Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Ares Integrated Vehicle System Safety Team

NASA is working on the Constellation Program to go to the Moon and beyond. The Program contains a number of projects: a) The Ares I Launch Vehicle for the Orion Crew Module; b) The Ares V Launch Vehicle to launch large payloads into orbit, including the Earth Departure Stage (EDS); d) The Orion vehicle to transport the crew to orbit and to other destinations; and d - The Altair Lunar Lander

Wetherholt, Jon↗

Variations of the Mid-IR Aromatic Features Inside and Among Galaxies

We present the results of a systematic study of mid-IR spectra of Galactic regions, Magellanic H II regions, and galaxies of various types (dwarf, spiral, starburst), observed by the satellites ISO and Spitzer. We study the relative variations of the 6.2, 7.7, 8.6 and 11.3 micron features inside spatially resolved objects (such as M 82, M 51, 30 Doradus, M 17 and the Orion bar), as well as among 90 integrated spectra of 50 objects. Our main results are that the 6.2, 7.7 and 8.6 micron bands are essentially tied together, while the ratios between these bands and the 11.3 micron band varies by one order of magnitude. This implies that the properties of the PAHs are remarkably universal throughout our sample, and that the relative variations of the band ratios are mainly controlled by the fraction of ionized PAHs. In particular, we show that we can rule out the modification of the PAH size distribution as an explanation of these variations. Using a few well-studied Galactic regions (including the spectral image of the Orion bar), we give an empirical relation between the I(6.2)/I(11.3) ratio and the ionization/recombination ratio Go/n(sub e) x square root of(T(sub gas)). Finally, we discuss the physical interpretation of the I(6.2)/I(11.3) ratio, on galactic size scales.

Galliano, F.↗

Simulated Reentry Heating by Torching

The two first order reentry heating parameters are peak heating flux (W/cm2) and peak heat load (kJ/cm2). Peak heating flux (and deceleration, gs) is higher for a ballistic reentry and peak heat load is higher for a lifting reentry. Manned vehicle reentries are generally lifting reentries at nominal 1-5 gs so that personnel will not be crushed by high deceleration force. A few off-nominal manned reentries have experienced 8 or more gs with corresponding high heating flux (but below nominal heat load). The Shuttle Orbiter reentries provide about an order of magnitude difference in peak heating flux at mid-bottom (TPS tiles, approximately 6 W/cm2 or 5 BTU/ft2- sec) and leading edge (RCC, approximately 60 W/cm2 or 50 BTU/ft2- sec). Orion lunar return and Mars sample lander are of the same order of magnitude as orbiter leading edge peak heat loads. Flight temperature measurements are available for some orbiter TPS tile and RCC locations. Return-to-Flight on-orbit tile-repair-candidate-material-heating performance was evaluated by matching propane torch heating of candidate-materials temperatures at several depths to orbiter TPS tile flight-temperatures. Char and ash characteristics, heat expansion, and temperature histories at several depths of the cure-in-place ablator were some of the TPS repair material performance characteristics measured. The final char surface was above the initial surface for the primary candidate (silicone based) material, in contrast to a receded surface for the Apollo-type ablative heat shield material. Candidate TPS materials for Orion CEV (LEO and lunar return), and for Mars sample lander are now being evaluated. Torching of a candidate ablator material, PICA, was performed to match the ablation experienced by the STARDUST PICA heat shield. Torching showed that the carbon fiberform skeleton in a sample of PICA was inhomogeneous in that sample, and allowed measurements (of the clumps and voids) of the inhomogeneity. Additional reentry heating-performance characterizations of high temperature insulation materials were performed.

Harvey, Gale A.↗

Crew Exploration Vehicle Environmental Control and Life Support Development Status

The Crew Exploration Vehicle (CEV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. The CEV is being developed to transport the crew safely from the Earth to the Moon and back again. This year, the vehicle continued to go through design refinements to reduce weight, meet requirements, and operate reliably. The design of the Orion Environmental Control and Life Support (ECLS) system, which includes the life support and active thermal control systems, is progressing through the design stage. This paper covers the Orion ECLS development from April 2008 to April 2009.

Lewis, John F.↗

Status of Constellation Pressure Garment Development

The Constellation Program requires the development of a space suit system to meet new requirements for launch, entry, and abort crew survival functions, microgravity intravehicular and extravehicular activities, and lunar surface exploration. This paper summarizes recent work and the current status of the NASA Constellation Space Suit Element Pressure Garment and Crew Survival Subsystem (PG/CS). The emphasis of the work by the PGS/CS team has been in the areas of feasibility studies toward PGS/CS architecture definition, risk mitigation, and requirements development. Included are results from component level engineering studies, testing in the Orion Vehicle and Orion seat mockups, microgravity testing on the Reduced Gravity Aircraft, occupant protection sled testing, analyses and studies, and their implications on Constellation PG/CS subsystem.

Ross, Amy↗

Development and Testing of a Sorbent-Based Atmosphere Revitalization System for the Crew Exploration Vehicle 2007/2008

The design of a Vacuum-Swing Adsorption (VSA) system to remove metabolic water and metabolic carbon dioxide from the Orion Crew Exploration Vehicle (CEV) atmosphere is presented. The approach for Orion is a VSA system that removes not only 100 percent of the metabolic CO2 from the atmosphere, but also 100% of the metabolic water as well, a technology approach that has not been used in previous spacecraft life support systems. The design and development of the Sorbent Based Atmosphere Regeneration (SBAR) system, including test articles, a facility test stand, and full-scale testing in late 2007 and early 2008 is discussed.

Knox, James C.↗

Food Mass Reduction Trade Study

Future long duration manned space flights beyond low earth orbit will require the food system to remain safe, acceptable, and nutritious while efficiently balancing appropriate vehicle resources such as mass, volume, power, water, and crewtime. Often, this presents a challenge since maintaining the quality of the food system can result in a higher mass and volume. The Orion vehicle is significantly smaller than the Shuttle vehicle and the International Space Station and the mass and volume available for food is limited. Therefore, the food team has been challenged to reduce the mass of the packaged food from 1.82 kg per person per day to 1.14 kg per person per day. Past work has concentrated on how to reduce the mass of the packaging which contributes to about 15% of the total mass of the packaged food system. Designers have also focused on integrating and optimizing the Orion galley equipment as a system to reduce mass. To date, there has not been a significant effort to determine how to reduce the food itself. The objective of this project is to determine how the mass and volume of the packaged food can be reduced while maintaining caloric and hydration requirements. The following tasks are the key elements to this project: (1) Conduct further analysis of the ISS Standard Menu to determine moisture, protein, carbohydrate, and fat levels. (2) Conduct trade studies to determine how to bring the mass of the food system down. Trade studies may include removing the water of the total food system and/or increasing the fat content. (3) Determine the preferred method for delivery of the new food (e.g. bars, or beverages) and the degree of replacement. (4) Determine whether there are commercially available products that meet the requirements. By the end of this study, an estimate of the mass and volume savings will be provided to the Constellation Program. In addition, if new technologies need to be developed to achieve the mass savings, the technologies, timeline, and budget will be identified at the end of the project.

Perchonok, Michele H.↗

SDBI 1904: Human Factors Assessment of Vibration Effects on Visual Performance during Launch

The primary objective of the of Human Factors Short Duration Bioastronautics Investigation (SDBI) 1904 is to determine visual performance limits during operational vibration and g-loads, specifically through the determination of minimal usable font sizes using Orion-type display formats. Currently there is little to no data available to quantify human visual performance under these extreme conditions. Existing data on shuttle vibration magnitude and frequency is incomplete, does not address seat and crew vibration in the current configuration, and does not address human visual performance. There have been anecdotal reports of performance decrements from shuttle crews, but no structured data has been collected. The SDBI is a companion effort to the Detailed Test Objective (DTO) 695, which will measure shuttle seat accelerations (vibration) during ascent. Data from the SDBI will serve an important role in interpreting the DTO vibration data. This data will be collected during the ascent phase of three shuttle missions (STS-119, 127, and 128). Both SDBI1904 and DTO 695 are low impact with respect to flight resources, and combined they represent an efficient and focused problem solving approach. The SDBI and DTO data will be correlated to determine the nature of perceived visual performance under varying vibrations and g-loads. This project will provide: * Immediate data for developing preliminary human performance vibration requirements * Flight validated inputs for ongoing and future ground-based research * Information of functional needs that will drive Orion display format design decisions

Shelby G Thompson↗

2008 Accomplishments for CEV Parachute Assembly System (CPAS)

The Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS) project is responsible for the design, development, fabrication, qualification and delivery of the CEV parachute system to support the Orion pad/ascent flight tests and the first three orbital flight tests (including the first human mission). This article will discuss the technical and research achievements accomplished in calendar year 2008, broken into three key categories: prototype testing and analysis (also referred to as the Generation 1 design), system requirements definition and design of the flight engineering development unit, and support for the Orion vehicle flight testing (primarily Pad-Abort 1).

Martin, Ricardo↗

Ares V: A National Launch Asset for the 21st Century

NASA is designing the Ares V as the cargo launch vehicle to carry NASA's exploration plans into the 21st century. The Ares V is the heavy-lift component of NASA's dual-launch architecture that will replace the current space shuttle fleet, complete the International Space Station, and establish a permanent human presence on the Moon as a stepping stone to destinations beyond. During extensive independent and internal architecture and vehicle trade studies as part of the Exploration Systems Architecture Study, NASA selected the Ares I crew launch vehicle and the Ares V to support future exploration. The smaller Ares I will launch the Orion crew exploration vehicle with four to six astronauts into orbit. The Ares V is designed to carry the Altair lunar lander into orbit, rendezvous with Orion, and send the mated spacecraft toward lunar orbit. The Ares V will be the largest and most powerful launch vehicle in history, providing unprecedented payload mass and volume to establish a permanent lunar outpost and explore significantly more of the lunar surface than was done during the Apollo missions. The Ares V also represents a national asset offering opportunities for new science, national security, and commercial missions of unmatched size and scope. Using the dual-launch Earth Orbit Rendezvous approach, the Ares I and Ares V together will be able to inject roughly 57percent more mass to the Moon than the Apollo-era Saturn V. Ares V alone will be able to send nearly 414,000 pounds into low Earth orbit (LEO) or more than 138,000 pounds directly to the Moon, compared with 262,000 pounds and 99,000 pounds, respectively for the Saturn V. Significant progress has been made on the Ares V to support a planned fiscal 2011 authority-to-proceed (ATP) milestone. This paper discusses recent progress on the Ares V and planned future activities.

Sumrall, Phil↗

Simulated Reentry Heating by Torching

The two first order reentry heating parameters are peak heating flux (W/square cm) and peak heat load (kJ/square cm). Peak heating flux (and deceleration, gs) is higher for a ballistic reentry and peak heat load is higher for a lifting reentry. Manned vehicle reentries are generally lifting reentries at nominal 1-5 gs so that personnel will not be crushed by high deceleration force. A few off-nominal manned reentries have experienced 8 or more gs with corresponding high heating flux (but below nominal heat load). The Shuttle Orbiter reentries provide about an order of magnitude difference in peak heating flux at mid-bottom (TPS tiles, approximately 6 W/square cm or 5 BTU/square ft - sec) and leading edge (RCC, approximately 60 W/square cm or 50 BTU/square ft- sec). Orion lunar return and Mars sample lander are of the same order of magnitude as orbiter leading edge peak heat loads. Flight temperature measurements are available for some orbiter TPS tile and RCC locations. Return-to-Flight on-orbit tile-repair-candidate-material-heating performance was evaluated by matching propane torch heating of candidate-materials temperatures at several depths to orbiter TPS tile flight-temperatures. Char and ash characteristics, heat expansion, and temperature histories at several depths of the cure-in-place ablator were some of the TPS repair material performance characteristics measured. The final char surface was above the initial surface for the primary candidate (silicone based) material, in contrast to a receded surface for the Apollo-type ablative heat shield material. Candidate TPS materials for Orion CEV (LEO and lunar return), and for Mars sample lander (MSL) are now being evaluated. Torching of a candidate ablator material, PICA, was performed to match the ablation experienced by the STARDUST PICA heat shield. Torching showed that the carbon fiberform skeleton in a sample of PICA was inhomogeneous in that sample, and allowed measurements (of the clumps and voids) of the inhomogeneity. Additional reentry heating-performance characterizations of high temperature insulation materials were performed.

Harvey, Gale A.↗

Objectives and Progress on Ground Vibration Testing for the Ares Launch Vehicles

NASA has conducted dynamic tests on each of its major launch vehicles during the past 45 years. Each test has provided invaluable data to correlate and correct analytical models used to predict structural responses to differing dynamics for these vehicles. With both Saturn V and Space Shuttle, hardware changes were also required to the flight vehicles to ensure crew and vehicle safety. The Ares I IVGVT will undoubtedly provide similar valuable test data to support successful flights of the Constellation Program. The IVGVT will provide test determined natural frequencies, mode shapes and damping for the Ares I. This data will be used to support controls analysis by providing this test data to reduce uncertainty in the models. The value of this testing has been proven by past launch vehicle successes and failures. Performing dynamic testing on the Ares vehicles will provide confidence that the launch vehicles will be safe and successful in their missions. In addition, IVGVT will provide the following benefits for the Ares rockets: a) IVGVT data along with Ares development flights like Ares I-X, Ares I-Y, Ares I-X Prime, and Orion-1 or others will reduce the risk to the Orion-2 crew. IVGVT will permit anchoring the various analytical and operational models used in so many different aspects of Ares operations. b) IVGVT data will permit better understanding of the structural and GN&C margins of the spacecraft and may permit mass savings or expanded day-of-launch opportunities or fewer constraints to launch. c) Undoubtedly IVGVT will uncover some of the "unknown unknowns" so often seen in developing, launching, and flying new spacecraft vehicles and data from IVGVT may help prevent a loss of vehicle or crew. d) IVGVT also will be the first time Ares I flight-like hardware is transported, handled, rotated, mated, stacked, and integrated. e) Furthermore, handling and stacking the IVGVT launch vehicle stacks will be an opportunity to understand certain aspects of vehicle operability much better (for example, handling procedures, touch-labor time to accomplish tasks, access at interfaces, access to stage mating bolts, access to avionics boxes, access to the Interstage, GSE functionality, and many other important aspects of Ares I operability). All of these results will provide for better vehicle safety and better stewardship of national resources as NASA begins its next phase of human space exploration.

Tuma, Margaret L.↗

Overview of NASA's Thermal Control System Development for Exploration Project

NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems (LSS) project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several subelements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles thermal control system. NASA s Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of approximately six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

Stephan, Ryan A.↗

Development of Life Support System Technologies for Human Lunar Missions

With the Preliminary Design Review (PDR) for the Orion Crew Exploration Vehicle planned to be completed in 2009, Exploration Life Support (ELS), a technology development project under the National Aeronautics and Space Administration s (NASA) Exploration Technology Development Program, is focusing its efforts on needs for human lunar missions. The ELS Project s goal is to develop and mature a suite of Environmental Control and Life Support System (ECLSS) technologies for potential use on human spacecraft under development in support of U.S. Space Exploration Policy. ELS technology development is directed at three major vehicle projects within NASA s Constellation Program (CxP): the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems, including habitats and pressurized rovers. The ELS Project includes four technical elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems and Habitation Engineering, and two cross cutting elements, Systems Integration, Modeling and Analysis, and Validation and Testing. This paper will provide an overview of the ELS Project, connectivity with its customers and an update to content within its technology development portfolio with focus on human lunar missions.

Barta, Daniel J.↗

Exploration Supply Chain Simulation

The Exploration Supply Chain Simulation project was chartered by the NASA Exploration Systems Mission Directorate to develop a software tool, with proper data, to quantitatively analyze supply chains for future program planning. This tool is a discrete-event simulation that uses the basic supply chain concepts of planning, sourcing, making, delivering, and returning. This supply chain perspective is combined with other discrete or continuous simulation factors. Discrete resource events (such as launch or delivery reviews) are represented as organizational functional units. Continuous resources (such as civil service or contractor program functions) are defined as enabling functional units. Concepts of fixed and variable costs are included in the model to allow the discrete events to interact with cost calculations. The definition file is intrinsic to the model, but a blank start can be initiated at any time. The current definition file is an Orion Ares I crew launch vehicle. Parameters stretch from Kennedy Space Center across and into other program entities (Michaud Assembly Facility, Aliant Techsystems, Stennis Space Center, Johnson Space Center, etc.) though these will only gain detail as the file continues to evolve. The Orion Ares I file definition in the tool continues to evolve, and analysis from this tool is expected in 2008. This is the first application of such business-driven modeling to a NASA/government-- aerospace contractor endeavor.

Source record↗

Space-Based Range

Space-Based Range (SBR), previously known as Space-Based Telemetry and Range Safety (STARS), is a multicenter NASA proof-of-concept project to determine if space-based communications using NASA's Tracking and Data Relay Satellite System (TDRSS) can support the Range Safety functions of acquiring tracking data and generating flight termination signals, while also providing broadband Range User data such as voice, video, and vehicle/payload data. There was a successful test of the Range Safety system at Wallops Flight Facility (WFF) on December 20, 2005, on a two-stage Terrier-Orion spin-stabilized sounding rocket. SBR transmitted GPS tracking data and maintained links with two TDRSS satellites simultaneously during the 10-min flight. The payload section deployed a parachute, landed in the Atlantic Ocean about 90 miles downrange from the launch site, and was successfully recovered. During the Terrier-Orion tests flights, more than 99 percent of all forward commands and more than 95 percent of all return frames were successfully received and processed. The time latency necessary for a command to travel from WFF over landlines to White Sands Complex and then to the vehicle via TDRSS, be processed onboard, and then be sent back to WFF was between 1.0 s and 1.1 s. The forward-link margins for TDRS-10 (TDRS East [TDE]) were 11 dB to 12 dB plus or minus 2 dB, and for TDRS-4 (TDRS Spare [TDS]) were 9 dB to 10 dB plus or minus 1.5 dB. The return-link margins for both TDE and TDS were 6 dB to 8 dB plus or minus 3 dB. There were 11 flights on an F-15B at Dryden Flight Research Center (DFRC) between November 2006 and February 2007. The Range User system tested a 184-element TDRSS Ku-band (15 GHz) phased-array antenna with data rates of 5 Mbps and 10 Mbps. This data was a combination of black-and-white cockpit video, Range Safety tracking and transceiver data, and aircraft and antenna controller data streams. IP data formatting was used.

Source record↗

Developing Soil Models for Dynamic Impact Simulations

This paper describes fundamental soils characterization work performed at NASA Langley Research Center in support of the Subsonic Rotary Wing (SRW) Aeronautics Program and the Orion Landing System (LS) Advanced Development Program (ADP). LS-DYNA(Registered TradeMark)1 soil impact model development and test-analysis correlation results are presented for: (1) a 38-ft/s vertical drop test of a composite fuselage section, outfitted with four blocks of deployable energy absorbers (DEA), onto sand, and (2) a series of impact tests of a 1/2-scale geometric boilerplate Orion capsule onto soil. In addition, the paper will discuss LS-DYNA contact analysis at the soil/structure interface, methods used to estimate frictional forces, and the sensitivity of the model to density, moisture, and compaction.

Fasanella, Edwin L.↗

An Autonomous Onboard Targeting Algorithm Using Finite Thrust Maneuvers

In earlier investigations, the adaptation and implementation of a modified two-level corrections process as the onboard targeting algorithm for the Trans-Earth Injection phase of Orion is presented. The objective of that targeting algorithm is to generate the times of ignition and magnitudes of the required maneuvers such that the desired state at entry interface is achieved. In an actual onboard flight software implementation, these times of ignition and maneuvers are relayed onto Flight Control for command and execution. Although this process works well when the burn durations or burn arcs are small, this might not be the case during a contingency situation when lower thrust engines are employed to perform the maneuvers. Therefore, a new version of the modified two-level corrections process is formulated to handle the case of finite burn arcs. This paper presents the development and formulation of that finite burn modified two-level corrections process which can again be used as an onboard targeting algorithm for the Trans-Earth Injection phase of Orion. Additionally, performance results and a comparison between the two methods are presented. The finite burn two-level corrector formulation presented here ensures the entry constraints at entry interface are still met without violating the available fuel budget, while still accounting for much longer burn times in its design.

Scarritt, Sara K.↗