Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

EVA Design, Verification, and On-Orbit Operations Support Using Worksite Analysis

The International Space Station (ISS) design is a very large and complex orbiting structure with thousands of Extravehicular Activity (EVA) worksites. These worksites are used to assemble and maintain the ISS. The challenge facing EVA designers was how to design, verify, and operationally support such a large number of worksites within cost and schedule. This has been solved through the practical use of computer aided design (CAD) graphical techniques that have been developed and used with a high degree of success over the past decade. The EVA design process allows analysts to work concurrently with hardware designers so that EVA equipment can be incorporated and structures configured to allow for EVA access and manipulation. Compliance with EVA requirements is strictly enforced during the design process. These techniques and procedures, coupled with neutral buoyancy underwater testing, have proven most valuable in the development, verification, and on-orbit support of planned or contingency EVA worksites.

Hagale, Thomas J.↗

STS-39 Discovery Rollback to the OPF High Bay #2 (Shots of Doors)

Shown is Discovery rolling back to the Orbiter Processing Facility (OPF) High Bay 2 for repair. High Bay 2, located west of the Vehicle Assembly Building (VAB), is used for external tank (ET) checkout and storage and as a contingency storage area for orbiters.

Source record↗

Shuttle Upgrade Using 5-Segment Booster (FSB)

In support of NASA's continuing effort to improve the over-all safety and reliability of the Shuttle system- a 5-segment booster (FSB) has been identified as an approach to satisfy that overall objective. To assess the feasibility of a 5-segment booster approach, NASA issued a feasibility study contract to evaluate the potential of a 5-segment booster to improve the overall capability of the Shuttle system, especially evaluating the potential to increase the system reliability and safety. In order to effectively evaluate the feasibility of the 5-segment concept, a four-member contractor team was established under the direction of NASA Marshall Space Flight Center (MSFC). MSFC provided the overall program oversight and integration as well as program contractual management. The contractor team consisted of Thiokol, Boeing North American Huntington Beach (BNA), Lockheed Martin Michoud Space Systems (LMMSS) and United Space Alliance (USA) and their subcontractor bd Systems (Control Dynamics Division, Huntsville, AL). United Space Alliance included the former members of United Space Booster Incorporated (USBI) who managed the booster element portion of the current Shuttle solid rocket boosters. Thiokol was responsible for the overall integration and coordination of the contractor team across all of the booster elements. They were also responsible for all of the motor modification evaluations. Boeing North American (BNA) was responsible for all systems integration analyses, generation of loads and environments. and performance and abort mode capabilities. Lockheed Martin Michoud Space Systems (LMMSS) was responsible for evaluating the impacts of any changes to the booster on the external tank (ET), and evaluating any design changes on the external tank necessary to accommodate the FSB. USA. including the former USBI contingent. was responsible for evaluating any modifications to facilities at the launch site as well as any booster component design modifications.

Sauvageau, Donald R.↗

Optimization of Maneuver Execution for Landsat-7 Routine Operations

Multiple mission constraints were satisfied during a lengthy, strategic ascent phase. Once routine operations begin, the ongoing concern of maintaining mission requirements becomes an immediate priority. The Landsat-7 mission has tight longitude control box and Earth imaging that requires sub-satellite descending nodal equator crossing times to occur in a narrow 30minute range fifteen (15) times daily. Operationally, spacecraft maneuvers must'be executed properly to maintain mission requirements. The paper will discuss the importance of optimizing the altitude raising and plane change maneuvers, amidst known constraints, to satisfy requirements throughout mission lifetime. Emphasis will be placed not only on maneuver size and frequency but also on changes in orbital elements that impact maneuver execution decisions. Any associated trade-off arising from operations contingencies will be discussed as well. Results of actual altitude and plane change maneuvers are presented to clarify actions taken.

Cox, E. Lucien, Jr.↗

Strategies and Recommended Targets for Mars Surveyor Program Landing Sites

The two major constraints for selecting the Mars Surveyor Program (MSP) 2001 landing site at the time of this meeting are latitude (30'N to 15S) and elevation (< 2.5 km). The latitude belt will be narrowed down to a 15' sector after this workshop. This mission will demonstrate the capability to perform a precision landing, with the goal of achieving an accuracy of approximately 10 km, 3-sigma. There will be at least two different landing sites ('01 and '03) selected in the MSP. However, there should be an option of having the '05 sample return mission land in a different site and the '05 mission should be equipped with a rover for two reasons. The reasoning behind this follows: '05 lander/rover package should have the option of going to an independent site from either '01 or '03 because predecessor missions (orbital) may locate the "Ultimate Site"; '05 needs a rover to either: (A) explore and sample this "ultimate site" for sample return; (B) retrieve samples from '01 or '03 rovers, as a contingency, in case these rovers malfunction and cannot negotiate the trek back to the sample return vehicle.

Rice, James W., Jr.↗

Trajectory Design and Control for the Compton Gamma Ray Observatory Re-Entry

The Compton Gamma Ray Observatory (CGRO) controlled re-entry operation was successfully conducted in June of 2000. The surviving parts of the spacecraft landed in the Pacific Ocean within the predicted footprint. The design of the maneuvers to control the trajectory to accomplish this re-entry presented several challenges. These challenges included timing and duration of the maneuvers, fuel management, post maneuver position knowledge, collision avoidance with other spacecraft, accounting for the break-up of the spacecraft into several pieces with a wide range of ballistic coefficients, and ensuring that the impact footprint would remain within the desired landing area in the event of contingencies. This paper presents the initial re-entry trajectory design and the evolution of the design into the maneuver sequence used for the re-entry. The paper discusses the constraints on the trajectory design, the modifications made to the initial design and the reasons behind these modifications. Data from the re-entry operation are presented.

Hoge, Susan↗

Detection of Extraterrestrial Ecology (Exoecology)

Researchers in the Astrobiology Technology Branch at Ames Research Center have begun investigating alternate concepts for the detection of extraterrestrial life. We suggest searching for extraterrestrial ecology, exoecology, as well as for extraterrestrial biology, exobiology. Ecology describes the interactions of living things with their environment. All ecosystems are highly constrained by their environment and are constrained by well-known system design principles. Ecology could exist wherever there is an energy source and living I things have discovered some means to capture, store, and use the available energy. Terrestrial ecosystems use as energy sources, light, organic molecules, and in thermal vents and elsewhere, simple inorganic molecules. Ecosystem behavior is controlled by matter and energy conservation laws and can be described by linear and nonlinear dynamic systems theory. Typically in an ecosystem different molecules are not in chemical equilibrium and scarce material is conserved, stored, or recycled. Temporal cycles and spatial variations are often observed. These and other -eneral principles of exoecology can help guide the search for extraterrestrial life. The chemical structure observed in terrestrial biology may be highly contingent on evolutionary accidents. Oxygen was not always abundant on Earth. Primitive sulfur bacteria use hydrogen sulfide and sulfur to perform photosynthesis instead of water and oxygen. Astrobiologists have assumed, for the sake of narrowing and focusing our life detection strategies, that extraterrestrial life will have detailed chemical similarities with terrestrial life. Such assumptions appear very reasonable and they allow us to design specific and highly sensitive life detection experiments. But the fewer assumptions we make, the less chance we have of being entirely wrong The best strategy for the detection of extraterrestrial life could be a mixed strategy. We should use detailed assumptions based on terrestrial biology to guide some but not all future searches for alien life. The systems principles of exoecology seem much more fundamental and inescapable than the terrestrial biology analogies of exobiology. We should search for exoecology as well as exobiology.

Jones, Harry↗

Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

Momoh, James A.↗

Smarter Software For Enhanced Vehicle Health Monitoring and Inter-Planetary Exploration

The existing philosophy for space mission control was born in the early days of the space program when technology did not exist to put significant control responsibility onboard the spacecraft. NASA relied on a team of ground control experts to troubleshoot systems when problems occurred. As computing capability improved, more responsibility was handed over to the systems software. However, there is still a large contingent of both launch and flight controllers supporting each mission. New technology can update this philosophy to increase mission assurance and reduce the cost of inter-planetary exploration. The advent of model-based diagnosis and intelligent planning software enables spacecraft to handle most routine problems automatically and allocate resources in a flexible way to realize mission objectives. The manifests for recent missions include multiple subsystems and complex experiments. Spacecraft must operate at longer distances from earth where communications delays make earthbound command and control impractical. NASA's Ames Research Center (ARC) has demonstrated the utility of onboard diagnosis and planning with the Remote Agent experiment in 1999. KSC has pioneered model-based diagnosis and demonstrated its utility for ground support operations. KSC and ARC are cooperating in research to improve the state of the art of this technology. This paper highlights model-based reasoning applications for Moon and Mars missions including in-situ resource utilization and enhanced vehicle health monitoring.

Larson, William E.↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

Trajectory Design and Control for the Compton Gamma Ray Observatory Re-Entry

The Compton Gamma Ray Observatory (CGRO) controlled re-entry operation was successfully conducted in June of 2000. The surviving parts of the spacecraft landed in the Pacific Ocean within the nominal impact target zone. The design of the maneuvers to control the trajectory to accomplish this re-entry presented several challenges. These challenges included the timing and duration of the maneuvers, propellant management, post-maneuver state determination, collision avoidance with other spacecraft, accounting for the break-up of the spacecraft into several pieces with a wide range of ballistic coefficients, and ensuring that the impact footprint would remain within the desired impact target zone in the event of contingencies. This paper presents the initial re-entry trajectory design and traces the evolution of that design into the maneuver sequence used for the re-entry. The paper also discusses the spacecraft systems and operational constraints imposed on the trajectory design and the required modifications to the initial design based on those constraints. Data from the reentry operation are also presented.

Hoge, Susan↗

Entry Debris Field Estimation Methods and Application to Compton Gamma Ray Observatory Disposal

For public safety reasons, the Compton Gamma Ray Observatory (CGRO) was intentionally deorbited on June 4, 2000. This deorbit was NASA's first intentional controlled deorbit of a satellite, and more will come including the eventual deorbit of the International Space Station. To maximize public safety, satellite deorbit planning requires conservative estimates of the debris footprint size and location. These estimates are needed to properly design a deorbit sequence that places the debris footprint over unpopulated areas, including protection for deorbit contingencies. This paper details a method for estimating the length (range), width (crossrange), and location of entry and breakup debris footprints. This method utilizes a three degree-of-freedom Monte Carlo simulation incorporating uncertainties in all aspects of the problem, including vehicle and environment uncertainties. The method incorporates a range of debris characteristics based on historical data in addition to any vehicle-specific debris catalog information. This paper describes the method in detail, and presents results of its application as used in planning the deorbit of the CGRO.

Mrozinski, Richard B.↗

Hubble Space Telescope Servicing Mission 3A Rendezvous Operations

The Hubble Space Telescope (HST) hardware complement includes six gas bearing, pulse rebalanced rate integrating gyros, any three of which are sufficient to conduct the science mission. After the loss of three gyros between April 1997 and April 1999 due to a known corrosion mechanism, NASA decided to split the third HST servicing mission into SM3A, accelerated to October 1999, and SM3B, scheduled for November 2001. SM3A was developed as a quick turnaround 'Launch on Need' mission to replace all six gyros. Loss of a fourth gyro in November 1999 caused HST to enter Zero Gyro Sunpoint (ZGSP) safemode, which uses sun sensors and magnetometers for attitude determination and momentum bias to maintain attitude stability during orbit night. Several instances of large attitude excursions during orbit night were observed, but ZGSP performance was adequate to provide power-positive sun pointing and to support low gain antenna communications. Body rates in ZGSP were estimated to exceed the nominal 0.1 deg/sec rendezvous limit, so rendezvous operations were restructured to utilize coarse, limited life, Retrieval Mode Gyros (RMGs) under Hardware Sunpoint (HWSP) safemode. Contingency procedures were developed to conduct the rendezvous in ZGSP in the event of RMGA or HWSP computer failure. Space Shuttle Mission STS-103 launched on December 19, 1999 after a series of weather and Shuttle-related delays. After successful rendezvous and grapple under HWSP/RMGA, the crew changed out all six gyros. Following deploy and systems checkout, HST returned to full science operations.

Lee, S.↗

A Proposal for an Integrated Geophysical Strategy to "Follow the Water" on Mars

The search for subsurface water has become a primary focus of Mars exploration. Its abundance and distribution (both as ground ice and groundwater) have important implications for understanding the geologic, hydrologic, and climatic evolution of the planet; the potential origin and continued survival of life; and the accessibility of a critical in situ resource for sustaining future human explorers. For these reasons, a principal goal of the Mars science, astrobiology, and the HEDS programs is to determine the 3-D distribution and state of subsurface H2O, at a resolution sufficient to permit reaching any desired volatile target by drilling. The three targets most often discussed are: groundwater, massive deposits of near-surface ground ice (associated with the ponded discharge of the outflow channels or the relic of a former ocean), and ice-saturated frozen ground. Based on the present best estimates of mean annual surface temperature, crustal thermal conductivity, geothermal heat flow, and groundwater freezing temperature, the mean thickness of frozen ground on Mars is expected to vary from approx. = 2.5 - 5 km at the equator to approx. = 6.5 - 13 km at the poles. However, natural variations in both crustal heat flow and thermal conductivity are likely to result in significant local departures from these predicted values. The recent discovery of "young" fluvial-like features, emanating from the slopes of local scarps, raises the possibility that liquid water may also exist episodically at shallow (approx. = 100 - 500 m) depth; however, the true nature and absolute age of these features remains highly uncertain. Although the belief that Mars is water-rich is supported by a wide variety geologic evidence, our ignorance about the heterogeneous nature and thermal evolution of the planet's crust effectively precludes geomorphic or theoretical attempts to quantitatively assess the current geographic and subsurface vertical distribution of ground ice and groundwater . For this reason, any exploration activity (such as drilling) whose success is contingent on the presence of subsurface water, must be preceded by a comprehensive high-resolution geophysical survey capable of assessing whether local reservoirs of water and ice actually exist. Terrestrial experience has demonstrated that the accurate identification of such targets is likely to require the application of multiple geophysical techniques. In this abstract we propose an integrated strategy for the geophysical exploration of Mars that we believe represents the fastest, most cost-effect, and technically capable approach to identifying the state and distribution of subsurface water. Additional information is contained in the original extended abstract.

Clifford, S. M.↗

Psychophysiological Control of Acognitive Task Using Adaptive Automation

The major focus of the present proposal was to examine psychophysiological variables related to hazardous states of awareness induced by monitoring automated systems. With the increased use of automation in today's work environment, people's roles in the work place are being redefined from that of active participant to one of passive monitor. Although the introduction of automated systems has a number of benefits, there are also a number of disadvantages regarding worker performance. Byrne and Parasuraman have argued for the use of psychophysiological measures in the development and the implementation of adaptive automation. While both performance based and model based adaptive automation have been studied, the use of psychophysiological measures, especially EEG, offers the advantage of real time evaluation of the state of the subject. The current study used the closed-loop system, developed at NASA-Langley Research Center, to control the state of awareness of subjects while they performed a cognitive vigilance task. Previous research in our laboratory, supported by NASA, has demonstrated that, in an adaptive automation, closed-loop environment, subjects perform a tracking task better under a negative than a positive, feedback condition. In addition, this condition produces less subjective workload and larger P300 event related potentials to auditory stimuli presented in a concurrent oddball task. We have also recently shown that the closed-loop system used to control the level of automation in a tracking task can also be used to control the event rate of stimuli in a vigilance monitoring task. By changing the event rate based on the subject's index of arousal, we have been able to produce improved monitoring, relative to various control groups. We have demonstrated in our initial closed-loop experiments with the the vigilance paradigm that using a negative feedback contingency (i.e. increasing event rates when the EEG index is low and decreasing event rates when the EEG index is high) results in a marked decrease of the vigilance decrement over a 40 minute session. This effect is in direct contrast to performance of a positive feedback group, as well as a number of other control groups which demonstrated the typical vigilance decrement. Interestingly, however, the negative feedback group performed at virtually the same level as a yoked control group. The yoked control group received the same order of changes in event rate that were generated by the negative feedback subjects using the closed-loop system. Thus it would appear to be possible to optimize vigilance performance by controlling the stimuli which subjects are asked to process.

Freeman, Frederick↗

Attentional Capture Can Depend on Search Mode

We have previously reported that an irrelevant singleton in one color does not capture attention when the target is defined by a singleton in a different color. Here, we show that when subjects are uncertain of the target color, capture occurs even when distractors and targets differ in color. The effects of target certainty on capture are explained in terms of the contingent involuntary orienting hypothesis of Folk, Remington, and Johnston (1992).

Remington, Roger W.↗

Inviscid Flow Computations of the Shuttle Orbiter for Mach 10 and 15 and Angle of Attack 40 to 60 Degrees

This report documents the results of a computational study done to compute the inviscid longitudinal aerodynamic characteristics of the Space Shuttle Orbiter for Mach numbers 10 and 15 at angles of attack of 40, 50, 55, and 60 degrees. These computations were done to provide limited aerodynamic data in support of the Orbiter contingency abort task. The Orbiter had all the control surfaces in the undeflected position. The unstructured grid software FELISA was used for these computations with the equilibrium air option. Normal and axial force coefficients and pitching moment coefficients were computed. The hinge moment coefficients of the body flap and the inboard and outboard elevons were also computed. These results were compared with Orbiter Air Data Book (OADB) data and those computed using GASP. The comparison with the GASP results showed very good agreement in Cm and Ca at all the points. The computed axial force coefficients were smaller than those computed by GASP. There were noticeable differences between the present results and those in the OADB at angles of attack greater than 50 degrees.

Prabhu, Ramadas K.↗

ISS Microgravity Research Payload Training Methodology

The NASA Microgravity Research Discipline has multiple categories of science payloads that are being planned and currently under development to operate on various ISS on-orbit increments. The current program includes six subdisciplines; Materials Science, Fluids Physics, Combustion Science, Fundamental Physics, Cellular Biology and Macromolecular Biotechnology. All of these experiment payloads will require the astronaut various degrees of crew interaction and science observation. With the current programs planning to build various facility class science racks, the crew will need to be trained on basic core operations as well as science background. In addition, many disciplines will use the Express Rack and the Microgravity Science Glovebox (MSG) to utilize the accommodations provided by these facilities for smaller and less complex type hardware. The Microgravity disciplines will be responsible to have a training program designed to maximize the experiment and hardware throughput as well as being prepared for various contingencies both with anomalies as well as unexpected experiment observations. The crewmembers will need various levels of training from simple tasks as power on and activate to extensive training on hardware mode change out to observing the cell growth of various types of tissue cultures. Sample replacement will be required for furnaces and combustion type modules. The Fundamental Physics program will need crew EVA support to provide module change out of experiment. Training will take place various research centers and hardware development locations. It is expected that onboard training through various methods and video/digital technology as well as limited telecommunication interaction. Since hardware will be designed to operate from a few weeks to multiple research increments, flexibility must be planned in the training approach and procedure skills to optimize the output as well as the equipment maintainability. Early increment lessons learned will be addressed.

Schlagheck, Ronald↗