Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Termination unit

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

42 ENGINEERING↗

Improvement of General Electric’s Chilled Ammonia Process with the use of Membrane Technology

General Electric Environmental Control Solutions (formerly Alstom Power Environmental Control Systems) set out to complete the Phase 1 award requirements for a Phase II renewal application for their project selected under DOE-FOA-0001190 “Small and Large Scale Pilots for Reducing the Cost of CO 2 Capture and Compression”. The project focus was to implement several improvement concepts utilizing membrane technology at the recipient’s Chilled Ammonia Process (CAP) CO 2 capture large-scale pilot plant. The goal was to lower the overall cost of technology. During the development of costs for the preliminary techno-economic assessment (TEA), it became clear that the capital and operating costs of this concept were not economically attractive. All work related to a Phase II renewal application at that point was halted as GE made the decision not to submit a Phase II renewal application. Discussions with DOE resulted in a path towards useful information produced from the design and cost work already completed on the project. With the reverse osmosis (RO) unit providing most of the cost issues, GE would provide a sensitivity analysis of the RO unit with respect to project cost. This information would be included with the Techno-Economic Analysis along with the Technology Gap Analysis.

20 FOSSIL-FUELED POWER PLANTS↗

Validation of MVP code with HTC critical experiments

In the 1980's, a series of high burnups critical experiments (HTC) was conducted at the Apparatus B experimental facility in Valduc with the support of the IRSN and AREVA NC. Four series of experiments were designed to assess profit associated with actinide-only burn-up credit in the criticality safety analysis for fuel handling (Phases 1 and 2), pool storage (Phase 3) and spent fuel cask (Phase 4) conditions. The HTC rods, specifically fabricated for the experiments, were designed to simulate a typical pressurized water reactor uranium oxide spent fuel. In order to validate the MVP-2.0 code and relatively new nuclear data libraries for the criticality safety analysis, the HTC critical experiments were analyzed using the MVP-2.0 code with JENDL-4.0, ENDF/B-VII.1 or JEFF-3.2. The effective neutron multiplication factor k{sub eff} values were obtained through analyses of all phases of the HTC experiments. It was shown that averaged values of k{sub eff} using JENDL-4.0 and ENDF/B-VII.1 were in good agreement with experimental results for all the phases, while those using JEFF-3.2 showed slight underestimation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Army-NASA aircrew/aircraft integration program. Phase 5: A3I Man-Machine Integration Design and Analysis System (MIDAS) software concept document

This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.

Banda, Carolyn↗

Series of Phase Transitions in Cesium Azide Under High Pressure Studied by in situ X-ray Diffraction

In situ x-ray diffraction measurements of cesium azide (CsN{sub 3}) were performed at high pressures of up to 55.4 GPa at room temperature. Three phase transitions were revealed as follows: tetragonal (I4/mcm, Phase II) {yields} monoclinic (C2/m, Phase III) {yields} monoclinic (P2{sub 1}/m or P2{sub 1}, Phase IV) {yields} triclinic (P1 or P1{sup -}, Phase V), at 0.5, 4.4, and 15.4 GPa, respectively. During the II-III phase transition, CsN{sub 3} keeps its layered structure and the azide anions rotate obviously. The compressibility of Phase II is dominated by the repulsions between azide anions. The deformation of unit cell is isotropic in Phases II and IV and anisotropic in Phase III. With increasing pressures, the monoclinic angle increases in Phase III and then becomes stable in Phase IV. The bulk moduli of Phases II, III, IV, and V are determined to be 18 {+-} 4, 20 {+-} 1, 27 {+-} 1 and 34 {+-} 1 GPa, respectively. The ionic character of alkali azides is found to play a key role in their pressure-induced phase transitions.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Volume 1: Survey of Available Information in Support of the Energy-Water Bandwidth Study of Desalination Systems

The U.S. Department of Energy (DOE) has set a goal to reduce the cost of seawater desalination systems to $0.50/ cubic meter (m 3 ) through the development of technology pathways to reduce energy, capital, operating, soft, and system integration costs.1 In support of this goal and to evaluate the technology pathways to lower the energy and carbon intensity of desalination while also reducing the total water cost, DOE is undertaking a comprehensive study of the energy consumption and carbon dioxide (CO 2 ) emissions for desalination technologies and systems. This study is being undertaken in two phases. Phase 1, Survey of Available Information in Support of the Energy-Water Bandwidth Study of Desalination Systems, collected the background information that will underpin Phase 2, the Energy Water Bandwidth Study for Desalination Systems. This report (Volume 1) summarizes the results from Phase 1. The results from Phase 2 will be summarized in Volume 2: Energy Water Bandwidth Study for Desalination Systems (Volume 2). The analysis effort for Phase 2 will utilize similar methods as other industry-specific Energy Bandwidth Studies developed by DOE,2 which has provided a framework to evaluate and compare energy savings potentials within and across manufacturing sectors at the macroscale. Volume 2 will assess the current state of desalination energy intensity and reduction potential through the use of advanced and emerging technologies. For the purpose of both phases of study, energy intensity is defined as the amount of energy required per unit of product water output (for example, kilowatt-hours per cubic meter of water produced). These studies will expand the scope of previous sectorial bandwidth studies by also evaluating CO 2 intensity and reduction opportunities and informing a techno-economic analysis of desalination systems. Volume 2 is expected to be completed in 2017.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Large space telescope, phase A. Volume 1: Executive summary

The Phase A study of the Large Space Telescope (LST) is reported. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. The LST is an unmanned astronomical observatory facility, consisting of an optical telescope assembly (OTA), scientific instrument package (SIP), and a support systems module (SSM). The report consists of five volumes. The report describes the constraints and trade off analyses that were performed to arrive at a reference design for each system and for the overall LST configuration. A low cost design approach was followed in the Phase A study. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and the sharing of shuttle maintenance flights with other payloads.

Source record↗

Solar Power Satellite antenna phase control system hardware simulation, phase 4: Volume 1: Executive summary

The phase control system is described. Potential sources of phase error are identified and the performance leading to selection of the allowable phase error for each source is summarized. The pilot transmitter, the effects of ionospheric, the master slave returnable timing system (MSRTS), the SPS receiver, and the high power amplifier for dc to microwave conversion are considered separately. Design parameters of the pilot transmitter and spacetenna transponder are presented.

Lindsey, W. C.↗

VERA Benchmarking Results for Watts Bar Nuclear Plant Unit 1 Cycles 1-12

Among the most important accomplishments during Phase 1 of the Consortium for Advanced Simulation of Light Water Reactors (CASL) is the development and deployment of what is known as VERA-CS, the steady-state nuclear reactor core simulation capability of the Virtual Environment for Reactor Applications, VERA. With this product CASL now has the ability to perform and support analyses relating to common evolutions of operating commercial pressurized water reactors (PWRs), including startup testing, power escalation, fuel cycle depletion, and fuel assembly discharge, reinsert, and shuffling. VERA-CS is a high-fidelity, multi-physics engineering tool that utilizes modest high-performance computing (HPC) systems and engineering-scale clusters to simultaneously simulate the local fuel rod neutronics and coolant channel thermal-hydraulics over the life of the reactor. Though it is still under development, the results demonstrated in this report provide encouraging evidence that VERA-CS will become highly acclaimed for industrial, scientific, and educational applications alike.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effects of composition and crystallographic ordering on the ferromagnetic transition in Ni–Co–Mn–In magnetic shape memory alloys

In the present study, the effects of composition and the level of crystallographic ordering were studied in Ni 45 Co 5 Mn 50-X In X magnetic shape memory alloys with X = 13.55, 13.71 and 13.92, in order to reveal the relationship between the Curie temperature (T C ) of the austenite phase and the degree of L2 1 ordering. Various samples were prepared using secondary heat treatments at different temperatures below the order-disorder transition temperature and for different durations, after solution heat treatment, in order to control the degree of ordering. T C s were determined using calorimetric and magnetometry measurements. The relationship between the T C and the degree of order was used to predict the evolution of the order during selected heat treatments. It was shown that the T C of austenite exhibits a monotonous non-linear dependence on the fraction of the L2 1 phase. This relationship was corroborated via ab initio numerical calculations within a mean field approximation. Dependence of the crystallographic order parameter on temperature and duration of secondary heat treatments showed that ordering kinetics is fast, the total degree of order depends only on the annealing temperature and cooling rate for long enough treatments, and maximum achievable degree of order is limited by the low thermal energy available for atomic diffusion at low temperatures. Lastly, small changes in composition were observed to have a significant impact on martensitic transformation temperatures, and a significant but smaller effect on the ferromagnetic transition in these systems.

36 MATERIALS SCIENCE↗

SU-E-T-648: Quality Assurance Using the RADPOS System for 4D Radiotherapy with CyberKnife

Purpose: The CyberKnife robotic radiosurgery system uses Synchrony respiratory motion compensation, which requires independent performance verification. In this work, the RADPOS 4D dosimetry system’s motion measurements are compared with internal fiducial position measurements. In addition, RADPOS measurements are compared with Synchrony’s predictive correlation model, which is based on internal fiducial and external LED marker position measurements. Methods: A treatment plan was created for a lung insert containing fiducials, RADPOS detector, and Solid Water tumor phantom. Two Quasar Respiratory Motion Phantoms (Q1 and Q2) and two RADPOS detectors (R1 and R2) were used: Q1 simulated lung motion with a lung insert moving in the superior/inferior direction, while Q2 simulated chest motion with a chest platform moving in the anterior/posterior direction. Before treatment, R1 was secured inside of the tumor phantom within Q1, while LED markers and R2 were positioned on the chest platform of Q2. Two treatment delivery cases were studied: isocentric plan (I) and non-isocentric patient plan (P). Four motion cases were studied: no motion (0), sinusoidal and in-phase (1), sinusoidal and out-of-phase (2), patient waveform and out-of-phase (3). A coordinate alignment algorithm was implemented, allowing RADPOS and model position data to be compared within the fiducial coordinate system. Results: The standard deviation of the differences between RADPOS and fiducial position measurements was below 0.6 mm for all experimental cases. The standard deviation of the differences between RADPOS and model position data was 1.0, 1.5, and 1.6 mm along the primary direction of motion for case I1, I2, and P3, respectively. Conclusion: Our work demonstrates that RADPOS is a useful tool for independent quality assurance of CyberKnife treatment with Synchrony respiratory compensation. RADPOS and fiducial position measurement closely match, and RADPOS confirms the effectiveness of CyberKnife’s Synchrony motion tracking. This work was supported by OCAIRO (Ontario Consortium for Adaptive Interventions in Radiation Oncology) grant.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Rotary Table Design for the Modular In-Chamber Electron Beam Welding System

The Modular In-Chamber Electron Beam Welding (MIC-EBW) system which is being designed and assembled under DOE Projects DE-NE0008846 (Phase 1--completed) and DE-NE0009039 (Phase 2—in progress) includes several major components: four modules (the lower vacuum module, electron beam module, a spacer module, and a lid), a robust rotary table, large vacuum pumps/system, electron beam welding system controls/power supply, and an electron beam generator/gun. Many of these components and their functions were described in the earlier EPRI-DOE report 3002018146. This report provides an overview of one of the primary components, the rotary table, that has been designed and will be manufactured by Rusach International in Phase 2 of the project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of NuCycle® Process Waste Streams and Identification of Candidate Waste Forms (CRADA 719) Abstract

The objective of this project is to support collaboration between PNNL and Curio to address technical gaps in the immobilization of waste streams generated by the NuCycle® process, thereby improving the overall viability of the technology. This work will be carried out in two phases, described below. Phase 1 – Waste Management Study The first phase consists of a comprehensive waste management study focused on the waste streams produced during the NuCycle® process, including those containing long lived fission products (LLFPs, e.g., I 129) and transuranic elements (TRUs). This phase involves compiling waste compositions and characteristics based on recently completed NuCycle® testing and modeling efforts. Established waste forms and processing methods will be identified for streams where they are applicable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Particle acceleration in solar flares

A review of observational data supports the proposal that there are two distinct phases of particle acceleration in solar flares. 'Phase 1' is associated with the flash phase and is here interpreted as acceleration during field-line reconnection. 'Phase 2' is associated with type II and type IV radio bursts, and is ascribed to stochastic acceleration in the turbulent plasma behind a magnetohydrodynamic shock formed ahead of an ejected plasmoid.

Sturrock, P. A.↗

Large spacecraft pointing and shape control

The overall objective of this program was the development of control algorithms that allow the concurrent operation of slewing, pointing, vibration, and shape control subsystems. This objective is important for near-term space surveillance missions that require the rapid retargeting and precise pointing of large flexible satellites. The success of these missions requires the design and concurrent operation of the various interacting control subsystems. There were two phases conducted: phase 1 was mathematical model development, and phase 2 was control development. The program is detailed and major conclusions given.

Hale, Arthur L.↗

Flight Testing of In-Time Safety Assurance Technologies for UAS Operations

Ongoing research at NASA is driven by a strategic plan defined by the Aeronautics Research Mission Directorate and a vision for future In-Time Aviation Safety Management Systems (IASMS) as described by the National Academies. In both visions, system safety awareness and provision are expanded through increased access to relevant data; integrated analysis and predictive capabilities; improved real-time detection and alerting of domain-specific hazards; decision support, and in some cases, automated risk mitigation strategies. One primary research focus is to develop means by which more timely (i.e., “in-time”) actions may be taken to mitigate precursors, anomalies, or trends that are observed during operations. In this paper, we describe such means as a collection of Services, Functions, and Capabilities (SFCs) that are supported by an underlying information system. For example, an integrated risk assessment capability is envisioned that continuously monitors safety-related metrics and margins and recommends timely operational changes. Assessment functions and/or services can be based on data analytics and predictive models derived from heterogeneous data sets that span relevant indicator metrics and their time histories. Likewise, on-board functions can identify and reduce susceptibility to precursor conditions that have led (and can lead) to aircraft loss-of-control or out-of-control accidents. This paper summarizes development and testing of such an information system tailored to hazards anticipated for future highly autonomous flight missions near and over densely populated areas. Testing is accomplished via simulation and by using small, unmanned aircraft operating over a test range at NASA’s Langley Research Center. Flight plans and test scenarios are defined to emulate several use-cases, including package delivery; reconnaissance; fire management; and urban air taxi vertiport operations. Two test phases are summarized with Phase 1 occurring in (2019-2020) and Phase 2 ongoing (2021-present). Results focus on SFC performance, technology readiness level assessment, and requirements discovery/validation. Companion papers are cited throughout for additional details on the recent testing.

safety management↗

Assessment of Vessel Requirements for the U.S. Offshore Wind Sector

Douglas-Westwood was commissioned by the US Department of Energy (DOE) to investigate the anticipated demand for various vessel types associated with offshore wind development in the United States through 2030, as well as to assess related market barriers and mitigating policy options. This Report contains our findings. It is intended to provide guidance on all vessel-related aspects of offshore wind installation to a wide range of audiences, including federal and state-level government agencies, research institutions, prospective project developers, installation companies, vessel operators and shipbuilders, as well as the general public. To develop scenarios of potential vessel demand, Douglas-Westwood, in conjunction with Navigant Consulting and the National Renewable Energy Laboratory (NREL) and in cooperation with the Department of Energy (DOE), established detailed rollout scenarios for four US offshore wind regions, respectively Atlantic Coast, Great Lakes, Gulf Coast and Pacific Coast. Rollout scenarios were based on DOE-provided offshore wind capacity targets by region in three sets of variations, reflecting several possible rates of wind farm installation and differing levels of technology advancement prior to 2030. The highest growth scenario reflects the potential for 54 GW of capacity installed by 2030 in alignment with the National Offshore Wind Strategy issued in 2011 by DOE and the Department of the Interior. The resulting scenarios used throughout this Report are referred to as the High Growth – High Technology (HH) scenario, the Medium Growth – High Technology (MH) scenario, and the Low Growth – Low Technology (LL) scenario. These scenarios inform our views of the vessel requirements in the US offshore wind sector through 2030. Each scenario falls into two phases: Phase 1 covers 2013 to 2020, while Phase 2 covers 2021 to 2030. The rollout scenarios are discussed in detail in Chapter 7 of this Report.

17 WIND ENERGY↗

Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗