Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Residential Cold Climate Heat Pump Technology Challenge (Rheem) (CRADA NFE-22-09374 Final Report)

The purpose of this CRADA was to test a nominal 3-ton capacity heat pump system supplied by Rheem Manufacturing to determine if it met the laboratory test requirements of the United States Department of Energy Cold Climate Heat Pump (CCHP) Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at ORNL demonstrated that the system met all requirements of the Challenge. Rheem Manufacturing has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the CCHP Challenge, the test plan created to measure the success of heat pump systems provided by CCHP Challenge participants, and the results of laboratory testing of the Rheem heat pump system.

42 ENGINEERING↗

Multi-Evaporator Miniature Loop Heat Pipe for Small Spacecraft Thermal Control: New Technologies and Validation Approach - Part 1

Under NASA s New Millennium Program Space Technology 8 (ST 8) Project, four experiments Thermal Loop, Dependable Microprocessor, SAILMAST, and UltraFlex - were conducted to advance the maturity of individual technologies from proof of concept to prototype demonstration in a relevant environment , i.e. from a technology readiness level (TRL) of 3 to a level of 6. This paper presents the new technologies and validation approach of the Thermal Loop experiment. The Thermal Loop is an advanced thermal control system consisting of a miniature loop heat pipe (MLHP) with multiple evaporators and multiple condensers designed for future small system applications requiring low mass, low power, and compactness. The MLHP retains all features of state-of-the-art loop heat pipes (LHPs) and offers additional advantages to enhance the functionality, performance, versatility, and reliability of the system. Details of the thermal loop concept, technical advances, benefits, objectives, level 1 requirements, and performance characteristics are described. Also included in the paper are descriptions of the test articles and mathematical modeling used for the technology validation. An MLHP breadboard was built and tested in the laboratory and thermal vacuum environments for TRL 4 and TRL 5 validations, and an MLHP proto-flight unit was built and tested in a thermal vacuum chamber for the TRL 6 validation. In addition, an analytical model was developed to simulate the steady state and transient behaviors of the MLHP during various validation tests. Capabilities and limitations of the analytical model are also addressed.

Ku, Jentung↗

Advancement of Functional Expansion Tallies Capabilities in Serpent 2

The need for accident tolerant fuels (ATFs) became self-evident after the series of unfortunate nuclear events at Fukushima Daiichi in 2011. Restarting the Transient Reactor Test Facility (TREAT) at INL is one component in this concerted effort to establish the ATF development and testing program under the United States Department of Energy. Prior to the closure of TREAT in 1994, each experiment required multiple low-power calibration tests before and after each run. Since then, computing advancements have set computer-based modeling and simulation (M and S) as the preferred calibration method. The anticipated savings are both temporal and monetary. MAMMOTH, a collection of M and S tools built from the finite element-based MOOSE Framework, has been established to support the designed experiments intended for TREAT. This collection of tools includes: 1) Rattlesnake, a striking diffusion-based neutronics code, 2) BISON, an advanced materials and fuels performance code, and 3) RELAP-7, a powerful thermal-hydraulics solver. Each is capable of independently performing its function accurately and effectively; unified, they create a powerful multiphysics reactor core M and S application. One unfortunate weakness in this configuration lies in the unique geometry and design of TREAT's core. Although simple to model, this poses a challenge to the diffusion solver in Rattlesnake. One alternative is to replace Rattlesnake with Serpent, a fully-fledged Monte Carlo (MC) neutronics code. Coincidentally, Rattlesnake calculations are frequently validated against Serpent simulations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integration Tests of the 4 kW-Class High Voltage Hall Accelerator Power Processing Unit with the HiVHAc and the SPT-140 Hall Effect Thrusters

NASA's Science Mission Directorate is sponsoring the development of a 4 kW-class Hall propulsion system for implementation in NASA science and exploration missions. The main components of the system include the High Voltage Hall Accelerator (HiVHAc), an engineering model power processing unit (PPU) developed by Colorado Power Electronics, and a xenon flow control module (XFCM) developed by VACCO Industries. NASA Glenn Research Center is performing integrated tests of the Hall thruster propulsion system. This paper presents results from integrated tests of the PPU and XFCM with the HiVHAc engineering development thruster and a SPT-140 thruster provided by Space System Loral. The results presented in this paper demonstrate thruster discharge initiation along with open-loop and closed-loop control of the discharge current with anode flow for both the HiVHAc and the SPT-140 thrusters. Integrated tests with the SPT-140 thruster indicated that the PPU was able to repeatedly initiate the thruster's discharge, achieve steady state operation, and successfully throttle the thruster between 1.5 and 4.5 kW. The measured SPT-140 performance was identical to levels reported by Space Systems Loral.

Power Processing Unit↗

Integration Tests of the 4 kW-class High Voltage Hall Accelerator Power Processing Unit with the HiVHAc and the SPT-140 Hall Effect Thrusters

NASAs Science Mission Directorate is sponsoring the development of a 4 kW-class Hall propulsion system for implementation in NASA science and exploration missions. The main components of the system include the High Voltage Hall Accelerator (HiVHAc), an engineering model power processing unit (PPU) developed by Colorado Power Electronics, and a xenon flow control module (XFCM) developed by VACCO Industries. NASA Glenn Research Center is performing integrated tests of the Hall thruster propulsion system. This presentation presents results from integrated tests of the PPU and XFCM with the HiVHAc engineering development thruster and a SPT-140 thruster provided by Space System Loral. The results presented in this paper demonstrate thruster discharge initiation, open-loop and closed-loop control of the discharge current with anode flow for both the HiVHAc and the SPT-140 thrusters. Integrated tests with the SPT-140 thruster indicated that the PPU was able to repeatedly initiate the thrusters discharge, achieve steady state operation, and successfully throttle the thruster between 1.5 and 4.5 kW. The measured SPT-140 performance was identical to levels reported by Space Systems Loral.

Hall Thrusters↗

Standardizing Microprocessor and GPU Radiation Test Approaches

Microprocessor, Graphics Processing Units (GPUs) and DDRx memory devices have emerged as promising next-generation technologies that enables both high performance processing and acceleration of complex algorithms for the latest challenges in human spaceflight, autonomous vehicles and artificial intelligence (AI). The feature sets of these devices offer exponential increases to throughput, calculation capability and system autonomy when compared to legacy flight systems. NASA's Electronic Part and Packaging (NEPP) Program has conducted an investigation into the radiation susceptibility of leading edge devices and process technologies by establishing standardized test approaches. Unlike most discrete devices, these require state of the art test systems to induce specific hardware activity similar to application software, thus allowing the characterization of failure modes within the system. To best characterize the tested part, NEPP eliminates variables that may impact device performance under radiation. Simplification of remaining system-level variables leads to an improved understanding of complex computational devices and their intended applications. The failure modes and error signatures that are recorded during testing are used to determine radiation sensitivity of the semiconductor process and the microcode architecture of the design. This presentation will discuss the test methodology that NASA Electronic Parts and Packaging (NEPP) is working to establish for its microprocessor, GPU and DDRx memory test programs to provide guidance on these devices and their underlying technology, in regards to their potential usage in future space flight systems.

GPU↗

Sliding Contact Bearings for Service to 700 C

Cylindrical, sliding contact bearings made entirely of a self-lubricating powder metallurgy composite (PM212) or of super alloy shells lined with clad PM212 were tested in an oscillating mode at temperatures from 25 to 700 C. Tests of 100 hr duration or longer were conducted at a bearing unit load of 3.45 Mpa (500 psi). Shorter duration tests at various unit loads up to 24.1 Mpa (3500 psi) were also conducted. In comparison tests, bearings lubricated with PM212 had superior anti-wear characteristics compared to the baseline, unlubricated, super alloy bearings: no galling of PM212-lubricated bearings occurred, while severe surface damage including galling occurred, especially at high loads, during the baseline tests. A heat treatment procedure, which dimensionally stabilizes PM212 and thereby minimizes clearance changes during high temperature bearing operation, is described.

Sliney, Harold E.↗

Historic Context, Character-Defining Elements, And Photographic Record For A 26.45-Mile Segment Of The 138-Kilovolt Power Transmission System, Areas 3, 5, 6, And 23, Nevada National Security Site, Nye County, Nevada

The subject of this report is the 138-kilovolt (kV) power transmission line on the Nevada National Security Site (NNSS) (see Figure 1). The NNSS, formerly the Nevada Test Site (NTS), was the main continental nuclear test site for the United States between 1951 and 1992. Known as the battleground of the Cold War, the NNSS hosted a total of 928 nuclear tests during that period. It also served as the location of numerous scientific advancements in the fields of rocketry, big-hole drilling, nuclear waste management, and defense. From its construction in the 1960s through the present day, the 138 kV line has provided electrical power to the numerous buildings, facilities, experiments, and tests on the NNSS. The Department of Energy (DOE), in consultation with the Nevada State Historic Preservation Officer (SHPO), has determined that it may contribute to the character and significance of the Mercury Historic District (MHD) on the NNSS, as well as other historic districts that have not been recorded or evaluated yet. The purpose of this report is to fulfill two of the stipulations in the Memorandum of Agreement DEGM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site (MOA). The MOA was executed as part of the DOE’s obligations under Section 106 of the National Historic Preservation Act (NHPA) to mitigate the adverse effects of two undertakings on historic properties. In particular, this report fulfills MOA Stipulations III.C.1-3, which state that the Department of Energy (DOE) will prepare the following: A historic context for the 138 kV transmission line and identification of the line’s characterdefining elements; High-quality digital images of the 26.45-mile segment of the 138 kV transmission line that is subject to the two undertakings for which the MOA was executed; and Photograph catalogs and map keys showing photograph viewpoints and directions.

54 ENVIRONMENTAL SCIENCES↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

Non-isolated 30 kW class arcjet PCU

A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. Some testing with hydrogen arcjets was also carried out at NASA LeRC. This system concept is now the design base for the ATTD program.

Wong, See-Pok↗

Nuclear Testing and the Joint Task Force System

During the 1940s, 50s, and early 60s, the United States conducted eight nuclear test operations in the far reaches of the Pacific Ocean. These operations were possible only because of a military command and control organization, the joint task force. Commanded by the Army Navy, and Air Force on a rotating basis, each of the seven JTFs provided the means by which the thousands of ships, planes, material, and personnel were moved over thousands of miles of ocean. The first task force, JTF-1, was created to test the destructive effects of the Fat Man bomb on Naval vessels at Bikini Atoll in the summer of 1946. Commanded by Vice Admiral William “Spike” Blandy, JTF-1 was a purely military operation supported by the MED. Never meant to be a permanent organization, JTF-1 was dissolved soon after completing its mission.

99 GENERAL AND MISCELLANEOUS↗

Wastewater Surveillance for Poliovirus in Selected Jurisdictions, United States, 2022–2023

Wastewater testing can inform public health action as a component of polio outbreak response. During 2022-2023, a total of 7 US jurisdictions (5 states and 2 cities) participated in prospective or retrospective testing of wastewater for poliovirus after a paralytic polio case was identified in New York state. Two distinct vaccine-derived poliovirus type 2 viruses were detected in wastewater from New York state and New York City during 2022, representing 2 separate importation events. Of those viruses, 1 resulted in persistent community transmission in multiple New York counties and 1 paralytic case. No poliovirus was detected in the other participating jurisdictions (Connecticut, New Jersey, Michigan, and Illinois and Chicago, IL). The value of routine wastewater surveillance for poliovirus apart from an outbreak is unclear. However, these results highlight the ongoing risk for poliovirus importations into the United States and the need to identify undervaccinated communities and increase vaccination coverage to prevent paralytic polio.

60 APPLIED LIFE SCIENCES↗

Experimental and Numerical Analysis of Additively Manufactured Inconel 718 Coupons With Lattice Structure

Abstract In the present paper, two lattice geometries suitable for near surface and double wall cooling were developed and tested. The first type of unit cell consisted of six ligaments of 0.5 mm diameter joined at a common vertex near the middle. The second type of unit cell was derived from the first type by adding four mutually perpendicular ligaments in the middle plane. Two lattice configurations, referred to as L1 and L2, respectively, were obtained by repeating the corresponding unit cell in streamwise and spanwise directions in an inline fashion. Test coupons consisting of these lattice geometries embedded inside rectangular cooling channel with dimensions of 2.54 mm height, 38.07 mm width, and 38.1 mm in length were fabricated using Inconel 718 powder and selective laser sintering (SLS) process. The heat transfer and pressure drop performance was then evaluated using steady-state tests with constant wall temperature boundary condition and for channel Reynolds number ranging from 2800 to 15,000. The lattices depicted a higher heat transfer compared with a smooth channel and both the heat transfer and pressure drop increased with a decrease in the porosity from L1 to L2. Steady-state conjugate numerical results revealed formation of prominent vortical structures in the inter-unit cell spaces, which diverted the flow toward the top end wall and created an asymmetric heat transfer between the two end walls. In conclusion, these lattice structures provided an augmented heat transfer while favorably redistributing the coolant within channel.

Engineering↗