Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Advanced control design for hybrid turboelectric vehicle

The new environment standards are a challenge and opportunity for industry and government who manufacture and operate urban mass transient vehicles. A research investigation to provide control scheme for efficient power management of the vehicle is in progress. Different design requirements using functional analysis and trade studies of alternate power sources and controls have been performed. The design issues include portability, weight and emission/fuel efficiency of induction motor, permanent magnet and battery. A strategic design scheme to manage power requirements using advanced control systems is presented. It exploits fuzzy logic, technology and rule based decision support scheme. The benefits of our study will enhance the economic and technical feasibility of technological needs to provide low emission/fuel efficient urban mass transit bus. The design team includes undergraduate researchers in our department. Sample results using NASA HTEV simulation tool are presented.

Abban, Joseph↗

Programmatic Equipment Procurement: An Improved System for Coordinating the Procurement of New Programmatic Equipment

A better structured system that outlines the communication required between the Project Manager (PM) and all the Key Stakeholders. This system will help the PM work with the SMEs to define the scope of the equipment to be procured. It will also help the PM confirm that all associated key stakeholders (WCI IT, FPOC, etc.) have been contacted and have reviewed the new equipment being proposed to be procured. This step is crucial in order to confirm that the piece of equipment being procured not only meets the SME requirements but also the security, safety and building requirements on site. This is a step that is currently missed or overlooked and can cause delays in procurement after the piece of equipment has already been decided on. This new system should help mitigate any delays or miscommunication regarding the piece of equipment being procured.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A land mobile satellite data system

The Telesat Mobile Incorporated (TMI) Mobile Data System (MDS) was developed to apply satellite technology to the transportation industry's requirement for a fleet management system. It will provide two-way messaging and automatic position reporting capabilities between dispatch centers and customers' fleets of trucks. The design was based on the Inmarsat L-Band space segment with system link parameters and margins adjusted to meet the land mobile satellite channel characteristics. The system interfaces with the Teleglobe Des Laurentides earth station at Weir, Quebec. The signaling protocols were derived from the Inmarsat Standard C packet signalling system with unique trucking requirements incorporated where necessary.

Kent, John D. B.↗

The Feasibility of Moving PMU Data in the Future Power Grid

The power grid is a complex network connecting electricity providers with their consumers. With an increasing consumer base requiring more resources and the requirement to integrate significant renewable sources, maintaining the network requires new and innovative management solutions. To manage this complexity and provide precise, real-time views of the grid, Phasor Measurement Units (PMUs) are undergoing widespread deployment. These units provide measurements as often as 60 times per second, with an accurate time identifier attached to each reading, enabling real-time monitoring of the network. However, this new capability generates much more data than the current infrastructure is designed to handle. With the expectation that there will eventually be tens of thousands of PMUs monitoring the transmission lines, the power community is looking towards accumulating multiple terabytes of data per day - several orders of magnitude beyond current data acquisition rates. This has led to questions being raised in the power community about whether or not a significant research effort is required to effectively transfer the volume of information generated by these new data streams. This paper answers that question by comparing a worst-case data generation scenario with several alternative networking protocols and historical trends in protocol advancement. Based on this analysis we are able to conclude that transferring the information between the PMUs and the resulting data repositories is feasible. We recognize that there are issues beyond transferring the data that need to be addressed such as effective access to historical data, data transfer latency, cyber security, and data analysis. There is also an extensive engineering trade-off that the power companies will need to make to decide the best mix of networking protocols for their particular PMU deployments, since that requires significant assumptions about proprietary information including deployment cost, deployment schedules, PMU locations, and available resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OWL Release Process

The Online Waste Library (OWL) provides one consolidated source of information on Department of Energy-managed wastes likely to require deep geologic disposal. With the release of OWL Version 1.0 in fiscal year (FY) 2019, much of the FY2020 work involved developing the OWL change control process and the OWL release process. These two processes (in draft form) were put into use for OWL Version 2.0, which was released in early FY2021. With the knowledge gained, the OWL team refined and documented the two processes in two separate reports. This report addresses the release process starting with a definition of release management in Section 2. Section 3 describes the Information Technology Infrastructure Library (ITIL) framework, part of which includes the three different environments used for release management. Section 4 presents the OWL components existing in the different environments and provides details on the release schedule and procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Transportation System Availability Requirement and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russell E.↗

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russell E.↗

Space Transportation System Availability Requirement and Its Influencing Attributes Relationships

It is important that engineering and management accept the need for an availability requirement that is derived with its influencing attributes. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability. Also important to provide bounds of the variables providing engineering the insight required to control the system's engineering solution, e.g., these influencing attributes become design requirements also. These variables will drive the need to provide integration of similar discipline functions or technology selection to allow control of the total parts count. The relationship of selecting a reliability requirement will place a constraint on parts count to achieve a given availability requirement or if allowed to increase the parts count will drive the system reliability requirement higher. They also provide the understanding for the relationship of mean repair time (or mean down time) to maintainability, e.g., accessibility for repair, and both the mean time between failure, e.g., reliability of hardware and availability. The concerns and importance of achieving a strong availability requirement is driven by the need for affordability, the choice of using the two launch solution for the single space application, or the need to control the spare parts count needed to support the long stay in either orbit or on the surface of the moon. Understanding the requirements before starting the architectural design concept will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

reliability↗

Modeling Aeolian Transport of Contaminated Sediments at Los Alamos National Laboratory, Technical Area 54, Area G: Sensitivities to Succession, Disturbance, and Future Climate

The Technical Area 54 (TA-54) Area G disposal facility is used for the disposal of radioactive waste at Los Alamos National Laboratory (LANL). U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety and the environment. In compliance with that requirement, DOE field sites must prepare and maintain site-specific radiological performance assessments for facilities that receive waste after September 26, 1988. Sites are also required to conduct composite analyses for facilities that receive waste after this date; these analyses account for the cumulative impacts of all waste that has been (and will be) disposed of at the facilities and other sources of radioactive material that may interact with these facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Safety-Driven Approach to Exploring and Comparing Air Traffic Management Concepts for Enabling Urban Air Mobility

There is broad recognition that the high tempo and density of Urban Air Mobility (UAM) operations will require identifying new Air Traffic Management (ATM) concepts to safely integrate UAM air traffic into the airspace alongside existing air traffic. However, the simulation models used to compare ATM concepts today are difficult to apply during the early stages of concept development and do not offer enough support in identifying potential new concepts. In addition, they have limited ability to evaluate ATM concepts in terms of safety, security, and other key emergent properties. Instead of using simulation to evaluate ATM concepts, this paper demonstrates how a safety-driven systems engineering approach based on Systems-Theoretic Accident Model and Processes (STAMP) can be used to design properties such as safety into an ATM system from the earliest stages of development. Using a hazard analysis technique called Systems-Theoretic Process Analysis (STPA), system requirements and the desired ATM behavior are derived. As an example, two possible ATM concepts to implement that behavior are compared to identify their safety-related benefits and tradeoffs. This new approach enables (1) systematic exploration of alternative ATM concepts and (2) identification of the safety-related tradeoffs between concepts as early as possible in the development process.

system safety↗

Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings

NASA's Cassini Spacecraft, launched on October 15th, 1997 which arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004–08), and has since been approved for a first and second extended mission through 2017. As part of the final extended missions, Cassini will begin an aggressive and exciting campaign of high inclination, low altitude flybys within the inner most rings of Saturn, skimming Saturn’s outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, requires a strategy for managing the Sun Sensor Assembly (SSA) health, the details of which are presented in this paper.

fault protection↗

Consequence Management (CM) program overview.

The missions is to Provide the Highest Quality Materiel Solution to our Consequence Management DoD Responder's Requirements by Applying Rapid Acquisition. To Interface With Customers in Respect to the Assessment of Needs, to Deliver Products That Exceed Expectations, to Optimize Safety, Performance, Cost, Schedule, and Sustainability, Throughout the Life Cycle of Each COTS Item. On Order, Support Other Federal, State Agencies, and Local First Responders.

61 RADIATION PROTECTION AND DOSIMETRY↗

Teamwork for Oversight of Processes and Systems (TOPS). Implementation guide for TOPS version 2.0, 10 August 1992

As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.

Strand, Albert A.↗

Nondestructive Examination for Nuclear Power Plant Cable Aging Management Programs

Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program (AMP) to justify cable performance under normal operation as well as accident conditions. This paper addresses various NDE technologies that constitute the essence of an acceptable aging management program.

cable aging inspection↗

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

Angelici, Gary L.↗

Multi-Artifact Analysis of Self-Admitted Technical Debt in Scientific Software

Context: Self-admitted technical debt (SATD) occurs when developers acknowledge shortcuts in code. In scientific software (SSW), such debt poses unique risks to the validity and reproducibility of results. Objective: This study aims to identify, categorize, and evaluate scientific debt, a specialized form of SATD in SSW, and assess the extent to which traditional SATD categories capture these domain-specific issues. Method: We conduct a multi-artifact analysis across code comments, commit messages, pull requests, and issue trackers from 23 open-source SSW projects. We construct and validate a curated dataset of scientific debt, develop a multi-source SATD classifier to guide SATD management, and conduct a practitioner validation to assess the practical relevance of scientific debt. Results: Our classifier performs strongly across 900,358 artifacts from 23 SSW projects. SATD is most prevalent in pull requests and issue trackers, underscoring the value of multi-artifact analysis. Models trained on traditional SATD often miss scientific debt, emphasizing the need for its explicit detection in SSW. Practitioner validation confirmed that scientific debt is both recognizable and useful in practice. Conclusions: Scientific debt represents a unique form of SATD in SSW that that is not adequately captured by traditional categories and requires specialized identification and management. Our dataset, classification analysis, and practitioner validation results provide the first formal multi-artifact perspective on scientific debt, highlighting the need for tailored SATD detection approaches in SSW.

Melin, Eric [Boise State University]↗

Preferred Concepts for Disposal of the UK Inventory of Depleted, Natural and Low Enriched Uranium - 16382

Depleted, natural and low enriched uranium (DNLEU) forms a significant quantity of the UK inventory of higher activity radioactive materials. The great majority comprises uranic materials produced from uranium enrichment operations and from reprocessing of spent nuclear fuels. The most recent estimate of the total quantity (stocks plus arisings) of UK-owned DNLEU from civil nuclear operations is 170,000 tU. Current UK Government strategy is for DNLEU to be stored indefinitely in existing or new facilities, as required. However, Government strategy for long-term management of uranic materials is under review and a change could potentially cause this material to be reclassified as a waste. An Integrated Project Team (IPT) was formed in 2012 with the objective of identifying and addressing the issues associated with the potential need to dispose of DNLEU, in order to inform wider decision-making on the long-term management of UK DNLEU. Key technical issues considered by the IPT relate to the following: 1. The need for an improved understanding of the UK DNLEU inventory. 2. The identification of preferred chemical and physical form(s), and preferred packaging and disposal concepts for DNLEU - the main subject of this paper. 3. The approach to safety assessment of DNLEU disposal. This paper summarises the disposal concepts under consideration by the IPT, and the rationale for identification of preferred concepts for disposal of DNLEU inventory components. The conclusions will be of interest to other programmes and countries with a requirement to manage large quantities of similar materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗