Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Black start demonstrations of small hydropower plants with energy storage

The U.S. has at least 500 municipal, electric co-operative, and publicly owned utilities with hydropower plants. These are mostly grid-connected to support the national grid. However, due to small size (at most 10 MW) and low ramping capacity, many of these hydropower plants lack the capability to form local grids to provide backup power to critical loads (during grid outage) and rural areas. Energy storage, such as Li-Ion batteries or ultracapacitors, can be used to enable these capabilities. Because this technology is relatively new, proof-of-concept demonstrations are needed to de-risk the approach before it can be deployed at scale. Two field demonstrations have been performed to validate this approach, namely, a 375 kVA / 1.24 kWh ultracapacitor with Idaho Falls Power’s 3.6 MW Old Lower (OL), 8.9 MW Lower Bulb (LB), and 8.9 MW City Bulb (CB) hydropower plants; and a 250 kVA / 320 kWh Li-Ion battery with Fall River Electric Cooperative’s 5.5 MW Felt hydropower plant. The Idaho Falls Power demonstration showed the resilience benefits of hybridization, and the Fall River Electric demonstration showed what the minimal requirements are to retrofit a hydropower plant for black start. These demonstrations are funded by the U.S. Department of Energy Water Power Technologies Office HydroWIRES Initiative.

13 HYDRO ENERGY↗

Isotope Specific Remediation Media and Systems - 13614

On March 11, 2011, now two years ago, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. While, of course, most of the outcome of this unprecedented natural and manmade disaster was a negative, both in Japan and worldwide, there have been some extremely invaluable lessons learned and new emergency recovery technologies and systems developed. As always, the mother of invention is necessity. Among these developments has been the development and full-scale implementation of proven isotope specific media (ISMs) with the intent of surgically removing specific hazardous isotopes for the purpose of minimizing dose to workers and the environment. The first such ISMs to be deployed at the Fukushima site were those removing cesium (Cs-137) and iodine (I-129). Since deployment on June 17, 2011, along with treated cooling water recycle, some 70% of the curies in the building liquid wastes have been removed by the Kurion system alone. The current levels of cesium are now only 2% of the original levels. Such an unprecedented, 'external cooling system' not only allowed the eventual cold shut down of the reactors in mid-December, 2011, but has allowed workers to concentrate on the cleanup of other areas of the site. Water treatment will continue for quite some time due to continued leakage into the buildings and the eventual goal of cleaning up the reactors and fuel pools themselves. With the cesium removal now in routine operation, other isotopes of concern are likely to become priorities. One such isotope is that of strontium, and yttrium (Sr-90 and Y-90), which is still at original levels causing further dose issues as well as impediments to discharge of the treated waste waters. For over a year now, a new synthetic strontium specific media has been under development and testing both in our licensed facility in Oak Ridge, Tennessee, but also in confirmatory tests by the Japan Atomic Energy Agency (JAEA) in Japan for Tokyo Electric Power Company (TEPCO). The tests have proven quite successful, even in high salt conditions, and, with loading and dose calculations being completed, will be proposed to add to the existing cesium system. There is no doubt, as high gamma isotopes are removed, other recalcitrant isotopes such as this will require innovative removal media, systems and techniques. Also coming out of this international effort are other ISM media and systems that can be applied more broadly to both Commercial Nuclear Power Plants (NPPs) as well as in Department of Energy (DOE) applications. This cesium and strontium specific media has further been successfully tested in 2012 at a Magnox station in the UK. The resulting proposed mitigation systems for pond and vault cleanup look quite promising. An extremely unusual ISM for carbon 14 (C-14), nickel (Ni-63) and cesium (Cs-137) has been developed for Diablo Canyon NPP for dose reduction testing in their fuel pool. These media will be deployed in Submersible Media Filter (SMF) and Submersible Columns (SC) systems adapted to standard Tri-Nuclear{sup R} housings common in the U.S. and UK. External Vessel Systems (mini-Fukushima) have also been developed as a second mitigation system for D and D and outages. Finally, technetium (Tc- 99) specific media developed for the Waste Treatment Plant (WTP) recycle or condensate (secondary) waste streams (WM 2011) are being further perfected and tested for At-Tank Tc-99 removal, as well as At Tank Cs media. In addition to the on-going media development, systems for deploying such media have developed over the last year and are in laboratory- and full-scale testing. These systems include the fore mentioned Submersible Media Filters (SMF), Submersible Columns (SC) and external pilot- and full-scale, lead-lag, canister systems. This paper will include the media development and testing, as well as that of the deployment systems themselves. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extreme Weather Events and PV Systems Impact

The impact of extreme weather events on PV performance was studied by comparing the National Oceanic and Atmospheric Administration database on severe weather with the National Renewable Energy Laboratory's (NREL) PV Fleet database on continuous PV performance. We identified 170 systems that were immediately impacted by weather events. These severe weather events lead to a median loss of only 1 % of annual production. However, flooding and high wind events were found to have an extremely long tail extending to 60 % loss, showing that these discrete events can pose a substantial risk to PV systems. Besides the short-term impact of lost production due to outages, we also found a statistically significant increased performance loss rate (PLR) for high wind events above 90 kilometer/hour, by comparing PLR before and after these events. Similarly, hail events caused higher PLR for hail sizes of and above 25 mm indicating that more stringent hail testing for PV modules is required. In addition, very high snow loads may also cause increased PLRs, but more data are required to better quantify the impact. These findings illustrate the substantial risk extreme weather events pose short-and long-term to fielded PV installations.

extreme weather↗

Design of Removable Shield Modules for Nuclear Plant Applications Using Monte Carlo Modeling - 16264

A new modular shielding system has been designed and developed for nuclear plant applications as a replacement for traditional concrete blocks and plugs. The shield comprises interlocking modules that are custom designed using CAD and Monte Carlo modelling methods. The key benefit of these new modules is that they can be quickly removed and re-installed to allow temporary access to high radiation environments e.g. for maintenance and repair of plant equipment at nuclear power plants or waste handling facilities. The traditional method for construction of these removable concrete blocks and plugs was to cast them in place. Within the aging fleet of commercial reactors, some plants are experiencing concrete degradation of these shield blocks and plugs as well as failure of lifting points. Additionally, the existing plugs are difficult to remove and re-install. The new modular system comprises a rigid steel enclosure filled with lead that can be installed in a fraction of the normal time. This approach can accelerate outage times leading to reduced dose uptake to operators and provide significant long term cost savings. Use of Monte Carlo methods enables the shielding modules to be designed efficiently for neutron and gamma ray attenuation with the minimum necessary thickness of lead and steel. Furthermore, the modelling ensures the design is not compromised by streaming pathways, for example at the overlaps between modules or through internal structural components. Shielding modules were supplied to the Brunswick Nuclear Power station (BNP), operated by Duke Energy, located in southeast United States. These modules have been installed to replace concrete shield plugs that are located on the roof above a Feed Water Heaters (FWH) bay. While specific in application, this project demonstrates that the shield module design concept could be expanded to address vertical block walls routinely found in personnel and equipment access hatches. This approach is applicable to a wide variety of new and existing nuclear facilities and will lead to improved safety and reduced lifetime costs all the way through to future decommissioning and dismantling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solving Operational Challenges with INL's Integrated Waste Treatment Unit (IWTU) - 19003

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. The initial commissioning was typical, until June of 2012 when an over-pressurization event resulted in a significant release of solids. Recovery and subsequent testing systematically dealt with challenges associated with operation of three primary vessels: the denitration and mineralization reformer, the process gas filter, and the carbon reduction reformer. Additional challenges with the following ancillary systems surfaced during testing: the auger/grinder, sample system, and the approach to decontamination of the process vessels prior to outages. The major operational challenges covered fluidization issues, premature refractory failure, high-temperature gaseous filter element blinding, cementitious material formation in solids handling equipment, sampling reliability, and vessel decontamination. The purpose of this paper is to share the lessons learned during the extended commissioning of the Integrated Waste Treatment Unit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Waste Treatment Unit Plan for Vessel and Canister Decontamination - 19283

The Integrated Waste Treatment Unit (IWTU) was designed to use a proprietary fluidized-bed steam reforming process to treat 3,400,000 L (898,184 gal) of radioactive sodium bearing waste (SBW). IWTU is currently in commissioning and startup phase prior to future processing of SBW. The current simulant SBW is introduced into the denitration mineralization reformer and transformed into a dry, granular product that is filtered and eventually transferred into a product canister. The intention of the facility is to process the SBW and store the product canisters in vaults to await shipping to a depository at a later date. The IWTU is a part of the Idaho Cleanup Project Core, located at the INL Site and operated by Fluor Idaho, LLC. During early operation and testing of the facility, it was observed that the original process equipment decontamination system did not possess the capability to recover from plant shutdowns that result from upset conditions or maintenance outages; thus, a need for a redesigned decontamination system was identified. This paper discusses current decontamination methods and their capabilities and areas where these methods fall short of decontaminating process equipment and product canisters. This paper discusses the design and purpose of the decontamination methods being tested and developed for implementation into the IWTU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Davis-Besse Water Processing System Upgrade - 19654

This paper looks at the in-house liquid radwaste (LRW) processing system configuration at Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The suboptimal performance of that system, which had been in service for over three decades, prompted Plant Management to canvass the industry for LRW processing technologies and techniques that might offer improvements. The goal was to upgrade water processing performance at Davis-Besse, particularly during outages, when water generation is high and the most difficult to decontaminate water is produced. This paper reviews the goals established by Management to guide the selection of technology and equipment components. The chosen vendor would be responsible for designing a system that would incorporate the plant's existing equipment as much as feasible, while respecting the limited space and funding available for the project. The LRW processing system changes eventually made by Davis-Besse are identified and discussed. We also offer a summary of pre- and post-upgrade operation and performance in vital areas, including manpower requirements (for operation and maintenance), effluent quality, waste production and overall operating cost. The information and experiences cited in this paper are directly applicable to other nuclear power plants who might contemplate an upgrade of LRW processing systems or of individual system components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BWR modernization project: installation of a new digital feedwater control system - 295

A European BWR plant carried out a relevant and pioneering modernization project regarding the Feedwater and Feed Pump Turbine Control System, replacing the legacy analogic control with the new General Electric MarkVIe digital system. This digital instrumentation and control modernization, motivated by obsolescence, had a great impact on the main control room and on the plant operation. Tecnatom collaborated with the nuclear power plant in the project performing the following activities: early installation of the system in the full scope and classroom simulators, Human Factors Engineering (HFE) Verification and Validation (V and V), Simulation Assisted Engineering (SAE), design and implementation of cyber secure communication with the Plant Process Computer (PPC), operating procedures modification and plant operators training. Those activities contributed to the success of the project that was completed during the refueling outage as planned. Scheduling HFE verification before the design freeze allowed the plant to modify the Human Machine Interface (HMI) to comply with the standards and increase safety without overcharging the project. SAE resulted in the reduction of costs and time during the system commissioning through the detection of discrepancies and improvements in the control, covering different plant scenarios. All the activities carried out in the simulators before the implementation of the system in the plant contributed to validate it and to build confidence in the new control among the plant personnel. New digital system communication interfaces with the PPC saved cable laying works and allowed future expansions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhanced electrical penetration components meet the high safety standards required for China's HTR-PM Shidaowan and generation mPower small modular reactors - 300

Enhanced glass-to-metal feedthroughs will be used to carry key instrumentation and control (I and C) signals in China's high-temperature, gas-cooled pebble-bed modular reactor (HTR-PM) at Shidaowan, and in Small Modular Reactor (SMR) prototyping. Chinergy Co., Ltd and Jiamusi Electric Machine Co., Ltd will use the feedthroughs, also called electrical penetration assemblies (EPAs), at the Shidaowan twin-reactor high temperature reactor (HTR). These feedthroughs are manufactured using specialized processes that make them far more robust than counterparts made with organic or ceramic materials. Improved EPAs manufactured by SCHOTT are the only feedthrough solution that can be used in the primary loop of an HTR because organic seals cannot withstand the high temperatures and pressures of this environment. Glass-to-metal seals (GTMS) are made using inorganic, non-aging materials which enable a virtually unlimited lifespan in high-temperature, high-radiation and high-pressure applications. This I and C technology package is being enhanced by the development and testing of new mineral-insulated (MI) cable connectors and EPAs made of crystallized glass-ceramic combined with superalloys. The EPAs have a maintenance-free lifespan of over 60 years, preventing any outage time related to these components and subsequently reducing costs associated with shutdowns. They are far more robust than organic seals and provide increased safety at a lower lifetime cost. Resistance against high pressure and high temperature are especially ideal qualities that make EPAs a valuable choice for environments with high standards for fire protection, such as nuclear plants, subsea oil drilling, or any other underwater application. Due to their significant offering of safety-relevant qualities, the EPAs have also been chosen by BWXT for implementation in its mPower SMR. Small modular reactor requirements are complex and very challenging but are met by the new EPA components, which will help form a strong I and C safety chain. Unlike ordinary compression glass-to-metal seals, GTMS with crystallized glass-ceramic have the ability to withstand temperatures of over 350 deg. C / 662 deg. F and operating pressures of 3500 bar. Furthermore, their lifetime is qualified for up to 60 years, including pressure and radiation requirements in accordance with the latest IEC/IEEE standards. Higher-specification EPAs and MI cable connectors have been designed into severe accident I and C instruments, including advanced hydrogen and oxygen sensors that exceed the challenging requirements of both HTR and SMR applications. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Zero-Discharge Policy and its Implications for Tritium Inventory at Columbia Generating Station

Columbia Generating Station, a boiling water reactor (BWR), has not made a discharge of radioactive liquids to the Columbia River since 1998. A concern raised when this zero-discharge policy was first considered was that radioactive tritium produced during plant operation would be concentrated in reactor plant water due to the reduced rate at which tritiated water is replaced with makeup water. Elevated concentration of tritium in plant systems could result in internal exposure, especially during refueling outages when personnel are working in the vicinity of the reactor cavity. Tritium data before and after implementation of the zero-discharge policy demonstrate that there has been no significant effect on tritium concentration in plant systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increasing ROI Using Your Digital Twin for Model Based Engineering

The purpose of this work is to identify innovative ways of using the plant reference simulator or digital twin differently than it has traditionally been used in the past. This paper will identify reasons that the plant reference simulator will support varying levels of model based design and engineering. I will point out real world examples in which the plant reference simulator was used to identify problems with engineering designs, digital control systems and plant modifications. The earlier these issues can be identified and resolved, the less impact they have on the plant modification or upgrade. By using the plant reference simulator earlier in the engineering process, utilities and engineering organizations can minimize costly outage extensions and increase the return on the investment made in the simulator.

42 ENGINEERING↗

Demonstration of Load-Follow Operations with Standalone BISON through VERA

As part of the Consortium for Advanced Simulation of Light Water Reactors (CASL), the Virtual Environment for Reactor Applications (VERA) is being developed to provide high-fidelity multiphysics simulations of nuclear reactor cores. VERA contains a number of single physics packages that are coupled together. MPACT is the primary deterministic neutron transport solver, CTF provides thermal hydraulics solutions, and BISON - which is built off of the MOOSE framework - is used for fuel performance simulations. Over the past year, a standalone BISON capability has been developed using a one-way coupling between MPACT/CTF coupling calculations and BISON. This has allowed CASL contributors to gain insight into the fuel performance characteristics while a more tightly coupled methodology between MPACT, CTF, and BISON has been under development. The standalone capability has been used to simulate Watts Bar Unit 1 (WBN1) Cycles 1-3 and to screen for quantities of interest to pellet-clad interaction in Cycles 6-7. The simulation and screening results are presented here. CASL recently partnered with Exelon and the University of Illinois at Urbana Champaign (UIUC) to begin simulating some of Exelon's plants, with particular focus on load-follow operations. In such operations, the power output from the plant will vary based on the demand or anticipated demand at the time. For example, demand is much lower late at night than during the day when people are awake, so it operating the plant at lower power in the evenings could be advantageous. Historically, nuclear power generation has been among the cheapest sources of energy, so most plants in the United States have been operated at full power except for outages and various small scale events. However, in the current economic climate, priorities have changed. A number of questions arise when load-follow operations are considered, particularly with respect to VERA's tools and capabilities. Can the coupled neutronics and thermal hydraulics simulations with MPACT and CTF perform well without substantial convergence issues? Can BISON handle the somewhat rapid power changes present with load-follow? Will clad hoop stresses be alarmingly high as a result of these power changes? This work addresses these questions and demonstrates operations to assess feasibility and robustness before Exelon and UIUC proceed with their simulations using VERA. To demonstrate load-follow capability, two test problems were developed. The first is a single rod that experiences nominal operations during Cycle 1, and then it simulates 18 months of representative load-follow operations in Cycle 2. This single-rod case was used to test the robustness of MPACT, CTF, and BISON on a typical rod. The second problem is a quarter-core model based on WBN1, Cycle 3, with a single month of load-follow operations inserted into the middle of the cycle. This provides better understanding of the stresses to the clad during the numerous power changes. Sections of this article are adapted from the original, full technical report on this capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems: Preprint

This work discusses methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices are critical in many power systems applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Sabathani Community Center Solar + Battery Resilience Hub

To meet south Minneapolis, Minnesota's clean energy goals, the community exploring opportunities to transition Sabathani Community Center into a resilience hub to provide critical community services during power outages, including shelter and warmth or cooling, continued food distribution services, and more. The National Renewable Energy Laboratory, through the U.S. Department of Energy's Communities LEAP (Local Energy Action Program) pilot, worked with Sabathani to quantify the costs and benefits of installing stand-alone solar photovoltaics (PV) and PV paired with battery systems to reduce energy costs, avoid emissions, and improve resilience.

battery energy storage system↗