Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Analysis facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Mobile Aerial Tracking and Imaging System (MATRIS) for Aeronautical Research

A mobile, rapidly deployable ground-based system to track and image targets of aeronautical interest has been developed. Targets include reentering reusable launch vehicles (RLVs) as well as atmospheric and transatmospheric vehicles. The optics were designed to image targets in the visible and infrared wavelengths. To minimize acquisition cost and development time, the system uses commercially available hardware and software where possible. The conception and initial funding of this system originated with a study of ground-based imaging of global aerothermal characteristics of RLV configurations. During that study NASA teamed with the Missile Defense Agency/Innovative Science and Technology Experimentation Facility (MDA/ISTEF) to test techniques and analysis on two Space Shuttle flights.

Banks, Daniel W.↗

Interactive Schematic Integration Within the Propellant System Modeling Environment

Task requirements for rocket propulsion test preparations of the test stand facilities drive the need to model the test facility propellant systems prior to constructing physical modifications. The Propellant System Modeling Environment (PSME) is an initiative designed to enable increased efficiency and expanded capabilities to a broader base of NASA engineers in the use of modeling and simulation (M&S) technologies for rocket propulsion test and launch mission requirements. PSME will enable a wider scope of users to utilize M&S of propulsion test and launch facilities for predictive and post-analysis functionality by offering a clean, easy-to-use, high-performance application environment.

Coote, David↗

Planetary CubeSats Come of Age

Jet Propulsion Laboratory initiatives in developing and formulating planetary CubeSats are described. Six flight systems already complete or underway now at JPL for missions to interplanetary space, the Moon, a near-Earth asteroid, and Mars are described at the subsystem level. Key differences between interplanetary nanospacecraft and LEO CubeSats are explained, as well as JPL's adaptation of vendor components and development of system solutions to meet planetary-mission needs. Feasible technology-demonstration and science measurement objectives are described for multiple modes of planetary mission implementation. Seven planetary-science demonstration mission concepts, already proposed to NASA by Discovery-2014 PIs partnered with JPL, are described for investigations at Sun-Earth L5, Venus, NEA 1999 FG3, comet Tempel 2, Phobos, main-belt asteroid 24 Themis, and metal asteroid 16 Psyche. The JPL staff and facilities resources available to PIs for analysis, design, and development of planetary nanospacecraft are catalogued.

TDO↗

Heads-Up Display with Virtual Precision Approach Path Indicator as Implemented in a Real-Time Piloted Lifting-Body Simulation

This document describes the heads-up display (HUD) used in a piloted lifting-body entry, approach and landing simulation developed for the simulator facilities of the Simulation Development and Analysis Branch (SDAB) at NASA Langley Research Center. The HUD symbology originated with the piloted simulation evaluations of the HL-20 lifting body concept conducted in 1989 at NASA Langley. The original symbology was roughly based on Shuttle HUD symbology, as interpreted by Langley researchers. This document focuses on the addition of the precision approach path indicator (PAPI) lights to the HUD overlay.

Neuhaus, Jason R.↗

Collab Fracture Characterization: Preliminary Results from the Modeling and Flow Testing of Experiment 1

The EGS Collab project is developing ~10-20 m-scale field sites where fracture stimulation and flow models can be validated against controlled, small-scale, in-situ experiments. At the first experimental site, a hydraulic fracture will be created in metamorphic rock at the 4850 level in the former Homestake Mine. The experimental concept is for fracturing to be initiated at an injection well and continue until it intersects a production well approximately 10 meters away. Initial step-pressure flow testing of the fracture are to be performed to describe pressure-aperture-flow relationships. The flow field between the injector and producer boreholes will be characterized using a series of forced gradient dipole tracer tests. A number of fracture characterization models have been used to assist in the design of the tracer tests. The tracer test program will use conservative, sorbing, and particulate tracers, as well as sampling for radon gas to describe the fracture surface area (i.e., potential heat transfer area), flow pathway distribution, and volume. Tracer concentration at the production well (i.e. break through curves) will be measured using a series of inline sensors, liquid sampling devices, filtering of the effluent, and the measuring of gas concentrations in the effluent. Tracer monitoring data will be compared against results from a collection of numerical simulators developed at U.S. national laboratories and universities for the purpose of validating these flow and transport models. Ultimately these same models will be used to predict the heat transfer characteristics of the fracture and will be compared to a thermal characterization field test where cold water will be injected at the injection well and the temperature will be measured at the production well. This paper discusses the early tracer transport model predictions and parameters sensitivity that affect the tracer breakthrough curves at the production well.

15 GEOTHERMAL ENERGY↗

Plant Water Profiler: A Tool for Understanding Water Use, Cost and Savings Potential for Manufacturing Plants

In the 1746 Poor Richard’s Almanack, Benjamin Franklin published “When the well’s dry, we know the worth of water” (Franklin, 1746); industrial water users have begun to see the truth in these words as they examine the potential and reality of water scarcity becoming a significant business risk. Through the authors’ interactions with manufacturers via the U.S. Department of Energy’s Better Plants program and Strategic Analysis projects, they realized that manufacturing facilities often do not fully understand the risks to the water supply and the consequential risks to their business. The authors’ also noticed that many facilities do not know how their water is used (baselining), how they compare with their peers (benchmarking), the actual cost impacts of water use (true cost of water), and potential areas for water savings. This results in a lack of motivation and ability to identify and implement effective water-efficiency measures.The Plant Water Profiler Tool (PWP) was created to help manufacturing plant management address these issues by identifying and accounting for water use in manufacturing operations, helping determine the true cost of water, and providing some high-level estimates for peer comparison. The PWP uses a water mass balance and common engineering equations to estimate water use by each of the facility’s systems (e.g., differentiating process water use from cooling and restroom water use), even when no submetering data is available. This new tool also helps users identify possible areas for water savings and associated water and energy cost savings, making it a potentially useful resource for corporations conducting water assessments. Additionally, governments and private organizations can use the methodology behind this tool to design a survey to help build a database of industrial water use. This paper and corresponding presentation provide an overview of current industrial water use practices and tools, as well as the value of determining the true cost of water. It also briefly describes the methodology behind the tool, then focuses on its functionality through an industrial case study and lessons learned from implementing the case study.

Armstrong, Kristina O.↗

Comparative assessment of nuclear criticality and neutronic performance indicators of 12.1% and 12.6% enriched LEU UO{sub 2} fuels for conversion of the GHARR-1 MNSR facility

Neutronic feasibility studies for converting the Ghana MNSR facility from HEU to LEU core have been performed using stochastic Monte Carlo particle transport methods. Several MCNP transport calculations using LEU UO{sub 2} fuel of varying enrichments but same fuel element dimensions and core configuration as the reference HEU core have been made in this feasibility studies. A critical core with 344 LEU UO{sub 2} fuel pins enriched to 12.6% has been reported for the Ghana MNSR. It has recently been reported that it is possible to achieve criticality with LEU UO{sub 2} of reduced fuel element dimensions in a similar MNSR-based. Following this report and in support of on-going IAEA Coordinated Research Project activities on conversion of MNSR facilities to LEU cores, further neutronic analysis and feasibility studies have been made on MNSR cores using LEU UO{sub 2} with reduced fuel element dimensions. In this paper, the results of the scoping studies for achieving nuclear criticality on the Ghana MNSR core with fuel element dimensions enriched to 12.1% is reported. The paper also presents results of other neutronic analysis of the two candidate LEU cores (12.1% and 12.6% enriched) from which a comparative assessment of the performance indicators are made. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Techno-economic Analysis for a Low Cost and Recyclable Oxygen Carrier

The novelty of a chemical looping combustion (CLC) process is its ability to oxidize solid or gaseous fuels in a nitrogen-free environment eliminating the need for post combustion carbon dioxide capture. The technology is based on the oxygen carrier (OC); a metal oxide that at high temperatures can undergo a reduction reaction with a fuel, followed by an oxidation reaction with air. Successful development of CLC processes is dependent on the OC having: low cost, high attrition resistance under CLC conditions, and high reactivity for coal. In this paper, we discuss the development of a novel iron-based OC formulation produced from low cost and abundant raw materials. The active OC components are recyclable, with reformulated material performance comparable to the virgin OC, even when reformulated with ash contents of up to 10%. Furthermore, we discuss a techno-economic analysis for a centrally located OC facility for the novel OC, with a production capacity of 1 million metric tonnes per year. The facility serves a hypothetical market comprising 25 chemical looping combustion facilities, averaging 5 tonnes per hour OC replacement per facility. Estimates for the cost of the OC are around $150/tonne, and include an energy-to-power option to improve process economics.

20 FOSSIL-FUELED POWER PLANTS↗

Sustainable disposition of unneeded materials and chemicals at Y-12 national security complex - 15181

The Y-12 National Security Complex (Y-12) strives to integrate sustainability into all aspects of operations. In 2006, Y-12 conducted a site inventory to identify Unneeded Materials and Chemicals (UMC). The final inventory included over 9,400 materials and equipment and over 9,000 chemicals. A cross-functional UMC Project Team (Team) was established to manage and facilitate disposition of inventory items. A Site Plan was developed to outline the strategy to methodically disposition UMC's with the commitment to put sustainability practices first. The Team works to overcome challenges and find new lives for inventory items prior to dispositioning the materials as waste. Cost-effective strategies are used to transfer UMC items to a new owner. The Team utilizes a systematic disposition evaluation process, which does not simply manage UMC's as waste but focuses on reuse with waste disposal as last resort. The dedicated efforts of the Team to divert items from disposal as waste are reflected in the results. Through Fiscal Year 2013, 35 percent of all chemicals and 55 percent of equipment and materials have been reused or recycled. Through Fiscal Year 2013, the Team has dispositioned over 9.62 million pounds of materials (11,600 items) and down-posted over 97,000 square feet of radiological areas. In Fiscal Year 2014, a UMC Phase II inventory was developed to address UMCs that have accumulated since the original inventory was finalized. Lessons learned from the original UMC scope are being applied to phase II activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2011

As a condition to the Disposal Authorization Statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year 2011 annual review for Area G. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 and formally approved in 2009. These analyses are expected to provide reasonable estimates of the long-term performance of Area G and, hence, the disposal facility's ability to comply with Department of Energy (DOE) performance objectives. Annual disposal receipt reviews indicate that smaller volumes of waste will require disposal in the pits and shafts at Area G relative to what was projected for the performance assessment and composite analysis. The future inventories are projected to decrease modestly for the pits but increase substantially for the shafts due to an increase in the amount of tritium that is projected to require disposal. Overall, however, changes in the projected future inventories of waste are not expected to compromise the ability of Area G to satisfy DOE performance objectives. The Area G composite analysis addresses potential impacts from all waste disposed of at the facility, as well as other sources of radioactive material that may interact with releases from Area G. The level of knowledge about the other sources included in the composite analysis has not changed sufficiently to call into question the validity of that analysis. Ongoing environmental surveillance activities are conducted at, and in the vicinity of, Area G. However, the information generated by many of these activities cannot be used to evaluate the validity of the performance assessment and composite analysis models because the monitoring data collected are specific to operational releases or address receptors that are outside the domain of the performance assessment and composite analysis. In general, applicable monitoring data are supportive of some aspects of the performance assessment and composite analysis. Several research and development (R and D) efforts have been initiated under the performance assessment and composite analysis maintenance program. These investigations are designed to improve the current understanding of the disposal facility and site, thereby reducing the uncertainty associated with the projections of the long-term performance of Area G. The status and results of R and D activities that were undertaken in fiscal year 2011 are discussed in this report. Special analyses have been conducted to determine the feasibility of disposing of specific waste streams, to address proposed changes in disposal operations, and to consider the impacts of changes to the models used to conduct the performance assessment and composite analysis. These analyses are described and the results of the evaluations are summarized in this report. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, all disposal operations at Area G have been confined to MDA G. Material Disposal Area G is scheduled to undergo final closure in 2015; disposal of waste in the pits and shafts is scheduled to end in 2013. In anticipation of the closure of MDA G, plans are being made to ship the majority of the waste generated at LANL to off-site locations for disposal. It is not clear at this time if waste that will be disposed of at LANL will be placed in Zone 4 or if disposal operations will move to a new location at the Laboratory. Separately, efforts to optimize the final cover used in the closure of MDA G are underway; a final cover design different than that adopted for the performance assessment and composite analysis will likely emerge from that investigation. All of these changes will require re-examination of the assumptions upon which the performance assessment and composite analysis are based and, in all likelihood, revision of those analyses.

54 ENVIRONMENTAL SCIENCES↗

DWPF GC FILTER ASSEMBLY SAMPLING AND ANALYSIS

On March 18, 2009 a Defense Waste Processing Facility (DWPF) GC Line Filter Assembly was received at the Savannah River National Laboratory (SRNL). This filter assembly was removed from operation following the completion of Sludge Batch 4 processing in the DWPF. Work on this sample was requested in a Technical Assistance Request. This document reports the pictures, observations, samples collected, and analytical results for the assembly. The assembly arrived at SRNL separated into its three component filters: high efficiency particulate air (HEPA)-1, HEPA-2, and a high efficiency mist evaporator (HEME). Each stage of the assembly's media was sampled and examined visually and by scanning electron microscopy (SEM). Solids built up in the filter housing following the first stage HEME, were dissolved in dilute nitric acid and analyzed by ICP-AES and the undissolved white solids were analyzed by x-ray diffraction (XRD). The vast majority of the material in each of the three stages of the DWPF GC Line Filter Assembly appears to be contaminated with a Hg compound that is {approx}59 wt% Hg on a total solids basis. The Hg species was identified by XRD analysis to contain a mixture of Hg{sub 4}(OH)(NO{sub 3}){sub 3} and Hg{sub 10}(OH){sub 4}(NO{sub 3}){sub 6}. Only in the core sample of the second stage HEPA, did this material appear to be completely covering portions of the filter media, possibly explaining the pressure drops observed by DWPF. The fact that the material migrates through the HEME filter and both HEPA filters, and that it was seen collecting on the outlet side of the HEME filter, would seem to indicate that these filters are not efficient at removing this material. Further SRAT off-gas system modeling should help determine the extent of Hg breakthrough past the Mercury Water Wash Tank (MWWT). The SRAT off-gas system has not been modeled since startup of the facility. Improvements to the efficiency of Hg stripping prior to the ammonia scrubber would seem to be the only way to prevent/mitigate the formation of the compounds found in the GC Line Filter Assembly filters and therefore prevent pluggage of this filter assembly.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALTERNATE APPROACH TO HAZARD CATEGORIZATION FOR SALTSTONE FACILITY AT SRS

The Saltstone Facility at Savannah River Site (SRS) was originally segmented into two segments: the Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). Based on the inventory of radionuclides available for release the SPF and SDF were categorized as Nonreactor Hazard Category (HC)-3. The hazard categorization recognized the SDF will contain contributions of radionuclides which would exceed the HC-2 Threshold Quantity (TQ) in the form of grout. However it was determined not to impact the facility hazard categorization based on the grout being in a solid, monolithic form which was not easily dispersible. But, the impact of a quantity of unset grout expected to be present at the vault following operation of the process was not addressed. A Potential Inadequacy in Safety Analysis (PISA) was later issued based on the hazard categorization determination for the facility not addressing unset grout. This initiated a re-evaluation of the accident scenarios within the hazards analysis. During this re-evaluation, the segmentation of the facility was challenged based on the potential interaction between facility segments; specifically, the leachate return line and the grout transfer line, which were considered separate segments, are located in close proximity at one point. such that for certain events (NPH as well as External Vehicle Impact) both could be damaged simultaneously and spill contents on the ground that could commingle. This would violate the guideline for segmentation. Therefore, the Hazard Categorization (HC) was reevaluated based on the facility being a single segment and including the additional unset grout as part of total inventory. This total inventory far exceeded the limit for HC-2 TQ and made the facility's initial categorization as HC-2. However, alternative analysis methodology based on credible release fractions allowed in DOE-STD-1027-92 (Ref.1) showed that the Saltstone facility could still be categorized as Hazard Category 3 Nuclear Facility with no segmentation. Since it was the first time any facility at SRS tried this alternate approach safety analyst had to face substantial resistance and reservations from both the facility and local DOE customers which were eventually overcome with approval and acceptance from DOE-HQ.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diffraction studies applicable to 60-foot microwave research facilities

The principal features of this document are the analysis of a large dual-reflector antenna system by vector Kirchhoff theory, the evaluation of subreflector aperture-blocking, determination of the diffraction and blockage effects of a subreflector mounting structure, and an estimate of strut-blockage effects. Most of the computations are for a frequency of 15.3 GHz, and were carried out using the IBM 360/91 and 360/95 systems at Goddard Space Flight Center. The FORTRAN 4 computer program used to perform the computations is of a general and modular type so that various system parameters such as frequency, eccentricity, diameter, focal-length, etc. can be varied at will. The parameters of the 60-foot NRL Ku-band installation at Waldorf, Maryland, were entered into the program for purposes of this report. Similar calculations could be performed for the NELC installation at La Posta, California, the NASA Wallops Station facility in Virginia, and other antenna systems, by a simple change in IBM control cards. A comparison is made between secondary radiation patterns of the NRL antenna measured by DOD Satellite and those obtained by analytical/numerical methods at a frequency of 7.3 GHz.

Schmidt, R. F.↗

Thermal Analysis of Next Generation Space Telescope (NGST) Mirrors During Optical Testing in the X-Ray Calibration Facility (XRCF)

The Next Generation Space Telescope (NGST) program and industry partners are developing extremely lightweight mirror designs. NGST development mirrors are being tested at Marshall Space Flight Center. Target temperature for development mirror testing is 35 K. Conduction and radiation are not sufficient to conduct thermal vacuum testing in a reasonable time. Helium gas is injected into the vacuum chamber to accelerate temperature transitions during testing. Free-molecular conduction can be modeled by adapting present thermal analysis techniques.

Page, Tim↗