Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Safety Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Systems Safety Evaluation Based on System Thinking

Every engineer knows well and always considers about 'The local optimization makes the entire worst', and therefore well balanced design is required. Even the total safety has been assured by the safety design based on defense in depth concept, operational problem would occur by the chain of the fallacy of the defense in depth, then safety culture degradation, and finely organizational accident eventually happened. Probabilistic approach is required to the problem. We should answer to the question 'Safety Goal: How safe is safe enough?' for public acceptance. To respond to the operational problem and safety goal question, PRA, Probabilistic Risk Analysis is required. Further, Risk Communication should include comparison and selection among technical systems by risk and benefit analysis. Therefore, systems safety consideration is important based on systems thinking with considering following characteristics: - Goal-oriented- Optimization, Alternative proposals; - Global perspective- Bird's Eye; - Hierarchy- Isomorphism; - Life Cycle: Plan-Design-Construction-Use-Disposal; - Learning and Evolution. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Detect-and-Avoid Safety and Operational Suitability Analysis using an Electro-Optical/Infared Sensor Model

This report documents a closed-loop analysis of an DAA system using a Electro/Optical sensor model. Safety and operational suitability metrics are computed. Results show that the safety metrics are most sensitive to the angular rate accuracy of the intruder aircraft. Trade-off between safety and operationl suitability metrics is discussed. Results from this work directly inform the requirements of an electro/optical sensors for detect-and-avoid.

Detect-and-avoid↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - Cola Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation, where the ISS would be unable to react to a conjunction with a newly launched object following the end of the launch Collision Avoidance (COLA) process. Once an object is launched, there is a finite period of time required to track, catalog, and evaluate that new object as part of standard onorbit COLA screening processes. Additionally, should a conjunction be identified, there is an additional period of time required to plan and execute a collision avoidance maneuver. While the computed prelaunch probability of collision with any object is extremely low, NASA/JSC has requested that all US launches take additional steps to protect the ISS during this "COLA gap" period. This paper details a geometric-based COLA gap analysis method developed by the NASA Launch Services Program to determine if launch window cutouts are required to mitigate this risk. Additionally, this paper presents the results of several missions where this process has been used operationally.

Hametz, Mark E.↗

Detecting Mode Confusion Through Formal Modeling and Analysis

Aircraft safety has improved steadily over the last few decades. While much of this improvement can be attributed to the introduction of advanced automation in the cockpit, the growing complexity of these systems also increases the potential for the pilots to become confused about what the automation is doing. This phenomenon, often referred to as mode confusion, has been involved in several accidents involving modern aircraft. This report describes an effort by Rockwell Collins and NASA Langley to identify potential sources of mode confusion through two complementary strategies. The first is to create a clear, executable model of the automation, connect it to a simulation of the flight deck, and use this combination to review of the behavior of the automation and the man-machine interface with the designers, pilots, and experts in human factors. The second strategy is to conduct mathematical analyses of the model by translating it into a formal specification suitable for analysis with automated tools. The approach is illustrated by applying it to a hypothetical, but still realistic, example of the mode logic of a Flight Guidance System.

Miller, Steven P.↗

A Geometric Analysis to Protect Manned Assets from Newly Launched Objects - COLA Gap Analysis

A safety risk was identified for the International Space Station (ISS) by The Aerospace Corporation following the launch of GPS IIR-20 (March 24, 2009), when the spent upper stage of the launch vehicle unexpectedly crossed inside the ISS notification box shortly after launch. This event highlighted a 56-hour vulnerability period following the end of the launch Collision Avoidance (COLA) process where the ISS would be unable to react to a conjunction with a newly launched object. Current launch COLA processes screen each launched object across the launch window to determine if an object's nominal trajectory is predicted to pass within 200 km of the ISS (or any other manned/mannable object), resulting in a launch time closure. These launch COLA screens are performed from launch through separation plus I 00 minutes. Once the objects are in orbit, they are cataloged and evaluated as part of routine on-orbit conjunction assessment processes. However, as the GPS IIR-20 scenario illustrated, there is a vulnerability period in the time line between the end of launch COLA coverage and the beginning of standard on-orbit COLA assessment activities. The gap between existing launch and on-orbit COLA processes is driven by the time it takes to track and catalog a launched object, identify a conjunction, and plan and execute a collision avoidance maneuver. For the ISS, the total time required to accomplish an of these steps is 56 hours. To protect human lives, NASA/JSC has requested that an US launches take additional steps to protect the ISS during this "COLA gap" period. The uncertainty in the state of a spent upper stage can be quite large after all bums are complete and all remaining propellants are expelled to safe the stage. Simply extending the launch COLA process an additional 56 hours is not a viable option as the 3-sigma position uncertainty will far exceed the 200 km miss-distance criterion. Additionally, performing a probability of collision (Pc) analysis over this period is also not practical due to the limiting effects of these large orbit state uncertainties. An estimated upper bound for Pc for a typical spent upper stage if nominally aligned for a direct broadside collision with the ISS is only on the order of 10-6. For a smaller manned object such as a Soyuz capsule, the risk level decreases to an order of 10'8 . In comparison, the Air Force Range policy (AFI 91-217) for launch COLAs would only eliminate launch opportunities when conjunctions with objects exceed a Pc of 10'5 This paper demonstrates a conservative geometry-based methodology that may be used to determine if launch opportunities pose a threat to the ISS during the COLA gap period. The NASA Launch Services Program at Kennedy Space Center has developed this COLA gap analysis method and employed it fQr three NASA missions to identify potential ISS conjunctions and corresponding launch window closures during the 56-hour at-risk period. In the analysis, for each launch opportunity, the nominal trajectory of the spent upper stage and the orbit state of the ISS are propagated over the 56 hour period. Each time the upper stage crosses the orbit plane of the ISS, the relative radial and argument of latitude separations are calculated. A window cutout is identified if these separation differences fall within a mission-specific violation box, which is determined from the evaluation of a Monte Carlo dispersions analysis that quantifies the potential variation in the upper stage radial and argument of latitude differences. This paper details the results of these analyses and their impacts to each mission.

Hametz, Mark E.↗

Modeling interconnections of safety and financial performance of nuclear power plants, part 3: Spatiotemporal probabilistic physics-of-failure analysis and its connection to safety and financial performance

Here, this paper is a byproduct of a line of research by the authors to analyze interrelationships of safety and financial performance of nuclear power plants (NPPs). The result of this line of research is summarized in three parts: Part 1 covers a categorical review of relevant literature and the theoretical bases that support the methodological developments in Part 2. Part 2 introduces an Integrated Enterprise Risk Management (I-ERM) methodological framework to quantify the interconnections of safety and financial performance with a focus on operation and maintenance (O&M) of NPPs. Part 2 has also demonstrated the applicability and values of the I-ERM methodology through an NPP case study. This paper is Part 3, where detailed development and implementation of one of the I-ERM modules, i.e., probabilistic physics-of-failure (PPoF) analysis, and its connection with safety and financial performance is reported. In this article, the physical failure modeling for hardware components is advanced by incorporating finite element analysis (FEA) into PPoF analysis and coupling the FEA-based PPoF with the maintenance performance through a renewal process model. This article covers two scientific contributions: (i) first-of-its-kind incorporation of FEA into the PPoF model of thermal fatigue for NPP components; and (ii) advancing the interface between the PPoF analysis and the renewal process model in order to deal with spatiotemporal FEA outputs and to efficiently estimate the physical transition rates even when the PPoF outputs are dominated by success data. Through the incorporation of FEA, the resolution of the PPoF analysis is enhanced as spatiotemporal conditions such as stress and temperature can be considered explicitly instead of relying on simplified assumptions or analytical models with reduced spatiotemporal dimensions. To demonstrate an application of the FEA-based PPoF analysis and its coupling with maintenance through the renewal process model, a case study is conducted using excess letdown elbow piping in the chemical and volume control system of a Pressurized Water Reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Energy Advanced Modeling and Simulation (NEAMS) waste Integrated Performance and Safety Codes (IPSC) : gap analysis for high fidelity and performance assessment code development.

This report describes a gap analysis performed in the process of developing the Waste Integrated Performance and Safety Codes (IPSC) in support of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) Campaign. The goal of the Waste IPSC is to develop an integrated suite of computational modeling and simulation capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive waste storage or disposal system. The Waste IPSC will provide this simulation capability (1) for a range of disposal concepts, waste form types, engineered repository designs, and geologic settings, (2) for a range of time scales and distances, (3) with appropriate consideration of the inherent uncertainties, and (4) in accordance with rigorous verification, validation, and software quality requirements. The gap analyses documented in this report were are performed during an initial gap analysis to identify candidate codes and tools to support the development and integration of the Waste IPSC, and during follow-on activities that delved into more detailed assessments of the various codes that were acquired, studied, and tested. The current Waste IPSC strategy is to acquire and integrate the necessary Waste IPSC capabilities wherever feasible, and develop only those capabilities that cannot be acquired or suitably integrated, verified, or validated. The gap analysis indicates that significant capabilities may already exist in the existing THC codes although there is no single code able to fully account for all physical and chemical processes involved in a waste disposal system. Large gaps exist in modeling chemical processes and their couplings with other processes. The coupling of chemical processes with flow transport and mechanical deformation remains challenging. The data for extreme environments (e.g., for elevated temperature and high ionic strength media) that are needed for repository modeling are severely lacking. In addition, most of existing reactive transport codes were developed for non-radioactive contaminants, and they need to be adapted to account for radionuclide decay and in-growth. The accessibility to the source codes is generally limited. Because the problems of interest for the Waste IPSC are likely to result in relatively large computational models, a compact memory-usage footprint and a fast/robust solution procedure will be needed. A robust massively parallel processing (MPP) capability will also be required to provide reasonable turnaround times on the analyses that will be performed with the code. A performance assessment (PA) calculation for a waste disposal system generally requires a large number (hundreds to thousands) of model simulations to quantify the effect of model parameter uncertainties on the predicted repository performance. A set of codes for a PA calculation must be sufficiently robust and fast in terms of code execution. A PA system as a whole must be able to provide multiple alternative models for a specific set of physical/chemical processes, so that the users can choose various levels of modeling complexity based on their modeling needs. This requires PA codes, preferably, to be highly modularized. Most of the existing codes have difficulties meeting these requirements. Based on the gap analysis results, we have made the following recommendations for the code selection and code development for the NEAMS waste IPSC: (1) build fully coupled high-fidelity THCMBR codes using the existing SIERRA codes (e.g., ARIA and ADAGIO) and platform, (2) use DAKOTA to build an enhanced performance assessment system (EPAS), and build a modular code architecture and key code modules for performance assessments. The key chemical calculation modules will be built by expanding the existing CANTERA capabilities as well as by extracting useful components from other existing codes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of critical experiment correlations using the sampler sequence within scale 6.2 - 14602

The validation of neutron transport methods used in nuclear criticality safety analyses is required by consensus American National Standards Institute/American Nuclear Society (ANSI/ANS) standards. In the last decade, there has been an increased interest in correlations among critical experiments used in validation that have shared physical attributes and which impact the independence of each measurement. The statistical methods included in many of the frequently cited guidance documents on performing validation calculations incorporate the assumption that all individual measurements are independent, so little guidance is available to practitioners on the topic. Typical guidance includes recommendations to select experiments from multiple facilities and experiment series in an attempt to minimize the impact of correlations or common-cause errors in experiments. Recent efforts have been made both to determine the magnitude of such correlations between experiments and to develop and apply methods for adjusting the bias and bias uncertainty to account for the correlations. This paper describes recent work performed at Oak Ridge National Laboratory using the Sampler sequence from the SCALE code system to develop experimental correlations using a Monte Carlo sampling technique. Sampler will be available for the first time with the release of SCALE 6.2, and a brief introduction to the methods used to calculate experiment correlations within this new sequence is presented in this paper. Techniques to utilize these correlations in the establishment of upper subcritical limits are the subject of a companion paper and will not be discussed here. Example experimental uncertainties and correlation coefficients are presented for a variety of low-enriched uranium water-moderated lattice experiments selected for use in a benchmark exercise by the Working Party on Nuclear Criticality Safety Subgroup on Uncertainty Analysis in Criticality Safety Analyses. The results include studies on the effect of fuel rod pitch on the correlations, and some observations are also made regarding difficulties in determining experimental correlations using the Monte Carlo sampling technique. (authors)

42 ENGINEERING↗

Subgroup analysis of efficacy and safety of orantinib in combination with TACE in Japanese HCC patients in a randomized phase III trial (ORIENTAL)

A randomized, phase III trial of orantinib in combination with transcatheter arterial chemoembolization (TACE) did not prolong overall survival (OS) over placebo (ORIENTAL study). A subgroup analysis was conducted to evaluate the efficacy and safety of orantinib in Japanese patients enrolled in the ORIENTAL study. The data of Japanese patients from this study were analyzed. The overall survival (OS), time to progression (TTP), and time to TACE failure (TTTF) were compared between orantinib and placebo arms using stratified log-rank test. Since TTTF in patients with Barcelona Clinic Liver Cancer stage B (BCLC-B) showed favor outcome in this study, the OS and TTTF according to BCLC staging system were also analyzed. The subgroup analysis consisted of 219 and 213 patients in the orantinib and placebo arms. Median OS was 32.5 vs 33.0 months (p = 0.906), median TTP was 4.7 vs 3.1 months (p = 0.011), and median TTTF was 25.3 vs 18.2 months (p = 0.160) in the orantinib and placebo groups, respectively. Patients with BCLC-B in the orantinib and placebo groups showed a median OS of 33.7 and 30.1 months, respectively (p = 0.260), while the corresponding median TTTF were 25.3 and 14.0 months (p = 0.125). The Japanese population safety profile was similar to all over population in the ORIENTAL study. No significant differences were observed in the OS and TTTF though the TTP was significantly improved in the orantinib arm. The OS and TTTF showed a tendency to be prolonged following orantinib treatment of Japanese HCC patients with BCLC-B in the ORIENTAL study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Guidance for Designing Safety into Urban Air Mobility: Hazard Analysis Techniques

The national airspace system is exceptionally safe, specifically in terms of commercial air traffic operations. The introduction of innovative aircraft (such as electric vertical takeoff and landing vehicles) undergoing novel operations (such as for an urban air passenger carrying mission) is a potential disruptor to the current means of regulating and ensuring the safety of air travel. The aviation industry and associated regulatory bodies are adapting their approaches to assuring system safety to enable these new paradigms. However, any system safety analysis requires that a hazard assessment be performed. In this work, we consider the Functional Hazard Assessment (FHA) and Systems Theoretic Process Analysis (STPA) techniques for hazard assessment and evaluate whether they can be used in a complementary fashion for regulatory approval purposes. We perform an FHA and an STPA on an electric vertical takeoff and landing (eVTOL) vehicle undergoing an urban air mobility (UAM) passenger carrying reference scenario and present excerpts of this analysis. We then draw parallels between the techniques and highlight elements where they naturally reinforce to each other’s results, specifically in the consideration of hazard severity with respect to flight phases, the design of hazard mitigations, and the applicability of the results to all types of regulatory approvals (e.g., type certification, operational approval, and crew training).

Mallory S Graydon↗

Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations

This LWRS research seeks to assist in breaking the impasse which has precluded digital safety system upgrades by generating and demonstrating a process and related business case tool to enable a Business Case Analysis (BCA). The purpose of a BCA is to show such upgrades can be economically justified. This BCA methodology first systematically establishes a forecast of expected lifecycle costs for I&C identified for upgrade by: • Definitively bounding the scope of current I&C systems envisioned for upgrade. • Collecting historical labor and material usage data that bound cost contributors related to the systems to be upgraded. • Synthesizing and analyzing the data to establish lifecycle cost forecasts for the current systems. In collaboration with engineers familiar with the attributes of the digital equipment to be used in the upgrade and how it is envisioned to be applied, cost savings categories and expected savings in those categories are then identified and applied using the analysis tools developed for this purpose. The result is an estimate NPV of savings enabled by the upgrade. This includes both direct cost savings (e.g., surveillance labor costs) as well as cost avoidance items (e.g., inventory carrying costs). Finally, when utility-provided digital upgrade costs estimates are included, the resultant BCA provides an NPV for the upgrade project. Development of a useful BCA methodology requires a real-world basis. With the cooperation of Exelon Generation (“Owner”), an Exelon-owned 2-Unit BWR Station (“Station”) was used as the foundation for this research. Exelon is pursuing a digital upgrade of current, first-echelon, safety-related I&C systems at these units, including the following: • Reactor Protection System (RPS) • Nuclear Steam Supply Shutoff System (N4S) • Emergency Core Cooling Systems (ECCS) • Anticipated Transient Without Scram (ATWS) Mitigation System

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic risk analysis toward cost-effective 3S (safety, safeguards, security) implementation

Probabilistic Risk Analysis (PRA) has been introduced for several decades in safety and nuclear advanced countries have already used this methodology in their own regulatory systems. However, PRA has not been developed in safeguards and security so far because of inherent difficulties in intentional and malicious acts. In this paper, probabilistic proliferation and risk analysis based on random process is applied to hypothetical reprocessing process and physical protection system in nuclear reactor with the Markov model that was originally developed by the Proliferation Resistance and Physical Protection Working Group (PRPPWG) in Generation IV International Framework (GIF). Through the challenge to quantify the security risk with a frequency in this model, integrated risk notion among 3S to pursue the cost-effective installation of those countermeasures is discussed in a heroic manner.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ares I-X Range Safety Simulation Verification and Analysis Independent Validation and Verification

NASA s Ares I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. To obtain approval for launch, a range safety final flight data package was generated to meet the data requirements defined in the Air Force Space Command Manual 91-710 Volume 2. The delivery included products such as a nominal trajectory, trajectory envelopes, stage disposal data and footprints, and a malfunction turn analysis. The Air Force s 45th Space Wing uses these products to ensure public and launch area safety. Due to the criticality of these data, an independent validation and verification effort was undertaken to ensure data quality and adherence to requirements. As a result, the product package was delivered with the confidence that independent organizations using separate simulation software generated data to meet the range requirements and yielded consistent results. This document captures Ares I-X final flight data package verification and validation analysis, including the methodology used to validate and verify simulation inputs, execution, and results and presents lessons learned during the process

Merry, Carl M.↗

Ares I-X Range Safety Simulation Verification and Analysis IV and V

NASA s ARES I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. NASA generated a Range Safety (RS) flight data package to meet the RS trajectory data requirements defined in the Air Force Space Command Manual 91-710. Some products included in the flight data package were a nominal ascent trajectory, ascent flight envelope trajectories, and malfunction turn trajectories. These data are used by the Air Force s 45th Space Wing (45SW) to ensure Eastern Range public safety and to make flight termination decisions on launch day. Due to the criticality of the RS data in regards to public safety and mission success, an independent validation and verification (IV&V) effort was undertaken to accompany the data generation analyses to ensure utmost data quality and correct adherence to requirements. Multiple NASA centers and contractor organizations were assigned specific products to IV&V. The data generation and IV&V work was coordinated through the Launch Constellation Range Safety Panel s Trajectory Working Group, which included members from the prime and IV&V organizations as well as the 45SW. As a result of the IV&V efforts, the RS product package was delivered with confidence that two independent organizations using separate simulation software generated data to meet the range requirements and yielded similar results. This document captures ARES I-X RS product IV&V analysis, including the methodology used to verify inputs, simulation, and output data for an RS product. Additionally a discussion of lessons learned is presented to capture advantages and disadvantages to the IV&V processes used.

Tarpley, Ashley↗

Model-based analysis of thromboxane B{sub 2} and prostaglandin E{sub 2} as biomarkers in the safety evaluation of naproxen

The assessment of safety in traditional toxicology protocols relies on evidence arising from observed adverse events (AEs) in animals and on establishing their correlation with different measures of drug exposure (e.g., C{sub max} and AUC). Such correlations, however, ignore the role of biomarkers, which can provide further insight into the underlying pharmacological mechanisms. Here we use naproxen as a paradigm drug to explore the feasibility of a biomarker-guided approach for the prediction of AEs in humans. A standard toxicology protocol was set up for the evaluation of effects of naproxen in rat, in which four doses were tested (7.5, 15, 40 and 80 mg/kg). In addition to sparse blood sampling for the assessment of exposure, thromboxane B{sub 2} and prostaglandin E{sub 2} were also collected in satellite groups. Nonlinear mixed effects modelling was used to evaluate the predictive performance of the approach. A one-compartmental model with first order absorption was found to best describe the pharmacokinetics of naproxen. A nonlinear relationship between dose and bioavailability was observed which leads to a less than proportional increase in naproxen concentrations with increasing doses. The pharmacodynamics of TXB{sub 2} and PGE{sub 2} was described by direct inhibition models with maximum pharmacological effects achieved at doses > 7.5 mg/kg. The predicted PKPD relationship in humans was within 10-fold of the values previously published. Moreover, our results indicate that biomarkers can be used to assess interspecies differences in PKPD and extrapolated data from animals to humans. Biomarker sampling should be used systematically in general toxicity studies. - Highlights: • Prediction of a drug's safety profile from preclinical protocols remains challenging. • Pharmacokinetic measures of safe exposure (e.g., AUC) ignore the role of biomarkers. • PKPD relationships enable the evaluation of adverse events in a mechanistic manner. • Major differences exist between rats and humans in the effects of naproxen on TXB{sub 2}. • A biomarker-guided approach may facilitate the prediction of adverse events in humans.

60 APPLIED LIFE SCIENCES↗