Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TEST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Galileo battery testing and the impact of test automation

Test complexity, changes of test specifications, and the demand for tight control of tests led to the development of automated testing used for Galileo and other projects. The use of standardized interfacing, i.e., IEEE-488, with desktop computers and test instruments, resulted in greater reliability, repeatability, and accuracy of both control and data reporting. Increased flexibility of test programming has reduced costs by permitting a wide spectrum of test requirements at one station rather than many stations.

Pertuch, W. T.↗

Computer aided system engineering and analysis (CASE/A) modeling package for ECLS systems - An overview

An overview of the CASE/A-ECLSS series modeling package is presented. CASE/A is an analytical tool that has supplied engineering productivity accomplishments during ECLSS design activities. A components verification program was performed to assure component modeling validity based on test data from the Phase II comparative test program completed at the Marshall Space Flight Center. An integrated plotting feature has been added to the program which allows the operator to analyze on-screen data trends or get hard copy plots from within the CASE/A operating environment. New command features in the areas of schematic, output, and model management, and component data editing have been incorporated to enhance the engineer's productivity during a modeling program.

Dalee, Robert C.↗

Design and analysis of composite primary structures for advanced launch vehicles

The current status of the Lightweight Composite Intertank Structures (LCIS) study, a program aimed at developing technologies required to apply advanced composite materials to launch vehicle primary structures, is reviewed. The launch system concept used for establishing design requirements consisted of a fully reusable winged booster and a partially reusable core vehicle. The component selected from this system for design and manufacturing studies was the core vehicle intertank adapter, a component consisting of approximately 26-ft diameter by 25 ft long stiffened cylindrical structure that separates the liquid hydrogen and liquid oxygen tanks on the core vehicle. The discussion covers the program approach, design requirements, material properties, structural analysis, and the test program.

Rix, C.↗

International Space Station Alpha trace contaminant control subassembly life test report

The Environmental Control and Life Support System (ECLSS) Life Test Program (ELTP) began with Trace Contaminant Control Subassembly (TCCS) Life Testing on November 9, 1992, at 0745. The purpose of the test, as stated in the NASA document 'Requirements for Trace Contaminant Control Subassembly High Temperature Catalytic Oxidizer Life Testing (Revision A)' was to 'provide for the long duration operation of the ECLSS TCCS HTCO (High Temperature Catalytic Oxidizer) at normal operating conditions... (and thus)... to determine the useful life of ECLSS hardware for use on long duration manned space missions.' Specifically, the test was designed to demonstrate thermal stability of the HTCO catalyst. The report details TCCS stability throughout the test. Graphs are included to aid in evaluating trends and subsystem anomalies. The report summarizes activities through the final day of testing, January 17, 1995 (test day 762).

Tatara, J. D.↗

Dynamic Inlet Distortion Prediction with a Combined Computational Fluid Dynamics and Distortion Synthesis Approach

A procedure has been developed for predicting peak dynamic inlet distortion. This procedure combines Computational Fluid Dynamics (CFD) and distortion synthesis analysis to obtain a prediction of peak dynamic distortion intensity and the associated instantaneous total pressure pattern. A prediction of the steady state total pressure pattern at the Aerodynamic Interface Plane is first obtained using an appropriate CFD flow solver. A corresponding inlet turbulence pattern is obtained from the CFD solution via a correlation linking root mean square (RMS) inlet turbulence to a formulation of several CFD parameters representative of flow turbulence intensity. This correlation was derived using flight data obtained from the NASA High Alpha Research Vehicle flight test program and several CFD solutions at conditions matching the flight test data. A distortion synthesis analysis is then performed on the predicted steady state total pressure and RMS turbulence patterns to yield a predicted value of dynamic distortion intensity and the associated instantaneous total pressure pattern.

Norby, W. P.↗

Inhibited Shaped Charge Launcher Testing of Spacecraft Shield Designs

This report describes a test program in which several orbital debris shield designs were impact tested using the inhibited shaped charge launcher facility at Southwest Research Institute. This facility enables researchers to study the impact of one-gram aluminum projectiles on various shielding designs at velocities above 11 km/s. A total of twenty tests were conducted on targets provided by NASA-MSFC. This report discusses in detail the shield design, the projectile parameters and the test configuration used for each test. A brief discussion of the target damage is provided, as the detailed analysis of the target response will be done by NASA-MSFC.

Grosch, Donald J.↗

Inhibited Shaped Charge Launcher Testing of Spacecraft Shield Designs

This report describes a test program in which several orbital debris shield designs were impact tested using the inhibited shaped charge launcher facility at Southwest Research Institute. This facility enables researchers to study the impact of one-gram aluminum projectiles on various shielding designs at velocities above 11 km/s. A total of twenty tests were conducted on targets provided by NASA-MSFC. This report discusses in detail the shield design, the projectile parameters and the test configuration used for each test. A brief discussion of the target damage is provided, as the detailed analysis of the target response will be done by NASA-MSFC.

Grosch, Donald J.↗

Pyrotechnically Operated Valves for Testing and Flight

Pyrovalves still warrant careful description of their operating characteristics, which is consistent with the NASA mission - to assure that both testing and flight hardware perform with the utmost reliability. So, until the development and qualification of the next generation of remotely controlled valves, in all likelihood based on shape memory alloy technology, pyrovalves will remain ubiquitous in controlling flow systems aloft and will possibly see growing use in ground-based testing facilities. In order to assist NASA in accomplishing this task, we propose a three-phase, three-year testing program. Phase I would set up an experimental facility, a 'test rig' in close cooperation with the staff located at the White Sands Test Facility in Southern New Mexico.

Conley, Edgar G.↗

Solar Sail Loads, Dynamics, and Membrane Studies

While a number of solar sail missions have been proposed recently, these missions have not been selected for flight validation. Although the reasons for non-selection are varied, principal among them is the lack of subsystem integration and ground testing. This paper presents some early results from a large-scale ground testing program for integrated solar sail systems. In this series of tests, a 10 meter solar sail tested is subjected to dynamic excitation both in ambient atmospheric and vacuum conditions. Laser vibrometry is used to determine resonant frequencies and deformation shapes. The results include some low-order sail modes which only can be seen in vacuum, pointing to the necessity of testing in that environment.

Slade, K. N.↗

RSRM and ETM03 Internal Flow Simulations and Comparisons

ETM03 (Engineering Test Motor-03) is an extended length RSRM (Reusable Solid Rocket Motor) designed to increase motor performance and create more severe internal environments compared with the standard four-segment RSRM motor configuration. This is achieved primarily through three unique design features. First is the incorporation of an additional RSRM center segment, second is a slight increase in throat diameter, and third is the use of an Extended Aft Exit Cone (EAEC). As a result of these design features, parameters such as web time, action time, head end pressure, web time average pressure, maximum thrust, mass flow rate, centerline Mach number, pressure and thrust integrals have all increased compared with nominal RSRM values. In some cases these increases are substantial. The primary objective of the ETM03 test program is to provide a platform for RSRM component margin testing. Test results will not only provide direct data concerning component performance under more adverse conditions, but serve as a second design data point for developing, validating and enhancing component analytical modeling techniques. To help component designers assess how the changes in motor environment will affect performance, internal flow simulations for both the nominal RSRM and ETM03 motor designs were completed to obtain comparisons of aero-thermal boundary conditions and system loads. Full geometries for both motors were characterized with two-dimensional axi-symmetric models at burn times of 1, 20, 54, 67 and 80-seconds. A sixth set considered burn times of 110 and 117-seconds for RSRM and ETM03, respectively. The simulations were performed using the computational fluid dynamics (CFD) commercial code FLUENT (trademark). Of particular interest were any differences between the two motor environments that could lead to a significant increase in system loads, or in internal insulation and/or nozzle component charring and erosion in ETM03 compared with RSRM. Based on these comparative analyses conducted in this study, the objective of ETM03 will be achieved by providing a more adverse operating environment for motor components than the nominal RSRM environment. For example: Higher chamber pressure drop in ETM03 than in RSRM; higher centerline Mach numbers approaching the nozzle in ETM03 than in RSRM; higher heat transfer rates for the internal insulation and nozzle components in ETM03 than in RSRM; and higher levels of droplet impingement and slag accumulation in ETM03 than in the RSRM.

Ahmad, R. A.↗

A Method for Calculating the Probability of Successfully Completing a Rocket Propulsion Ground Test

Propulsion ground test facilities face the daily challenges of scheduling multiple customers into limited facility space and successfully completing their propulsion test projects. Due to budgetary and schedule constraints, NASA and industry customers are pushing to test more components, for less money, in a shorter period of time. As these new rocket engine component test programs are undertaken, the lack of technology maturity in the test articles, combined with pushing the test facilities capabilities to their limits, tends to lead to an increase in facility breakdowns and unsuccessful tests. Over the last five years Stennis Space Center's propulsion test facilities have performed hundreds of tests, collected thousands of seconds of test data, and broken numerous test facility and test article parts. While various initiatives have been implemented to provide better propulsion test techniques and improve the quality, reliability, and maintainability of goods and parts used in the propulsion test facilities, unexpected failures during testing still occur quite regularly due to the harsh environment in which the propulsion test facilities operate. Previous attempts at modeling the lifecycle of a propulsion component test project have met with little success. Each of the attempts suffered form incomplete or inconsistent data on which to base the models. By focusing on the actual test phase of the tests project rather than the formulation, design or construction phases of the test project, the quality and quantity of available data increases dramatically. A logistic regression model has been developed form the data collected over the last five years, allowing the probability of successfully completing a rocket propulsion component test to be calculated. A logistic regression model is a mathematical modeling approach that can be used to describe the relationship of several independent predictor variables X(sub 1), X(sub 2),..,X(sub k) to a binary or dichotomous dependent variable Y, where Y can only be one of two possible outcomes, in this case Success or Failure. Logistic regression has primarily been used in the fields of epidemiology and biomedical research, but lends itself to many other applications. As indicated the use of logistic regression is not new, however, modeling propulsion ground test facilities using logistic regression is both a new and unique application of the statistical technique. Results from the models provide project managers with insight and confidence into the affectivity of rocket engine component ground test projects. The initial success in modeling rocket propulsion ground test projects clears the way for more complex models to be developed in this area.

Messer, Bradley P.↗

Chapter 19B - Antenna Radiation Patterns

Modern civil and military aircraft are equipped with a variety of communication devices, radio navigation equipment, and air traffic control systems. For all of these devices appropriate antennas must be available to transmit and receive the signals. As a result, as many as 30 antennas, and sometimes even more, are mounted around today's aircraft. For this reason, it is necessary to know the capabilities of the receiving/transmitting equipment on board. These capabilities are driven by the antenna characteristics. Therefore, coverage, shading, and beam pointing pattern data are necessary for optimum electronic coverage. The aircraft antenna has to convert the available power density of the electromagnetic field to an electric voltage at its connector. This voltage level must be sufficiently high to operate the connected equipment. The reciprocity principle states that it makes no difference if the antenna is receiving or transmitting. For the certification of the aircraft antennas it must be proven that the antennas are at least generating the minimum receiver input voltage which is required for each radio service. The prime condition is, of course, that the specified field power densities of the different radio navigation and communication services are available. An important property of a radio frequency link is the electro-magnetic field intensity at every point in space for a given output power of the antenna. As the propagation of radio frequency waves in free space is well known, the spatial distribution of the field intensity needs only be measured at one spatial sphere around the antenna. The information is usually given as distributions along the circumference of flat sections through this sphere: each of these is called an ARP. Several ARPs are usually required to describe the complete spatial antenna pattern of an antenna. In addition to mathematical modeling, measurements on sub-scale models, and static measurements on full size models or aircraft on the ground, dynamic measurements on aircraft in flight play the most important role in the aircraft antenna testing and certification. [19B-1] The shape of an ARP, for one given frequency, is determined by the shape of the antenna and the shape and material of the surface it is mounted on. As the directly transmitted waves interfere with waves reflected by the aircraft skin with its complex geometry, and the surface material parameters are only roughly known, it is not possible to predict the ARP with the required accuracy. In ground measurements the earth's surface also acts as a reflector thereby causing the ground ARP to be different from the in-flight ARP. As the in-flight ARP is the ARP we are actually interested in it becomes clear that it is necessary to conduct in-flight ARP measurements. The Flight Test Engineer must be aware of the needs of the specialists who are establishing the test program for measuring antenna patterns and radar cross sections. These tests will require special test equipment and dedicated flights to obtain the data that they require. This Section provides an introduction to the principles of determining antenna patterns and the flight techniques for determining both antenna patterns and radar cross section. Reference 19B-1 provides detailed information.

Helmut Bothe↗

Stress Corrosion Evaluation of Nitinol 60 for the International Space Station Water Recycling System

A stress corrosion cracking (SCC) evaluation of Nitinol 60 was performed because this alloy is considered a candidate bearing material for the Environmental Control and Life Support System (ECLSS), specifically in the Urine Processing Assembly of the International Space Station. An SCC evaluation that preceded this one during the 2013-2014 timeframe included various alloys: Inconel 625, Hastelloy C-276, titanium (Ti) commercially pure (CP), Ti 6Al-4V, extra-low interstitial (ELI) Ti 6Al-4V, and Cronidur 30. In that evaluation, most specimens were exposed for a year. The results of that evaluation were published in NASA/TM-2015-218206, entitled "Stress Corrosion Evaluation of Various Metallic Materials for the International Space Station Water Recycling System,"1 available at the NASA Scientific and Technical Information program web page: http://www.sti.nasa.gov. Nitinol 60 was added to the test program in 2014.

Torres, P. D.↗

NASA's Space Launch System: Progress Report

NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight

Cook, Jerry↗

Correlation of Full-Scale Isolated Proprotor Performance and Loads

A full-scale isolated proprotor test is currently being conducted in the USAF National Full-Scale Aerodynamics Complex (NFAC) 40- by 80-Foot Wind Tunnel at NASA Ames. The test article is a 3-bladed research rotor derived from the right-hand rotor of the AW609; this rotor was manufactured by Bell Helicopter under contract to NASA. In this paper, this research rotor is referred to as "699". The test, nearly completed, is an integral part of the initial checkout test of the newly developed Tiltrotor Test Rig (TTR), whose purpose is to test advanced, full-scale proprotors in the NFAC. Figure 1 shows the TTR/699 installed in the 40- by 80-Foot test section. The TTR rotor axis is horizontal and the rig rotates in yaw on the wind tunnel turntable for conversion (transition) and helicopter mode testing. To date, a substantial amount of wind tunnel test data has already been acquired. The completed operational conditions include hover, airplane mode (cruise, wind tunnel airspeed V=61 to 267 knots), and the helicopter and conversion conditions (with a comprehensive sweep of the TTR yaw angle ranging, to date, from 90-deg yaw helicopter mode to 30-deg yaw conversion mode, at varying airspeeds). This 699 proprotor performance and loads correlation study uses these newly acquired wind tunnel test data. This paper represents the third analytical study, coming after two earlier analytical studies on the TTR/699; that is, a 2018 paper on pre-test predictions of 699 performance and loads, Ref. 1, and an upcoming January 2019 paper on aeroelastic stability analysis of the TTR/699 installed in the 40- by 80-Foot Wind Tunnel, Ref. 2. Reference 8 will present an overview of the entire TTR/699 test program. For completeness, Ref. 3 addresses the development and initial testing of the TTR. Background information on the TTR effort at NASA Ames can be found at the Aeromechanics website: https://rotorcraft.arc.nasa.gov/Research/Facilities/ttr.html. To the authors' knowledge, the full-scale results presented in this paper are the first of their kind. A literature survey brought up several existing correlation studies, but these were either based on small-scale test data (for example, the studies performed by the University of Maryland) or full-scale aircraft flight test data (for example, flight tests conducted by Bell Helicopter). Separately, the 2009 NASA study involving the JVX rotor is relevant (see Ref.4). The JVX is closely similar to the 699 in size and aerodynamics, and is accordingly a good reference for performance calculations. In Ref. 1 (as mentioned above), pre-test reality checks of the current analytical model were made by comparing JVX and 699 predictions in hover and forward flight (airplane mode).

Isolated Proprotor Performance↗

Meeting the challenges with the Douglas Aircraft Company Aeroelastic Design Optimization Program (ADOP)

An overview of the Aeroelastic Design Optimization Program (ADOP) at the Douglas Aircraft Company is given. A pilot test program involving the animation of mode shapes with solid rendering as well as wire frame displays, a complete aircraft model of a high-altitude hypersonic aircraft to test ADOP procedures, a flap model, and an aero-mesh modeler for doublet lattice aerodynamics are discussed.

Rommel, Bruce A.↗

Closing the design loop on HiMAT (highly maneuverable aircraft technology)

The design methodology used in the HiMAT program and the wind tunnel development activities are discussed. Selected results from the flight test program are presented and the strengths and weaknesses of testing advanced technology vehicles using the RPV concept is examined. The role of simulation on the development of digital flight control systems and in RPV's in particular is emphasized.

Putnam, T. W.↗

Engineered Solutions Group's SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only legacy LWR designs, but also Small Modular Reactors designs currently being designed by several different suppliers. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and more severe normal operating conditions as well. We developed two approaches to qualify Electrical Penetration Assembly (EPA) and Containment Cabling Systems for SMRs and Advanced Reactors. We take into consideration the more severe environmental parameters found with SMR designs. The system will need to meet a qualification test program addressing wear/cyclic aging, potential radiation exposure, thermal aging, vibration aging, thermal cycling, seismic qualification, electrical fault testing (per IEEE 317) and accident simulation. The equipment must meet the requirements of 10CFR50.49, GDC 50 in 10CFR50 Appendix A, and 10CFR50 Appendix J. NRC Regulatory Guides (RGs) identify an acceptable way of meeting regulatory requirements. RGs frequently endorse a standard for meeting these requirements. Specific to this review, equipment would be qualified in accordance with the following IEEE Standards. • IEEE 317-2013 (Electrical Penetration Assemblies), which is endorsed by RG 1.63, Rev. 3, • IEEE 323-2003 and the more current IEC/IEEE 60780-323 (Environmental Qualification of 1E Equipment) which is endorsed by RG 1.89. IEEE 323-2003 is endorsed by RG 1.209, • IEEE 344-2020 (Seismic Qualification. The 2013 version endorsed by RG 1.100, Rev. 4, with exceptions), • IEEE 383-2015 (Electrical Cables) (which is endorsed by RG 1.189 Rev. 4 and the -2003 version endorsed by RG 1.211 rev. 0), • IEEE 572-2019 (Electrical Connectors and Assemblies), which is endorsed by 1.156 Rev 1, and • [IEEE 1202 (endorsed by RG 1.189) would normally be applicable but the advanced cable designs are impervious to this cable flame test.] The primary goal of such a program is to provide an EPA design that can meet the qualification requirements for all legacy light water reactor plants currently operating as well as new plant designs including light water Small Modular Reactors. Thus, these requirements are applicable to plants licensed under 10CFR50 and 10CFR52. Other reactor designs may be evaluated, and this test system and qualification method applied to those applications if the requirements would satisfy the requirements of the intended plant. A secondary benefit of this work is to document some of the history and background in these requirements as there have been recent delays in an SMR licensing process due to NRC Requests for Additional Information in this subject matter area.

42 ENGINEERING↗