Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Source Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Policy-Driven Sustainable Saline Drainage Disposal and Forage Production in the Western San Joaquin Valley of California

Environmental policies to address water quality impairments in the San Joaquin River of California have focused on the reduction of salinity and selenium-contaminated subsurface agricultural drainage loads from westside sources. On 31 December 2019, all of the agricultural drainage from a 44,000 ha subarea on the western side of the San Joaquin River basin was curtailed. This policy requires the on-site disposal of all of the agricultural drainage water in perpetuity, except during flooding events, when emergency drainage to the River is sanctioned. The reuse of this saline agricultural drainage water to irrigate forage crops, such as ‘Jose’ tall wheatgrass and alfalfa, in a 2428 ha reuse facility provides an economic return on this pollutant disposal option. Irrigation with brackish water requires careful management to prevent salt accumulation in the crop root zone, which can impact forage yields. The objective of this study was to optimize the sustainability of this reuse facility by maximizing the evaporation potential while achieving cost recovery. This was achieved by assessing the spatial and temporal distribution of the root zone salinity in selected fields of ‘Jose’ tall wheatgrass and alfalfa in the drainage reuse facility, some of which have been irrigated with brackish subsurface drainage water for over fifteen years. Electromagnetic soil surveys using an EM-38 instrument were used to measure the spatial variability of the salinity in the soil profile. The tall wheatgrass fields were irrigated with higher salinity water (1.2–9.3 dS m -1 ) compared to the fields of alfalfa (0.5–6.5 dS m -1 ). Correspondingly, the soil salinity in the tall wheatgrass fields was higher (12.5 dS m -1 –19.3 dS m -1 ) compared to the alfalfa fields (8.97 dS mm -1 –14.4 dS mm -1 ) for the years 2016 and 2017. Better leaching of salts was observed in the fields with a subsurface drainage system installed (13–1 and 13–2). The depth-averaged root zone salinity data sets are being used for the calibration of the transient hydro-salinity computer model CSUID-ID (a one-dimensional version of the Colorado State University Irrigation Drainage Model). This user-friendly decision support tool currently provides a useful framework for the data collection needed to make credible, field-scale salinity budgets. In time, it will provide guidance for appropriate leaching requirements and potential blending decisions for sustainable forage production. This paper shows the tie between environmental drainage policy and the role of local governance in the development of sustainable irrigation practices, and how well-directed collaborative field research can guide future resource management.

54 ENVIRONMENTAL SCIENCES↗

An integrated analytical framework for quantifying the LCOE of waste-to-energy facilities for a range of greenhouse gas emissions policy and technical factors

This study presents a novel integrated method for considering the economics of waste-to-energy (WTE) facilities with priced greenhouse gas (GHG) emissions based upon technical and economic characteristics of the WTE facility, MSW stream, landfill alternative, and GHG emissions policy. The study demonstrates use of the formulation for six different policy scenarios and explores sensitivity of the results to ranges of certain technical parameters as found in existing literature. The study shows that details of the GHG emissions regulations have large impact on the levelized cost of energy (LCOE) of WTE and that GHG regulations can either increase or decrease the LCOE of WTE depending on policy choices regarding biogenic fractions from combusted waste and emissions from landfills. Important policy considerations are the fraction of the carbon emissions that are priced (i.e. all emissions versus only non-biogenic emissions), whether emissions credits are allowed due to reducing fugitive landfill gas emissions, whether biogenic carbon sequestration in landfills is credited against landfill emissions, and the effectiveness of the landfill gas recovery system where waste would otherwise have been buried. The default landfill gas recovery system effectiveness assumed by much of the industry yields GHG offsets that are very close to the direct non-biogenic GHG emissions from a WTE facility, meaning that small changes in the recovery effectiveness cause relatively larger changes in the emissions factor of the WTE facility. Finally, the economics of WTE are dependent on the MSW stream composition, with paper and wood being advantageous, metal and glass being disadvantageous, and plastics, food, and yard waste being either advantageous or disadvantageous depending upon the avoided tipping fee and the GHG emissions price.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adapting LEU-Modified Cintichem Process for Processing Up to 750 Grams of Uranium Targets

Argonne National Laboratory (Argonne) developed a low-enriched uranium (LEU)-modified Cintichem (LMC) process to enable production and purification of fission-produced molybdenum-99 (Mo-99) from LEU foil targets. This separation scheme starts with nitric acid (HNO 3 ) dissolution of irradiated LEU foil targets that yields an approximate final volume of 2 L. The dissolved uranium solution containing fission products, including Mo-99, is then treated by loading the solution on a titania-based recovery column to separate Mo-99 from bulk uranium. After several washing steps, Mo and other fission products are stripped from the titania column using sodium hydroxide (NaOH). The eluate is then acidified using nitric acid and subsequently processed for final purification using the LMC process. Uranium and most fission products are not adsorbed on the titania column but are eluted (i.e., removed using a solvent) during the wash steps; they can be purified and recycled into new uranium targets.

07 ISOTOPE AND RADIATION SOURCES↗

Lawrence Livermore National Security CFO Processes Functional Management Assessment

The scope of the Functional Management Assessment of the CFO included a review of the CFO Organizational Structure, including deployed financial services and the division of responsibilities and internal controls between CFO and other organizations that perform financial functions across the Laboratory. In addition, the assessment team solicited input from end users and reviewers. Three issues discussed are: ISSUE 1: Financial activities and cash transactions are occurring outside the CFO organization. Approximately $200M of non-purchase order spending occurs in seven areas outside CFO control (travel, relocation, special disbursements, IPO, legal, risk management, and freight). NIF financial services have not been integrated into the CFO organization and operate outside CFO control. Business risks--There is no single point of financial accountably; Currently within the CFO and Business and Operations organizations there is a lack of clarity of roles and responsibilities for financial activities; Financial talent within the laboratory is fragmented; and Inefficiencies exist based on the current structure; An example of the above business risks associated with organizational structure can be observed in the process for reimbursement of relocation costs to employees. Currently, Human Resources and Travel both administer portions of an employee's relocation. Costs are reviewed for compliance with FAR travel guidelines and for compliance with the offer letter but there is no financial review for allowability of costs nor is there a single point where the total relocation costs are reviewed. Through the e-pay system the check is processed by the CFO organization but there is no review by that organization. ISSUE 2: Impact of involuntary separation on current and future activities. 3 risks are: (1) Loss of internal controls--with the upcoming involuntary reductions there will be a loss of personnel with institutional knowledge which will increase the risk of losing internal control on some processes. The organization needs to be cognizant of this risk and take measures to minimize financial risk and ensure on-going A-123 compliance. (2) Project Costing Implementation (PCI) delay--the implementation of PCI is key to achieving integration and reporting of financial data. Presently, business analysts spend half of their time collecting and compiling data and 94% of the labs financial management reports are created using spreadsheets. Currently, the PCI project is on schedule but the involuntary reductions may result in loss of support in this area. (3) Financial Performance Milestones not met--for FY-08 there are fixed, base and stretch financial performance milestones for the laboratory. With reductions in staff the risk of missing key milestones increases. ISSUE 3: Strategically growing the Work for Others (WFO) Portfolio. A key objective of the laboratory is to increase WFO. Greater reliance on WFO will result in additional funding sources and increase the number of control points and financial activities to be monitored thus increasing the level of financial complexity at the lab. The CFO organization should work now to improve controls and processes to accommodate these changes. In particular the following areas should be focused on: (1) Cost reporting needs to be streamlined; (2) Cost Transfer controls need to be increased; and (3) Timely monitoring and close out of contracts needs occur.

99 GENERAL AND MISCELLANEOUS↗

Y-12 National Security Complex Biological Monitoring and Abatement Program 2007 Calendar Yeare Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2007 study period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERCLA-funded data is summarized in Appendix A (for Bear Creek) and Appendix B (for McCoy Branch). Data for these two watersheds is provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit'. For potential comparison with instream biological measures, a summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Y-12 National Security Complex Biological Monitoring And Abatement Program 2008 Calendar Year Report

The National Pollutant Discharge Elimination System (NPDES) permit issued for the Oak Ridge Y-12 National Security Complex (Y-12 Complex) which became effective May 1, 2006, continued a requirement for a Biological Monitoring and Abatement Program (BMAP). The BMAP was originally developed in 1985 to demonstrate that the effluent limitations established for the Y-12 Complex protected the classified uses of the receiving stream (East Fork Poplar Creek: EFPC), in particular, the growth and propagation of aquatic life (Loar et al. 1989). The objectives of the current BMAP are similar, specifically to assess stream ecological conditions relative to regulatory limits and criteria, to assess ecological impacts as well as recovery in response to Y-12 operations, and to investigate the causes of continuing impacts. The BMAP consists of three tasks that reflect complementary approaches to evaluating the effects of the Y-12 Complex discharges on the biotic integrity of EFPC. These tasks include: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. As required by the NPDES permit, the BMAP benthic macroinvertebrate community monitoring task includes studies to annually evaluate the receiving stream's biological integrity in comparison to TN Water Quality Criteria. BMAP monitoring is currently being conducted at five primary EFPC sites, although sites may be excluded or added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) appropriate habitat distribution, and (5) access. The primary sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18.2 and 19), located off the ORR and below an area of intensive commercial and light industrial development; EFK 13.8, located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1). Actual sampling locations on EFPC may differ slightly by task according to specific requirements of the task. Brushy Fork (BF) at kilometer (BFK) 7.6 and Hinds Creek at kilometer (HCK) 20.6 are the most commonly used reference sites for the Y-12 BMAP. Additional sites off the ORR are also occasionally used for reference, including Beaver Creek, Bull Run, Cox Creek, and Paint Rock Creek (Fig. 1.2). Summaries of the sampling designs for the three primary tasks of the Y-12 Complex BMAP for EFPC are presented in Tables 1.1-1.3. This report covers the 2008 period, although data collected outside this time period are included as appropriate. To address the biological monitoring requirements for Bear Creek and McCoy Branch, CERLCA-funded programs, data are summarized in Appendix A and Appendix B respectively. Data for these two watersheds are provided herein to address Section IX of the NPDES Permit for Y-12, where 'Results of these CERCLA programs can be used to meet the biological monitoring requirements of this permit...'. A summary of the toxicity testing results for Y-12 outfalls into upper EFPC is provided in Appendix C (these results have been previously reported) to provide a more thorough perspective of conditions in the stream. Data summarized in this report are available from the Oak Ridge Environmental Information system (OREIS) in an Arc-GIS usable format (http://www-oreis.bechteljacobs.org/oreis/help/oreishome.html). Per requirements specified in the NPDES permit, data collected following TDEC monitoring protocols (TDEC 2006) is also submitted directly to TDEC in Excel format.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Linear and Nonlinear Solvers for Simulating Multiphase Flow within Large-Scale Engineered Subsurface Systems

Simulation of multiphase flow in the subsurface is well-known to be computationally challenging. While there have been many studies that have explored approaches to overcoming these challenges, they often utilize relatively simple case studies. In this paper, we focus on the unique numerical challenges posed by modeling large-scale engineered subsurface systems, characterized by discrete features embedded in a heterogeneous natural subsurface setting. The man-made features such as shafts, tunnels, and barriers often cause multiple challenges in modeling the domain for multiphase porous media flow. This flow scenario can have a wide range of applications such as nuclear waste repositories, enhanced recovery of a petroleum reservoir, geothermal engineering, and carbon sequestration. An example of these severe numerical challenges is the case of performance assessment (PA) for Waste Isolation Pilot Plant (WIPP), the only operating deep geological repository in the US, which simulates extreme material properties of bedded salt rock formation and extreme contrast due to open excavation next to the formation. The models have extremes not only of permeability and porosity but also of the constitutive models needed for multiphase flow; additionally, they have process models like salt creep closure reducing porosity over time, fracturing in clay and anhydrite interbeds of the bedded salt, gas generation from the waste materials, and unintentional human borehole intrusions in some scenarios. Numerical simulations require the solution of coupled systems of nonlinear PDEs; in our work, we use the open-source simulator PFLOTRAN which is based on Finite Volume discretization. The solution of the nonlinear equations requires use of the Newton-Raphson iteration at each time step, which entails the solution of the linearized Jacobian system at each iteration. The effects of all the processes (i.e., large number of unknowns, highly nonlinear constitutive relations, large contrasts in material properties in short distances) lead to an ill-conditioned Jacobian matrix that severely challenges traditional linear solver, i.e., stabilized biconjugate gradient with block Jacobi incomplete LU preconditioner (BCGS-ILU) leading to non-convergence for traditional Newton-Raphson nonlinear solver causing unacceptably long computation time for each model. This paper presents linear solvers such as constrained pressure residual (CPR) two-stage preconditioner with alternate-block-factorization (ABF) and quasi- implicit pressure and explicit saturation (QIMPES) decouplers and flexible generalized residual solver (FGMRES). The new general-purpose nonlinear solver, Newton trust-region dogleg Cauchy (NTRDC), is also introduced to resolve extreme nonlinearities in the models. We demonstrate the effectiveness of each method relative to the default BCGS-Newton solver. The two best cases had nearly 50 times speed-up and achieved completion of a simulation in 14 hours that never completed due to non-convergence with the default solver. We also investigate the strong scalability of each method and discuss some of the deficiencies found for Block Jacobi preconditioner using parallel domain decomposition, and node packing effects of modern processor architecture.

Preconditioner, Nonlinear, Porous media, Multiphas↗

Satellite-based monitoring of groundwater depletion in California’s Central Valley

Abstract Range change data, obtained from Synthetic Aperture Radar satellites, form the basis for estimates of aquifer volume change in California’s Central Valley. The estimation algorithm incorporates a function penalizing changes far from known well locations, linking the aquifer volume changes to agricultural, industrial, and municipal pumping within the Tulare basin. We show that the range changes are compatible with the hypothesis that the source of aquifer volume changes are variations in effective pressure around documented wells. Specifically, inclusion of the well distance penalty does not degrade the fit to the observations, inversions with and without it both give variance reductions of 99.6%. The patterns of aquifer volume change vary significantly from the drought year, between October 2015 and October 2016, to a wet year in 2017, and into 2018, a year with near average rainfall. The 2.3 million acre-feet of estimated volume reduction, a lower bound on the amount of water extracted from the basin between October 2015 and 2016, agrees with independent estimates of 1.8 and 2.3 million acre-feet. The aquifer volume reduction is also compatible with a loss of 3.1 km 3 (2.5 million acre-feet) in groundwater volume derived from Gravity Recovery and Climate Experiment (GRACE) satellite data.

47 OTHER INSTRUMENTATION↗

Research Roadmap on Grid-Forming Inverters

This research roadmap is intended to fill the knowledge gap by providing a system view of grid-forming inverter-based resource controls and their impact on grid stability, which we believe is central to meeting some of the challenges to operating the future North American electric power system. This includes the roles and requirements of grid-forming inverter-based resources—including solar photovoltaics, wind generators, and energy storage. For this roadmap, we focus on a specific family of grid-forming inverter control approaches that do not rely on an external voltage source (i.e., no phase-locked loop) and that can share load without explicit communications. Although the roadmap is focused narrowly on system challenges for grid-forming controls and power system stability, including interactions with protection, we hope it serves as a foundational element for future system-of-systems roadmapping needed in a broader grid modernization effort with increasing deployments of inverter-based resources. The roadmap first introduces formal definitions for the grid stability topics and then describes the differences between grid-forming and traditional grid-following control approaches for inverter-based resources. The core of the roadmap consists of a review of current research and an outline of research needs related to five grid-forming inverter topics: frequency control, voltage control, system protection, fault ride-through and voltage recovery, and modeling and simulation. The review both delineates contemporary advances and highlights open research questions that must be addressed to enable the widespread adoption of inverter-based resources across the grid. Feedback from industry on these research questions is incorporated, including discussions during the Workshop on Grid-forming Inverters for Low-inertia Power Systems. The workshop included industry presentations and discussion of ongoing research, technology gaps, and piloting needs. This roadmap concludes by offering a multiyear perspective on the gradual field validation of grid-forming inverters. This perspective recognizes that the scale and scope of the types of power systems that inverters will be called on to provide grid-forming services will and should begin modestly. Specifically, this roadmap recognizes that inverter controls today are predominantly grid-following and that future power systems will involve a mix of inverter-based resources with both grid-following and grid-forming control capabilities. Growth over time will depend on how well grid-forming inverters perform and what advantages they bring as penetration levels (instantaneous and average) of inverter-based resources increases. This recognition, in turn, establishes a natural sequence of priorities for the research questions that must be addressed. Following this multiyear perspective, the roadmap offers short descriptions of two specific near-term research priorities: the review of regulatory and technical standards and the development of advanced modeling techniques. These priorities are foundational. We recommend immediate pursuit of them in parallel with and in direct support of the research outlined by our multiyear perspective.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EGS Collab Project: Accomplishments and Plan

To better understand stimulation and inter-well flow in crystalline rock with the goal of developing and improving subsurface heat exchangers for enhanced geothermal energy recovery, the EGS (Enhanced Geothermal Systems) Collab project is developing highly monitored, well- characterized intermediate scale (~10-20 m) field test beds, stimulating, and performing flow tests. These tests provide the ability to evaluate concepts, data to test and validate models, and tools to be used for EGS development, which may be evaluated at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) project. Numerical simulation is key to the project, for experiment design and interpretation of results. Testbed characterization included optical and acoustic televiewers, full waveform seismic, electromagnetic, gamma, and temperature. The test block was further characterized using seismic tomography (p- and s-), electrical resistance tomography (ERT), and hydrologic characterization including tracer tests. Coupled process models are constrained by the detailed site characterization data. Installed monitoring systems include: 1) passive seismic/acoustic emissions; 2) continuous active source seismic; 3) ERT, with dynamic imaging using high contrast fluids; and 4) distributed acoustic, temperature, and strain fiber optic sensors. During flow and stimulation tests, fracture aperture strain monitoring is performed using the Step-rate Injection Method for Fracture In-situ Properties (SIMFIP) tool. Pressure and flow in the injection and production boreholes are monitored, and tracer tests and wavefield imaging and inversion are performed to provide additional constraints. Stimulations have been performed at several locations, connecting our injection and production wells. An overview of the EGS Collab project is presented to provide a framework for other EGS Collab presentations, along with results from numerical simulations and experiments performed at the Sanford Underground Research Facility in South Dakota.

Enhanced Geothermal Systems, EGS Collab, stimulati↗

Open‐Source Anaerobic Digestion Modeling Platform, Anaerobic Digestion Model No. 1 Fast (ADM1F)

An open‐source modeling platform, called Anaerobic Digestion Model No. 1 Fast (ADM1F), is introduced to achieve fast and numerically stable simulations of anaerobic digestion processes. ADM1F is compatible with an iPython interface to facilitate model configuration, simulation, data analysis, and visualization. Faster simulations and more stable results are accomplished by implementing an advanced open‐source library of numerical methods called Portable Extensive Toolkit for Scientific Computation (PETSc) to solve the ADM1 system of equations. Leveraging PETSc, ADM1F can consistently complete a steady‐state simulation under 0.2 s, over 99% faster than a benchmark ADM1 model implemented with MATLAB while achieving agreement of model outputs within 1% of those obtained with the benchmark model. For dynamic simulations, however, ADM1F has a computational speed advantage only when the influent characteristics update more frequently than every 4 h. The ability of ADM1F to be useful as a tool to study anaerobic digestion systems is demonstrated through two example implementations of ADM1F: (1) a two‐phase co‐digestion scenario evaluating the impact of the organic loading rate and the substrate composition on reactor performance and stability, and (2) a conventional digester scenario assessing the effectiveness of recovery strategies after disruptions that led to instability. These examples demonstrate how the high simulation speed and the convenience of the iPython interface allow ADM1F to complete complex analyses within minutes, much faster than computational strategies currently reported in the literature.

anaerobic co-digestion↗

Supporting Building Portfolio Investment and Policy Decision Making through an Integrated Building Utility Data Platform

The American Recovery and Reinvestment Act stimulus funding of 2009 for smart grid projects resulted in the tripling of smart meters deployment. In 2012, the Green Button initiative provided utility customers with access to their real-time1 energy usage. The availability of finely granular data provides an enormous potential for energy data analytics and energy benchmarking. The sheer volume of time-series utility data from a large number of buildings also poses challenges in data collection, quality control, and database management for rigorous and meaningful analyses. In this paper, we will describe a building portfolio-level data analytics tool for operational optimization, business investment and policy assessment using 15-minute to monthly intervals utility data. The analytics tool is developed on top of the U.S. Department of Energy’s Standard Energy Efficiency Data (SEED) platform, an open source software application that manages energy performance data of large groups of buildings. To support the significantly large volume of granular interval data, we integrated a parallel time-series database to the existing relational database. The time-series database improves on the current utility data input, focusing on real-time data collection, storage, analytics and data quality control. The fully integrated data platform supports APIs for utility apps development by third party software developers. These apps will provide actionable intelligence for building owners and facilities managers. Unlike a commercial system, this platform is an open source platform funded by the U.S. Government, accessible to the public, researchers and other developers, to support initiatives in reducing building energy consumption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Extractability of Rare Earth Elements from Coal Preparation Fines Refuse Using an Organic Acid Lixiviant

We report that this work is a first-order study to assess the suitability of an organic acid lixiviant to extract rare earth elements (REE) from coal preparation fines refuse sourced from a Pennsylvania mine with a total REE of ~ 300 ppm. The extraction of REE using an organic acid, in this case 0.1 M citric acid and 0.5 M trisodium citrate solution, is compared against 0.5 M (NH 4 ) 2 SO 4 , 1 M HCl, 1.2 M H 2 SO 4 , and 0.5 M ethylenediaminetetraacetic acid (EDTA). Ashing the coal waste material prior to leaching tests with the citrate solution nominally improved REE extraction. Buffered citrate solution recovered 7% of the total REE in the as-received Isabella Fines as compared to 11% in ashed samples, whereas (NH 4 ) 2 SO 4 extracted 5–6%, respectively. EDTA recovered up to 33% of the total REE, most likely due to the higher coordination chelate bond. Mineral acids, however, outperformed the organic acids on ashed material (16–52% REE recovery), suggesting that organic acids may not be a suitable competitive option for REE extraction from these types of feedstocks.

01 COAL, LIGNITE, AND PEAT↗

Vapor Extraction Well Performance and Recommendations for Future Soil Vapor Extraction Activities at the A-014 Outfall

The vadose zone near the A-014 Outfall contains residual volatile organic compounds that serve as a potential source for groundwater contamination. Since 1995 active soil vapor extraction has been an integral part of the corrective actions at this facility. Currently two separate soil vapor extraction systems are being used to remove contamination in the vapor phase from the subsurface. The 782-3M soil vapor extraction unit was deployed in April of 1995 and the A-014 Mobile #3 unit was deployed in January of 2009. The objective of this investigation is to evaluate the performance of individual wells associated with these systems and provide recommendations on possible optimizations to these systems. Options that are considered include continuation of active extraction, transition to a low-energy soil vapor extraction treatment, or abandon nonperforming wells. The scope of the investigation examined the eighteen (18) vadose zone wells that are associated with the ongoing Resource Conservation and Recovery Act corrective action program within A/M Area. During the evaluation process, individual wells were isolated and purged for a standard period using the existing soil vapor extraction system. Following the purge period, vapor samples were collected intermittently over the following 24–72-hour period. The objective of the sampling activity was to collect sufficient data to estimate the mass flow rate of contaminants from the individual extraction wells. Subsequent analysis then evaluated and ranked extraction performance to provide recommendations on the viability, operational scheme, and applicability of low energy soil vapor extraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Asymmetric pathways for lithium extraction and recovery based on the two-phase equilibrium of layered oxides

Electrochemical intercalation offers a promising platform for Li + extraction. However, only limited types of electrode materials have been investigated. The challenge to broaden and tailor materials for electrochemical intercalation-based Li + extraction lies in the lack of understanding of material’s response upon co-intercalation of multiple ions, therefore, paired process design to enable reversible Li + extraction and recovery. Here, we showcase the design of asymmetric ion pathways for Li + extraction and recovery for host material with complex Li + and Na + interaction using layered cobalt oxide as a model material. The two-phase equilibrium of Na 0.48 CoO 2 and Li 0.94 CoO 2 governs Li + selectivity when a high depth of intercalation is achieved (low vacancy level). We show that the relative rate between ion exchange and intercalation is critical to determine the ion pathways. The relationship can be quantitatively compared using the average pseudo ion exchange rate (C pseudoIX ) and the intercalation rate (C inter ). The ion pathways at the three regimes with C pseudoIX > C inter , C pseudoIX ~ C inter , and C pseudoIX < C inter are constructed. By selecting the optimized ion pathway and particle size, we demonstrate 9.7×10 4 Li + selectivity with 99% purity Li + recovery from an initial 1:1000 Li: Na molar ratio solution using 115 mAh/g specific capacity.

electrochemistry↗

Recovery of Glass and Silicon Solar Cells from Si-Modules Through Laser Processing

This study demonstrates an innovative and environmentally friendly laser-based approach for the efficient recovery of glass and silicon solar cells, allowing the recycling of photovoltaic modules. The methodology involves the use of a high-power pulsed laser beam focusing at various interfaces within the modules. Specifically, the delivery of ultra-short pulse laser energy at the interfaces of glass and polymeric encapsulants, as well as at the encapsulants and silicon solar cells, facilitates the debonding of polymers from both glass and silicon cell surfaces. The debonding occurs through photothermal, ablation, chemical modification, and localized heat generation. The research successfully demonstrates the recovery of glass from commercial mini solar modules of size 11.5 x 6.8 cm 2 and a silicon wafer of size 3.0x1.6 cm 2 . Ongoing efforts aim to extend the effectiveness of this laser-based methodology to comprehensively recycle larger-size components. This innovative approach holds promise for addressing environmental concerns associated with the disposal of solar modules, contributing to sustainable practices in the renewable energy sector.

glass↗

2012-13 Blue Room Low Enriched Uranium Sample Irradiation, Associated Gas Handling System, and Subsequent Separation Chemistry

An irradiation experiment was designed for the production of 100 mCi of medical isotope Mo-99 from a Low Enriched Uranium (LEU) solution. 300 mL of 150 gU/L LEU sulfate solution (pH1) was prepared and irradiated at the LANSCE Blue Room facility. The apparatus designed for the irradiation included a gas handling system, in which safe operation could be controlled by monitoring change in gas pressure. The gas handling system also contained a hydrogen oxygen recombiner, to recombine the gases generated through radiolysis of water, and an iodine trap, primarily for I-131. Pressure transients were observed during irradiation, which could be controlled by increasing the flow rate of the circulating pump. After irradiation the LEU solution was transferred to a hot cell facility for subsequent Mo-99 recovery using a titania column separation process, with samples also subsequently shipped to a radiochemical laboratory for further analysis. Gamma spectroscopy analysis revealed that ca. 70 mCi of Mo-99 was present at end of beam, in good agreement with the predicted value when actual beam history was included into the calculation. There was 80-85 % recovery of Mo-99 through a titania column separation, excluding losses through radioactive decay. The % Mo-99 recovery was lower than observed previously for the 1 mCi Mo-99 production (Target 4) experiments undertaken at LANL using the same separation apparatus, with on this occasion evidence of lower oxidation state molybdenum remaining irreversibly bound to the titania column. Subsequent postmortem analysis of the Blue room apparatus revealed that there had been no leaks in the gas handling system, the hydrogen and oxygen recombination appeared to work efficiently, and recovery of irradiated uranium trapped in the system allowed for >99% uranium mass balance.

07 ISOTOPE AND RADIATION SOURCES↗

Developing a roadmap for carbon capture, and storage in Oklahoma by assessing the viability of stacked storage

Abstract The Intergovernmental Panel on Climate Change concludes that CO 2 capture and storage (CCS) is critical for climate‐stabilizing energy transitions. In CCS, captured CO 2 is sequestered in saline aquifers within sedimentary basins. The CO 2 storage capacity and the rate of injection are functions of the geology of the saline aquifer, which is uncertain. To minimize impacts of this uncertainty, CCS projects could include backup plans, such as co‐locating geologic CO 2 storage (GCS) sites with or near existing CO 2 ‐enhanced oil recovery (CO 2 ‐EOR) operations. These “stacked storage” projects could hedge against uncertainty in the saline formation performance because captured CO 2 could be injected into either location in the event of unexpected events (e.g., the injectivity decreases). Here, we investigate the possibility and ramifications of developing CCS networks in Oklahoma that are amendable to stacked storage. We find that stacked storage is possible in Oklahoma but the counties with the lowest‐cost saline storage resources do not have existing CO 2 ‐EOR operations. At the systems level, we find it is slightly more expensive (e.g., $1/tCO 2 to $5/tCO 2 ) to site GCS in counties with CO 2 ‐EOR projects. This increased expense is largely due to increased CO 2 transportation costs because hundreds of km of additional pipeline is required to capture CO 2 from the lowest‐cost sources. Overall, our results suggest that it is optimal to build more pipelines and avoid injecting CO 2 in some of the lowest‐cost saline storage resources, to enable capturing CO 2 from the least‐cost sources. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

42 ENGINEERING↗