space Station, and a Mitigation configuration in which a variety of software tools, information displays, and crew-ground communications protocols were employed to assist both crews and Flight Control Team (FCT) members with the long-delay conditions. Preliminary findings indicate: 1) Workload of both crew members and FCT members generally increased along with increasing time delay. 2) Advanced procedure execution viewers, caution and warning tools, and communications protocols such as text messaging decreased the workload of both flight controllers and crew, and decreased the difficulty of coordinating activities. 3) Whereas crew workload ratings increased between 50 sec and 300 sec of time-delay in the Baseline configuration, workload ratings decreased (or remained flat) in the Mitigation configuration.

Mission Operations↗

Flip-flop resolving time test circuit

Integrated circuit (IC) flip-flop resolving time parameters are measured by wafer probing, without need of dicing or bonding, throught the incorporation of test structures on an IC together with the flip-flop to be measured. Several delays that are fabricated as part of the test circuit, including a voltage-controlled delay with a resolution of a few picosecs, are calibrated as part of the test procedure by integrating them into, and out of, the delay path of a ring oscillator. Each of the delay values is calculated by subtracting the period of the ring oscillator with the delay omitted from the period with the delay included. The delay measurement technique is sufficiently general for other applications. The technique is illustrated for the case of the flip-flop parameters of a 5-micron feature size NMOS circuit.

Rosenberger, F.↗

Present status and future prospects for ionospheric propagation corrections for precise time transfer using GPS

The ionosphere can be the greatest variable source of error in precise time transfer using Global Positioning System (GPS) satellites. For single frequency GPS users, the ionospheric correction algorithm can provide an approximate 50 percent r.m.s. correction to the time delay, but users who desire a more complete correction must make actual measurements of ionospheric time delay along the path to the GPS satellite. Fortunately, at least three commercial GPS receivers, specifically designed to measure and correct for ionospheric time delay, are now, or soon will be, available. Initial operation with two different types of GPS ionospheric receivers demonstrated a high degree of accuracy in measuring the ionospheric group delay. Results of these measurements are presented. For those who use a model to correct for ionospheric time delay, it is tempting to use daily values of solar 10.7 cm radio flux to correct a monthly average ionospheric time delay model for each day's operation. The results of correlation of daily maximum ionospheric time delay against solar radio flux values show a poor correlation will be obtained by this procedure. Prospects for improving ionospheric corrections during the declining phase of the present solar cycle are discussed.

Klobuchar, John A.↗

A test of water vapor radiometer-based troposphere calibration using VLBI observations on a 21-kilometer baseline

Simultaneous very long baseline interferometry (VLBI) and water vapor radiometer (WVR) measurements on a 21 km baseline showed that calibration by WVRs removed a significant fraction of the effect of tropospheric delay fluctuations for these experiments. From comparison of the residual delay variations within scans and between scans, the total tropospheric contribution t the delay residuals for each of the three 5 to 20 hour sessions was estimated as 1, 17, and 10%, with the first value being uncertain. The observed improvement in rms residual delay from WVR calibration during these three sessions was 4, 16, and 2%, respectively. The improvement is consistent with the estimated 2 to 3 mm path delay precision of current WVRs. The VLBI measurements, of natural radio sources, were conducted in April and May 1993 at Goldstone, California. Dual-frequency (2.3 and 8.4 GHz) observations were employed to remove the effects of charged particles from the data. Measurements with co-pointed WVRs, located within 50 m of the axis of each antenna, were performed to test the ability of the WVRs to calibrate line-of-sight path delays. Factors that made WVR performance assessment difficult included (1) the fact that the level of tropospheric fluctuations was smaller than is typical for Goldstone during these experiments and (2) VLBI delay variations on longer time scales (i.e., over multiple scans) contained uncalibrated instrumental effects (probably a result of slow temperature variations in the VLBI hardware) that were larger than the tropospheric effects.

Linfield, R. P.↗

Apparatus and method for measuring relative phase of signals in a multiple-echo system

An apparatus and method for measuring the relative phase of echo signals in a multiple-echo system. A signal generator generates an exciting tone burst and subsequent tone bursts delayed in phase from the exciting tone burst. The exciting tone burst is gated into a transducer coupled to the multiple-echo system. Each subsequent tone burst is converted into a series of pulses. Each pulse triggers a sample/hold circuit to sample each echo signal. The samples of the echo signal are averaged and then compared to a reference value. The signal generator is controlled to vary the subsequent tone burst phase delay to determine for each echo signal a subsequent tone burst phase delay that causes the average of the samples of the echo signal to be substantially equal to the reference value wherein the determined subsequent tone burst phase delay is the phase delay of the echo signal with respect to the exciting tone burst. The control circuit then determines the difference in phase delay between echo signals to determine the relative phase delay of the echo signals.

Froggatt, Mark E.↗

Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

Couluris, G. J.↗

Space Link Extension Protocol Emulation for High-Throughput, High-Latency Network Connections

New space missions require higher data rates and new protocols to meet these requirements. These high data rate space communication links push the limitations of not only the space communication links, but of the ground communication networks and protocols which forward user data to remote ground stations (GS) for transmission. The Consultative Committee for Space Data Systems, (CCSDS) Space Link Extension (SLE) standard protocol is one protocol that has been proposed for use by the NASA Space Network (SN) Ground Segment Sustainment (SGSS) program. New protocol implementations must be carefully tested to ensure that they provide the required functionality, especially because of the remote nature of spacecraft. The SLE protocol standard has been tested in the NASA Glenn Research Center's SCENIC Emulation Lab in order to observe its operation under realistic network delay conditions. More specifically, the delay between then NASA Integrated Services Network (NISN) and spacecraft has been emulated. The round trip time (RTT) delay for the continental NISN network has been shown to be up to 120ms; as such the SLE protocol was tested with network delays ranging from 0ms to 200ms. Both a base network condition and an SLE connection were tested with these RTT delays, and the reaction of both network tests to the delay conditions were recorded. Throughput for both of these links was set at 1.2Gbps. The results will show that, in the presence of realistic network delay, the SLE link throughput is significantly reduced while the base network throughput however remained at the 1.2Gbps specification. The decrease in SLE throughput has been attributed to the implementation's use of blocking calls. The decrease in throughput is not acceptable for high data rate links, as the link requires constant data a flow in order for spacecraft and ground radios to stay synchronized, unless significant data is queued a the ground station. In cases where queuing the data is not an option, such as during real time transmissions, the SLE implementation cannot support high data rate communication.

Computer Networking↗