Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Financial analysis of experimental releases conducted at Glen Canyon Dam during Water Year 2013

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2013. It is the fifth report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011), a report released June 2012 examined water year 2011 (Poch et al. 2012), and a report released April 2013 examined water year 2012 (Poch et al. 2013).

13 HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2013

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2013. It is the fifth report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011), a report released June 2012 examined water year 2011 (Poch et al. 2012), and a report released April 2013 examined water year 2012 (Poch et al. 2013).

54 ENVIRONMENTAL SCIENCES↗

Clean and Secure Energy from Domestic Oil Shale and Oil Sands Resources

This report summarizes the significant findings from the Clean and Secure Energy from Domestic Oil Shale and Oil Sands Resources program sponsored by the Department of Energy through the National Energy Technology Laboratory. There were four principle areas of research; Environmental, legal, and policy issues related to development of oil shale and oil sands resources; Economic and environmental assessment of domestic unconventional fuels industry; Basin-scale assessment of conventional and unconventional fuel development impacts; and Liquid fuel production by in situ thermal processing of oil shale Multiple research projects were conducted in each area and the results have been communicated via sponsored conferences, conference presentations, invited talks, interviews with the media, numerous topical reports, journal publications, and a book that summarizes much of the oil shale research relating to Utah’s Uinta Basin. In addition, a repository of materials related to oil shale and oil sands has been created within the University of Utah’s Institutional Repository, including the materials generated during this research program. Below is a listing of all topical and progress reports generated by this project and submitted to the Office of Science and Technical Information (OSTI). A listing of all peer-reviewed publications generated as a result of this project is included at the end of this report; Geomechanical and Fluid Transport Properties 1 (December, 2015); Validation Results for Core-Scale Oil Shale Pyrolysis (February, 2015); and Rates and Mechanisms of Oil Shale Pyrolysis: A Chemical Structure Approach (November, 2014); Policy Issues Associated With Using Simulation to Assess Environmental Impacts (November, 2014); Policy Analysis of the Canadian Oil Sands Experience (September, 2013); V-UQ of Generation 1 Simulator with AMSO Experimental Data (August, 2013); Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges (March, 2012); Conjunctive Surface and Groundwater Management in Utah: Implications for Oil Shale and Oil Sands Development (May, 2012); Development of CFD-Based Simulation Tools for In Situ Thermal Processing of Oil Shale/Sands (February, 2012); Core-Based Integrated Sedimentologic, Stratigraphic, and Geochemical Analysis of the Oil Shale Bearing Green River Formation, Uinta Basin, Utah (April, 2011); Atomistic Modeling of Oil Shale Kerogens and Asphaltenes Along with their Interactions with the Inorganic Mineral Matrix (April, 2011); Pore Scale Analysis of Oil Shale/Sands Pyrolysis (March, 2011); Land and Resource Management Issues Relevant to Deploying In-Situ Thermal Technologies (January, 2011); Policy Analysis of Produced Water Issues Associated with In-Situ Thermal Technologies (January, 2011); and Policy Analysis of Water Availability and Use Issues for Domestic Oil Shale and Oil Sands Development (March, 2010)

04 OIL SHALES AND TAR SANDS↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2015

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year (WY) 2015. It is the seventh report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released June 2012 examined WY 2011 (Poch et al. 2012); a report released April 2013 examined WY 2012 (Poch et al. 2013); a report released June 2014 examined WY 2013 (Graziano et al. 2014); and a report released September 2015 examined WY 2014 (Graziano et al. 2015). An experimental release may have either a positive or negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2015; specifically, a high flow experimental (HFE) release conducted in November 2014. For this experimental release, financial costs of approximately $2.1 million were incurred because the HFE required sustained water releases that exceeded the powerplant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production to either follow firm power customer loads or to respond to market prices. This study identifies the main factors that contribute to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating the GCD operations under two scenarios: (1) a baseline scenario that mimics both HFE operations during the experiment and during the rest of the year when it complies with the 1996 ROD operating criteria, and (2) a “without experiments” scenario that is identical to the baseline except it assumes that the HFE did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to simulate the dispatch of hydropower plants at GCD and other plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase prices in the modeling process. In addition to estimating the financial impact of the HFE, the team used the GTMax model to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and WAPA operating practices.

54 ENVIRONMENTAL SCIENCES↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2017

This report examines the financial implications of the high-flow experiment (HFE) conducted at Glen Canyon Dam (GCD) during water year (WY) 2017. It is the eighth in a series of reports examining the financial implications of experimental flows conducted since the 1996 Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). The 1996 ROD implemented the Modified Low Fluctuating Flow (MLFF) regime. This is the first report since the 2016 ROD was adopted in January 2017 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime for monthly water releases, daily and hourly operating criteria, and experimental releases. A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released in June 2012 examined WY 2011 (Poch et al. 2012); a report released in April 2013 examined WY 2012 (Poch et al. 2013); a report released in June 2014 examined WY 2013 (Graziano et al. 2014); a report released in September 2015 examined WY 2014 (Graziano et al. 2015); and a report released in November 2016 examined WY 2015 (Graziano et al. 2016). An experimental release may have either a positive or a negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2017, specifically, a HFE release in November 2016. For this experimental release, financial costs of approximately $1.15 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production, neither to follow firm electric service (FES) customer day-ahead energy deliveries nor to respond to market prices. This study identifies the main factors contributing to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics HFE operations both during the experiment and during the rest of the year when it complies with the 1996 daily/hourly operating criteria and the 2016 ROD monthly water release mandates, and (2) a counterfactual Without Experiments scenario identical to the Baseline scenario except it assumes that the HFE did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). In the modeling process the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase and sale prices. In addition to estimating the financial impact of the HFE, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Multi-Sensors Observations of Pre-Earthquake Signals. What We Learned from the Great Tohoku Earthquake?

The lessons learned from the Great Tohoku EQ (Japan, 2011) will affect our future observations and an analysis is the main focus of this presentation. Multi-sensors observations and multidisciplinary research is presented in our study of the phenomena preceding major earthquakes Our approach is based on a systematic analysis of several physical and environmental parameters, which been reported by others in connections with earthquake processes: thermal infrared radiation; temperature; concentration of electrons in the ionosphere; radon/ion activities; and atmospheric temperature/humidity [Ouzounov et al, 2011]. We used the Lithosphere-Atmosphere-Ionosphere Coupling (LAIC) model, one of several possible paradigms [Pulinets and Ouzounov, 2011] to interpret our observations. We retrospectively analyzed the temporal and spatial variations of three different physical parameters characterizing the state of the atmosphere, ionosphere the ground surface several days before the March 11, 2011 M9 Tohoku earthquake Namely: (i) Outgoing Long wave Radiation (OLR) measured at the top of the atmosphere; (ii) Anomalous variations of ionospheric parameters revealed by multi-sensors observations; and (iii) The change in the foreshock sequence (rate, space and time); Our results show that on March 8th, 2011 a rapid increase of emitted infrared radiation was observed and an anomaly developed near the epicenter with largest value occurring on March 11 at 07.30 LT. The GPS/TEC data indicate an increase and variation in electron density reaching a maximum value on March 8. Starting from this day in the lower ionosphere there was also observed an abnormal TEC variation over the epicenter. From March 3 to 11 a large increase in electron concentration was recorded at all four Japanese ground-based ionosondes, which returned to normal after the main earthquake. We use the Japanese GPS network stations and method of Radio Tomography to study the spatiotemporal structure of ionospheric perturbations, and to distinguish ionospheric responses to processes of EQ preparation against the effects of other factors. The 2-D snapshots of the electron density over Japan showed abnormal increase over the maximum stress during the night, a few hours before the main shock. Our results from recording atmospheric and ionospheric conditions during the earthquake indicate the presence of anomalies in the atmosphere and ionospheres occurring consistently over regions of maximum stress near the epicenter. Due to their long duration (hours and days) and spatial appearance (only over the Sendai region) these results do not appear to be caused by meteorological or magnetic activity. They reveal the existence of atmospheric and ionospheric phenomena occurring prior to the earthquake, which indicates new evidence of a distinct coupling between the lithosphere and atmosphere/ionosphere. Similar results have been reported before the catastrophic events in Chile (M8.8, 2010), Italy (M6.3, 2009) and Sumatra (M9.3, 2004).

Ouzonounov, D.↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Climate Variability Drives Plankton Community Composition Changes: the 2010-2011 El Nino to La Nina Transition Around Australia

The strong La Nina of 2010-2011 provided an opportunity to investigate the ecological impacts of El Nino-Southern Oscillation on coastal plankton communities using the nine national reference stations around Australia. Based on remote sensing and across the entire Australian region 2011 (La Nina) was only modestly different from 2010 (El Nino) with the average temperature declining 0.2 percent surface chlorophyll a up 3 percent and modelled primary production down 14 percent. Other changes included a poleward shift in Prochlorococcus and Synechococcus. Along the east coast, there was a reduction in salinity, increase in nutrients, Chlorophytes and Prasinophytes (taxa with chlorophyll b, neoxanthin and prasinoxanthin). The southwest region had a rise in the proportion of 19-hexoyloxyfucoxanthin; possibly coccolithophorids in eddies of the Leeuwin Current and along the sub-tropical front. Pennate diatoms increased, Ceratium spp. decreased and Scrippsiella spp. increased in 2011. Zooplankton biomass declined significantly in 2011. There was a reduction in the abundance of Calocalanus pavo and Temora turbinata and increases in Clausocalanus farrani, Oncaea scottodicarloi and Macrosetella gracilis in 2011. The changes in the plankton community during the strong La Nina of 2011 suggest that this climatic oscillation exacerbates the tropicalization of Australia.

phytoplankton↗

ISMB Conference Proceedings

This special issue comprises the papers accepted for presentation at the 19th Annual International Conference on Intelligent Systems for Molecular Biology, joint with the 10th European Conference on Computational Biology, an official conference of the International Society for Computational Biology (ISCB; http://www.iscb.org). ISMB/ECCB 2011 (http://www.iscb.org/ismb2011/) will take place in Vienna, Austria, from July 17 through July 19, 2011; preceded during July 14–16 by eight 1- or 2- day Special Interest Group (SIG) meetings, three satellite meetings and nine half-day tutorials; and followed by two additional satellite meetings. The 48 papers in this volume were selected from 258 submitted papers. Submitted papers were assigned to 13 areas. Area Chairs led each topic area by selecting their area's program committee and overseeing the reviewing process. Many Area Chairs were new compared to 2010, and two completely new areas were added in 2011, ‘Data Visualization’ and ‘Mass Spectrometry and Proteomics’. Six papers for which Area Chairs were in conflict were reviewed under a ‘Conflicts Management’ section headed by the Proceedings Chairs; one such paper was accepted in ‘Bioimaging’. Areas, co-chairs and acceptance information are listed in Table 1. Compared to prior years, five mature topic areas had steady submissions, ‘Evolution and Comparative Genomics’, ‘Gene Regulation and Transcriptomics’, ‘Protein Structure and Function’, ‘Sequence Analysis’, ‘Text Mining’. Two areas newer to ISMB were underrepresented this year, ‘Bioimaging’ and ‘Disease Models and Epidemiology’. One area doubled, ‘Applied Bioinformatics’, renamed from last year's ‘Other Bioinformatics Applications’; and one tripled, ‘Protein Interactions and Molecular Networks’. Across the areas, 326 members of the bioinformatics community provided reviews. Most papers received three reviews and several received four or more. There was significant discussion of the merits of the papers first between referees and the Area Chairs, and then between Area Chairs and the proceedings chairs. Initial decisions to accept papers were made during a comprehensive conference call with the Area Chairs, and several papers underwent a further evaluation by additional Area Chairs before acceptance decisions were finalized. We appreciate that in several cases reviewers' opinions might have changed with additional input or further clarifications from the authors; because the ISMB/ECCB 2011 timeline did not allow for a second round of reviews, however, only papers where referees suggested minor revisions could be accepted. For several papers where referee comments might have been unclear to the authors, Area Chairs added additional comments and explanations. In total, 48 papers were conditionally accepted, pending revision. After acceptance notices were sent, the authors had 2 weeks to modify their papers according to the suggestions made by the reviewers and to respond to the reviewers' comments. Modified papers and authors' responses were reexamined during the next week to ensure each paper was modified appropriately in response to the reviewers' comments. We were pleased that all 48 conditionally accepted papers were finally accepted for the conference. The final acceptance rate was 19%, similar to the rates of 20% and 19% in the two prior years. Collectively, the 48 accepted papers had 185 authors from 18 countries across 6 continents, with 82 authors from North America, 54 from Europe, 25 from Asia (excluding Israel), 10 from Israel, 9 from Australia, 4 from South America and 1 author from Africa. We thank the area chairs and reviewers for their hard work and dedication to maintaining a professional review process. We thank all authors of submitted papers and authors of accepted papers for their diligences in responding to reviewer comments within 2 weeks. We thank Steven Leard's team for extensive technical support with the EasyChair submission and reviewing system; Mona Singh and Joel S. Bader for sharing their experience from last year; the team at Oxford University Press for typesetting the papers; Conference Chairs Burkhard Rost, Michal Linial, Peter Schuster and Kurt Zatloukal, as well as the ISMB/ECCB 2011 Steering Committee, for their valuable input; and Steven Leard for helping us oversee the process.

60 APPLIED LIFE SCIENCES↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of ENSO and the NAO on terrestrial carbon uptake in the Texas-northern Mexico region

Climate extremes such as drought and heat waves can cause substantial reductions in terrestrial carbon uptake. Advancing projections of the carbon uptake response to future climate extremes depends on (1) identifying mechanistic links between the carbon cycle and atmospheric drivers, (2) detecting and attributing uptake changes, and (3) evaluating models of land response and atmospheric forcing. Here, we combine model simulations, remote sensing products, and ground observations to investigate the impact of climate variability on carbon uptake in the Texas-northern Mexico region. Specifically, we (1) examine the relationship between drought, carbon uptake, and variability of El Niño–Southern Oscillation (ENSO) and the North Atlantic Oscillation (NAO) using the Joint UK Land-Environment Simulator (JULES) biosphere simulations from 1950–2012, (2) quantify changes in carbon uptake during record drought conditions in 2011, and (3) evaluate JULES carbon uptake and soil moisture in 2011 using observations from remote sensing and a network of flux towers in the region. Long-term simulations reveal systematic decreases in regional-scale carbon uptake during negative phases of ENSO and NAO, including amplified reductions of gross primary production (GPP) (-0.42 ± 0.18 Pg C yr -1 ) and net ecosystem production (NEP) (-0.14 ± 0.11 Pg C yr -1 ) during strong La Niña years. The 2011 megadrought caused some of the largest declines of GPP (-0.50 Pg C yr -1 ) and NEP (-0.23 Pg C yr -1 ) in our simulations. In 2011, consistent declines were found in observations, including high correlation of GPP and surface soil moisture (r = 0.82 ± 0.23, p = 0.012) in remote sensing-based products. These results suggest a large-scale response of carbon uptake to ENSO and NAO, and highlight a need to improve model predictions of ENSO and NAO in order to improve predictions of future impacts on the carbon cycle and the associated feedbacks to climate change.

54 ENVIRONMENTAL SCIENCES↗

Tempo-spatial characteristics of sub-daily temperature trends in mainland China

The spatial and temporal pattern of sub-daily temperature change in mainland China was analysed for the period from 1973 to 2011 using a 3-hourly dataset based on 408 stations. The increase in surface air temperature was more significant by night between 1973 and 1992, with the fastest upward trend around local midnight being about 0.27 °C/decade, while it was more significant by day between 1992 and 2011, with the fastest upward trend being about 0.46 °C/decade in mid-late morning. The season with rapid temperature increase also shifted from winter in 1973–1992 (the largest increase happened near midnight in December, 0.75 °C/decade) to spring in 1992–2011 (the largest increase happened at in the early afternoon in March, 0.82 °C/decade). The change in the spatial distributions of the sub-daily temperature trends shows that Northeast China warmed more significantly in 1973–1992 than elsewhere, but it cooled in 1992–2011, when Southwest China was the new focus of temperature increase whereas it had previously been cooling. A preliminary analysis of the possible causes implies that changes in solar radiation, cloud cover, aerosols and the observational environments near the stations might have contributed to these observed temperature changes.

Meteorology & Atmospheric Sciences↗

Understanding recent market trends of the US ESCO industry

The US energy services company (ESCO) industry is an example of a private-sector business model that delivers energy savings to customers primarily through the use of performance-based contracts. US ESCO projects garner significant incremental annual savings: approximately 1% of total US commercial building consumption in 2014. From 2000 to 2011, the industry experienced year over year growth; however, based on information drawn from interviews with ESCO executives conducted in late 2015, the authors find that from 2012 to 2014, ESCO industry revenues did not increase. While public and institutional market sectors accounted for 85% of industry revenue in 2014, consistent with previous research findings, the share of revenue from performance contracting increased to 74% in 2014, as compared to 69% share reported for 2011 and 2008. The revenue numbers between 2011 and 2014 are not fully comparable, because a few ESCOs that were subsidiaries of larger companies had undergone reorganization and some categories of revenue reported in 2011 were not included for 2014. Other factors that may have contributed to the recent revenue trend include the following: (1) increased competition from companies not historically defined as an ESCO (e.g. mechanical contractors), (2) uncertainty among some potential customers about committing to long-term performance contracts, and (3) reduction of performance contracting’s perceived benefit of hedging energy price increases and variability due to customer expectations of continued low and less volatile energy prices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Biomass Production of Prairie Cordgrass (Spartina pectinata Link.) Using Urea and Kura Clover (Trifolium ambiguum Bieb.) as a Source of Nitrogen

Abstract Optimizing nitrogen (N) management is an important factor for sustainable perennial biomass systems. However, N application is costly, both financially and environmentally. Our objectives were to determine: (1) N rate and plant spacing effects on yield and yield components of prairie cordgrass swards and (2) fertilizer N replacement value (FNRV) of kura clover in prairie cordgrass-kura clover binary mixtures. Plots were established in Illinois, Minnesota, South Dakota, and Wisconsin, USA, in 2010. Kura clover was transplanted on 30-cm centers in all treatments in which it was a component; prairie cordgrass seedlings were transplanted within the kura clover on 60- and 90-cm centers. Monoculture prairie cordgrass stands were established at the same population densities of mixed stands and fertilized with 0, 75, 150, or 225 kg N ha -1 . Biomass was harvested in the autumn from 2011 to 2013. N (urea), year, plant spacing, and year × plant spacing affected prairie cordgrass production at all locations. Prairie cordgrass yield increased with N application, but the response varied by location. N application tended to increase prairie cordgrass tiller density and consistently increased tiller mass. Prairie cordgrass yield with 0 N was equal to or less than the yield of prairie cordgrass/kura clover mixtures at all locations in 2011 and 2012; however, kura clover provided a FNRV of 25–82 kg N ha -1 to prairie cordgrass in 2013. Kura clover has potential to provide N to prairie cordgrass in binary mixtures of these two species and on land that may not be easily farmed due to wetness.

Energy & Fuels↗

Discovery of VHE γ -rays from the blazar 1ES 1215+303 with the MAGIC telescopes and simultaneous multi-wavelength observations

Here, we present the discovery of very high energy (VHE, E > 100 GeV) γ-ray emission from the BL Lac object 1ES 1215+303 by the MAGIC telescopes and simultaneous multi-wavelength data in a broad energy range from radio to γ-rays. We also study the VHE γ-ray emission from 1ES 1215+303 and its relation to the emissions in other wavelengths. Triggered by an optical outburst, MAGIC observed the source in 2011 January - February for 20.3 h. The target was monitored in the optical R-band by the KVA telescope that also performed optical polarization measurements. Furthermore, we triggered target of opportunity observations with the Swift satellite and obtained simultaneous and quasi-simultaneous data from the Fermi Large Area Telescope and from the Metsähovi radio telescope. We also present the analysis of older MAGIC data taken in 2010. The MAGIC observations of 1ES 1215+303 carried out in 2011 January - February resulted in the first detection of the source at VHE with a statistical significance of 9.4σ. Simultaneously, the source was observed in a high optical and X-ray state. In 2010 the source was observed in a lower state in optical, X-ray, and VHE, while the GeV γ-ray flux and the radio flux were comparable in 2010 and 2011. The spectral energy distribution obtained with the 2011 data can be modeled with a simple one zone SSC model, but it requires extreme values for the Doppler factor or the electron energy distribution.

79 ASTRONOMY AND ASTROPHYSICS↗

Interpretation of the I-Regime and transport associated with relevant heavy particle modes

The excitation of a novel kind of heavy particle [B. Coppi et al., Phys. Rev. Lett. 17, 377 (1966); B. Coppi and T. Zhou, MIT(LNS) Report HEP 09/04, 2009, Cambridge, MA [Phys. Lett. A 375, 2916 (2011)]] mode at the edge of the plasma column is considered as the signature of the I-confinement Regime [R. McDermott et al., Bull. Am. Phys. Soc. 53, 112 (2008); R. McDermott et al., Phys. Plasmas 16, 056103 (2009); E. Marmar et al., Bull. Am. Phys. Soc. 54, 97 (2009); D. Whyte et al., Nucl. Fusion 50, 105005 (2010); A. Hubbard et al., Phys. Plasmas 18, 056115 (2011)]. The outward transport of impurities produced by this mode is in fact consistent with the observed expulsion of them from the main body of the plasma column (a high degree of plasma purity is a necessary feature for fusion burning plasmas capable of approaching ignition). Moreover, the theoretically predicted mode phase velocity, in the direction of the electron diamagnetic velocity, has been confirmed by relevant experimental analyses [I. Cziegler, private communication (2010)] of the excited fluctuations (around 200 kHz). The plasma ''spontaneous rotation'' in the direction of the ion diamagnetic velocity is also consistent, according to the accretion theory [B. Coppi, Nucl. Fusion 42, 1 (2002)] of this phenomenon, with the direction of the mode phase velocity. Another feature of the mode that predicted by the theory is that the I-Regime exhibits a knee of the ion temperature at the edge of the plasma column, but not one of the particle density as the mode excitation factor is the relative main ion temperature gradient exceeding the local relative density gradient. The net plasma current density appearing in the saturation stage of the relevant instability, where the induced particle and energy fluxes are drastically reduced, is associated with the significant amplitudes of the poloidal magnetic field fluctuations [D. Whyte et al., Nucl. Fusion 50, 105005 (2010); A. Hubbard et al., Phys. Plasmas 18, 056115 (2011)] observed to accompany the density fluctuations. The theoretical implications of the significant electron temperature fluctuations [A. White, private communication (2011)] observed are discussed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Micro-earthquake signal analysis and hypocenter determination around Lokon volcano complex

Mount Lokon is one of five active volcanoes which is located in the North Sulawesi region. Since June 26{sup th}, 2011, standby alert set by the Center for Volcanology and Geological Hazard Mitigation (CVGHM) for this mountain. The Mount Lokon volcano erupted on July 4{sup th}, 2011 and still continuously erupted until August 28{sup th}, 2011. Due to its high seismic activity, this study is focused to analysis of micro-earthquake signal and determine the micro-earthquake hypocenter location around the complex area of Lokon-Empung Volcano before eruption phase in 2011 (time periods of January, 2009 up to March, 2010). Determination of the hypocenter location was conducted with Geiger Adaptive Damping (GAD) method. We used initial model from previous study in Volcan de Colima, Mexico. The reason behind the model selection was based on the same characteristics that shared between Mount Lokon and Colima including andesitic stratovolcano and small-plinian explosions volcanian types. In this study, a picking events was limited to the volcano-tectonics of A and B types, hybrid, long-period that has a clear signal onset, and local tectonic with different maximum S – P time are not more than three seconds. As a result, we observed the micro-earthquakes occurred in the area north-west of Mount Lokon region.

58 GEOSCIENCES↗