Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Security Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Spot size measurement of a deuterium–tritium dense plasma focus using neutron radiography

Neutron radiography is a technique uniquely suited to applications in nuclear diagnostics, non-destructive testing, and subcritical experiments. The spatial resolution of neutron radiographs is degraded by optical blur in the imaging system and the neutron source size, where the ideal source is point-like to optimize the point-spread function. A potential neutron source for radiography is the dense plasma focus (DPF), a coaxial Z-pinch that produces thermonuclear and beam-target neutrons. To assess if the source size is suitable for radiography, a neutron imaging system was used to measure the source size of the 4 MA Sodium DPF at the Nevada National Security Site operating with deuterium–tritium gas-fill. The source size was measured using the edge-spread function of tungsten objects, each having a rolled (convex) edge. The spot size was found to be 7–12 mm full-width at half-max (FWHM) assuming a Gaussian source, though comparison is presented for Lorentzian and Bennett distributions. The average FWHM was found to be 8.6 ± 1.2 mm vertically and 10.8 ± 1.2 mm horizontally with respect to the image plane, averaging over varied edges and alignments. The results were sensitive to source alignment and edge metrology, which introduced notable uncertainties. These results are consistent with separate experimental measurements as well as magnetohydrodynamics simulations of this DPF, which suggest that neutron production can originate from pinches ∼5–7 mm off-axis. These results suggest that the DPF should be used for radiography at low magnification (M < 1) where spot size does not dominate spatial blur.

47 OTHER INSTRUMENTATION↗

Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluated to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).

54 ENVIRONMENTAL SCIENCES↗

Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada: (CY2017 January 2017–December 2017, Rev. 0)

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2017. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The 86,000-picocuries-per-liter (pCi/L) tritium concentration in one of the wells is about 12 percent higher than measured in 2016 but is over an order of magnitude less than the peak value measured in the well in 1980. The concentration in the other source/plume well is lower than measured in 2016. The water-level monitoring network includes 16 wells. Depth to water measured in 2017 is generally consistent with recent measurements for most wells. Water-level declines differing from long-term trends were observed in four wells. Three of these (WW-4, WW-4A, and WW-5B) are water-supply wells that experienced increases in pumping during the year. No definitive cause for the sharp decline in the fourth well (ER-5-3-2) in 2016 is known as yet. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 1

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2016. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The tritium concentration in both wells is slowly decreasing. The water-level monitoring network includes 16 wells. Depth to water measured in 2016 in all wells is consistent with recent measurements. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Securing Vehicle Charging Infrastructure

As the US electrifies the transportation sector, cyber attacks targeting vehicle charging could bring consequences to electrical system infrastructure. This is a growing area of concern as charging stations increase power delivery and must communicate to a range of entities to authorize charging, sequence the charging process, and manage load (grid operators, vehicles, OEM vendors, charging network operators, etc.). The research challenges are numerous and are complicated because there are many end users, stakeholders, and software and equipment vendors interests involved. Poorly implemented electric vehicle supply equipment (EVSE), electric vehicle (EV), or grid communication system cybersecurity could be a significant risk to EV adoption because the political, social, and financial impact of cyberattacks - or public perception of such - ripples across the industry and has lasting and devastating effects. Unfortunately, there is no comprehensive EVSE cybersecurity approach and limited best practices have been adopted by the EV/EVSE industry. There is an incomplete industry understanding of the attack surface, interconnected assets, and unsecured interfaces. Thus, comprehensive cybersecurity recommendations founded on sound research are necessary to secure EV charging infrastructure. This project is providing the power, security, and automotive industry with a strong technical basis for securing this infrastructure by developing threat models, determining technology gaps, and identifying or developing effective countermeasures. Specifically, the team is creating a cybersecurity threat model and performing a technical risk assessment of EVSE assets, so that automotive, charging, and utility stakeholders can better protect customers, vehicles, and power systems in the face of new cyber threats.

33 ADVANCED PROPULSION SYSTEMS↗

Data Summary Report for Soil and Slab Sampling at Former Building 175

Lawrence Livermore National Security (LLNS) and the U.S. Department of Energy (DOE) are in the process of returning the area where Building 175 existed to beneficial use for future site development. The completed assessment will help LLNS and DOE to outline project scope and costs associated with the removal, characterization, and disposal of materials generated when the concrete slab for the former building and any associated remaining subsurface structures are demolished. Slab removal under the Transition & Disposition process requires full screening for potential site contamination to determine appropriate future land use. Borehole locations and depths were designed to correctly assess DOE’s future liability for characterizing residual vadose zone contamination. If a residual source area is identified at depth, DOE will need to evaluate the additional cost of future subsurface cleanup (with limited access) due to planned development. This is necessary to leave the location in a “ready-to-build” status. As a result, Phase II sampling requirements may in some cases extend beyond the construction zone required for slab removal to ensure the necessary due diligence. To avoid the potential spread of contamination and/or the creation of an environmental release by impacting the integrity of known contamination areas (e.g., pit within room 102 and the east to west boundary seam), these locations were not sampled for this project. During demolition of the slab, these locations and their underlying soils should be further evaluated. The assessment was conducted in accord with the May 2022 Lawrence Livermore National Laboratory Former Building 175 Assessment Soil Sampling and Analysis Plan / Quality Assurance Plan. Thirty-six, direct-push borings were advanced, along with collecting concrete (where present) and soil samples for laboratory analyses. Thirty-two of the borings were advanced to a depth of 25 feet below ground (bgs), and four borings were advanced to a depth of 55 feet bgs. The concrete slab for former Building 175 ranged from approximately 8 inches to over two feet in thickness. Soils encountered during the investigation consisted primarily of clayey silt, with interbeds of sandy gravel and silty sand to the total depth explored of 55 feet bgs. Field photoionization detector readings – checking for volatile organic compound (VOC) vapors in soils, ranged from zero (0) to a peak of 33 parts per million at 25 feet bgs in boring PC-B175- 028. The cause for the peak reading is unknown, however, no visually discolored or odorous soils were encountered during the assessment and all VOC results were below Lawrence Livermore National Laboratory’s (LLNL’s) Soil Screening and Management Plan (SSMP) soil screening levels (SSL). Groundwater was not encountered during the assessment and is expected to occur at roughly 65 feet bgs in the project area. No metals were detected at concentrations of concern in the concrete core samples collected and analyzed. Low gross alpha and beta activity concentrations were detected in the concrete core samples collected and analyzed. The detected activity concentrations would appear to be from naturally occurring radioactive isotopes, i.e., potassium 40, present in the raw materials used to make concrete and not artificially added. Tritium was not detected above the testing laboratory's Method Detection Limit (MDL) in any of the concrete core samples collected and analyzed. The radioactive isotopes - actinium 228, bismuth 214, lead 212, lead 214, potassium 40, radium 226, radium 228, and thallium 208, were detected at low activity concentrations in the concrete core samples analyzed. Based on the detected activity concentrations, the isotopes would appear to be naturally occurring in the raw materials used to make concrete and not artificially added. Acetone – a common laboratory contaminant, was detected in nine of the soil samples collected and analyzed. Concentrations of two other volatile organic compounds (benzene and tetrachloroethene) were detected in five of the soil samples analyzed. All concentrations were below SSLs. Total petroleum hydrocarbons as diesel range organics were detected at 43.9 milligrams per kilogram (mg/kg) in the 20-foot bgs duplicate sample from boring PC-B175-007. Total petroleum hydrocarbons as motor oil were detected at 7.20 mg/kg in the 15-foot bgs routine sample from boring PC-B175-001, and at 20.7 mg/kg in the 20-foot bgs duplicate sample from boring PC-B175-007. The SSL for diesel-range TPHs is 260 mg/kg. LLNL does not have an SSL for motor oil range TPHs. No indications of a release, e.g., visibly stained, or odorous soil, were present at the boring locations. No samples collected contained polychlorinated biphenyls (PCBs) in concentrations above the laboratory reporting limit. Arsenic was detected above its SSL of 8.51 mg/kg in the 25-foot bgs routine sample collected from boring PC-B175-023. Nickel was detected above its SSL of 86.0 mg/kg in the 10-foot bgs routine sample from boing PC-B175-005, the 20-foot bgs routine sample from boring PC-B175-025, and the 25-foot bgs routine sample from boring PC-B175-034. The detected concentrations, however, were well below ten times (10x) their respective STLCs. Gross alpha and/or gross beta were detected above their respective SSL activity concentrations in three routine soil samples. Retesting (two per sample) of the samples showed that the initial reported activity concentrations were anomalous. Tritium was not detected in any of the routine or duplicate soil samples collected and analyzed during the investigation. The radioactive isotopes - actinium 228, bismuth 212 and 214, lead 212 and 214, potassium 40, radium 224, 226 and 228, thallium 208, thorium 234 and uranium, were detected at low activity concentrations in the soil samples analyzed for radioactive constituents. The detected isotopes and their associated activity concentrations are typical of those naturally occurring in the marine-type sedimentary deposits underlying the Livermore Valley. No radiological controls are necessary for the soil evaluated.

54 ENVIRONMENTAL SCIENCES↗

EMP Testing of NAE Magnetic Motor Starters

Sandia National Laboratories (SNL) performed a high-altitude nuclear electromagnetic pulse (HEMP) critical generation station component vulnerability test campaign with a focus on high-frequency, conducted early-time (E1) HEMP for the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER). This report provides vulnerability test results to investigate component response and/or damage thresholds to reasonable HEMP threat levels that will help to inform site vulnerability assessments, mitigation planning, and modeling calibrations. This work details testing of North American Electric (NAE) magnetic motor starters to determine the effects of conducted HEMP environments. Motor starters are the control elements that provide power to motors throughout a generating plant; a starter going offline would cause loss of power to critical pumps and compressors, which could lead to component damage or unplanned plant outages. Additionally, failed starters would be unable to support plant startup. Six industrial motor starters were tested: two 2 horsepower (HP) starters with breaker disconnects and typical protection equipment, two 20 HP starters with breaker disconnects, and two 20 HP starters with fused disconnects. Each starter was placed in a circuit with a generator and inductive motor matching the starter rating. The conducted EMP insult was injected on the power cables passing through the motor starter, with separate tests for the generator and motor sides of the starter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of IEC 62443 Standard Gaps for Electric Grid Substation Model Use Case

This report presents an evaluation of the IEC 62443 standards in the context of electric grid substations, as part of a collaborative effort among Sandia National Laboratories (SNL), Idaho National Laboratory (INL), and the National Renewable Energy Laboratory (NREL). The primary objective is to assess the applicability of these standards to enhance cybersecurity measures for industrial automation and control systems (IACS) within the energy sector. The evaluation identifies strengths, such as the scalability of security levels and the structured lifecycle guidance provided by IEC 62443. However, it also highlights significant gaps, including limited integration of physical security, insufficient guidance for legacy systems, and challenges in addressing emerging threats like supply chain vulnerabilities. Recommendations for refining the standards are proposed, including the need for tailored guidance for securing legacy systems, integrating physical security with cybersecurity frameworks, and enhancing interoperability across multi-vendor environments. By addressing these gaps, the IEC 62443 standards can be strengthened to ensure comprehensive cybersecurity for electric grid substations, thereby supporting the resilience and reliability of critical energy infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercialization of Pumped Storage Hydropower Technologies

Argonne National Laboratory and the National Laboratory of the Rockies were tasked by the U.S. Department of Energy’s Water Power Technology Office (WPTO) to conduct the Commercialization of Pumped Storage Hydropower Technologies study to investigate commercialization challenges faced by developers of pumped storage hydropower (PSH) projects and technologies by going beyond literature review to gather direct industry insights, lessons learned and best practices from interviews and webinars with industry specialists to create this report for PSH stakeholders and the general public. Researchers explored key challenges faced by PSH developers and innovators seeking to commercialize new technologies to improve PSH design, siting, construction, and operations. Along with highlighting challenges, the study sought to identify the best practices in developing and deploying new PSH projects and innovations. This report is designed to present insights, lessons learned, and best practices relevant to those with an interest in highlighting, informing, or advancing these PSH commercialization efforts. Along with highlighting challenges and best practices, the study sought to identify avenues by which DOE and national laboratories can help support and streamline PSH commercialization and project development processes.

13 HYDRO ENERGY↗

Microgrid Disaster Resiliency Analysis: Reducing Costs in Continuity of Operations (COOP) Planning

The electric grid serves a vital role in the supply chain of nearly all industrial and commercial organizations. A Microgrid infrastructure can provide this service and beneficial non-emergency services including a variety of generation/energy sources. To demonstrate the applicability of microgrids for energy resiliency, we present a microgrid resiliency case study for United Parcel Service’s (UPS) three separate shipping facilities. The goal, to enhance energy security, minimize cost and prevent cascading losses within other related business units. The impacts and consequences of which are quantified in this study using a Mean Failure Cost (MFC) risk assessment measure. MFC accounts for the potential loses to identified stakeholders that may result from a set of identified failures due to a set of identified threats. In this case, our study uses a method we call All Hazards Econometric System (AHES). AHES incorporates the cost of COOP using a strategy that considers the payback period of microgrid installation as compared to other energy delivery strategies.

Abercrombie, Robert K.↗

Enhanced Flight Termination System (EFTS): Flight Demonstration and Results

The Enhanced Flight Termination System (EFTS) program was initiated and propelled due to the inadvertent terminations of Global Hawk and the Strategic Target System and the NASA Inspector General's assessment letter and recommendations regarding the exploration of low-cost, lightweight space COMSEC for FTS. Additionally, the standard analog and high alphabet systems most commonly used in FTS are secure, but not encrypted. A study group was initiated to select and document a robust, affordable, reliable technology that provides encrypted FTS capability. A flight demonstration was conducted to gain experience using EFTS in an operational environment, provide confidence in the use of the EFTS components, integrate EFTS into an existing range infrastructure to demonstrate the scalability of system components, to provide a command controller that generated the EFTS waveform using an existing range infrastructure, and to provide a report documenting the results of the demonstration. The primary goal of the demonstration was to obtain operational experience with EFTS. Areas of operational experience include: mission planning, pre-flight configuration and testing, mission monitoring and recording, vehicle termination, developing mission procedures. and post mission data reduction and other post mission activities. An Advanced Medium-Range Air-to-Air Missile (AMRAAM) was selected to support the EFTS demonstration due to interest in future use of EFTS by the AMRAAM program, familiarity of EFTS by range personnel, and the availability of existing operational environment to support EFTS testing with available program funding. For demonstration purposes, the AMRAAM was successfully terminated using an EFTS receiver and successfully demonstrating EFTS. The EFTS monitoring software with spectrum analyzer and digital graphical display of aircraft, missile, and target were also demonstrated.

Tow, David↗

Trace Oxygen Measurements of Asteroid Sample Storage Desiccators

The Astromaterials Curation facility at the NASA Johnson Space Center is currently curating more than 120 g of carbonaceous asteroid Bennu material as well as over 500 mg of asteroid Ryugu [1 and 2]. These astromaterials are stored in isolating desiccators and gloveboxes under a continuous purge of pure (<1 ppm O 2 ) gaseous nitrogen. The oxygen and moisture concentrations in our OSIRIS-REx sample processing gloveboxes are continuously monitored via integrated sensors; however, our sample storage desiccators lack integrated oxygen and humidity sensors. In previous studies, we used PreSens Fibox 4 trace oxygen meters and optochemical PSt9 spot sensors to measure the oxygen concentrations in candidate asteroid sample containers that had been sealed in nitrogen; we determined that Eagle stainless steel containers inhibit the ingress of external oxygen for several weeks [3]. This optochemical sensor technology allowed us to take precise, contactless measurements within a trace range of 0 to 200 ppmv O 2 . The effectiveness of the trace oxygen sensors in our container experiments inspired us to utilize them to assess the performance of our desiccators that previously lacked trace oxygen monitoring. In this study, our goal was to determine the quality of the nitrogen purge in the isolating desiccator under normal operating conditions by measuring the trace oxygen content. Utilizing optochemical sensor technology, we determined how long the oxygen concentration takes to reach an equilibrium in the desiccator; that is, determine the rate at which the oxygen diffusion into the desiccator equals the rate at which oxygen diffuses out of the desiccator via N2 purge. Additionally, we wanted to determine the oxygen concentration at this equilibrium, the state in which our desiccators are in during normal operating conditions. We tested a custom three chamber desiccator manufactured by Germfree using a PSt9 trace oxygen sensor spot that was mounted into a ¼” National Pipe Tapered (NPT) metal flow-through cell and attached it to the desiccator exhaust. The desiccator consists of top, middle, and bottom isolating chambers. The top chamber door was opened for several minutes to simulate a sample exchange, it was sealed, and then purged ~15 Standard Cubic Feet per Hour (SCFH). Oxygen measurements were automatically recorded via the Fibox 4 trace oxygen meter in 5-minute intervals over the course of a 24-hour period. Our results indicate the desiccator reached an equilibrium value of 10-15 ppm O 2 after ~5 hours (Fig. 1). This data allows us to explore standards for purging and exchange protocols that can be applied to similar types of desiccators in Hayabusa2, OSIRIS-REx, and for sample return collections. The assessment of the internal gaseous compositions of desiccators also allows us to share with the community the N 2 environment in which many of our asteroid samples and hardware are securely curated. Future measurements will include other nitrogen flow rates and measuring the trace oxygen concentration as a function of time for the levels of the previous commercial desiccator in which the Hayabusa2 sample collection was stored. We will also analyze how long the desiccators hold N2 after being disconnected from their N2 source, an extended measurement for sample security reassurance.

Curation↗

Reimagining What's Possible: How NREL's Energy Analysis and Decision Support Capabilities are Guiding Energy Systems Transformation at Home and Around the World; NREL (National Renewable Energy Laboratory)

This engaging brochure shows examples of how NREL enables energy system transformation through robust capabilities in energy analysis and decision support. By reimagining what's possible for renewable energy, NREL contributes to the Department of Energy mission to create energy systems that are cleaner, more reliable, and more secure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of Platforms for Nuclear Science Experiments at the National Ignition Facility

When neutrons are produced in nuclear processes such as fission or fusion, they can interact with any surrounding materials, inducing radioactivity through neutron capture reactions. Neutron reactions are fundamental to many areas of nuclear science, including studies of nuclear reactors, determining the formation of matter in stars, nuclear forensics, medical radiotherapy, and assessing the safety of our nuclear stockpile. The National Ignition Facility (NIF) offers a unique opportunity to use the inertial confinement fusion platform to measure neutron reactions essential to national security or fundamental and applied science applications. A typical fusion experiment at NIF currently produces approximately 10 16 neutrons through the fusion of deuterium and tritium in a target capsule. Materials introduced into the NIF target chamber in close proximity to the capsule will undergo neutron reactions such as capture or fission, and the resultant reaction rates can be evaluated. While neutron reactions can be measured at other facilities, NIF offers unique advantages. The flux of neutrons produced (number of neutrons per square centimeter per second) is much higher than any other available neutron source due to both the small size of the NIF capsule (2-mm diameter before implosion) and the short time (roughly 100 ps) over which the neutrons are produced. This results in less target material required to perform a reaction-rate study (less than or equal to 10 16 atoms) as compared to traditional particle accelerators, which require targets that are approximately 1 mg or roughly 10 20 atoms. Also, the NIF neutron spectrum is peaked at thermonuclear (14 MeV) neutron energy, which means that nuclear reactions with nonthermal energy thresholds can be studied at NIF, whereas neutron energies at a nuclear reactor are generally insufficient for studying higher-energy neutron reactions. Several experimental configurations have been developed that enable the use of NIF fusion capsules as powerful neutron sources for nuclear reaction measurements.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Work With Us to Advance Cybersecurity for the Current and Future Grid

The energy sector is undergoing rapid change. Advanced technologies and controls, digitally connected devices, and a mix of generation sources offer increased energy reliability and security, reduced energy costs, and enhanced grid operations. But they can also carry physical and cybersecurity risks that are not yet fully understood. With deep expertise in advanced energy technologies, the National Laboratory of the Rockies is examining the cybersecurity implications of evolving systems and developing cutting-edge tools, novel approaches, and innovative research capabilities to address sector-wide challenges. Together with our partners, we are working to achieve a more secure, defensible, and reliable grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗