Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Dexterous Operations on ISS and Future Applications

The Mobile Servicing System (MSS) is a complex robotics system used extensively in the assembly, inspection and maintenance of the International Space Station (ISS). Its external components are comprised of the Space Station Remote Manipulator System (SSRMS), the Mobile Base System (MBS), and the Special Purpose Dexterous Manipulator (SPDM or "Dextre"). Dexterous robotic maintenance operations on the ISS are now enabled with the launch and deployment of "Dextre" in March 2008 and the recently completed commissioning to support nominal operations. These operations include allowing for maintenance of the MSS capability to be executed uniquely via robotic means. Examples are detailed inspection and the removal and replacement of On-orbit Replaceable Units (ORUs) located outside the pressurized volume of the ISS, alleviating astronauts from performing numerous risky and time-consuming extra-vehicular activities (EVAs). In light of the proposed extension of the ISS to 2020 and beyond, "Dextre" can also be seen as a resource for the support and conduct of external ISS experiments. "Dextre" can be utilized to move experiments around ISS, as test bed for more elaborate experiments outside the original design intent, and as a unique platform for external experiments. This paper summarizes the status of "Dextre", its planned use, and future potential for dexterous operations on the ISS. Lessons learned from the planning and execution of SPDM commissioning are first introduced, and significant differences between "Dextre" and SSRMS operations are discussed. The use of ground control as the predominant method for operating "Dextre" is highlighted, along with the benefits and challenges that this poses. Finally, the latest plans for dexterous operations on ISS are summarized including visiting vehicle unloading, nominal maintenance, and operations of a more experimental flavor.

Keenan, P. Andrew↗

Joint Test Plan for Gas Dynamic Spray Technology Demonstration

Air Force Space Command (AFSPC) and NASA have similar missions, facilities, and structures located in similar harsh environments. Both are responsible for a number of facilities/structures with metallic structural and non-structural components in highly and moderately corrosive environments. Regardless of the corrosivity of the environment, all metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are subject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by AFSPC and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GDS) technology (also known as Cold Spray) will be evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GDS coatings also have no VOCs and are environmentally preferable coatings. To achieve a condition suitable for the application of a coating system, including GDS coatings, the substrate must undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The GDS unit selected for demonstration has a powder feeding system that can be used for surface preparation or coating application. The surface preparation feature will also be examined. The primary objective of this effort is to demonstrate GDS technology as a repair method for TSCs. The project will also determine the optimal GDS coating thickness for acceptable performance. Successful completion of this project will result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations and will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

Lewis, Pattie↗

Dual-Compartment Inflatable Suitlock

A paper discusses a dual-compartment inflatable suitlock (DCIS) for Extra - vehicular Activity (EVA) that will allow for dust control, suit maintenance, and efficient EVA egress/ingress. The expandable (inflatable technologies) aspect of the design will allow the unit to stow in a compact package for transport. The DCIS consists of three hard, in line bulkheads, separating two cylindrical membrane-walled compartments. The inner bulkhead can be fitted with a variety of hatch types, docking flanges, and mating hardware, such as the common berthing mechanism (CBM), for the purpose of mating with vehicles, habitats, and other pressurized modules. The inner bulkhead and center bulkhead function as the end walls of the inner compartment, which, during operations, would stay pressurized, either matching the pressure of the habitat or acting as a lower-pressure transitional volume. The suited crewmember can quickly don a suit, and egress the suitlock without waiting for the compartment to depressurize. The outer compartment can be pressurized infrequently, when a long dwell time is expected prior to the next EVA, or during off-nominal suit maintenance tasks, allowing shirtsleeve inspections and maintenance of the space suits. The outer bulkhead has a pressure-assisted hatch door that stays open and stowed routinely, but can be closed for suit maintenance and pressurization as needed.

Howe, Scott↗

Seven Years of Permanent Running of MELFI-1 on Board the ISS and Utilisation of the Three MELFI Units Refrigeration Pool

The pool of three Minus Eighty Laboratory freezer for ISS (MELFI) units continues providing the scientific community with robust and permanent freezer and refrigeration capabilities for life science experiments on the International Space Station (ISS). Launched in 2006, the first unit will complete, by summer 2013, seven years of continuous operations without intervention on the internal Nitrogen gas cycle, while all necessary hardware and operations were initially planned for preventive maintenance every two years. This unit has demonstrated outstanding performance on orbit and proved the technical decisions made during the development program. Current utilization of MELFI units in the ISS is taking full benefit of the initial specifications, which allows for wide adaptations to cope with the mission scenario imposed by the life extension in orbit. The two other MELFI units, launched respectively in 2008 and 2009, are supporting the first unit providing additional conditioned volume necessary for the science on board, and also for preparing thermal mass used to protect the samples on their way down to earth. The MELFI pool is outfitted with all supporting hardware to allow for extended operation on orbit including preventive and corrective maintenance. The internal components were designed to allow for easy on board maintenance. Spare equipment was installed in the MELFI rack on ISS and specific maintenance means were developed which required crew training before the cold gas cycle could be accessed. The paper will present first how the design choices made for the initial missions are identifying features necessary for extended duration missions, and will then give highlights on the utilization of the MELFI refrigeration pool during the recent years in ISS.

Chegancas, Jean↗

Dual-Compartment Inflatable Suitlock

There is a need for an improvement over current NASA Extravehicular Activity (EVA) technology. The technology must allow the capacity for quicker, more efficient egress/ingress, allow for shirtsleeve suit maintenance, be compact in transport, and be applicable to environments ranging from planetary surface (partial-g) to orbital or deep space zero-g environments. The technology must also be resistant to dust and other foreign contaminants that may be present on or around a planetary surface. The technology should be portable, and be capable of docking with a variety of habitats, ports, stations, vehicles, and other pressurized modules. The Dual-Compartment Inflatable Suitlock (DCIS) consists of three hard inline bulkheads, separating two cylindrical membrane-walled compartments. The Inner Bulkhead can be fitted with a variety of hatch types, docking flanges, and mating hardware, such as the Common Berthing Mechanism (CBM), for the purpose of mating with vehicles, habitats, and other pressurized modules. The Inner Bulkhead and Center Bulkhead function as the end walls of the Inner Compartment, which during operations, would stay pressurized, either matching the pressure of the habitat or acting as a lower-pressure transitional volume. The Inner Compartment contains donning/doffing fixtures and inner suit-port hatches. The Center Bulkhead has two integrated suit-ports along with a maintenance hatch. The Center Bulkhead and Outer Bulkhead function as the end walls of the Outer Compartment, which stays at vacuum during normal operations. This allows the crewmember to quickly don a suit, and egress the suitlock without waiting for the Outer Compartment to depressurize. The Outer Compartment can be pressurized infrequently for both nominal and off-nominal suit maintenance tasks, allowing shirtsleeve inspections and maintenance/repair of the environmental suits. The Outer Bulkhead has a pressure-assisted hatch door that stays open and stowed during EVA operations, but can be closed for environmental protection of the suits, suit maintenance, and pressurization.

Kennedy, Kriss J.↗

Developing a Crew Time Model for Human Exploration Missions to Mars

Candidate human missions to Mars require mission lengths that could extend beyond those that have previously been demonstrated during crewed Lunar (Apollo) and International Space Station (ISS) missions. The nature of the architectures required for deep space human exploration will likely necessitate major changes in how crews operate and maintain the spacecraft. The uncertainties associated with these shifts in mission constructs - including changes to habitation systems, transit durations, and system operations - raise concerns as to the ability of the crew to complete required overhead activities while still having time to conduct a set of robust exploration activities. This paper will present an initial assessment of crew operational requirements for human missions to the Mars surface. The presented results integrate assessments of crew habitation, system maintenance, and utilization to present a comprehensive analysis of potential crew time usage. Destination operations were assessed for a short (approx. 50 day) and long duration (approx. 500 day) surface habitation case. Crew time allocations are broken out by mission segment, and the availability of utilization opportunities was evaluated throughout the entire mission progression. To support this assessment, the integrated crew operations model (ICOM) was developed. ICOM was used to parse overhead, maintenance and system repair, and destination operations requirements within each mission segment - outbound transit, Mars surface duration, and return transit - to develop a comprehensive estimation of exploration crew time allocations. Overhead operational requirements included daily crew operations, health maintenance activities, and down time. Maintenance and repair operational allocations are derived using the Exploration Maintainability and Analysis Tool (EMAT) to develop a probabilistic estimation of crew repair time necessary to maintain systems functionality throughout the mission.

Battfeld, Bryan↗

Systems Analysis of In-Space Manufacturing Applications for the International Space Station and the Evolvable Mars Campaign

Maintenance logistics support is a significant challenge for extended human operations in space, especially for missions beyond Low Earth Orbit (LEO). For missions to Mars (such as NASA's Evolvable Mars Campaign (EMC)), where timely resupply or abort in the event of emergency will not be possible, maintenance logistics mass is directly linked to the Probability of Loss of Crew (P(LoC)), and the cost of driving down risk is an exponential increase in mass requirements. The logistics support strategies that have maintained human operations in LEO will not be effective for these deep space missions. In-Space Manufacturing (ISM) is a promising technological solution that could reduce logistics requirements, mitigate risks, and augment operational capabilities, enabling Earth- independent human spaceflight. This paper reviews maintenance logistics challenges for spaceflight operations in LEO and beyond, and presents a summary of selected results from a systems analysis of potential ISM applications for the ISS and EMC. A quantitative modeling framework and sample assessment of maintenance logistics and risk reduction potential of this new technology is also presented and discussed.

Owens, Andrew C.↗

Limitations of Reliability for Long-Endurance Human Spaceflight

Long-endurance human spaceflight - such as missions to Mars or its moons - will present a never-before-seen maintenance logistics challenge. Crews will be in space for longer and be farther way from Earth than ever before. Resupply and abort options will be heavily constrained, and will have timescales much longer than current and past experience. Spare parts and/or redundant systems will have to be included to reduce risk. However, the high cost of transportation means that this risk reduction must be achieved while also minimizing mass. The concept of increasing system and component reliability is commonly discussed as a means to reduce risk and mass by reducing the probability that components will fail during a mission. While increased reliability can reduce maintenance logistics mass requirements, the rate of mass reduction decreases over time. In addition, reliability growth requires increased test time and cost. This paper assesses trends in test time requirements, cost, and maintenance logistics mass savings as a function of increase in Mean Time Between Failures (MTBF) for some or all of the components in a system. In general, reliability growth results in superlinear growth in test time requirements, exponential growth in cost, and sublinear benefits (in terms of logistics mass saved). These trends indicate that it is unlikely that reliability growth alone will be a cost-effective approach to maintenance logistics mass reduction and risk mitigation for long-endurance missions. This paper discusses these trends as well as other options to reduce logistics mass such as direct reduction of part mass, commonality, or In-Space Manufacturing (ISM). Overall, it is likely that some combination of all available options - including reliability growth - will be required to reduce mass and mitigate risk for future deep space missions.

Owens, Andrew C.↗

Analyzing the Effects of Climate and Thermal Configuration on Community Energy Storage Systems (Presentation)

Community energy storage (CES) has been proposed to mitigate the high variation in output from renewable sources and reduce peak load on the electrical grid. Thousands of these systems may be distributed around the grid to provide benefits to local distribution circuits and to the grid as a whole when aggregated. CES must be low cost to purchase and install and also largely maintenance free through more than 10 years of service life to be acceptable to most utilities.Achieving the required system life time is a major uncertainty for lithium-ion batteries. The lifetime and immediate system performance of batteries can change drastically with battery temperature, which is a strong function of system packaging, local climate, electrical duty cycle, and other factors. In other Li-ion applications, this problem is solved via air or liquid heating and cooling systems that may need occasional maintenance throughout their service life. CES requires a maintenance-free thermal management system providing protection from environmental conditions while rejecting heat from a moderate electrical duty cycle. Thus, the development of an effective, low-cost, zero-maintenance thermal management system poses a challenge critical to the success of CES. NREL and Southern California Edison have collaborated to evaluate the long-term effectiveness of various CES thermal configurations in multiple climates by building a model of CES based on collected test data, integrating it with an NREL-developed Li-ion degradation model, and applying CES electrical duty cycles and historic location-specific meteorological data to forecast battery thermal response and degradation through a 10-year service life.

25 ENERGY STORAGE↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plants (NPPs) in USA are facing premature closures due to financial difficulties. A significant contributing factor in the NPP electricity generation cost is Operational and Maintenance (O&M) cost. This research aims to reduce O&M cost by developing a framework which creates flexibility in NPP maintenance program. This framework relies on FLEX portable equipment to reduce NPP risk and to substitute and/or backup fixed equipment in different NPP operation modes. Probabilistic Risk Assessment (PRA) methodology is used to quantify the change of plant risk to justify the framework's applicability. The framework enables plant managers to shift maintenance workload from refueling outage period into online maintenance programs. As a result, it is expected to increase NPP capacity factor while also reducing the risk of unexpected outage. These results are expected to increase NPP electricity generation revenue and decrease O&M costs while complying to existing nuclear safety regulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

Electronic Out-fall Inspection Application - 12007

In early 2009 an exciting opportunity was presented to the Geographic Information Systems (GIS) team at the Savannah River Site (SRS). The SRS maintenance group was directed to maintain all Out-falls on Site, increasing their workload from 75 to 183 out-falls with no additional resources. The existing out-fall inspection system consisted of inspections performed manually and documented via paper trail. The inspections were closed out upon completion of activities and placed in file cabinets with no central location for tracking/trending maintenance activities. A platform for meeting new improvements required for documentation by the Department of Health and Environmental Control (DHEC) out-fall permits was needed to replace this current system that had been in place since the 1980's. This was accomplished by building a geographically aware electronic application that improved reliability of site out-fall maintenance and ensured consistent standards were maintained for environmental excellence and worker efficiency. Inspections are now performed via tablet and uploaded to a central point. Work orders are completed and closed either in the field using tablets (mobile application) or in their offices (via web portal) using PCs. And finally completed work orders are now stored in a central database allowing trending of maintenance activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of turbine and plant upsizing on the levelized cost of energy for offshore wind

Turbine and plant upsizing are major trends in offshore wind deployment, although the quantitative impact on project costs has not been well-characterized. The uncertain value of continued wind turbine and project growth limits the ability of the supply chain to prepare for future technology trends, leading to challenges in the realization of larger projects. This analysis explores the levelized cost of energy impacts of turbine ratings between 6 and 20 MW and plant capacities between 250 and 2,500 MW for fixed-bottom offshore wind using techno-economic cost models for foundation, electrical, installation, and operation and maintenance costs, along with annual energy production. We consider a nominal set of technology assumptions for all scenarios to isolate economies of size and scale without additional benefits from decreasing turbine capital costs, quantity discounts for larger projects, or optimized technology solutions. These results indicate that using a 20-MW wind turbine in a 2,500-MW power plant array can reduce the levelized cost of energy by over 23% relative to the global average turbine and plant size installed in 2019; primarily because of reductions in the balance-of-system and operation and maintenance costs. We also identify improved installation vessels, optimized export systems, and novel operation and maintenance strategies as additional cost reduction opportunities. These results suggest that upsizing represents a significant cost reduction opportunity for offshore wind energy and will continue to be a main factor in shaping the future of the sector.

17 WIND ENERGY↗

Modeling interconnections of safety and financial performance of nuclear power plants, part 3: Spatiotemporal probabilistic physics-of-failure analysis and its connection to safety and financial performance

Here, this paper is a byproduct of a line of research by the authors to analyze interrelationships of safety and financial performance of nuclear power plants (NPPs). The result of this line of research is summarized in three parts: Part 1 covers a categorical review of relevant literature and the theoretical bases that support the methodological developments in Part 2. Part 2 introduces an Integrated Enterprise Risk Management (I-ERM) methodological framework to quantify the interconnections of safety and financial performance with a focus on operation and maintenance (O&M) of NPPs. Part 2 has also demonstrated the applicability and values of the I-ERM methodology through an NPP case study. This paper is Part 3, where detailed development and implementation of one of the I-ERM modules, i.e., probabilistic physics-of-failure (PPoF) analysis, and its connection with safety and financial performance is reported. In this article, the physical failure modeling for hardware components is advanced by incorporating finite element analysis (FEA) into PPoF analysis and coupling the FEA-based PPoF with the maintenance performance through a renewal process model. This article covers two scientific contributions: (i) first-of-its-kind incorporation of FEA into the PPoF model of thermal fatigue for NPP components; and (ii) advancing the interface between the PPoF analysis and the renewal process model in order to deal with spatiotemporal FEA outputs and to efficiently estimate the physical transition rates even when the PPoF outputs are dominated by success data. Through the incorporation of FEA, the resolution of the PPoF analysis is enhanced as spatiotemporal conditions such as stress and temperature can be considered explicitly instead of relying on simplified assumptions or analytical models with reduced spatiotemporal dimensions. To demonstrate an application of the FEA-based PPoF analysis and its coupling with maintenance through the renewal process model, a case study is conducted using excess letdown elbow piping in the chemical and volume control system of a Pressurized Water Reactor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Knowledge based ranking algorithm for comparative assessment of post-closure care needs of closed landfills

Post-closure care (PCC) activities at landfills include cap maintenance; water quality monitoring; maintenance and monitoring of the gas collection/control system, leachate collection system, groundwater monitoring wells, and surface water management system; and general site maintenance. The objective of this study was to develop an integrated data and knowledge based decision making tool for preliminary estimation of PCC needs at closed landfills. To develop the decision making tool, 11 categories of parameters were identified as critical areas which could affect future PCC needs. Each category was further analyzed by detailed questions which could be answered with limited data and knowledge about the site, its history, location, and site specific characteristics. Depending on the existing knowledge base, a score was assigned to each question (on a scale 1-10, as 1 being the best and 10 being the worst). Each category was also assigned a weight based on its relative importance on the site conditions and PCC needs. The overall landfill score was obtained from the total weighted sum attained. Based on the overall score, landfill conditions could be categorized as critical, acceptable, or good. Critical condition indicates that the landfill may be a threat to the human health and the environment and necessary steps should be taken. Acceptable condition indicates that the landfill is currently stable and the monitoring should be continued. Good condition indicates that the landfill is stable and the monitoring activities can be reduced in the future. The knowledge base algorithm was applied to two case study landfills for preliminary assessment of PCC performance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Several Small or Single Large? Quantifying the Catchment-Wide Performance of On-Site Wastewater Treatment Plants with Inaccurate Sensors

On-site wastewater treatment plants (OSTs) often lack monitoring, resulting in unreliable treatment performance. They thus appear to be a stopgap solution despite their potential contribution to circular water management. Low-maintenance but inaccurate soft sensors are emerging that address this concern. However, how their inaccuracy impacts the catchment-wide treatment performance of a system of many OSTs has not been quantified. Here, we develop a stochastic model to estimate catchment-wide OST performances with a Monte Carlo simulation. In our study, soft sensors with a 70% accuracy improved the treatment performance from 66% of the time functional to 98%. Soft sensors optimized for specificity, indicating the true negative rate, improve the system performance, while sensors optimized for sensitivity, indicating the true positive rate, quantify the treatment performance more accurately. This new insight leads us to suggest programming two soft sensors in practical settings with the same hardware sensor data as input: one soft sensor geared to high specificity for maintenance scheduling and one geared to high sensitivity for performance quantification. Our findings suggest that a maintenance strategy combining inaccurate sensors with appropriate alarm management can vastly improve the mean catchment-wide treatment performance of a system of OSTs.

54 ENVIRONMENTAL SCIENCES↗