Thermal Optimization of a Silicon Carbide, Half-Bridge Power Module

This project describes the modeling process to design the packaging and heat exchanger for a half-bridge wide-bandgap (WBG) power semiconductor module. The module uses two silicon carbide, metal-oxide-semiconductor field-effect transistor (MOSFET) devices per switch position that are soldered to an aluminum nitride, direct-bond copper (DBC) substrate. A baseplate cooling configuration (e.g., no thermal grease) is used along with a water-ethylene glycol, jet-impingement-style heat exchanger. The heat exchanger was designed to be fabricated using prototyping equipment from the National Renewable Energy Laboratory, complies with automotive standards (for minimal channel sizes, flow rates, and coolant), and considers reliability aspects (i.e., erosion/corrosion). Device-scale computational fluid dynamics (CFD) is used first to design the slot jet impingement cooling configuration and compute the effective heat transfer coefficient (HTC) of the concept. The computed HTCs are then used as boundary conditions for a finite element study to optimize the package geometry (e.g., device layout and baseplate thickness) to minimize thermal resistance and minimize temperature variation between the module's four devices. Finally, a fluid manifold is designed to generate the slot jets and cool the devices. Module-scale CFD predicts a relatively low junction-to-fluid thermal resistance of 16.7 mm2 K/W, a 1.4 degrees C temperature variation between devices, and a total pressure drop of 5,860 Pa (0.85 psi) for the design. The thermal resistance of the module design is about 67% lower than the 2015 BMW i3 power electronics/modules thermal resistance.

DIRECT ENERGY CONVERSION↗

Intelligent Energy Optimizer for Residential Buildings

Demand-side management in the buildings is essential for meeting grid flexibility needs in a highly renewable energy scenario. Appliance load monitoring helps decision making for demand-side management by providing the information on operation status/power consumption from different appliances in the buildings. Nonintrusive load monitoring (NILM) is an attractive option for appliance load monitoring using because it has lower cost for sensors and helps mitigate privacy concerns. In this study, the team used an event detection technique followed by two different methods for event classification. The results from k-means clustering showed that the events from a single appliance are often distributed in multiple clusters. Thus, the unsupervised method of NILM using k-means clustering used in this study was not very suitable for load disaggregation. The results from NILM showed that the F1 score for event classification was 0.77 for a heat pump water heater and very low for other appliances using the rule-based classification.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Developing a Framework for Valuation of Grid Services

The electric system is rapidly evolving and growing, raising new questions about how to define and value grid services delivered by a diverse set of resources, including customer-owned assets. This report advances a service–parameter–value framework that links what a grid service does to why it matters, and how its benefits are evidenced. We build upon prior efforts (Bender et al. 2021) and extend them to include value categories (reliability, resilience, cost & access, and security) with primary and secondary tiers, service-specific value streams that explain how benefits materialize, and metrics that make valuation traceable and comparable. We apply the framework to the six core grid services defined in (Kolln et al. 2023): Frequency Response, Regulation, Reserves, Energy, Voltage Management, and Blackstart and demonstrate it on three use cases to highlight the adaptability of these value streams. Further, we outline how the framework integrates with existing tools such as asset optimization, hosting capacity and cost-benefit analysis, and propose a path to portable qualifications and consistent stacking rules for use in tariffs and filings. Finally, we identify future pathways for research and application research needs to support standardization and decision-ready comparisons across services, assets, and architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Non-Cooperative Game-Based Distributed Beam Scheduling Framework for 5G Millimeter-Wave Cellular Networks

Here, this paper studies the problem of distributed beam scheduling for 5G millimeter-Wave (mm-Wave) cellular networks where base stations (BSs) belonging to different operators share the same spectrum without centralized coordination among them. Our goal is to design efficient distributed scheduling algorithms to maximize the network utility, which is a function of the achieved throughput by the user equipment (UEs), subject to the average and instantaneous power consumption constraints of the BSs. We propose a Media Access Control (MAC) and a power allocation/adaptation mechanism utilizing the Lyapunov stochastic optimization framework and non-cooperative games. In particular, we first decompose the original utility maximization problem into two sub-optimization problems for each time frame, which are a convex optimization problem and a non-convex optimization problem, respectively. By formulating the distributed scheduling problem as a non-cooperative game where each BS is a player attempting to optimize its own utility, we provide a distributed solution to the non-convex sub-optimization problem via finding the Nash Equilibrium (NE) of the game whose weights are determined optimally by the Lyapunov optimization framework. Finally, we conduct simulation under various network settings to show the effectiveness of the proposed game-based beam scheduling algorithm in comparison to that of several reference schemes.

42 ENGINEERING↗

Weather forecast-based optimization of integrated energy systems.

In this work, we establish an on-line optimization framework to exploit detailed weather forecast information in the operation of integrated energy systems, such as buildings and photovoltaic/wind hybrid systems. We first discuss how the use of traditional reactive operation strategies that neglect the future evolution of the ambient conditions can translate in high operating costs. To overcome this problem, we propose the use of a supervisory dynamic optimization strategy that can lead to more proactive and cost-effective operations. The strategy is based on the solution of a receding-horizon stochastic dynamic optimization problem. This permits the direct incorporation of economic objectives, statistical forecast information, and operational constraints. To obtain the weather forecast information, we employ a state-of-the-art forecasting model initialized with real meteorological data. The statistical ambient information is obtained from a set of realizations generated by the weather model executed in an operational setting. We present proof-of-concept simulation studies to demonstrate that the proposed framework can lead to significant savings (more than 18% reduction) in operating costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SHARP pre-release v1.0 - Current Status and Documentation

The NEAMS Reactor Product Line effort aims to develop an integrated multiphysics simulation capability for the design and analysis of future generations of nuclear power plants. The Reactor Product Line code suite’s multi-resolution hierarchy is being designed to ultimately span the full range of length and time scales present in relevant reactor design and safety analyses, as well as scale from desktop to petaflop computing platforms. In this report, building on a several previous report issued in September 2014, we describe our continued efforts to integrate thermal/hydraulics, neutronics, and structural mechanics modeling codes to perform coupled analysis of a representative fast sodium-cooled reactor core in preparation for a unified release of the toolkit. The work reported in the current document covers the software engineering aspects of managing the entire stack of components in the SHARP toolkit and the continuous integration efforts ongoing to prepare a release candidate for interested reactor analysis users. Here we report on the continued integration effort of PROTEUS/Nek5000 and Diablo into the NEAMS framework and the software processes that enable users to utilize the capabilities without losing scientific productivity. Due to the complexity of the individual modules and their necessary/optional dependency library chain, we focus on the configuration and build aspects for the SHARP toolkit, which includes capability to autodownload dependencies and configure/install with optimal flags in an architecture-aware fashion. Such complexity is untenable without strong software engineering processes such as source management, source control, change reviews, unit tests, integration tests and continuous test suites. Details on these processes are provided in the report as a building step for a SHARP user guide that will accompany the first release, expected by Mar 2016.

Mahadevan, Vijay S.↗

Digital Image Correlation of Concrete Slab at University of Tennessee, Knoxville

Assessment and management of aging concrete structures in nuclear power plants require a more systematic approach than simple reliance on existing code margins of safety. Some degradation mechanisms of concrete manifest themselves via swelling or by other shape deformation of the concrete. Specifically, degradation of concrete structure damaged by ASR is viewed as one of the dominant factors impacting the structural integrity of aging nuclear power plants. Structural health monitoring of concrete structures aims to understand the current health condition of a structure based on heterogeneous measurements to produce high-confidence actionable information regarding structural integrity that supports operational and maintenance decisions. Number of nondestructive examination techniques (i.e., thermography, digital image correlation, mechanical deformation measurements, nonlinear impact resonance (DIC) acoustic spectroscopy, and vibro-acoustic modulation) is used to detect the damage caused by ASR. DIC techniques have been increasing in popularity, especially in micro- and nano-scale mechanical testing applications due to its relative ease of implementation and use. Advances in computer technology and digital cameras help this method moving forward. To ensure the best outcome of the DIC system, important factors in the experiment are identified. They include standoff distance, speckle size, speckle pattern, and durable paint. These optimal experimental options are selected basing on a thorough investigation. The resulting DIC deformation map indicates that this technique can be used to generate data related to degradation assessment of concrete structure damaged by the impact of ASR.

36 MATERIALS SCIENCE↗

Global Nuclear Energy Partnership Integrated Waste Management Strategy

Key to successful implementation and expansion of nuclear energy in the United States is establishing an effective waste management system to allow routine disposition of spent fuel and all byproduct and waste streams. While it would be possible to manage and dispose wastes that would be generated from the advanced separations proposed in the Global Nuclear Energy Partnership (GNEP) program under a policy and regulatory framework that is essentially identical to what is currently in place, a more optimal approach exists that, if implemented, could result in a more efficient system for managing and disposing radioactive materials. An Integrated Waste Management Strategy (IWMS) is described here to manage and disposition all wastes from any radioactive operations, including, but not limited to nuclear fuel reprocessing. The IWMS was developed considering the need for a sustainable nuclear fuel cycle effectively integrating waste management in a manner that can be commercialized and eventually adapted to be used internationally. The GNEP Program proposes a combination of thermal and fast reactors, supported by fuel recycling and the use of recovered transuranic materials in nuclear fuel. This comes close to closing the fuel cycle and improves the system for managing and disposing of radioactive wastes derived from electricity generation. As an example, removing actinides and key heat-generating fission products from the waste could permit increased waste loading densities within a geologic repository, allowing for increased disposal capacity in a facility of the same size. As long as the primary function of the repository is not impacted, i.e. controlling the potential radiation dose to the public, the same facility could hold the waste from generating more electricity. This is desirable to support expanded use of nuclear power and sharing the benefits of nuclear energy with the international community while maintaining proliferation resistance and safe waste disposal. This IWMS does not establish a program or propose policy. Rather, it provides a logical basis for radioactive waste disposal on which potential changes to current programs and policies can be formulated and evaluated. The current version of the Nuclear Waste Policy Act (NWPA) could be interpreted to include any and all wastes from fuel reprocessing that are highly radioactive as high level wastes requiring repository disposal regardless of the magnitude or duration of the risks they pose. All wastes generated by the processes being developed under GNEP can be disposed under the current regulations, however, significant efficiencies can be realized if the partitioned wastes can be dispositioned based on their characteristics rather than their origin. This IWMS is based on the premise that the NWPA can be clarified or amended to use a graded scale of waste management considering the actual risks of specific waste streams similar to the structure of chemical waste regulations currently accepted by the public. Such an alternative approach would allow for more efficient, and cost-effective, management and disposal of nuclear waste while safely protecting the public from unacceptable risk.

Deliverable↗

Flexible Geothermal Power Generation utilizing Geologic Thermal Energy Storage (Final Seedling Project Report)

This report concludes that there is a cost-effective strategy for seasonal storage of heat that will provide firm, but dispatchable, electrical generating capacity in times when other renewable energy is not available to meet demand. Deployment of the technology appears to require no new technology, but instead combines solar, geothermal, and conventional oil and gas drilling technologies in a novel way. The study basis is the use of sedimentary geologic formations as a medium for thermal energy storage (TES), specifically for heat collected in concentrating solar collectors. The study identifies methodologies that could be used to transport this heat into and out of the subsurface in order to produce dispatchable electrical power, and reports on initial optimization results. The GeoTES system (heat input, storage, heat recovery, and heat to electric conversion) described in this analysis has the potential to provide a unique pathway for increasing the grid penetration of renewable energy in large blocks of power and across many states and regions. Further, the system can be used both to meet the nation’s flexible energy needs while also improving grid stability and reliability. The present study evaluated the use of a large number of dedicated wells to store and recover the heat, essentially creating a synthetic geothermal reservoir. The use of sedimentary geology allows the wells to be drilled at low cost. Dedicated hot and cold wells are used, arranged in a five-spot well pattern with each hot or cold well surrounded at an appropriate distance by the opposite type of well. In large numbers this becomes alternating rows of hot and cold wells. Each hot and cold well is operated using a push-pull strategy. This configuration provides the ability to immediately recover stored hot fluid from a GeoTES reservoir, or to store the heat over many months for recovery at low loss when needed. This is a practical approach for managing the system’s fluid inventory and reducing parasitic load. The production and injection power requirements are reduced because the rows of wells operating in “push” mode provide help to the wells operating in “pull” mode, and vice-versa. Initial charging of a GeoTES system increases the heat recovery temperature. Increasing the duration of the charging period decreases the magnitude of the temperature fluctuations that occur following prolonged system operation. Because of direct contact of the heated water with the reservoir formation, the production of both hot water and steam from the TES, and the temperature ranges of the recovered fluid (190 – 230°C or 375 – 445°F), conventional geothermal power cycles were used to convert the stored heat to electricity. A power cycle configuration for the GeoTES system was selected following a screening study of a number of flash, and flash/binary hybrid options. This analysis concluded that, of the configurations evaluated, a dual-stage flash steam cycle provides the lowest capital costs per unit net power generation with an acceptable hot brine inlet fluid flow rate. The evaluation included the power plant cost estimate, the cost and number of wells and the associated parasitic loads. Annual power generation performance was simulated to evaluate capacity factor and LCOE. The LCOE calculated for the inherently high capacity GeoTES system was $\$$0.13/kWhe. This value was calculated for the case where the solar thermal collector was sized in such a way that the solar collectors permitted an annual power plant capacity factor of up to 97%. The power cycle was able to provide power to the grid every night of the year, and flexible base-load power during the winter, if needed. This LCOE value compares favorably with reported values for solar photovoltaic plus battery energy storage (PV+BES) systems in the open literature, i.e. $\$$0.148/kWhe for a PV+BES system with 4 hours of electrochemical battery energy storage capacity. Addition of battery energy storage with more hours of storage would further increase PV+BES system LCOE and increase the separation between GeoTES and PV+BES. A GeoTES system would therefore provide superior economics for high capacity and long duration solar energy storage.

14 SOLAR ENERGY↗

Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Optimization of Backfill Material Transport for the Future Belgian Geological Disposal Facility - 19071

In Belgium, long-lived, low- and intermediate level waste (B waste) will be conditioned in concrete monoliths B and high-level waste (C waste) in so-called Supercontainers (SC). It is planned to dispose of the waste packages in a Geological Disposal Facility (GDF). The B and C waste shall be disposed of each in one emplacement field at a depth between 200 m and 600 m below the surface. Two access galleries run through each field and connect the disposal galleries with a central shaft and support zone. After the emplacement of a specified number of waste packages, a stepwise backfilling of the voids is planned in order to stabilize the galleries, to limit the amount of voids, and to ensure a favourable chemical environment. Taking into account the objectives of backfilling and the specific material properties of the waste packages two mortars were developed to backfill the disposal galleries. In particular, for reasons of safety at work, the mortars should be hydraulically pumped through pipelines. Accordingly, in any case, it is necessary to operate storage facilities of the raw materials, a mix plant and a pump. The raw materials are foreseen to be supplied by trucks from external producers. Due to this fact, the better accessibility of the plants and with the aim of minimizing noise and dust emissions and the space for technical systems in the GDF, it is advisable to install the technical equipment above ground outside the GDF control area. However, the feasibility of this basic concept depends on the processing time of the backfill materials and the capacity of the transport system. Thus, although short transport times can theoretically be realized if pipelines with a small cross sections are chosen, in this case the required power of the pump increases significantly. If no suitable configuration can be found, the distance of the mixing and pumping system to the backfill segment has to be shortened. In this case a pneumatic conveyor system would have to be installed to transport the solids to a mix plant and pumping unit located in the underground galleries to be able to meet the desired backfill rates. In order to identify the optimum solution, the decision criteria and the advantages and disadvantages of existing and planned transport systems were evaluated. The investigations showed that it is technically feasible to pump the backfill material from above ground into the disposal galleries. As failures of the backfill system would result in interruptions of the general disposal operation, a redundant pump and pipeline system was developed. The two lines can be operated separately or simultaneously in order to realize high flow rates needed for the backfilling of segments far from the shaft. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

Managing the techno-economic impacts of partial string failure in multistring energy storage systems

The role of energy storage systems (ESSs) is becoming increasingly important for today’s electric power systems. Unavailability of an ESS assigned to critical grid services may cause unwanted disruption of those services and hence, may have a significant techno-economic impact. Like any physical equipment, an ESS is vulnerable to various types of faults. Failure of one or more strings in a multistring ESS does not have to be the cause of shutting down the entire ESS. It can still operate with a partial number of strings and continue providing critical services to the grid, if there are no reliability or safety issues and is acceptable under applicable standards. However, it is important to make sure that the control strategies are adaptable to the changes in ESS capacity caused by failed strings. Also, depending on the previous operation and type of failure, the reallocation of duty cycle burden among available strings could be non-uniform. These complexities suggest that mitigation of the impact of partial failure in multistring ESSs is not trivial and needs careful consideration. This is the topic of this paper. The proposed work investigates the impact of partial failure of a large multistring ESS on the assigned service and develops strategies to adjust the ESS control duty cycles for reducing such impacts. In doing so, the paper proposes a novel two-stage framework that plans for the multistring failure using robust optimization theory and then adjusts in real-time using a rule-based algorithm, based on the real-time information on the power availability of the string. Illustrations provided in this work are based on frequency regulation use-case, which is a common application for many utility-scale ESSs. A 750 kilowatt (kW)/1500 kilowatt-hour (kWh) 3-string ESS is used for the demonstration in this work and the efficacy of the proposed method is demonstrated and compared against methods that do not incorporate string failure in their strategy. In particular, here we show that revenue loss of 93% can be incurred when partial string failure is not included in operation and planning. These losses in revenue are reduced by 60% with the proposed method.

25 ENERGY STORAGE↗

Sodium Ion Expansion Power Block for Distributed CSP

The Sodium Ion Expansion Power Block for Distributed CSP was a three-plus-one-year effort under the Concentrating Solar Power: Advanced Projects Offering Low LCOE Opportunities (CSP: APOLLO) funding program within the U.S. Department of Energy Solar Energy Technologies Office. The primary objective of this project is to develop a dual-stage modular sodium thermal electrochemical converter (Na-TEC) heat engine power block, which can be potentially integrated with either a small-scale dish solar or large-scale heliostats and parabolic trough CSP. Na-TEC is a heat engine that generates electricity through the isothermal expansion of sodium ions. The Na-TEC is a closed system that can theoretically achieve conversion efficiencies above 45% when operating between thermal reservoirs at 1150 K and 550 K. However, thermal designs have confined previous single-stage devices to thermal efficiencies below 20%. To mitigate some of these limitations, we consider dividing the isothermal expansion into two stages; one at the evaporator temperature (1150 K) and another at an intermediate temperature (650 K –1050 K). This dual-stage Na-TEC takes advantage of regeneration and reheating, and could be amenable to better thermal management. In light of this, we first designed and developed a thermo-electrochemical model, and thermodynamically demonstrated how the dual-stage device can improve the efficiency by up to 8% points over the best performing single-stage device. We also established an application regime map for the single- and dual-stage Na-TEC in terms of the power density and the total thermal parasitic loss. Moreover, a thermal design of an axisymmetric dual-stage Na-TEC is developed to guide the scale-up and fabrication of sub-components of prototype module. A reduced-order finite-element model is used in conjunction with a Na-TEC thermodynamic model that was developed to determine the total parasitic heat loss of this dual-stage design. A number of simplifications are applied in the reduced-order model to decrease the computational time while maintaining acceptable accuracy. According to this analysis, a maximum efficiency of 29% and a maximum power output of 125 W can be achieved. Ultimately, we were able to demonstrate thermal efficiency improvements of the Na-TEC heat engine from 19% up to 40.3%, in a dual-stage (non-optimized) prototype module that we designed, fabricated, and tested with high temperature stage at 923 K. Furthermore, a cost-performance analysis for this improved dual-stage design was carried out for distributed-CSP systems. A high-level techno-economic analysis (TEA) explores four scenarios where a Na-TEC is used as the heat engine for a distributed-CSP system. Overnight capital cost and levelized cost of electricity (LCOE) are estimated for a system lifetime of 30 years, revealing that overnight capital costs in a range from $3.57 to $17.71 per We are feasible, which equate to LCOEs from 6.9 to 17.2 cents/kWh e -1 . This analysis makes a significant contribution by concurrently quantifying the efficiency and unit costs for a range of multistage configurations, and demonstrating that a Na-TEC may be a promising alternative to Stirling engines for distributed-CSP systems at residential scale of 1–5 kW e .

14 SOLAR ENERGY↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

Determining the Appropriate Emergency Planning Attributes for Microreactors

Micro-reactor designs incorporate design features that provide very low reactor decay heat power at 24 hours after shutdown that is manageable in comparison with larger reactors. This attribute translates into a low probability of core damage negligible offsite dose. This paper provides the conceptual framework for appropriately structuring emergency planning requirements for micro-reactors while ensuring the U.S. Nuclear Regulatory Commission’s (NRC) commitment to safety is met. Due to the diversity in reactor designs comprising the micro-reactor community, this paper identifies the necessary concepts that should be considered to ensure emergency plans for micro-reactors are appropriate for the risk. This paper does not mandate specific design features for micro-reactors but provides reactor designers a conceptual framework for a scalable, graded approach to Emergency Planning Standards that should be considered in their individual designs in order to support simplified emergency plans. Given that accident source terms associated with micro-reactors are essentially negligible when compared with those for large light water reactors, revisions to emergency planning standards are justified. A graded approach to implementing emergency planning guidance can be used to appropriately structure micro-reactor emergency plans and reduce the size of the emergency planning zone and plume exposure pathway. Appropriately structuring emergency planning requirements will better optimize licensee and offsite agencies emergency planning resources and reduce the resources associated with emergency planning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗