Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011, Part 2

This report evaluates collapse evolution for selected Lawrence Livermore National Laboratory (LLNL) underground nuclear tests at the Nevada National Security Site (NNSS, formerly called the Nevada Test Site). The work is being done to support several different programs that desire access to the ground surface above expended underground nuclear tests. The programs include: the Borehole Management Program, the Environmental Restoration Program, and the National Center for Nuclear Security Gas-Migration Experiment. Safety decisions must be made before a crater area, or potential crater area, can be reentered for any work. Evaluation of cavity collapse and crater formation is input into the safety decisions. Subject matter experts from the LLNL Containment Program who participated in weapons testing activities perform these evaluations. Information used included drilling and hole construction, emplacement and stemming, timing and sequence of the selected test and nearby tests, geology, yield, depth of burial, collapse times, surface crater sizes, cavity and crater volume estimations, ground motion, and radiological release information. Both classified and unclassified data were reviewed. The evaluations do not include the effects of erosion that may modify the collapse craters over time. They also do not address possible radiation dangers that may be present. Various amounts of information are available for these tests, depending on their age and other associated activities. Lack of data can hamper evaluations and introduce uncertainty. We make no attempt to quantify this uncertainty. Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011 was published on March 2, 2011. This report, considered Part 2 of work undertaken in calendar year 2011, compiles evaluations requested after the March report. The following unclassified summary statements describe collapse evolution and crater stability in response to a recent request to review 6 LLNL test locations in Yucca Flat, Rainier Mesa, and Pahute Mesa. They include: Baneberry in U8d; Clearwater in U12q; Wineskin in U12r, Buteo in U20a and Duryea in nearby U20a1; and Barnwell in U20az.

07 ISOTOPE AND RADIATION SOURCES↗

Legacy Vehicle Fuel System Testing with Intermediate Ethanol Blends

The effects of E10 and E17 on legacy fuel system components from three common mid-1990s vintage vehicle models (Ford, GM, and Toyota) were studied. The fuel systems comprised a fuel sending unit with pump, a fuel rail and integrated pressure regulator, and the fuel injectors. The fuel system components were characterized and then installed and tested in sample aging test rigs to simulate theexposure and operation of the fuel system components in an operating vehicle. The fuel injectors were cycled with varying pulse widths during pump operation. Operational performance, such as fuel flow and pressure, was monitored during the aging tests. Both of the Toyota fuel pumps demonstrated some degradation in performance during testing. Six injectors were tested in each aging rig. The Fordand GM injectors showed little change over the aging tests. Overall, based on the results of both the fuel pump testing and the fuel injector testing, no major failures were observed that could be attributed to E17 exposure. The unknown fuel component histories add a large uncertainty to the aging tests. Acquiring fuel system components from operational legacy vehicles would reduce theuncertainty.

09 BIOMASS FUELS↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Safety and Function Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Safety and Function testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, duration, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Safety and Function Test Report for the Viryd CS8 Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Several turbines were selected for testing at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of the Small Wind Turbine Independent Testing project. Safety and function testing is one of up to five tests that may be performed on the turbines. Other tests include duration, power performance, acoustic noise, and power quality. Viryd Technologies, Inc. of Austin, Texas, was the recipient of the DOE grant and provided the turbine for testing.

17 WIND ENERGY↗

Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY-2015 Methyl Iodide Deep-Bed Adsorption Test Report

Nuclear fission produces fission and activation products, including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Deep-bed methyl iodide adsorption testing has continued in Fiscal Year 2015 according to a multi-laboratory methyl iodide adsorption test plan. Updates to the deep-bed test system have also been performed to enable the inclusion of evaporated HNO 3 and increased NO 2 concentrations in future tests. This report summarizes the result of those activities. Test results showed that iodine adsorption from gaseous methyl iodide using reduced silver zeolite (AgZ) resulted in initial iodine decontamination factors (DFs, ratios of uncontrolled and controlled total iodine levels) under 1,000 for the conditions of the long-duration test performed this year (45 ppm CH3I, 1,000 ppm each NO and NO 2 , very low H 2 O levels [3 ppm] in balance air). The mass transfer zone depth exceeded the cumulative 5-inch depth of 4 bed segments, which is deeper than the 2-4 inch depth estimated for the mass transfer zone for adsorbing I 2 using AgZ in prior deep-bed tests. The maximum iodine adsorption capacity for the AgZ under the conditions of this test was 6.2% (6.2 g adsorbed I per 100 g sorbent). The maximum Ag utilization was 51%. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Architectural Survey of the Test Cell C Historic District, Area 25, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) has authorized an updated recording and evaluation of Test Cell C. This facility is part of the former Nuclear Rocket Development Station (NRDS) in Area 25 of Nevada National Security Site (NNSS) in Nye County, Nevada (formerly the Nevada Test Site [NTS]). Future alterations to the facility are anticipated to meet current and future National Weapons Science, Global and Homeland Security Programs, and Environmental Management mission requirements. Therefore, this survey was done to comply with requirements of Section 106 of the National Historic Preservation Act and its implementing regulations, 36 C.F.R. Part 800. An architectural survey of 35.75 acres was completed by Desert Research Institute (DRI). This area also represents the potential Test Cell C Historic District and is identified by NNSA/NFO as the Area of Potential Effect (APE) within which the undertaking may directly cause alterations to the character of historic properties. One resource, Building 25-3210 (SHPO Resource No. B2444), within this area was previously surveyed by DRI. It was found eligible for inclusion in the National Register of Historic Places (NRHP or National Register) under Criteria A and C, and Consideration G. Mitigation of this building was completed prior to its demolition. The APE for reasonably foreseeable effects that may indirectly cause alterations later in time, be farther removed in distance, or be cumulative is the unrecorded NRDS historic district. The present survey updates the previous survey to present standards and expands it to include the entire Test Cell C complex. This includes updated recording and evaluation of the remains of 25-3210 and its 32 previously unrecorded and unevaluated Accessory Resources. The entire complex was recorded as the Test Cell C Historic District (SHPO Resource No. D346), which is eligible for the National Register at the National Level under Criteria A, C, and D. All nine architectural resources in the district are recommended as contributing elements of the Test Cell C Historic District (Figure 2). Of these, four (25-3210 Resource No. B2444, 25-3220 SHPO Resource No. B18110, 25-3226 SHPO Resource No. B18111, and 25-3230-32 SHPO Resource No. B18114) are recommended as individually eligible to the National Register under Criteria A and C, and one (KIWI-TNT [Transient Nuclear Test] SHPO Resource No. S2287) is recommended as individually eligible under Criteria A, C, and D. The remaining four resources (25-3214 SHPO Resource No. B18109, 25-3228 SHPO Resource No. B18112, 25-3229 SHPO Resource No. B18113, and 25-3233 SHPO Resource No. 18115) are not recommended as individually eligible. In addition, the Test Cell C Historic District is regarded as a contributor to the potential national significance of the NRDS Historic District. In 2010, the NTS became the NNSS. Because of the nature of the discussion in the Historic Context below, “NTS” is used throughout that section, otherwise “NNSS” is used to refer to the site. The survey area is located in unplatted sections of T13S R51E Mount Diablo Baseline and Meridian (projected) in Area 25 of the NNSS. It is within the NRDS in Jackass Flats, which has long been recognized as a potential historic district. An oblique aerial photo of the Test Cell C complex is shown on the cover of this report.

54 ENVIRONMENTAL SCIENCES↗

PNNL ARENA Cable Motor Test Bed Update

A major focus of the Light Water Reactor Sustainability (LWRS) Cable Nondestructive Examination (NDE) 2021 research is to acquire new equipment and integrate it with existing NDE instruments for a cable motor test bed which has been dubbed the Accelerated and Real Time Experimental Nodal Analysis or “ARENA”. All the primary components have been received and are being staged in the 2410 Stevens building on PNNL’s Richland campus. Building modifications to support a plug-in 480VAC receptacle have been completed and details of the system operating procedure (SOP) are in review. The approved SOP is required before the system is energized but is expected before July 2021. The ARENA system will support planned cable tests for 2021 and beyond that cannot conveniently be performed with on-site installations of cable test equipment including: (1) NDE Tests including Frequency Domain Reflectometry (FDR), Time Domain Reflectometry (TDR), Tan Delta (TD) Impedance measurements, Low Frequency Dielectric Spectroscopy (DS) measurements, standard multi-meter resistance checks, withstand tests and other bulk and distributed tests from the instrument panel with and without motors connected. (2) Online energized live wire tests using partial discharge instruments and LIVE-WIRE spread-spectrum TDR instruments. (3) Cable tests with partially submerged cable segments (including ability to submerge live cable segments). (4) Cable tests with partially or completely thermally aged segments (including ability to expose energized cable segments to thermal aging and use online monitoring instruments to monitor cable performance. (5) Ability to introduce low resistance simulations of connector or splice faults to off-line and on-line instrument setups.

42 ENGINEERING↗

Measurement and Reporting Guidelines for Solar Mirror Aging Tests Using Xenon Arc Lamp Exposure (XALE)

This technical report provides a guideline for accelerated aging tests on solar reflectors. Solar reflectors must have a high durability, with goal lifespans reaching 30 years. To test and develop state-of-the-art solar reflectors, relevant durability tests must be conducted. Existing guidelines for materials testing include isothermal testing, humidity testing, corrosion, etc., but many tests do not specify to include solar irradiance or address its relevance to solar reflector durability. The guideline focuses on test design and reporting guidelines for using Xenon Arc Lamp Exposure (XALE). The XALE environmental chambers can subject samples to a combination of relevant environmental factors including concentrated solar irradiance, heat, humidity, and weathering cycles. The guideline is meant to provide information on developing relevant test conditions, exposure times, reflectance characterization procedures, and data reporting.

14 SOLAR ENERGY↗

Eight plane IPND mechanical testing.

A mechanical test of an 8 plane IPND mechanical prototype, which was constructed using extrusions from the testing/tryout of the 16 cell prototype extrusion die in Argonne National Laboratory, was conducted. There were 4 vertical and 4 horizontal planes in this 8 plane IPND prototype. Each vertical plane had four 16 cell extrusions, while each horizontal plane had six 16 cell extrusions. Each plane was glued together using the formulation of Devcon adhesive, Devcon 60. The vertical extrusions used in the vertical planes shares the same dimensions as the horizontal extrusions in the horizontal planes with the average web thickness of 2.1 mm and the average wall thickness of 3.1 mm. This mechanical prototype was constructed with end-seals on the both ends of the vertical extrusions. The gaps were filled with epoxy between extrusions and end-seals. The overall dimension of IPND is 154.8 by 103.1 by 21.7 inches with the weight of approximately 1200 kg, as shown in a figure. Two similar mechanical tests of 3 layer and 11 layer prototypes have been done in order to evaluate the strength of the adhesive joint between extrusions in the NOvA detector. The test showed that the IPND prototype was able to sustain under the loading of weight of itself and scintillator. Two FEA models were built to verify the measurement data from the test. The prediction from FEA slice model seems correlated reasonably well to the test result, even under a 'rough' estimated condition for the wall thickness (from an untuned die) and an unknown property of 'garage type' extrusion. A full size of FEA 3-D model also agrees very well with the test data from strain gage readings. It is worthy to point out that the stress distribution of the structure is predominantly determined by the internal pressure, while the buckling stability relies more on the loading weight from the extrusions themselves and scintillate. Results of conducted internal pressure tests, including 3- cell, 11-cell and the IPND prototypes, have been correlated to the FEA analysis very well. The authors believe they have quite good understanding of response of the NOvA structures subjected to the internal pressure, while the understanding of buckling stability is far behind. Therefore, more effect should be laid to improve the buckling considering that the FEA analysis usually is not able accurately modeling the stability as good as the stress analysis. The IPND structure was mostly built using 'scrape' piece extrusions (whatever available in shop). Therefore, a future test should be more focus on by using a actual real extrusions, for example like Nova -27 (if a final choice is made) and extrusion from a tuned die (very important). The authors should/will repeat 11 layers test with an actual thicker piece for the vertical to verify the adhesive joint and similar large scale prototype with a symmetry case, either 9 or 11 layers with the dial indicator on the both side.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PROTEC TM TEAR-OFFS: RESULTS OF LONG TERM TESTING

The Savannah River National Laboratory (SRNL) has completed a series of tests (Phases 1 and 2) to assess the potential use of a Mylar{reg_sign} tear-off system as a primary or secondary protective barrier to minimize acid etching ('frosting'), accidental scratching, and/or radiation damage for shielded cells, glovebox, and/or chemical hood windows. Conceptually, thin, multi-layered sheets of Mylar (referred to throughout this report as the ProTec{trademark} tear-off system) can be directly applied to the shielded cell, glovebox, or hood sash window to serve as a secondary (or primary) barrier. Upon degradation of visual clarity due to accidental scratching, spills/splatters, and/or radiation damage, the outer layer (or sheet) of Mylar could be removed refreshing or restoring the view. Due to the multilayer aspect, the remaining Mylar layers would provide continued protection for the window from potential reoccurrences. Although the concept of using a tear-off system as a protective barrier is conceptually enticing, potential technical issues were identified and addressed as part of this phased study to support implementation of this type of system in the Defense Waste Processing Facility (DWPF). Specific test conditions of interest to the DWPF included the performance of the tear-off system exposed to or under the following conditions: (1) acid(s) (concentrated (28.9 M) HF, concentrated (15.9M) HNO{sub 3}, 6M HCl, and 0.6M H{sub 3}BO{sub 3}); (2) base (based on handling of radioactive sludges with pH of {approx}12-13); (3) gamma radiation (due to radioactive sources or materials being used in the analytical cells); (4) scratch resistance (simulating accidental scratching with the manipulators); and (5) in-situ testing (sample coupons exposed to actual field conditions in DWPF). The results of the Phase 1 study indicated that the ProTec tear-off concept (as a primary or secondary protective barrier) is a potential technical solution to prevent or retard excessive damage that would result from acid etching, base damage (as a result of a sludge spill or splatter), gamma radiation damage, and/or accidental scratching (due to manipulator/tool contact). Although identified as a potential solution, the Phase 1 testing was relatively short-term with exposure times up to 1-2 months for the acid and gamma radiation tests. Phase 2 testing included longer exposure times for the acid resistance (up to 456 days) and gamma radiation exposure (700 days with a cumulative gamma dose of {approx}3.1 x 10{sup 5} rad) assessments. The tear-off system continued to perform well in these longer-term acid resistance testing and gamma exposure conditions. Complete removal of the tear-offs after these long-term exposure times indicate that not only could visual clarity be restored but the mechanical integrity could be retained. The results also provided insight into the ability of the ProTec tear-off system to withstand the chemical and physical abuses expected in off-normal shielded cells operations. The conceptual erasing of scratches or marks by excessive manipulator abuse was demonstrated in the SRNL Shielded Cells mock-up facility through the removal of the outer layer tear-off with manipulators. In addition, the Phase 2 testing included an in-situ assessment of a prototype tear-off system in the DWPF Sampling Cells where the system was exposed to actual field conditions including radioactive sources, acidic and basic environments, dusting, and chemical cleaning solutions over a 5-6 month period. DWPF personnel were extremely satisfied with the performance (including the successful removal of 3 layers with manipulators) of the ProTec tear-off system under actual field conditions. The successful removal of the outer layer tear-offs with the manipulator, using tabs not specifically designed for remote operations, demonstrates that the system is 'manipulator-friendly' and could be implemented in a remote environment. The ability to remove the outer layer tear-off not only regains visual clarity but also reduces waste disposal volumes (i.e., disposal of a thin sheet of Mylar which is 'collapsible' versus the bulk disposal of a rigid Lexan{reg_sign} sheet (alpha shield) or glovebox/sash window) which is more cost effective. The tear-off system could also reduce the number of cell entries needed to replace the Lexan sheet and increase the time interval between glovebox/sash window replacements, which can be costly and time consuming. Although the primary focus of this study addresses the application of the ProTec tear-off system to shielded cells windows, the concept is also potentially applicable to glovebox and hood sash windows. In fact, the tear-off concept is potentially applicable to any system where visual clarity is compromised given the environmental conditions of the test. In addition, the tear-offs could be applied to walls or shelves where a protective barrier would reduce deterioration or discoloration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization, Leaching, and Filtration Testing for Bismuth Phosphate Sludge (Group 1) and Bismuth Phosphate Saltcake (Group 2) Actual Waste Sample Composites

A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan.() The test program was subdivided into logical increments. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. The actual waste-testing program included homogenizing the samples by group, characterizing the solids and aqueous phases, and performing parametric leaching tests. Two of the eight defined groups—bismuth phosphate sludge (Group 1) and bismuth phosphate saltcake (Group 2)—are the subjects of this report. The Group 1 waste was anticipated to be high in phosphorus and was implicitly assumed to be present as BiPO4 (however, results presented here indicate that the phosphate in Group 1 is actually present as amorphous iron(III) phosphate). The Group 2 waste was also anticipated to be high in phosphorus, but because of the relatively low bismuth content and higher aluminum content, it was anticipated that the Group 2 waste would contain a mixture of gibbsite, sodium phosphate, and aluminum phosphate. Thus, the focus of the Group 1 testing was on determining the behavior of P removal during caustic leaching, and the focus of the Group 2 testing was on the removal of both P and Al. The waste-type definition, archived sample conditions, homogenization activities, characterization (physical, chemical, radioisotope, and crystal habit), and caustic leaching behavior as functions of time, temperature, and hydroxide concentration are discussed in this report. Testing was conducted according to TP-RPP-WTP-467.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2007 Nissan Altima-7982 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy's Advanced Vehicle Testing Activity conducts several different types of tests on hybrid electric vehicles, including testing hybrid electric vehicles batteries when both the vehicles and batteries are new, and at the conclusion of 160,000 miles of accelerated testing. This report documents the battery testing performed and battery testing results for the 2007 Nissan Altima hybrid electric vehicle (Vin Number 1N4CL21E27C177982). Testing was performed by the Electric Transportation Engineering Corporation. The Advanced Vehicle Testing Activity is part of the U.S. Department of Energy's Vehicle Technologies Program. The Idaho National Laboratory and the Electric Transportation Engineering Corporation conduct Advanced Vehicle Testing Activity for the U.S. Department of Energy.

33 ADVANCED PROPULSION SYSTEMS↗

Quick setup of unit test for accelerator controls system

Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

43 PARTICLE ACCELERATORS↗

TESTING AND PERFORMANCE ANALYSIS OF NASA 5 CM BY 5 CM BI-SUPPORTED SOLID OXIDE ELECTROLYSIS CELLS OPERATED IN BOTH FUEL CELL AND STEAM ELECTROLYSIS MODES

A series of 5 cm by 5 cm bi-supported Solid Oxide Electrolysis Cells (SOEC) were produced by NASA for the Idaho National Laboratory (INL) and tested under the INL High Temperature Steam Electrolysis program. The results from the experimental demonstration of cell operation for both hydrogen production and operation as fuel cells is presented. An overview of the cell technology, test apparatus and performance analysis is also provided. The INL High Temperature Steam Electrolysis laboratory has developed significant test infrastructure in support of single cell and stack performance analyses. An overview of the single cell test apparatus is presented. The test data presented in this paper is representative of a first batch of NASA's prototypic 5 cm by 5 cm SOEC single cells. Clearly a significant relationship between the operational current density and cell degradation rate is evident. While the performance of these cells was lower than anticipated, in-house testing at NASA Glenn has yielded significantly higher performance and lower degradation rates with subsequent production batches of cells. Current post-test microstructure analyses of the cells tested at INL will be published in a future paper. Modification to cell compositions and cell reduction techniques will be altered in the next series of cells to be delivered to INL with the aim to decrease the cell degradation rate while allowing for higher operational current densities to be sustained. Results from the testing of new batches of single cells will be presented in a future paper.

08 HYDROGEN↗

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

43 PARTICLE ACCELERATORS↗

AGR Irradiated Specimen Air/Moisture Heating Test Plan

The Advanced Gas Reactor (AGR) program has a need to perform high-temperature oxidation testing of tristructural isotropic (TRISO)-coated particle fuel and reactor core materials to evaluate their performance under conditions relevant to air- and moisture-ingress events in high-temperature gas-cooled reactors (HTGRs). The objectives of these tests are to assess the impact of oxidizing environments on fission product release from exposed fuel kernels, compact matrix, and nuclear grade graphite, and to determine the impact of oxidizing environments on TRISO coating integrity. The program is currently developing a capability for testing irradiated fuel, matrix, and graphite specimens inside a hot cell. The Air/Moisture Ingress Experiment (AMIX) system will be capable of temperatures up to 1650°C in atmospheres containing oxygen or moisture with varying concentrations. The system will be capable of collecting fission gases as well as condensable fission products, in order to quantify total released inventory from the heated specimens. A basis for establishing experimental test matrices, and the test matrices themselves, are presented in this document. This includes considerations on specific objectives for the tests, types of oxidizing environments that should be tested, and the expected availability of irradiated specimens from the various AGR program irradiation experiments. This document only briefly discusses post-test analysis of the heated specimens, and it is recognized that in many cases the post-test analysis may be extensive. It is expected that this will be a “living” document, subject to revision as data are collected and scoping calculations are performed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗