Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Irradiation Planning for Fully-Ceramic Micro-encsapsulated fuel in ATR at LWR-relevant conditions: year-end report on FY-2011

This report presents the estimation of required ATR irradiation levels for the DB-FCM fuel design (fueled with Pu and MAs). The fuel and assembly designs are those considered in a companion report [R. S. Sen et al., FCR&D-2011- 00037 or INL/EXT-11-23269]. These results, pertaining to the DB-FCM fuel, are definitive in as much as the design of said fuel is definitive. In addition to the work performed, as required, for DB-FCM fuel, work has started in a preliminary fashion on single-cell UO2 and UN fuels. These latter activities go beyond the original charter of this project and although the corresponding work is incomplete, significant progress has been achieved. However, in this context, all that has been achieved is only preliminary because the corresponding fuel designs are neither finalized nor optimized. In particular, the UO2 case is unlikely to result in a viable fuel design if limited to enrichment at or under 20 weight % in U-235. The UN fuel allows reasonable length cycles and is likely to make an optimal design possible. Despite being limited to preliminary designs and offering only preliminary conclusions, the irradiation planning tasks for UO2 and UN fuels that are summarized in this report are useful to the overall goal of devising and deploying FCM-LWR fuel since the methods acquired and tested in this project and the overall procedure for planning will be available for planning tests for the finalized fuel design. Indeed, once the fuel design is finalized and the expected burnup level is determined, the methodology that has been assembled will allow the prompt finalization of the neutronic planning of the irradiation experiment and would provide guidance on the expected experimental performance of the fuel. Deviations from the expected behavior will then have to be analyzed and the outcome of the analysis may be corrections or modifications for the assessment models as well as, possibly, fuel design modifications, and perhaps even variation of experimental control for future experimental phases. Besides the prediction of irradiation times, preliminary work was carried out on other aspects of irradiation planning. In particular, a method for evaluating the interplay of depletion, material performance modeling and irradiation is identified by reference to a companion report. Another area that was addressed in a preliminary fashion is the identification and selection of a strategy for the physical and mechanical design of the irradiation experiments. The principal conclusion is that the similarity between the FCM fuel and the fuel compacts of the Next Generation Nuclear Plant prismatic design are strong enough to warrant using irradiation hardware designs and instrumentation adapted from the AGR irradiation tests. Modifications, if found necessary, will probably be few and small, except as pertains to the water environment and its implications on the use of SiC cladding or SiC matrix with no additional cladding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Developing The Organized Village of Kasaan's Strategic Energy Plan

The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

99 GENERAL AND MISCELLANEOUS↗

Underground Test Area Project Waste Management Plan, Revision 3

This plan provides a general framework for all UGTA participants to follow for the characterization, torage/accumulation, treatment, and disposal of wastes generated by UGTA Sub-Project activities. The objective of this Waste Management (WM) Plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Those wastes generated will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NSO ERP waste minimization and pollution prevention objectives. Section 1.0 of this plan provides an introduction to the UGTA Sub-Project. Section 2.0 describes the responsibilities of UGTA participants. Section 3.0 describes UGTA Sub-Project activities, wastes expected to be produced from these activities, characterization requirements and parameters, and proper management and minimization of wastes. Section 4.0 contains a list of references. Attachment 1 to this plan is the Fluid Management Plan (FMP) and details specific strategies for management of fluids produced under UGTA operations.

54 ENVIRONMENTAL SCIENCES↗

Community Energy Planning: Best Practices and Lessons Learned in NREL's Work with Communities

Whether driven by local goals and actions, external market forces, or both, the clean energy transition is accelerating. The associated increase in clean energy deployment occurs on the ground in communities. As a result, communities increasingly need technical expertise and assistance in planning for and managing the energy transition. Building on decades of work with state, local, and tribal jurisdictions, NREL's work providing modeling, analysis, and technical expertise to enable more data-driven community energy planning is expanding. To inform and enhance NREL's capabilities in community energy planning and provide a resource for others working in this space, NREL developed this best-practices document through interviews with seasoned NREL practitioners and a review of the literature on equitable community planning. Findings include five best practices for community energy planning that NREL practitioners can apply to increase the impact of their work.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution Capacity Expansion Planning: Current Practice, Opportunities, and Decision Support

The distribution utility industry and its engineers are experiencing monumental shifts in consumer needs and expectations. Characterizing future native loads as compared to net load demand for long-term capacity planning is especially difficult, as consumers are increasingly adopting prosumer technologies. This paper is the culmination of 5 months of utility interviews coordinated by the National Renewable Energy Lab (NREL) and Kevala, Inc. (Kevala) to better understand distribution capacity planning challenges. The interviews covered all aspects of capacity planning including load and DER forecasting, criteria for assessing system constraints, solution types, and organizational and decision-making structures. Our intent is to provide insight into distribution capacity planning decision support needs for utilities and the increasing number of stakeholders involved, from state and regulatory agencies to community and solution providers with interest in increasing their understanding in the distribution capacity planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVENT PLANNING USING FUNCTION ANALYSIS

Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

99 GENERAL AND MISCELLANEOUS↗

Community Energy Planning: Best Practices and Lessons Learned in NREL's Work with Communities

The clean energy transition is accelerating due to local, state, and national actions combined with external market forces. Regardless of where goals are set and decisions are made, clean energy deployment occurs on the ground in communities. As a result, communities increasingly need technical expertise and assistance with planning for and managing the energy transition. Building on decades of work with state, local, and tribal jurisdictions, the National Renewable Energy Laboratory (NREL) increasingly provides community-driven modeling, analysis, and technical assistance to enable more data-driven and equitable community energy planning. To inform and enhance NREL's capabilities in community energy planning and provide a resource for others working in this space, the Joint Institute for Strategic Energy Analysis (JISEA) Sustainable Communities Catalyzer supported this best-practices presentation based on interviews with seasoned NREL practitioners and a literature review on equitable community energy planning. Findings include five best practices for community energy planning that NREL practitioners and others can apply to strengthen their impact: 1) do your homework in preparation for community interactions; 2) be humble, authentic, and honest in your interactions with community members; 3) respect community agency in every step of the process; 4) meet the community where they are; 5) democratize participation.

best practices↗

Municipal Fleet Action Plan Guide

This action plan template and guide have been designed to support light-duty or medium-duty municipal fleet managers as they plan to adopt electric vehicles. The resource is an adaptation of content created by the National Laboratory of the Rockies (NLR), with support from World Resources Institute (WRI), for participants in the U.S. Department of Energy's Energy to Communities peer-learning cohort, Charting a Path to Municipal Fleet Electrification. Fifteen participating municipalities joined monthly cohort workshops from July through December 2024 to learn and plan for their own fleet electrification. Clean Cities and Communities coalitions supported participating municipalities throughout the cohort series by conducting fleet analysis and planning activities on their behalf. This template is an adapted version of cohort activities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, andtransmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

17 WIND ENERGY↗

Structured versus narrative reporting of pelvic MRI in perianal fistulizing disease: impact on clarity, completeness, and surgical planning

Objective: To evaluate clarity, completeness, and impact on surgical planning of MRI reporting of perianal fistulizing disease using a structured disease-specific template versus narrative reporting for planning of disease treatment by colorectal surgeons. Materials and methods: In this HIPAA-compliant, IRB-approved study with waiver of informed consent, a structured reporting template for perianal fistulizing disease MRIs was developed based on collaboration between colorectal surgeons and abdominal radiologists. The study population included 45 consecutive patients who underwent pelvic MRI for perianal fistulizing disease prior to implementation of structured reporting, and 60 consecutive patients who underwent pelvic MRI for perianal fistulizing disease after implementation of structured reporting. Objective evaluation of the reports for the presence of 12 key features was performed, as also subjective evaluation regarding the clarity and completeness of reports, and impact on surgical planning. Results: Significantly more key features were absent in narrative reports [mean: 6.3 ± 1.8 (range 3–11)] than in structured reports [mean: 0.3 ± 0.9 (range 1–5)] (p ≤ 0.001). The use of structured reporting also increased the percentage of completeness (72.5–88.3% for surgeon 1, and 61.2–81.3% for surgeon 2; p = 0.05 and 0.03, respectively), helpfulness in surgical planning (7.1 ± 1.5–7.6 ± 1.5 for surgeon 1, and 5.8 ± 1.4–7.1 ± 1.1 for surgeon 2; p = 0.05 and p < 0.001, respectively), and clarity (7.6 ± 1.3–8.3 ± 1.1 for surgeon 1, and 5.2 ± 1.4–7.1 ± 1.3 for surgeon 2; p = 0.006 and p < 0.001, respectively) of the reports. Conclusion: Structured MRI reports in patients with perianal fistulizing disease miss fewer key features than narrative reports. Moreover, structured reports were described as more complete and clear, and more helpful for treatment planning.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

A wide range of factors within spatial planning can affect health. There is therefore an important scope for Strategic Environmental Assessment (SEA) of spatial plans to protect and improve human health. Due to the EU Directive 2001/42/EC on SEA, health has been made explicit in Danish legislation and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts are included in SEA practice and are being interpreted in a broader sense than what the national guidance exemplifies. The frequent included health aspects are noise, drinking water, air pollution, recreation/outdoor life and traffic safety. The primary determinant for health is transport-whether it is at the overall or local planning level. The main conclusion is that SEA shows a potential to catalyse healthier spatial planning. Despite the broad inclusion of health in SEA practice the examination shows potential improvements, hereunder qualification of assessments by better explaining the nature and significance of impacts and by including the distributional aspects of human health impacts. Inclusion from the health sector is put forward as an important institutional mean to secure cross disciplinarily and higher quality assessment.

54 ENVIRONMENTAL SCIENCES↗

One common way - The strategic and methodological influence on environmental planning across Europe

In the last decades the European Union exerted influence on precautionary environmental planning by the establishment of several Directives. The most relevant were the Habitat-Directive, the EIA-Directive, the SEA-Directive and the Water Framework Directive. Comparing these EU policies in the area of environmental precaution it becomes obvious that there is a lot of common ground. Thus, the conclusion seems likely that the European Union, in doing so, has intended to establish general planning concepts through introducing several methodological steps indicated by the regulations. The goal of this article is firstly to point out, which are the common planning principles, converted by methodological elements and secondly examine the consideration of these planning concepts by the implementation and application in the member states. In this context it is analysed whether the connections and divergences between the directives lead to significant differences in the implementation process. To this aim the directives are shortly introduced and significant steps of the processes regulated by them are outlined. In the second steps the national legal implementation in the Alpine states and its consequences for the practical application are discussed. The results show a heterogeneous application of the EU principles. Within the comparative view on the four directives influence and causalities between the national implementation and the practical application were identified, which can be simplified as four types. Since a coherent strategic and methodological concept for improving environmental precaution planning from part of the EU is noticeable, more unity and comparability within the implementation is desirable, particularly in areas with comparable habitats such as the alpine space. Beyond this the trade-off between the directives poses an important task for the future.

54 ENVIRONMENTAL SCIENCES↗

Accounting for uncertainty in evaluating water quality impacts of urban development plan

The implementation of urban development plans causes land use change, which can have significant environmental impacts. In light of this, environmental concerns should be considered sufficiently at an early stage of the planning process. However, uncertainties existing in urban development plans hamper the application of strategic environmental assessment, which is applied to evaluate the environmental impacts of policies, plans and programs. This study develops an integrated assessment method based on accounting uncertainty of environmental impacts. And the proposed method consists of four main steps: (1) designing scenarios of economic scale and industrial structure, (2) sampling for possible land use layouts, (3) evaluating each sample's environmental impact, and (4) identifying environmentally sensitive industries. In doing so, uncertainties of environmental impacts can be accounted. Then environmental risk, overall environmental pressure and potential extreme environmental impact of urban development plans can be analyzed, and environmentally sensitive factors can be identified, especially under considerations of uncertainties. It can help decision-makers enhance environmental consideration and take measures in the early stage of decision-making.

54 ENVIRONMENTAL SCIENCES↗

Testing three health impact assessment tools in planning: A process evaluation

There is increasing interest in Health Impact Assessment in planning. This paper describes the results of different approaches to health impact assessment (HIA) conducted in 10 municipalities and one county in Minnesota. The paper outlines the HIA processes, outputs, and short-term outcomes concluding that it is important to engage a diverse group of stakeholders. Overall, HIA is potentially an important new tool in the planning toolkit. Strategic use of HIA to evaluate draft plans and inform plan updates and project redesigns can help raise awareness about health issues and focus planning on important human problems.

54 ENVIRONMENTAL SCIENCES↗

Implementing Strategic Environmental Assessment of spatial planning tools

After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

54 ENVIRONMENTAL SCIENCES↗

Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

54 ENVIRONMENTAL SCIENCES↗

Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainly because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.

54 ENVIRONMENTAL SCIENCES↗