Shielding Analysis for Spallation Neutron Source Second Target Station Water Cooling Tanks
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract Not Provided
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe remediation of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites, and to provide information for designing long-term monitoring of the sites. The monitoring program in 2018 included five stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center. Stations 401 and 403 are located on the northern and southeastern perimeter fence lines, respectively, of the Clean Slate III site. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II. The stations are generally downwind of the contaminated areas during either northwesterly or southerly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403. Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Monitoring at TTR in calendar year (CY) 2018 provided surveillance of both ambient conditions, and ground disturbance associated with remediation activities at Clean Slate II and III. The first half of CY2018 data from Stations 404 and 405 at Clean Slate II were collected during remediation activities at that site, and data collected during the final third of the year at Stations 401 and 403 at Clean Slate III coincided with remediation work at the site. Ambient conditions prevailed at Station 400 throughout the year. Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM 10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 kilometers per hour (km/hr) (20 miles per hour [mph]). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time at the sites. Ground disturbing remediation activities were carried out at Clean Slate II from October 31, 2017, until July 26, 2018. Station 404 is located closest to the remediation area and is downwind of the area when winds are from the south. By late November, analysis of dust from the air sampler at Station 404 registered increases in plutonium-239+240 ( 239+240 Pu) concentrations. Peak plutonium concentrations, accompanied by elevated gross alpha concentrations and the detection of americium-241 ( 241 Am) by gamma spectroscopy, occurred between March and May 2018. During spring and early summer of 2018, elevated radionuclide concentrations were also measured in dust collected from the air sampler at Station 405, which is more than twice the distance from the remediation activity as Station 404. A minor but sustained increase in gross alpha concentration of suspended dust collected at Stations 400, 401, and 403 was also observed starting in May 2018 and continuing into August. Stations 401 and 403 are approximately 4.8 to 6.4 km (three to four miles) from Clean Slate II and Station 400 is approximately 13 km (eight miles) from that site. The radionuclide content of material that saltated into the passive Big Spring Number Eight (BSNE) traps during the Clean Slate II remediation period increased in both the traps facing toward and away from the fenced contamination area at Station 404, with the largest increases in concentration (almost five times the previous 239+240 Pu concentration) observed in the traps facing the fenced area. The radionuclide concentration in material in the trap facing away from the fence more than doubled from that measured in 2017. A similar increase was observed for the saltation trap facing away from the fenced area at Station 405, although no increase was observed for material captured in the trap facing the fenced area. Particles ranging in size from 50 to 500 µm generally move by saltation processes and are not expected to significantly contribute to dose for someone breathing in the standard respiratory zone for adult humans (1.5 to 1.7 m [4.9 to 5.6 ft] above ground level) because they are too large to be entrained in the air as suspended dust. Remediation activities at Clean Slate III began on September 5, 2018, and continued until a brief hiatus started on December 20, 2018. Although Station 401 is much closer to the remediation area than Station 403, the first increase in gross alpha and 239+240 Pu concentrations was noted in dust from filters collected at Station 403 in early November 2018. The highest radionuclide concentrations of 2018 at the Clean Slate III stations were recorded in air samples taken from Stations 401 and 403 in late December 2018 and these concentrations were comparable between the two station locations. Gamma rate data measured by the PICs was slightly higher than the annual average at Stations 401 and 403 after remediation activities began, but no single measurement was outside of the range observed in 2018 prior to remediation activities. No increase in radionuclide concentration was observed for the Clean Slate III remediation time period on air filters collected from the other stations. Radiological monitoring at Station 400—which is located at the ROC, and therefore the closest regularly staffed work location to the Clean Slate sites—recorded a higher mean gross alpha activity from dust collected on air sampler filters than in previous years. The individual biweekly air filters yielded measurements of gross alpha that were at or below the mean plus one standard deviation measured in CY2017, except for the period from April 25, 2018, through September 12, 2018. Nonetheless, gamma spectroscopy of all air filters from Station 400 identified only naturally occurring radionuclides, with no detection of americium-241 ( 241 Am) (which is used as an indicator of plutonium-241[ 241 Pu]). Alpha spectroscopy of selected air filters collected at Station 400 did not detect plutonium-238 ( 238 Pu) or 239+240 Pu above the analytical detection limit. Gross beta and gamma exposure rate data were comparable to data from regional CEMP stations. No saltation traps are deployed at Station 400. Considering the ambient monitoring periods during CY2018, the monitoring stations adjacent to the Clean Slate sites recorded above-background 238 Pu and 239+240 Pu concentrations (SNL, 1998; Turner et al., 2003) in samples collected by passive saltation traps and on selected air filters. These observations were consistent with previous years and indicated that radionuclide movement occurred under ambient conditions by processes of both saltation and suspension. The presence of radionuclides in all saltation traps, both upwind and downwind of the fenced contamination areas, was consistent with previous radiological survey results (EG&G, 1979) that show lower concentration radiologically contaminated material dispersed outside the fenced area. Although 239+240 Pu concentrations in the air filter samples were sometimes orders of magnitude higher than background, the concentrations were below risk-based action levels defined for an industrial area worker scenario (U.S. DOE, 2014). The interception of airborne dust with above-background radionuclide concentrations demonstrates that dispersal processes are continuing. Strong winds are the driver for both suspension and saltation of dust and soil. The recorded wind speed and PM10 during remediation activities at Clean Slate II and III identified discrete wind events lasting approximately five to eight hours each, which accounted for the greatest PM 10 concentrations at the monitoring stations. These events captured the effect of winds from the northwest and from the south. The observed differences in dust loading and radionuclide concentrations for the monitoring stations when they were either upwind or downwind of the contamination area identify the remediation area as a source of plutonium contaminated dust. The increase in concentration of radionuclides in airborne dust during the remediation activities, compared with measurements under previous ambient conditions (mean 239+240 Pu concentrations during remediation activities are approximately nine to 40 times higher compared to pre-remediation concentrations, depending on monitoring station), highlights the impact of land disturbance on wind-borne contaminant transport from the Clean Slate test areas. The meteorological and particulate matter monitoring indicated that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation occurred under ambient conditions and accelerated when the sites were disturbed. The 239+240 Pu alpha spectroscopy results indicated that airborne concentrations during remediation activities ranged from 2 × 10-16 to 380 × 10-16 µCi/ml. These results can be compared to the derived air concentration limit for 239 Pu of 6 × 10-11 µCi/ml for occupational workers contained in Code of Federal Regulations 10 CFR 835, Occupational Radiation Protection. Even though the air sampling results document an increase in concentration during remediation activities, the observed concentrations are less than 0.06 percent of the occupational limit. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure.
Desert Research Institute (DRI) conducted a field assessment of the potential for radionuclide-contaminated soil to be transported from the Plutonium Valley Dispersion Sites Contamination Area (CA) because of both wind and storm water runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Plutonium Valley Dispersion Sites Corrective Action Unit (CAU) 366. The DRI task was intended to identify the likely mechanism(s) of transport and determine the meteorological conditions that might cause the movement of radionuclide-contaminated soils. The emphasis of the work was on collecting sediment transported by channelized storm runoff and measuring airborne dust concentrations and associated wind conditions. These data will facilitate an appropriate post-closure monitoring program. In 2011, DRI installed meteorological monitoring stations north and south of the Plutonium Valley CA—known as Pu Valley North and Pu Valley South, respectively—as well as a fluvial sediment sampling station within the CA. Since installation, temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, volumetric soil moisture content, and airborne particulate concentrations have been collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters were recorded for each 10-minute interval. The sediment sampling station included an automatically activated sampling pump with collection bottles for suspended sediment, which was activated when sufficient flow was present in the channel, and passive traps for bedload material that was transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2019. During the FY2019 (October 1, 2018, through September 30, 2019) reporting period, the warmest month was July and the coldest month was February. Monthly total solar radiation was highest in June or July (depending on the station) and lowest in December. Monthly mean wind speeds were highest during February. At the Pu Valley North station, winds were commonly northerly, northwesterly, and southerly. At the Pu Valley South station, the wind direction was more variable and winds frequently came from most directions, excluding westerly and northwesterly winds. Winds above 15.0 miles per hour (mph) (24.1 kilometers per hour [km/hr]) were frequently southerly at both stations, and less-frequent strong winds were northerly (at the Pu Valley South station) or northwesterly (at the Pu Valley North station). Monthly average relative humidity ranged from 18 percent in August to 62 percent in January and February. Monthly total precipitation ranged from zero at both stations in September to 2.23 inches (in) (56.6 millimeters [mm]) during February at the Pu Valley South station and 2.09 in (53.1 mm) during March at the Pu Valley North station. From October 1, 2018, through September 30, 2019, the total precipitation was 8.23 in (209 mm) and 8.15 in (207 mm) at the Pu Valley South and Pu Valley North stations, respectively. The largest daily precipitation totals of 1.46 in (37.1 mm) and 1.14 in (29.0 mm) occurred at the Pu Valley South and Pu Valley North stations, respectively, on March 6, 2019. However, the ISCO autosampler was not activated during any storm event in FY2019 because the channel water depth measurements were insufficient for suspended sediment sample collection. Additionally, because no significant flow through the channel was indicated, no bedload samples were collected. Light breezes of 0.0 mph to 5.0 mph (0.0 km/hr to 8.0 km/hr) occurred most frequently (approximately 55 percent to 57 percent of the time). The frequency of occurrence diminished exponentially as the wind speed increased such that winds in excess of 25.0 mph (40.2 km/hr) occurred less than 0.01 percent of the time. Winds in excess of 15.0 mph (24.1 km/hr) were most commonly southerly, which is likely controlled by the topography of the valley because topographic highs define the east and west sides of the valley and converge toward the north.The concentrations of PM2.5 (particulate matter with an aerodynamic diameter ≤2.5 micrometers [μm]) and PM10 (particulate matter with an aerodynamic diameter ≤10 μm) in the air generally increase as wind speed increases. However, the particle profiler at the Pu Valley South station regularly malfunctioned, which resulted in poor data quality and a limited period of record within FY2019. Therefore, discussion of the annual dust observations is mostly limited to the Pu Valley North station. At the Pu Valley North station, significant increases in windblown dust concentrations were observed when wind speeds exceeded 15.0 mph (24.1 km/hr), especially during southerly winds. When all wind speeds were considered, high dust concentrations at the Pu Valley North station were frequently associated with northerly, northwesterly, or southerly winds. The majority of PM10 transport at the Pu Valley North station occurred when winds were blowing northerly and northwesterly because of the high frequency of winds up to 15.0 mph (24.1 km/hr). The ratio of PM10 to PM2.5 is a qualitative indicator of the proximity of dust sources to the observation point and the values of the PM10 to PM2.5 ratio tend to be higher nearer to the source. The PM10 to PM2.5 ratio increased from 1.2 to 2.8 with higher wind speeds at the Pu Valley North station. This increase suggests that some locally sourced PM10 was present in the air when local winds exceeded 15.0 mph (24.1 km/hr). Local dust suspension is interpreted during major dust events when peaks in the PM10 to PM2.5 ratio occur simultaneously with the maximum wind speed and the peak PM10 concentration. Analysis of the five major dust events in FY2019 revealed that northerly winds were dominant in three events and southerly winds were dominant in two events. Local suspension of dust within Plutonium Valley is suspected to have occurred during two of the five major events (April 9, 2019, and September 28 to 29, 2019), and a nonlocal source of dust is presumed for the three other major dust events (October 14, 2018; May 16, 2019; and September 2, 2019). The three suspected regional dust transport events exhibited winds that typically did not exceed the 15.0 mph (24.1 km/hr) wind speed threshold for local dust transport and featured PM10 to PM2.5 ratios that indicate large-scale regional dust transport. Similar event characteristics (e.g., wind speed and PM10 concentration) were observed at air monitoring stations approximately 70 mi (113 km) to the northwest within the Tonopah Test Range (TTR). Therefore, these three regional events may not reflect transport from the Plutonium Valley CA. Routine monitoring of meteorological and hydrologic parameters at Plutonium Valley has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition has been completed, and both Pu Valley North and Pu Valley South meteorological stations within Plutonium Valley as well as the ISCO autosampler station within the CA were removed on October 14, 2019.
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]), implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range). This operation resulted in radionuclide-contaminated soils at the Double Tracks site and Clean Slate I, II, and III sites. This report documents observations made during ongoing monitoring of radiological, meteorological, and dust conditions at stations installed adjacent to the Clean Slate sites and at the TTR Sandia National Laboratories (SNL) Range Operations Center (ROC). The primary objective of the monitoring effort is to support the DOE Environmental Management Nevada Program (EM NV) in the safe cleanup of the environmental legacy of nuclear device development and testing by determining if wind blowing across the Clean Slate sites is transporting particles of radionuclide-contaminated soil beyond the physical and administrative boundaries of the sites. The monitoring program underwent a significant change during 2017 with the decommissioning of one monitoring station and the establishment of three new stations. Station 400, located within TTR Area 3 and near the ROC, monitors conditions near the local workforce center and was in operation the full calendar year. Stations 401 and 403 are located on the northwest and southeast perimeter fence lines, respectively, of the Clean Slate III site. Station 401 operated throughout 2017, whereas Station 403 began operation at the end of April 2017. Stations 404 and 405 are along the northern and eastern boundary fence, respectively, at Clean Slate II and both began data collection at the end of April 2017. Also at the end of April, the Clean Slate I monitoring site, Station 402, was decommissioned. The stations are located to be generally downwind of the contaminated areas during either north-northwesterly or south-southeasterly winds, which are the predominant wind directions. The stations—which are similar in design to the Community Environmental Monitoring Program (CEMP) stations operating at locations surrounding the Nevada National Security Site and TTR—include meteorological instruments and continuous-flow, low-volume air samplers. Three pressurized ionization chambers for measuring gamma energy are in use at Stations 400, 401, and 403 (formerly at 402). Saltation sensors and saltation traps are deployed at the stations adjacent to the Clean Slate sites. Detailed meteorological data are recorded on data loggers, with periodic uploads via a satellite system to the Western Regional Climate Center (WRCC) at Desert Research Institute (DRI), to monitor instrument and site conditions. Air filter samples are collected every two weeks and the deposits in the saltation traps are collected when a sufficient sample mass for analysis has accumulated (generally a six- to eight-month interval). Dust transport by suspension and saltation is strongly dependent on wind speed. Concentrations of PM10 (particulate matter of aerodynamic diameter ≤10 micrometers [μm], a size fraction of small particles that are suspended in the air and can be easily inhaled) remain low until winds exceed approximately 32 km/hr (20 mph). Saltation particle counts also increase above the same general threshold wind speed. Wind speeds in excess of 32 km/hr (20 mph) occur less than three percent of the time. High winds are associated with two predominant directions: north-northwest and south. In 2017, the very highest winds were from the north, but all winds above 40 km/hr (25 mph) were approximately evenly split between south and northwest directions. The low-volume air samplers collect total suspended dust, and saltating particles are captured by the passive saltation traps, both for radiological analysis. Radionuclide monitoring at the ROC in TTR Area 3 (Station 400) found natural background levels of gross alpha and gross beta radiation. Similar background levels were found on filter samples analyzed using gamma and alpha spectroscopy. The gamma exposure rate data from pressurized ionization chambers (PIC) are comparable to those from the regional CEMP stations. Plutonium concentrations above background values were measured during 2017 from soil samples collected in passive saltation traps and on select air filters from the monitoring stations adjacent to the Clean Slate sites. The background for soils in the region is assumed to be 0.014 pCi/g plutonium-239+240 ( 239+240 Pu) as measured by Turner et al. (2003), whereas the background concentration of suspended 239+240Pu is assumed to be 9.5 x 10 -19 μCi/ml, which was determined by continuous air monitoring at the TTR airport in 1996 and 1997 (SNL, 1998). Background concentrations are exceeded by one to four orders of magnitude by the majority of samples from Clean Slate I, II, and III. The gross alpha and gross beta measurements of the air filters are also generally higher than those measured at the regional CEMP stations, although the gamma exposure rates determined by the PICs located at Clean Slate I and III are similar to CEMP measurements. The highest radionuclide concentrations of suspended dust are associated with individual filter samples from Clean Slate II Station 404 and Clean Slate III Station 401. Both of the stations are downwind of their respective sites during southerly winds, but they are also geographically closer to the highly contaminated detonation areas than the other monitoring stations. Considering all the analyzed samples, the 239+240Pu concentrations are generally higher for the Clean Slate II samples compared with those from Clean Slate III. The highest gross alpha and gross beta results are also observed for the Clean Slate II stations. The highest radionuclide concentrations are measured on the smaller (≤63 μm) saltation-sized particles and particulate matter collected downwind of each site. Nonetheless, traps oriented to collect dust moving toward the contamination areas also had plutonium concentrations significantly above background values, which is consistent with observations of low-level contamination dispersed beyond the fenced area. All the observed 239+240 Pu concentrations are below the risk-based action level (25 millirem per year, equivalent to a 239+240 Pu concentration of 4,120 pCi/g for an industrial worker scenario; U.S. DOE, 2014). The meteorological and particulate matter monitoring indicate that conditions for wind-borne contaminant movement exist at the Clean Slate sites, and that transport of radionuclide-contaminated soil by both suspension and saltation is occurring. The Corrective Action Unit (CAU) closure strategy uses a risk-based approach, whereby acceptable contaminant concentrations are determined as a function of anticipated human exposure. This strategy is consistent with the fence lines at the Clean Slate sites encircling areas of higher concentration and the observed presence of lower concentrations of contamination outside the fences.
Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user's fueling experience.
The primary objective of this study was to analyze the spatial variability of temperature and relative humidity across Kansas (KS) and Oklahoma (OK) for sparse and dense networks by comparing data from (1) the Surface Meteorological Observing System (SMOS) installations at the Atmospheric Radiation Measurement (ARM; Peppler et al. 2007) Program's Southern Great Plains site and (2) the Oklahoma Mesonet (OKM; McPherson et al. 2007). Given the wealth of observations available from these networks, this study provided the unique opportunity to determine, within a quantifiable statistical limit, an optimal distance between stations deployed for observation of the climatological values of temperature and relative humidity. Average distances between a given station and its closest neighboring station for the ARM SMOS ({approx} 70 km) and the OKM ({approx} 30 km; Brotzge and Richardson 2003) networks provided an excellent framework for comparisons of sparse and dense observations (Figure 1). This study further lays groundwork for a future investigation to determine the necessary spacing between observations for initialization of gridded numerical models. The spatial variability of temperature and relative humidity was examined over KS and OK by comparing observations between station pairs located in three primary domains: (1) a sparse domain in KS, consisting only of ARM SMOS stations; (2) a dense domain centered in northern OK, consisting of both ARM SMOS and OKM stations; and (3) a dense domain centered in central OK, also consisting of both ARM SMOS and OKM stations (Figure 2). In addition, the ARM SMOS stations in OK were utilized to create two secondary sparse domains. Before the observations were compared, quality control (QC) beyond the standard ARM range test was added through implementation of tighter range tests specified by data quality objectives (DQOs). Furthermore, instances of poor-quality data were removed from the data set on the basis of ARM data quality reports (DQRs). Finally, to account for spatial differences in terrain, temperature observations were corrected to mean sea level by using a standard lapse rate of 6.5 C km{sup -1} and the elevation of each observing station. For the comparison, a central station was chosen in each domain. Observations during the time period 2004-2006 from each of the other stations within a respective domain were compared to those from this central station. The Pearson correlation coefficient ({rho}) and root-mean-square difference (RMSD) were the statistics used to quantify the relationship between station pairs. For each domain, the {rho} and RMSD values were plotted against the distance separating each station pair, and a least-squares (LS) regression line was fitted to the values. The regression slopes and intercepts were compared between the various domains. The results of this analysis demonstrated positive correlations between all individual station pairs for both temperature and relative humidity. In addition, the {rho} and RMSD values for both temperature and relative humidity exhibited, in general, a linear relationship with distance from a central station. The calculated slope and intercept values were comparable across most domains, and spatial differences in temperature were smaller than those for relative humidity. The findings suggest that although the sparse networks studied might provide an accurate spatial representation for climatological values of temperature and relative humidity over the specific distances between stations, the relative importance of the temperature and relative humidity observations is a critical consideration in network design.
On April 24, 1957, the Atomic Energy Commission (AEC) (now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley northeast of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DOD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a non-nuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Various radiological surveys were performed in the area and in 2007, the DOE expanded the demarked Contamination Area (CA) by posting signs 200 to 400 ft (60 to 120 m) outside of the original fence. Plutonium in soil attaches preferentially to smaller particles (Tamura, 1985; Friesen, 1992; Murarik et al., 1992; and Misra et al., 1993). Therefore, redistribution of soil particles by wind (dust) and water are the mechanisms most likely to transport plutonium beyond the boundary of the Project 57 CA. Monitoring was implemented in 2011 by Desert Research Institute (DRI) to determine if radionuclide contamination was detectable in samples of airborne dust and to characterize meteorological and environmental parameters that influence dust transport. Initially, two monitoring stations consisting of radiological, meteorological, and dust sampling equipment were installed near the southeast and northeast corners of the CA. In January 2015, the original monitoring stations were dismantled and moved farther to the west along the CA boundary. This move was made to place the monitoring stations downwind of ground zero and the High Contamination Area (HCA) during the dominant northerly and southerly winds. Samples of particles suspended in the air are collected every two weeks and submitted for laboratory assessments of gross alpha and gross beta radioactivity, and for determinations of gamma-emitting radionuclides. In calendar year (CY) 2017, the mean gross alpha concentration at monitoring station P57-4 was approximately 4.25 times the value at monitoring station P57-3. In CY2015 and CY2016, the difference in mean gross alpha concentration at the two stations was approximately 1.5. The mean gross alpha concentrations at P57-3 and P57-4 were approximately 1.9 and 7.9 times, respectively, the mean gross alpha concentrations at the surrounding Community Environmental Monitoring Program (CEMP) stations. The minimum gross alpha concentrations reported for the Project 57 stations are in the range of the minimum values observed at the CEMP stations. However, maximum gross alpha concentrations are greater than the maximum concentrations observed at the surrounding CEMP stations. Gamma spectroscopy analyses resulted in the detection of seven radionuclides. Except for americium-241 (Am-241), all reported radionuclides occur naturally in the environment. The Am-241 detection by gamma spectroscopy was confirmed by alpha spectroscopy. During each quarter of CY2017, four suspended particulate matter samples were selected for alpha spectroscopy analysis. Two were selected each quarter from the regular biweekly samples collected at each of the two monitoring stations. Of the eight samples from P57-3, one was reported to have plutonium-238 (Pu-238) above the minimum detectable activity (MDA) and five were reported to have plutonium 239/240 (Pu-239/240) above the MDA. Of the eight samples from P57-4, three were reported to have Pu-238 above the MDA and six were reported to have Pu-239/240 above the MDA. Soil material is also transported by saltation, which is a wind driven phenomena that bounces sand-sized soil particles across the land surface because they are too heavy to be suspended in the air. Samples of particles transported by saltation were collected downwind and upwind of the CA at both monitoring stations in May 2017 after a 190-day deployment and again in September 2017 after a 114-day deployment. Mass of the saltation samples was determined after oven drying. The September sample had greater mass than the May sample. The same relationship was observed for the suspended particulate matter samples during periods of saltation sample collection. The difference in the collected mass appears to be because of the amount of soil moisture. Higher soil moisture exerts additional isotopic bonds between soil particles and water molecules, and between water molecules that envelop soil particles, making it more difficult for wind to raise the particles as dust. In general, samples collected from saltation traps facing south contained more material than samples collected from traps facing north. This suggests that although saltation material may have been moving back and forth in conjunction with the two dominant wind directions, there was a net trend for saltation material to be transported toward the north. Radiological analyses of the saltation samples show that the smaller particle size faction (<63 μm) generally produced the highest activity levels of Am-241, Pu-238, and Pu-239/240. In general, the isotope activity levels decreased as the particle size increased. These results are consistent with the expectation that the greatest potential for transport of radiological contamination is with the smaller particles. Thermoluminescent dosimeters (TLDs) indicated that the average annual external radioactivity dose at the monitoring stations is slightly higher than the dose determined at the surrounding CEMP stations, but approximately half of the estimated national average dose received by the general public from exposure to natural sources. The TLDs at the Project 57 monitoring stations are exposed to both natural sources (terrestrial and cosmic) and radioactive releases from the Project 57 CA. Winds in excess of approximately 15 mph (24 km/hr) begin to generate dust movement by saltation or suspension, as determined by the monitoring instruments. Saltated particles, PM10 (i.e., inhalable dust), and PM2.5 (i.e., fine particulate dust) exhibit an approximately exponential increase with increasing wind speed. The greatest concentrations of dust occurred for winds exceeding 20 mph (32 km/hr). When the wind/dust analysis was performed for winds separated into the dominant northerly and southerly wind directions, it was evident that the northerly winds generated the higher PM10 concentrations and had the dominate influence on the PM10 concentration determined for all wind speeds when all wind directions were evaluated together. During the year, winds in excess of 20 mph (32 km/hr) occurred approximately one percent of the time. Although winds sufficient to generate dust occur at the Project 57 site, they are infrequent and of short duration. A preliminary assessment of individual wind events suggests that dust generation in response to specific wind conditions is highly variable. Wind speeds that would be expected to generate noticeable dust may not do so in every instance. Additionally, saltation transport in response to wind conditions was less common than expected. These variations were likely because of the influence of meteorological and environmental parameters other than wind.
The purpose of this report is to discuss the projects implemented, utilizing Department of Energy grant funds, to support the use and understanding of renewable energy in Orange County, Florida and the Greater Orlando Area. Orange County is located in the State of Florida and is most popularly referred to as Orlando. The greater Orlando area’s current population is 1,225,267 and in 2015 was the first destination to surpass 60 million visitors. Orange County utilized grant funds to add to the growing demand for access to charging stations by installing one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party. Data collected includes the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data used for reporting purposes. Orange County continues to support the use of electric vehicles in Metro Orlando and this project continues to bring awareness to our public regarding using alternative vehicles. Additionally, we offer all visitors to the Orange County/University of Florida Cooperative Extension Center free charges for their electric vehicles 24 hours a day. Since the operation of the charging station there have been 52 unique driver users, a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. The installation of the additional electric vehicle charging station is part of a county-wide goal of promoting implementation of renewable energy technologies as well as supporting the use of electric vehicles including the Drive Electric Orlando & Florida programs. http://driveelectricorlando.com/ & ; http://www.driveelectricflorida.org/ . Grant funds were also used for Outreach and Educational efforts. Educational efforts about renewable energy were accomplished through the continued support as well as a proposed expansion and potential relocation of the Climate Change Education Center. The growth of the Climate Change Education Center focused on 2 educational subsectors. The first educational sector focused on an apprenticeship with university students. The second sector Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six educational seminars. The first seminar focused on community based social marketing techniques for driving sustainable behavior changes. The second seminar held was a green team workshop. The third seminar focused on urban sustainability planning. The fourth and fifth seminars held were Florida Energy Code workshops for building inspectors. A sixth transit oriented development seminar in partnership with Rollins College was explored, but was not conducted because the proposed on campus venue was not accessible for an extended period of time due to renovations. Additionally, an ENERGY STAR training program was conducted with students from the University of Central Florida; three of the five buildings assessed received ENERGY STAR ratings; one student completed the training and received their certification as an ENERGY STAR Specialist. Background: Location: Orange County is located in the central region of the State of Florida and is most popularly known for including the City of Orlando. The greater Orlando area’s current population is 1,225,267 and is home to large corporations such as Walt Disney World, Universal Studios Orlando, Ritz Carlton, Darden Restaurants, and the nation’s second largest convention center. Opportunities Identified: Encouraging Sustainability in Major Sectors: The Central Florida economy is largely dependent on the hospitality industry and in 2015 it was the first destination to surpass 60 million visitors. With over 60 million visitors each year, 120,000 hotel rooms, 4,000 restaurants, and 75 theme parks and attractions, the local hospitality industry provided a wealth of opportunity to reduce greenhouse gas emissions through building energy efficiency and renewable energy. Accordingly, Central Florida is an ideal training ground for teaching best practices for sustainability focused on the hospitality industry. Meeting the Growing Demand for Electric Vehicle Infrastructure: According to the 2014 U.S Clean Tech Leadership Index Report, nationwide electric vehicle ownership in the top 50 largest metro areas increased sharply in 2013; the Orlando Metro Area was ranked #5 in the nation in in terms of electric vehicle charging stations per one million people. Additionally, the Orange County 2014-2015 Annual Sustainable Orange County Report indicated there are 300 electric vehicle charging stations in Central Florida (roughly 300 charging stations within ~70 mile radius available to our residents of Orange County). By increasing and improving access to charging stations, Orange County supports the growing demand for renewable energy technologies. Project Achievements/Accomplishments: Installed an Electric Charging Station: Orange County utilized grant funds to install one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party that monitors the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data. During the six months of operation of the charging station there have been 52 unique driver users of the charging station; a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. Operation and Potential Relocation of the Orange County Climate Change Education Center: The Climate Change Education Center, originally located within the Orange County Convention Center, served as a central place to inform and educate commercial and residential sectors of environmental, health, and economic benefits of renewable energy, energy efficiency, and greenhouse gas emission reductions. Grant funds were used to pay for the rent required to maintain a lease at the Convention Center, conduct five educational workshops, and for planned upgrades to the Center displays highlighting a number of energy efficiency and renewable energy projects implemented at the Orange County Convention Center and Downtown Orange County. An initial design concept for an upgraded Climate Change Education Center and educational displays was proposed. However, after the Convention Center determined the space occupied by the Climate Change Education Center; a feasibility study for relocation to the proposed area was conducted in October 2013. In December 2013, it was determined that the desired location of the for the Climate Change Education Center at the Orange County Extension Education Center provided too many construction challenges for relocation with too many building retrofits and access problems, including lack of access for loading and unloading exhibits as well as roof drainage relocations and sewer service connection issues. Another suitable location for relocating the Climate Change Education Center could not be located so the project was terminated. The Climate Change Education Center is no longer in existence in Orange County and has been eliminated. Grant funds were used to pay for marketing services for a state wide marketing program including solar & other renewable energy technologies for rebranding and developing marketing materials including web site design and updating. A website was maintained and updated the www.PowerUpGreenEnergy.com website (no longer in service). Sustainability Training for the Hospitality Industry and Major Sectors: To introduce energy efficiency and renewable energy concepts to the hospitality industry, Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six education seminars. Seminar topics included: driving sustainable behavior change through community based social marketing; green team programs; urban sustainability planning; and Florida Energy Code workshops for building inspectors. In partnership with Rollins College, a sixth seminar focused on transit-oriented development was explored, but was not conducted due to extended renovations at the proposed on-campus venue. Green Job Training Development: To promote green industry development and on-the-job training in occupations that encourage energy efficiency and resource reduction, Orange County piloted an ENERGY STAR training and apprenticeship program with students from the University of Central Florida; three students applied for the program; one student completed the training and received their certification as an ENERGY STAR specialist; three of the five buildings assessed received ENERGY STAR Ratings.
In 1963, the U.S. Department of Energy (DOE) (formerly the Atomic Energy Commission [AEC]) implemented Operation Roller Coaster on the Tonopah Test Range (TTR) and an adjacent area of the Nevada Test and Training Range (NTTR) (formerly the Nellis Air Force Range [NAFR]). Operation Roller Coaster consisted of four tests in which chemical explosions were detonated in the presence of nuclear devices to assess the dispersal of radionuclides and evaluate the effectiveness of storage structures to contain the ejected radionuclides. These tests resulted in the dispersal of plutonium over the ground surface downwind of the test ground zero (GZ). Three tests—Clean Slate I, II, and III—were conducted on the TTR in Cactus Flat. The fourth, Double Tracks, was conducted in Stonewall Flat on the NTTR. The Desert Research Institute (DRI) installed two monitoring stations in 2008, Station 400 at the Sandia National Laboratories (SNL) Range Operations Center (ROC) and Station 401 at Clean Slate III. Station 402 was installed at Clean Slate I in 2011 to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination in the soil at the Clean Slate sites was being transported beyond the contamination area boundaries. Some of the data collected also permits comparison of radiological exposure at the TTR monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Annual average gross alpha values from the TTR monitoring stations are higher than values from the surrounding CEMP stations. Annual average gross beta values from the TTR monitoring stations are generally lower than values observed for the surrounding CEMP stations. This may be due to use of sample filters with larger pore space because when glass-fiber filters began to be used at TTR Station 400, gross beta values increased. Gamma spectroscopy typically identified only naturally occurring radionuclides. The radionuclides cesium-134 and -137 were identified in only two samples at each station collected in the weeks following the destruction of the nuclear power reactor in Fukushima, Japan, on March 11, 2011. Observed gamma energy values never exceeded the local background by more than 4 μR/h. The higher observed gamma values were coincident with wind from any of the cardinal directions, which suggests that there is no significant transport from the Clean Slate contamination areas. Annual average daily gamma values at the TTR stations are higher than at the surrounding CEMP stations, but they are equivalent to or just slightly higher than the background estimates made at locations at equivalent elevations, such as Denver, Colorado. Winds in excess of approximately 15 mph begin to resuspend soil particles and create dust, but dust generation is also affected by soil temperature, relative humidity, and soil water content. Power curves provide good predictive equations for dust concentration as a function of wind speed. However, winds in the highest wind speed category occur infrequently.
A number of concepts have been presented for distributed neutrino detectors formed of large numbers of autonomous detectors. Examples include the Antarctic Ross Ice Shelf Antenna Neutrino Array (ARIANNA) [Barwick 2006], as well as proposed radio extensions to the IceCube detector at South Pole Station such as AURA and IceRay. [Besson 2008]. We have focused on key enabling technical developments required by this class of experiments. The radio Cherenkov signal, generated by the Askaryan mechanism [Askaryan 1962, 1965], is impulsive and coherent up to above 1 GHz. In the frequency domain, the impulsive character of the emission results in simultaneous increase of the power detected in multiple frequency bands. This multiband triggering approach has proven fruitful, especially as anthropogenic interference often results from narrowband communications signals. A typical distributed experiment of this type consists of a station responsible for the readout of a cluster of antennas either near the surface of the ice or deployed in boreholes. Each antenna is instrumented with a broadband low-noise amplifier, followed by an array of filters to facilitate multi-band coincidence trigger schemes at the antenna level. The power in each band is detected at the output of each band filter, using either square-law diode detectors or log-power detectors developed for the cellular telephone market. The use of multiple antennas per station allows a local coincidence among antennas to be used as the next stage of the trigger. Station triggers can then be combined into an array trigger by comparing timestamps of triggers among stations and identifying space-time clusters of station triggers. Data from each station is buffered and can be requested from the individual stations when a multi-station coincidence occurs. This approach has been successfully used in distributed experiments such as the Pierre Auger Observatory. [Abraham et al. 2004] We identified the filters as being especially critical. The frequency range of interest, {approx}200 MHz to {approx}1.2 GHz, is a transitional region where the lumped circuit element approach taken at low frequencies begins to reach limitations due to component tolerances, component losses, and parasitic effects. Active circuits can help to mitigate against these effects at the cost of added power consumption that becomes prohibitive for distributed experiments across the band of interest. At higher frequency microstrip, stripline, and other microwave techniques come to the fore. We have developed designs and design tools for passive filters extending the high frequency techniques to the frequency range of interest. Microstrip and stripline techniques are not usually attractive here because of the large physical dimensions of the resulting circuits, but in this application the tradeoff of size against power consumption favors this choice. These techniques are also intrinsically low-cost, as the filter is built into the circuit boards and the cost of components and their assembly onto the board is avoided. The basic element of the filter tree is an impedance matched wideband diplexer. This consists of a pair of low pass and high pass filters with a shared cutoff frequency and complementary frequency responses. These are designing the lowpass filter as a high order LC filter, which can be implemented as a series of transmission line segments of varying width. This can be transformed in to a CL high pass filter with a complementary frequency response. When the two filters are coupled to a common input, the input impedances of the networks add in parallel to give a constant input impedance as a function of frequency, with power flowing into one leg or the other of the filter pair. These filters can be cascaded to divide the band into the frequency ranges of interest; the broadband impedance matching at the inputs makes coupling of successive stages straightforward. These circuits can be produced in quantity at low cost using standard PCB fabrication techniques. We have determined that to achieve best performance the circuits should be built on a low loss-tangent RF substrate. We are working in cooperation with our colleagues in condensed matter who also have a need for this capability to purchase the equipment for in-house fabrication of prototype quantities of these circuits. We plan to continue the work on these filtersusing internal funds, and produce and characterize the performance of prototypes. We also participated in deployment of a prototype detector station near McMurdo Station, Antarctica in collaboration with colleagues at UCLA and UC-Irvine. The prototype station includes a single-board computer, GPS receiver, ADC board, and Iridium satellite modem powered by an omnidirectional solar array. We operated this station in the austral summer of 2006-2007, and used the Iridium SMS mode to transmit the status of the station until the end of the daylight season.
Methylotrophic methanogenesis in the sulfate-rich zone of coastal and marine sediments couples with anaerobic oxidation of methane (AOM), forming the cryptic methane cycle. This study provides evidence of cryptic methane cycling in the sulfate-rich zone across a land–ocean transect of four stations–two brackish, one marine, and one hypersaline–within the Carpinteria Salt Marsh Reserve (CSMR), southern California, USA. Samples from the top 20 cm of sediment from the transect were analyzed through geochemical and molecular (16S rRNA) techniques, in-vitro methanogenesis incubations, and radiotracer incubations utilizing 35 S-SO 4 , 14 C-mono-methylamine, and 14 C-CH 4 . Sediment methane concentrations were consistently low (3 to 28 µM) at all stations, except for the marine station, where methane increased with depth reaching 665 µM. Methanogenesis from mono-methylamine was detected throughout the sediment at all stations with estimated CH 4 production rates in the sub-nanomolar to nanomolar range per cm 3 sediment and day. 16S rRNA analysis identified methanogenic archaea (Methanosarcinaceae, Methanomassiliicoccales, and Methanonatronarchaeacea) capable of producing methane from methylamines in sediment where methylotrophic methanogenesis was found to be active. Metabolomic analysis of porewater showed mono-methylamine was mostly undetectable (<3 µM) or present in trace amounts (<10 µM) suggesting rapid metabolic turnover. In-vitro methanogenesis incubations of natural sediment showed no linear methane buildup, suggesting a process limiting methane emissions. AOM activity, measured with 14 C-CH 4 , overlapped with methanogenesis from mono-methylamine activity at all stations, with rates ranging from 0.03 to 19.4 nmol cm −3 d −1 . Geochemical porewater analysis showed the CSMR sediments are rich in sulfate and iron. Porewater sulfate concentrations (9–91 mM) were non-limiting across the transect, supporting sulfate reduction activity (1.5–2,506 nmol cm −3 d −1 ). Porewater sulfide and iron (II) profiles indicated that the sediment transitioned from a predominantly iron-reducing environment at the two brackish stations to a predominantly sulfate-reducing environment at the marine and hypersaline stations, which coincided with the presence of phyla (Desulfobacterota) involved in these processes. AOM activity overlapped with sulfate reduction and porewater iron (II) concentrations suggesting that AOM is likely coupled to sulfate and possibly iron reduction at all stations. However, 16S rRNA analysis identified anaerobic methanotrophs (ANME-2) only at the marine and hypersaline stations while putative methanogens were found in sediment across all stations. In one sediment horizon at the marine station, methanogen families (Methanosarcinaceae, Methanosaetaceae, Methanomassiliicoccales, and Methanoregulaceae) and ANME 2a,2b, and 2c groups were found together. Collectively, our data suggest that at the brackish stations methanogens alone may be involved in cryptic methane cycling, while at the marine and hypersaline stations both groups may be involved in the process. Differences in rate constants from incubations with 14 C-labeled methane and mono-methylamine suggest a non-methanogenic process oxidizing mono-methylamine to inorganic carbon, likely mediated by sulfate-reducing bacteria. Understanding the potential competition of sulfate reducers with methanogens for mono-methylamine needs further investigation as it might be another important process responsible for low methane emissions in salt marshes.
On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory assessment of gross alpha and gross beta radioactivity and for determination of gamma-emitting radionuclides. Annual average gross alpha values at the Project 57 monitoring stations are in the same range as the highest two values reported for the CEMP stations surrounding the NTTR. Annual average gross beta values at the Project 57 monitoring stations are slightly higher than the lowest value reported for the CEMP stations surrounding the NTTR. Gamma spectroscopy analyses on samples collected from the Project 57 stations identified only naturally occurring radionuclides. No manmade radionuclides were detected. Thermoluminescent dosimeters (TLDs) indicated that the average annual radioactivity dose at the monitoring stations is higher than the dose determined at surrounding CEMP stations but approximately half of the estimated national average dose received by the general public as a result of exposure to natural sources. The TLDs at the Project 57 monitoring stations are exposed to both natural sources (terrestrial and cosmic) and radioactive releases from the Project 57 contamination area. These comparisons show that the gross alpha, gross beta, and gamma spectroscopy levels at the Project 57 monitoring stations are similar to levels observed at the CEMP stations but that the average annual dose rate is higher than at the CEMP stations. Winds in excess of approximately 15 mph begin to generate dust movement by saltation (migration of sand at the ground surface) or direct suspension in the air. Saltated sand, PM10 (inhalable) dust, and PM2.5 (fine particulate dust) exhibit an approximately exponential increase with increasing wind speed. The greatest concentrations of dust occur for winds exceeding 20 mph. During the reporting period, winds in excess of 20 mph occurred approximately 1.6 percent of the time. Preliminary assessment of individual wind events suggests that dust generation is highly variable likely because of the influence of other meteorological and environmental parameters. Although winds sufficient to generate significant amounts of dust occur at the Project 57 site, they are infrequent and of short duration. Additionally, the potential for wind transport of dust is dependent on other parameters whose influence have not yet been assessed.
The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.