Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coils”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Synthesis and simulation of a two-level magnetic control system for tokamak-reactor plasma

Synthesis and simulation of a hierarchical (two-level) magnetic system for controlling a tokamakreactor plasma throughout the entire divertor discharge stage, including the plasma current ramp-up phase, are carried out. The plasma vertical velocity is stabilized about zero by using a proportional controller in a scalar control loop. The gain of the controller-the coefficient that ensures the required stability margins-is found by using a second-order linear model constructed by solving the identification problem on the basis of numerical experiments carried out with the DINA plasmophysical computer code. The internal cascade (the lower level of the system) for tracking the scenario currents in the poloidal magnetic field coils is synthesized by using the complete dynamic channel decoupling method. The external cascade (the upper level of the system) for tracking the plasma current and shape is synthesized by using the method of pseudoseparation of the control channels and the multidimensional diagonal proportional-integral controller, with proportional, integrating, and double integrating units connected in parallel in each channel. In the hierarchical control system, the lower level (the internal cascade) is subordinated to the upper level (the external cascade). The external cascade acts on the internal one by the signals that set the required currents in the coils of the central solenoid and of the poloidal magnetic field in order to ensure the required plasma current and shape in accordance with the output signals from the plant, which are transmitted through the vector feedback channel. The lower level is aimed exclusively at tracking the reference inputs by tracking the currents in the control coils. An operating mode of the system under the conditions of current saturation in the control coils is proposed and implemented. Results are presented from numerical simulations of the two-level (cascade) control system for reference scenario no. 2 of the ITER database (www.iter.org) with the DINA nonlinear code.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modelling of Ablatant Deposition from Electromagnetically Driven Radiative Pellets for Disruption Mitigation Studies

The Electromagnetic Particle Injector (EPI) concept is advanced through the simulation of ablatant deposition into ITER H-mode discharges with calculations showing penetration past the H-mode pedestal for a range of injection velocities and granule sizes concurrent with the requirements of disruption mitigation. As discharge stored energy increases in future fusion devices such as ITER, control and handling of disruption events becomes a critical issue. An unmitigated disruption could lead to failure of the plasma facing components resulting in financially and politically costly repairs. Methods to facilitate the quench of an unstable high current discharge are required. With the onset warning time for some ITER disruption events estimated to be less than 10 ms, a disruption mitigation system needs to be considered which operates at injection speeds greater than gaseous sound speeds. Such an actuator could then serve as a means to augment presently planned pneumatic injection systems. The EPI uses a rail gun concept whereby a radiative payload is delivered into the discharge by means of the JxB forces generated by an external current pulse, allowing for injection velocities in excess of 1 km/s. The present status of the EPI project is outlined, including the addition of boost magnetic coils. These coils augment the self-generated rail gun magnetic field and thus provide a more efficient acceleration of the payload. The coils and the holder designed to constrain them have been modelled with the ANSYS code to ensure structural integrity through the range of operational coil cu

disruption↗

Reduced Model for Direct Induction Startup Scenario Development on MAST-U and NSTX-U

A reduced semi-empirical model using time-dependent axisymmetric vacuum field calculations is used to develop the prefill and feed-forward coil current targets required for reliable direct induction (DI) startup on the new MA-class spherical tokamaks, MAST-U and NSTX-U. The calculations are constrained by operational limits unique to each device, such as the geometry of the conductive elements and active coils, power supply specifications and coil heating and stress limits. The calculations are also constrained by semi-empirical models for sufficient breakdown, current drive, equilibrium and stability of the plasma developed from a shared database. A large database of DI startup on NSTX and NSTX-U is leveraged to quantify the requirements for achieving a reliable breakdown (Ip ~ 20 kA). It is observed that without pre-ionization, STs access the large E/P regime at modest loop voltage (Vloop) where the electrons in the weakly ionized plasma are continually accelerating along the open field lines. This ensures a rapid (order millisecond) breakdown of the neutral gas, even without pre-ionization or high-quality field nulls. The timescale of the initial increase in Ip on NSTX is reproduced in the reduced model provided a mechanism for impeding the applied electric field is included. Most discharges that fail in the startup phase are due to an inconsistency in the evolution of the plasma current (Ip) and equilibrium field or loss of vertical stability during the burn-through phase. The requirements for the self-consistent evolution of the fields in the weakly and full-ionized plasma states are derived from demonstrated DI startup on NSTX, NSTX-U and MAST. The predictive calculations completed for MAST-U and NSTX-U illustrate that the maximum Ip ramp rate (dIp/dt) in the early startup phase is limited by the voltage limits on the poloidal field coils on MAST-U and passive vertical stability on NSTX-U.

Direct induction↗

Four-channel optically pumped magnetometer for a magnetoencephalography sensor array

We present a novel four-channel optically pumped magnetometer (OPM) for magnetoencephalography that utilizes a two-color pump/probe scheme on a single optical axis. We characterize its performance across 18 built sensor modules. The new sensor implements several improvements over our previously developed sensor including lower vapor-cell operating temperature, improved probe-light detection optics, and reduced optical power requirements. The sensor also has new electromagnetic field coils on the sensor head which are designed using stream-function-based current optimization. We detail the coil design methodology and present experimental characterization of the coil performance. The magnetic sensitivity of the sensor is on average 12.3 fT/rt-Hz across the 18 modules while the average gradiometrically inferred sensitivity is about 6.0 fT/rt-Hz. The sensor 3-dB bandwidth is 100 Hz on average. The on-sensor coil performance is in good agreement with the simulations.

Iivanainen, Joonas (ORCID:0000000160344604)↗

Study of Conduction-Cooled Superconducting Quadrupole Magnets Combined with Dipole Correctors for the ILC Main Linac

A superconducting rf (SRF) cryomodule for International Linear Collider(ILC) Main Linac equips focus/steering magnets. The magnets are "superferric" magnets with four superconducting (SC) race track coils conductively cooled from the cryomodule LHe supply pipe. The quadrupole field gradient and dipole field are 40 T/m and 0.1 T, respectively. The magnet length and iron-pole radius are 1 m and 0.045 m, respectively. It is known that dark current is generated at SRF cavities and accelerated through the following linac string. The dark current reaches and heats the SC magnets. It is estimated that the power deposition in the magnet may reach more than a few watts and temperature of the SC coils may locally reach to critical temperature of NbTi. It is important to make the magnet not reach quench with sufficient conduction cooling. We aim to realize the SC magnet which can stably operate under such condition. We plan to develop test coils made of three types of SC materials, NbTi, Nb₃Sn, and MgB₂ and study thermal characteristics and stability . We will develop a short model magnet, based on the test coil results. Here, we will present the magnet design study and the R&D plan.

43 PARTICLE ACCELERATORS↗

What Caused the Lead burn-out in Spectrometer Magnet 2B

The spectrometer solenoids are supposed to be the first magnets installed in the MICE Cooling Channel. The results of the test of Spectrometer Magnet 2B are reported in a previous MICE Note. Magnet 2B was tested with all five coils connected in series. The magnet failed because a lead to coil M2 failed before it could be trained to its full design current of 275 A. First, this report describes the condition of the magnet when the lead failure occurred. The lead that failed was between the cold mass feed-through and the heavy lead that connected to coil M2 and the quench protection diodes. It is believed that the lead failed because the minimum propagation zone (MPZ) length was too short. The quench was probably triggered by lead motion in the field external to the magnet center coil. The effect of heat transfer on quench propagation and MPZ length is discussed. The MPZ length is compared for a number of cases that apply to the spectrometer solenoid 2B as built and as it has been repaired. The required heat transfer coefficient for cryogenic stability and the quench propagation velocity along the leads are compared for various parts of the Magnet leads inside the cold mass cryostat. The effect of the insulation on leads on heat transfer is and stability is discussed.

42 ENGINEERING↗

Magnetic Field Analysis of Helical Undulators

The analytical expression of the on-axis field for an infinitely long helical undulator, derived in terms of undulator period length, uniform current density, inner ra ius and dimensions of the coils, was compared with numerical analyses of model undulators based on the Biot-Savart law. The two calculations agreed within 1 x 10 -3 . The expression also showed that the on-axis field has the first harmonic only, and no higher harmonics exist, regardless of the coil dimensions. Calculations for 61-period models showed that the third and fifth harmonics were less than 2 x 10 -7 . For a finite-length model the end fields were adjusted by reducing the currents in a discrete number of steps for the last two or four periods of both ends. It was also shown as a practical method that increasing the coil winding radius can be a substitute for reducing the coil current.

Kim, S. H.↗

DOE-RCT-0003641 Final Technical Report

This program studied novel concepts for an Axial Flux Reluctance Machine to capture energy from marine hydrokinetic sources and compared their attributes to a Radial Flux Reluctance Machine which was designed under a prior Department of Energy program for the same application. Detailed electromagnetic and mechanical analyses were performed to determine the validity of the concept and to provide a direct comparison with the existing conventional Radial Flux Switched Reluctance Machine designed during the Advanced Wave Energy Conversion Project, DE-EE0003641. The alternate design changed the machine topology so that the flux that is switched flows axially rather than radially and the poles themselves are long radially, as opposed to the radial flux machine that has pole pieces that are long axially. It appeared possible to build an axial flux machine that should be considerably more compact than the radial machine. In an “apples to apples” comparison, the same rules with regard to generating magnetic force and the fundamental limitations of flux density hold, so that at the heart of the machine the same torque equations hold. The differences are in the mechanical configuration that limits or enhances the change of permeance with rotor position, in the amount of permeable iron required to channel the flux via the pole pieces to the air-gaps, and in the sizing and complexity of the electrical winding. Accordingly it was anticipated that the magnetic component weight would be similar but that better use of space would result in a shorter machine with accompanying reduction in housing and support structure. For the comparison the pole count was kept the same at 28 though it was also expected that the radial tapering of the slots between pole pieces would permit a higher pole count machine, enabling the generation of greater power at a given speed in some future design. The baseline Radial Flux Machine design was established during the previous DOE program. Its characteristics were tabulated for use in comparing to the Axial Flux Machine. Three basic conceptual designs for the Axial Flux Machine were considered: (1) a machine with a single coil at the inner diameter of the machine, (2) a machine with a single coil at the outside diameter of the machine, and (3) a machine with a coil around each tooth. Slight variations of these basic configurations were considered during the study. Analysis was performed on these configurations to determine the best candidate design to advance to preliminary design, based on size, weight, performance, cost and manufacturability. The configuration selected as the most promising was the multi-pole machine with a coil around each tooth. This configuration provided the least complexity with respect to the mechanical configuration and manufacturing, which would yield the highest reliability and lowest cost machine of the three options. A preliminary design was performed on this selected configuration. For this first ever axial design of the multi rotor configuration the 'apples to apples' comparison was based on using the same length of rotor pole as the axial length of rotor pole in the radial machine and making the mean radius of the rotor in the axial machine the same as the air gap radius in the radial machine. The tooth to slot ratio at the mean radius of the axial machine was the same as the tooth to slot ratio of the radial machine. The comparison between the original radial flux machine and the new axial flux machine indicates that for the same torque, the axial flux machine diameter will be 27% greater, but it will have 30% of the length, and 76% of the weight. Based on these results, it is concluded that an axial flux reluctance machine presents a viable option for large generators to be used for the capture of wave energy. In the analysis of Task 4, below, it is pointed out that our selection of dimensional similarity for the 'apples to apples' comparison did not produce an optimum axial flux design. There is torque capability to spare, implying we could reduce the magnetic structure, but the winding area, constrained by the pole separation at the inner pole radius has a higher resistance than desirable, implying we need more room for copper. The recommendation is to proceed via one cycle of optimization and review to correct this unbalance and then proceed to a detailed design phase to produce manufacturing drawings, followed by the construction of a prototype to test the performance of the machine against predicted results.

16 TIDAL AND WAVE POWER↗

Cold Mass Issues in the MICE Coupling Magnet

I have identified two potential issues in the design of the attachments to the MICE coupling magnet cold mass. One of these attachment issues may extend into the cold mass. Both issues came to light during the analysis of what happened to the spectrometer solenoids. We must not make the same mistakes that were made on the spectrometer solenoids. The two questions that result from the identified issues are; 1) Are the superconducting low temperature superconducting leads between the coupling coil and the lower end of the high temperature superconducting (LTS) leads robust enough not quench and burn out? In the spectrometer solenoid one part of the LTS lead was not robust enough to prevent quenching and a burn out of the LTS lead and ; 2) Will there be problems with the quench protection resistors and diodes when the magnet quenches as a result of an HTS lead burning out or a disconnect of the magnet from its power supply? The second question is very important because the coupling coil has a large stored energy and inductance. As result, when current flows through the diodes and the resistors, both can be over heated. We observed resistor overheating in spectrometer magnet 2. This heating probably happened when the HTS lead the LTS lead burned out during the tests of magnet 2A and 2B respectively. (See MICE Note 324.) The answer to the first question is simple and straightforward. This is the issue that is primarily dealt with in MICE Note 324. If the resistance across the coil sub-divisions is high enough, the whole magnet will turn normal through quench-back. Making the resistance across a coil sub-division high enough is not simple.

43 PARTICLE ACCELERATORS↗

Phase I Final Technical Report

Two subscale coils of Bi-2212 wire have been made and tested in a DOE 2018 STTR collaboration between Cryomagnetics and the Applied Superconductivity Center at Florida State University. These coils are used to test the feasibility of using small-diameter wire in a solenoidal configuration where single strand wire performance is crucial. If successful, the implementation of small-diameter wire into high field Bi-2212 HTS solenoids will allow for high J_E operation with moderate currents, making feasible the use of more modest control equipment, power supplies, and current leads. Furthermore, lower operating currents may allow series-connected design configurations with LTS background magnets, allowing for better, simpler, and more effective quench protection methods. A 25-Tesla magnet design, consisting of an 8-Tesla Bi-2212 coil with a 17-Tesla LTS coil, is fully underway at Cryomagnetics, and considerations of critical current, hoop stress, and quench protection will all be fully addressed. This document reports our findings up to this point, the end of the Phase I period.

36 MATERIALS SCIENCE↗

Regal Beloit Final Technical Report

The original project proposal submitted from NovaTorque Inc (NovaTorque) in 2016 was to improve the existing motor with 95% efficiency by reducing the losses by 21% to achieve 96%. A few months after the proposal was submitted, NovaTorque lost funding and went out of business. The assets of NovaTorque were then acquired by Regal Beloit Corporation (“Regal Beloit” or “Regal”). When the NovaTorque proposal was selected, the project was transferred to Regal Beloit. Once we had production samples from the new Regal production line, they were tested at the Regal Beloit test lab in Wausau, WI. The original NovaTorque motor had an efficiency of 95%, but when the technology was transferred to Regal Beloit, there were multiple manufacturing improvements made, even though the basic electromagnetic design did not change. The test results in Wausau showed that the motors made at the Regal Beloit plant had an efficiency of 96%. Since the goal of the project was to reduce the losses by 21%, a new efficiency target of 96.8% became the project objective. In the first budget period, motors were tested to get the baseline performance. We then used FEA modeling with ANSYS Maxwell to model the existing motor to get correlation between the FEA simulations and the actual test results. Once the model was validated, we evaluated some changes that could be made to the stator to reduce the losses and improve efficiency without changing the rotor or stator housing, keeping the modifications easy to implement. The changes were primarily in the area of making the stator axially shorter and adding Soft Magnetic Composite (SMC) tooth tips. In the second budget period, we proceeded to design and build the new stator that was identified above and identified additional improvements in the process that included a stator machining modification and the use of rectangular wire. When we actually built the motor, the choice of rectangular wire turned out to be a problem. The wire was made by squishing round wire to get the rectangular shape, which caused work hardening, making the wire too stiff to make the desired coils. We shifted to annealed square wire which was better, but we still could not maintain the proper coil envelope. The result was that we had reduced cross section area for stator laminations. We also had to have a radial offset resulting in a radial misalignment between the stator and rotor because of the oversized coils. After the motor was completed, it was shipped to Texas A&M University for testing. With the loss of flux from these issues, the measured motor efficiency was only 96.3%. The primary focus of this motor was to make sure our FEA simulation model predicted the measured losses and overall efficiency, this we moved on to the FEA simulation. The FEA simulations of the motor “as built” with misalignments had good correlation with the test results, so the next step was to use that model to optimize the design of the motor for a final build. This time we considered changes to the stator and rotor and also minor changes to the housing diameter. In the third budget period, we did the detailed design and construction of the final prototypes. The final prototypes had a slight increase in the stator diameter to fit in a standard Regal Beloit housing. We shortened the stator and use more layers of wire in the coils. We also increased the cone angle of the rotor and stator from the original 110 degrees to 130 degrees to get some additional efficiency and optimized the stator cross section. The predicted efficiency from the FEA simulations was 96.9%. When completed, the motors were tested. We were a little short of reaching our target efficiency goal of 96.8%. We were only able to get to 96.7% efficiency. While it may be possible with additional iterations in designs and future builds to gain that additional 0.1%, we believe that we are close to the best we can achieve from a practical viewpoint, and additional iterations would be more work than the potential gains would be worth. No other motor in this class can even reach the 96% that we started with.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preliminary Sensitivity Analysis for Sensors Impacts on Building Control Performance

This report describes the preliminary sensitivity analysis for sensor impacts on building control performance through the US Department of Energy’s Oak Ridge National Laboratory’s Flexible Research Platform (FRP-2) building. The rooftop unit system provides cooling and heating to the building. The main heating coil is a gas heating coil. Each zone is served by a variable air volume box with an electricity reheat coil. The rooftop unit and variable air volume box controls adopted the practical control sequences from ASHRAE Guideline 36-2018: High-Performance Sequences of Operation. For sensors, the incipient (time-changing) sensor errors, including bias sensor error and precision sensor error, are the inputs of interest. The outputs are energy consumption and thermal comfort (e.g., the predicted percentage of dissatisfied occupants). The large-scale simulation (3,600 cases) was conducted on a cloud platform by integrating sensor errors and ASHRAE Guideline 36 control sequences into an emulator based on the EnergyPlus simulation program with Python energy management system feature. The surrogate models were developed based on cloud simulation results. The uncertainty analysis showed that the sensor errors substantially affect building energy consumption and thermal comfort. The sensitivity analysis shows a ranking of sensor error impacts for each interested output item (e.g., cooling energy, reheat coil heating energy, predicted percentage of dissatisfied occupants). In FY 2022, sensor locations, types, and costs will be evaluated. The field test in Oak Ridge National Laboratory’s Flexible Research Platform building regarding sensor impacts will also be performed. Finally, a comparative analysis will be conducted based on the field test results and emulator results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Postirradiation Examination of WIRE-21 Experiment Irradiated in the High Flux Isotope Reactor

Westinghouse Electric Company is developing wireless sensors to monitor the centerline temperature and internal pressure of commercial light-water reactor fuel rods during irradiation. Oak Ridge National Laboratory and Westinghouse Electric Company developed the Wireless Instrumented RB Experiment 2021 (WIRE-21) to test wireless temperature and pressure sensor technologies in a removable beryllium position in the High Flux Isotope Reactor. The experiment was irradiated for a total of 75 days, at temperatures ranging from approximately 150°C to 400°C, resulting in a peak fast (energy > 0.1 MeV) neutron fluence of about 3 × 10 21 n/cm 2 . The temperature was intentionally cycled multiple times to compare the response of the wireless temperature sensor to collocated thermocouples. Similarly, the pressure sensor was actuated in multiple steps to compare the response of the wireless measurement to excore pressure transducers (Petrie et al., 2023). After irradiation, the experiment was disassembled in the Irradiated Fuels Examination Laboratory (IFEL) hot cell at Oak Ridge National Laboratory with the intent to recover sensor and dosimetry components, document the as-irradiated condition of the hardware, and investigate possible causes of the sensor behavior observed during irradiation. The postirradiation examination successfully recovered and preserved key WIRE-21 components. After the housing was removed using a milling machine, the internal experiment sections were examined. All eight fiber-optic sensors were recovered, cut, and stored. The silicon carbide thermometry, temperature sensor, pressure sensor, lower spacer, and selected pressure and temperature cable sections were also removed and stored. The metal bellows of the pressure sensor was found to be plastically deformed, indicating that it had been properly pressurized during irradiation and generally behaved as expected. X-ray diffraction analysis of a section of one of the irradiated inductor cores within the pressure sensor was performed and confirmed the presence of phase-pure alpha ferrite (i.e., no unexpected phase transformations). Inductance testing was performed on the irradiated pressure sensor cores using an unirradiated test coil, and DC resistance measurements of the transceiver coils were also performed. The measurements with irradiated inductor cores assembled inside unirradiated coils showed slightly reduced inductance compared to measurements made with unirradiated cores, but the difference was not sufficient to explain the more significant reductions in inductance that were observed in-pile. Therefore, it is suspected that degradation of the inductor coils (specifically the wire wrapping) is responsible for the reduced inductance observed in-pile.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pair-Trawl Detection of PIT-Tagged Juvenile Salmonids Migrating in the Columbia River Estuary, 2008 Report of Research.

In 2008, we sampled migrating juvenile Pacific salmonids Oncorhynchus spp. tagged with passive integrated transponder (PIT) tags using a surface pair trawl in the upper Columbia River estuary (rkm 61-83). The cod-end of the trawl was replaced with a cylindrical PIT-tag detection antenna with an 86-cm-diameter fish-passage opening and two detection coils connected in series. The pair trawl was 105 m long with a 91.5-m opening between the wings and a sample depth of 4.9 m. Also during 2008, we finalized the development of a prototype 'matrix' antenna, which was larger than previous antennas by a considerable magnitude. The matrix antenna consisted of 6 coils: a 3-coil front component and a 3-coil rear component, which were separated by 1.5-m of net mesh. The fish-passage opening was 2.5 m wide by 3.0 m tall and was attached to a standard-size pair trawl net. Intermittent sampling with a single crew began on 7 March and targeted yearling Chinook salmon O. tshawytscha and steelhead O. mykiss. Daily sampling using two crews began on 30 April and continued through 14 June; during this period we detected 2.7% of all juvenile salmonids previously detected at Bonneville Dam--a measure of sample efficiency. Sampling with a single crew continued through 20 August and targeted subyearling Chinook salmon. We detected 7,397 yearling Chinook salmon, 2,735 subyearling Chinook salmon, 291 coho salmon O. kisutch, 5,950 steelhead, and 122 sockeye salmon O. nerka in the upper estuary. We deployed the matrix antenna system and the older, cylindrical antenna system (86-cm-diameter fish-passage opening) simultaneously in mid-May 2008 to test matrix detection efficiency. The cylindrical antenna system had been used successfully in 2007 and early 2008. Because distribution of migrating salmonids in the estuary changes rapidly, we felt that a tandem sampling effort between the two systems was the only way to truly evaluate comparative detection efficiency. We deployed both systems within 1 km of each other during a period of high fish densities on 13, 14, and 15 May. Detections of the matrix system surpassed those of the cylindrical system by 53% in 14 h of simultaneous sampling (total detections 716 and 339, respectively). We believe that the higher detection rate observed with the matrix system was due to fewer smolts escaping the trawl entrance and to more smolts readily passing through the larger fish-passage opening. After tandem sampling, we continued exclusive use of the matrix system for the remainder of the 2008 juvenile migration season. Mean survival rates from Lower Granite to Bonneville Dam for yearling Chinook salmon and steelhead were 42% (SE = 3.7%) and 46% (SE = 1.5%), respectively. Over 358,000 PIT-tagged salmonids were transported, and we detected 4,619 of these fish.

13 HYDRO ENERGY↗

Series transistors isolate amplifier from flyback voltage

Circuit enables high sawtooth currents to be passed through a deflection coil and isolate the coil driving amplifier from the flyback voltage. It incorporates a switch consisting of transistors in series with the driving amplifier and deflection coil. The switch disconnects the deflection coil from the amplifier during the retrace time.

Banks, W.↗

Measured losses in superconductor magnets for 60-Hertz ac operation.

Results of an experimental study of electrical losses in superconductor magnets. Preliminary 60-Hz ac loss data are presented for coils constructed of Nb3Sn ribbon, Nb-Ti cable, and multifilament Nb-Ti. Losses have been measured for different size coils up to approximately 20 cm in diameter. Of the conductor types tested, Nb3Sn ribbon has the lowest losses for ac operation. In Nb3Sn-ribbon coils of different sizes, the loss per unit length of conductor is shown to decrease with a decrease in the rate of change of current and to increase, in general, with increase in coil size. An important aspect of the study is the high degree of repeatability of the data.

Hamlet, I. L.↗

Characteristics and performance of a superconducting bumpy-torus magnet facility for plasma research

The NASA Lewis bumpy-torus facility consists of 12 superconducting coils, each 19 cm i.d. and capable of 3.0 T on its axis. The coils are equally spaced around a toroidal array with a major diameter of 1.52 m; they are mounted with the major axis of the torus vertical in a single vacuum tank 2.6 m in diameter. Tests of the facility mapped out its magnetic, cryogenic, vacuum, mechanical, and electrical performance. The design value of the maximum magnetic field on the magnetic axis, 3.0 T, was reached and exceeded. A maximum magnetic field of 3.23 T was held for a period of 60 minutes. When the coils were charged to a maximum magnetic field of 3.35 T, the coil system went normal without apparent damage or degradation of performance.

Roth, J. R.↗

Driving lamps by induction

An electrodeless lamp circuit with a coil surrounding a krypton lamp is driven by an RF input source. A coil surrounding a mercury lamp is tapped across the connection of the input central to the krypton-lamp coil. Each coil is connected in parallel with separate capacitors which form resonant circuits at the input frequency.

Laue, H. H.↗