Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “uncertainties”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Incorporating Operational Uncertainties into the Dispatch of an Integrated Solar and Storage System

The economic assessment of hybrid energy systems (HES) pairing battery energy storage systems (BESSs) and photovoltaics (PV) is highly important for advancing their deployment in power systems. This paper presents an innovative assessment framework, including an optimal control policy for dispatch under uncertainty and procedures for exploring control parameters that maximize economic benefits. The proposed dispatch policy consists of two steps using system forecast information. The first step is to determine whether a BESS will be used within an operational scheduling time frame based on the probability of events and their thresholds. Once the dispatch of BESS is triggered, a model predictive control (MPC) is carried out in the second step for scheduling using the expected value of system information. By exercising this policy with different thresholds, one can explore the trade-offs between short-term benefits and battery lifetime, and identify an optimal threshold that maximizes the total economic benefits within the battery lifetime. An evaluation study in a real-world HES project is presented to illustrate the proposed framework. Compared with traditional optimal dispatch algorithms, the proposed method can significantly improve the economic benefits of an HES scheduled under forecast uncertainties.

Ma, Xu↗

Network-Cognizant Time-Coupled Aggregate Flexibility of Distribution Systems Under Uncertainties

Increasing integration of distributed energy resources (DERs) within distribution feeders provides unprecedented flexibility at the distribution-transmission interconnection. To exploit this flexibility and to use the capacity potential of aggregate DERs, feasible substation power injection trajectories need to be efficiently characterized. This paper provides an ellipsoidal inner approximation of the set of feasible power injection trajectories at the substation such that for any point in the set, there exists a feasible disaggregation strategy of DERs for any load uncertainty realization. The problem is formulated as one of finding the robust maximum volume ellipsoid inside the flexibility region under uncertainty. Though the problem is NP-hard even in the deterministic case, this paper derives novel approximations of the resulting adaptive robust optimization problem based on optimal second-stage policies. The proposed approach yields less conservative flexibility characterization than existing flexibility region approximation formulations. The efficacy of the proposed method is demonstrated on a realistic distribution feeder.

adaptive robust optimization↗

Numerical and Visual Representations of Uncertainty Lead to Different Patterns of Decision Making

Although visualizations are a useful tool for helping people to understand information, they can also have unintended effects on human cognition. This is especially true for uncertain information, which is difficult for people to understand. Prior work has found that different methods of visualizing uncertain information can produce different patterns of decision making from users. However, uncertainty can also be represented via text or numerical information, and few studies have systematically compared these types of representations to visualizations of uncertainty. We present two experiments that compared visual representations of risk (icon arrays) to numerical representations (natural frequencies) in a wildfire evacuation task. Like prior studies, we found that different types of visual cues led to different patterns of decision making. In addition, our comparison of visual and numerical representations of risk found that people were more likely to evacuate when they saw visualizations than when they saw numerical representations. These experiments reinforce the idea that design choices are not neutral: seemingly minor differences in how information is represented can have important impacts on human risk perception and decision making.

97 MATHEMATICS AND COMPUTING↗

Voltage Probability Density Function Shaping Control Strategy Considering Grid Operational Uncertainties

It is well-known that power systems operation always affected by various uncertainties which make the bus voltage a random process that can be characterized by its probability density function (PDF) at any time instant. In this context, this paper presents a novel PDF-based voltage control framework for power systems. By modeling voltage as a stochastic process, we formulate a stochastic differential equationthat captures grid uncertainties. The associated Fokker-Planck-Kolmogorov equation is derived to describe the evolution of the voltage PDF, which enables the formulation of a PDF-shaping control strategy. To simplify the PDF control formulation, a B-spline neural network is introduced for real-time estimation and regulation of the voltage distribution. The proposed PDF control law updates voltage references for energy storage systems and synchronous generators using real-time PDF measurements and feedback signals. The proposed method is validated on a modified Kundur’s two-area system. Simulation results demonstrate that the controller can significantly improve the voltage stability under stochastic conditions, highlighting its effectiveness in modern inverter-rich grids.

Gui, Yonghao [ORNL] (ORCID:0000000250435534)↗

Restoring Distribution System Under Renewable Uncertainty Using Reinforcement Learning

Distributed energy resources (DERs) in distribution systems, including renewable generation, micro-turbine, and energy storage, can be used to restore critical loads following extreme events to increase grid resiliency. However, properly coordinating multiple DERs in the system for multi-step restoration process under renewable uncertainty and fuel availability is a complicated sequential optimal control problem. Due to its capability to handle system non-linearity and uncertainty, reinforcement learning (RL) stands out as a potentially powerful candidate in solving complex sequential control problems. Moreover, the offline training of RL provides excellent action readiness during online operation, making it suitable to problems such as load restoration, where in-time, correct and coordinated actions are needed. In this study, a distribution system prioritized load restoration based on a simplified single-bus system is studied: with imperfect renewable generation forecast, the performance of an RL controller is compared with that of a deterministic model predictive control (MPC). Our experiment results show that the RL controller is able to learn from experience, adapt to the imperfect forecast information and provide a more reliable restoration process when compared with the baseline controller.

61 RADIATION PROTECTION AND DOSIMETRY↗

Uncertainty-Informed Operation Coordination in a Water-Energy Nexus

The widespread deployment of smart heterogeneous technologies and the growing complexity in our modern society calls for effective coordination of the interdependent lifeline networks. In particular, operation coordination of electric power and water infrastructures is urgently needed as the water system is one of the most energy-intensive networks, an interruption in which may quickly evolve into a dramatic societal concern. This paper develops a novel analytic for uncertainty-aware day-ahead operation optimization of the interconnected power and water systems (PaWS). Joint probabilistic constraint (JPC) programming is employed to capture the uncertainties in wind resources and water demand forecasts. The proposed integrated stochastic model is presented as a non-linear non-convex optimization problem, where the non-linear hydraulic constraints in the water network are linearized using piece-wise linearization technique, and the non-convexity is efficiently tackled with a solution methodology to convert the proposed model with JPCs to a tractable mixed-integer linear programming (MILP) formulation that can be quickly solved to optimality. Here, the suggested framework is applied to a 15-node commercial-scale water network jointly operated with a power transmission system using a modified IEEE 57-bus test system. The numerical results demonstrate the of the proposed stochastic framework, resulting in cost reduction (13% on average when compared to the traditional setting) and energy saving of the integrated model under different realizations of uncertain renewable energy sources (RESs) and water demand scenarios. Additionally, the scalability of the proposed model is tested on a modified IEEE 118-bus test system connected to five water networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust System Separation Strategy Considering Online Wide-Area Coherency Identification and Uncertainties of Renewable Energy Sources

With the fast growth of renewable energy sources (RES), more and more uncertainties are involved and influencing the stable operation of power systems. Controlled islanding is the last measure to prevent power system blackouts, thus this paper aims to propose a novel model of system separation based on Online Coherency Identification and Adjustable Robust Optimization Programming (OCI-AROP) for minimizing load shedding considering the uncertainties of RES. First, Fuzzy C-Means (FCM) clustering method with F-statistics is utilized to identify the coherent generator groups with the frequency data measured by Phasor Measurement Units (PMUs). Then, the OCI-AROP model considering coherent group constraints, connectivity constraints and robustness constraints about RES are presented. Finally, the case studies on IEEE-39 bus system and WECC-179 bus system are employed to demonstrate the effectiveness of the proposed OCI-AROP model, and comparisons among the OCI-AROP model and the other models are also given to show its superiority.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Entropy-Based Test and Development Framework for Uncertainty Modeling in Level-Set Visualizations

We present a simple comparative framework for testing and developing uncertainty modeling in uncertain marching cubes implementations. The selection of a model to represent the probability distribution of uncertain values directly influences the memory use, run time, and accuracy of an uncertainty visualization algorithm. We use an entropy calculation directly on ensemble data to establish an expected result and then compare the entropy from various probability models, including uniform, Gaussian, histogram, and quantile models. Our results verify that models matching the distribution of the ensemble indeed match the entropy. We further show that fewer bins in nonparametric histogram models are more effective whereas large numbers of bins in quantile models approach data accuracy.

Sisneros, Robert↗

Statistical upscaling of ecosystem CO 2 fluxes across the terrestrial tundra and boreal domain: Regional patterns and uncertainties

Abstract The regional variability in tundra and boreal carbon dioxide (CO 2 ) fluxes can be high, complicating efforts to quantify sink‐source patterns across the entire region. Statistical models are increasingly used to predict (i.e., upscale) CO 2 fluxes across large spatial domains, but the reliability of different modeling techniques, each with different specifications and assumptions, has not been assessed in detail. Here, we compile eddy covariance and chamber measurements of annual and growing season CO 2 fluxes of gross primary productivity (GPP), ecosystem respiration (ER), and net ecosystem exchange (NEE) during 1990–2015 from 148 terrestrial high‐latitude (i.e., tundra and boreal) sites to analyze the spatial patterns and drivers of CO 2 fluxes and test the accuracy and uncertainty of different statistical models. CO 2 fluxes were upscaled at relatively high spatial resolution (1 km 2 ) across the high‐latitude region using five commonly used statistical models and their ensemble, that is, the median of all five models, using climatic, vegetation, and soil predictors. We found the performance of machine learning and ensemble predictions to outperform traditional regression methods. We also found the predictive performance of NEE‐focused models to be low, relative to models predicting GPP and ER. Our data compilation and ensemble predictions showed that CO 2 sink strength was larger in the boreal biome (observed and predicted average annual NEE −46 and −29 g C m −2 yr −1 , respectively) compared to tundra (average annual NEE +10 and −2 g C m −2 yr −1 ). This pattern was associated with large spatial variability, reflecting local heterogeneity in soil organic carbon stocks, climate, and vegetation productivity. The terrestrial ecosystem CO 2 budget, estimated using the annual NEE ensemble prediction, suggests the high‐latitude region was on average an annual CO 2 sink during 1990–2015, although uncertainty remains high.

Virkkala, Anna‐Maria↗

Decision-Making Under Uncertainty for a Digital Thread-Enabled Design Process

Abstract Digital thread is a data-driven architecture that links together information from all stages of the product lifecycle. Despite increasing application in manufacturing, maintenance/operations, and design related tasks, a principled formulation of analyzing the decision-making problem under uncertainty for the digital thread remains absent. The contribution of this article is to present a formulation using Bayesian statistics and decision theory. First, we address how uncertainty propagates in the product lifecycle and how the digital thread evolves based on the decisions we make and the data we collect. By using these mechanics, we explore designing over multiple product generations or iterations and provide an algorithm to solve the underlying multistage decision problem. We illustrate our method on an example structural design problem where our method can quantify and optimize different types and sequences of decisions, ranging from experimentation, manufacturing, and sensor placement/selection, to minimize total accrued costs.

Engineering↗

Uncertainty Quantification for Dissimilar Material Joints Under Corrosion Environment

Abstract Self-Piercing Riveting (SPR) is one of the most commonly used methods for joining dissimilar materials in the automotive industry. These joints are popular due to their adaptability, high performance and short cycle time. However, since these joints involve two dissimilar materials, they are susceptible to galvanic corrosion in the presence of an electrolyte which is driven by the difference in the equilibrium potential of the metals. This can affect the safety and resilience of these joints. In this paper, we focus on galvanic corrosion in Al-Fe SPR joints. A Machine learning (ML) based surrogate model, which is based off of FE simulations, for statistical corrosion analysis is developed. This model enables the resilience and reliability analysis of SPR joints under corrosion environment. In this study, first a physics-based finite element (FE) corrosion model has been developed to simulate the galvanic corrosion between a Fe cathode and an Al anode of a SPR joint. This model takes into account the effect of the crystal microstructure of the Al anode and the precipitation of the corrosion product. Several geometric and environmental factors including crevice gap, roughness of anode, conductivity, pH and the temperature of the electrolyte that effect corrosion are investigated. A thorough Uncertainty Quantification (UQ) analysis is conducted for the overall corrosion behavior of the Fe-Al SPR joints using a novelistic Probabilistic Confidence-Based Adaptive Sampling (PCAS) technique. PCAS is used to train the surrogate model by identifying the critical sampling points and thus reducing the overall computational costs. It is found that the electrolyte temperature has the largest effects on the material loss and needs to be managed closely for better corrosion control. By understanding the corrosion performance and resultant uncertainty impact on SPR joints, the reliability and resilience of these joints can be improved.

36 MATERIALS SCIENCE↗

Threefold reduction of modeled uncertainty in direct radiative effects over biomass burning regions by constraining absorbing aerosols

Absorbing aerosols emitted from biomass burning (BB) greatly affect the radiation balance, cloudiness, and circulation over tropical regions. Assessments of these impacts rely heavily on the modeled aerosol absorption from poorly constrained global models and thus exhibit large uncertainties. By combining the AeroCom model ensemble with satellite and in situ observations, we provide constraints on the aerosol absorption optical depth (AAOD) over the Amazon and Africa. Our approach enables identification of error contributions from emission, lifetime, and MAC (mass absorption coefficient) per model, with MAC and emission dominating the AAOD errors over Amazon and Africa, respectively. In addition to primary emissions, our analysis suggests substantial formation of secondary organic aerosols over the Amazon but not over Africa. Furthermore, we find that differences in direct aerosol radiative effects between models decrease by threefold over the BB source and outflow regions after correcting the identified errors. This highlights the potential to greatly reduce the uncertainty in the most uncertain radiative forcing agent.

09 BIOMASS FUELS↗

Instrumental uncertainties in radiative corrections for the MUSE experiment

The MUSE experiment at the Paul Scherrer Institute is measuring elastic lepton-proton scattering cross sections in a four-momentum transfer range from Q 2 of approximately 0.002–0.08 GeV 2 using positively and negatively charged electrons and muons. The extraction of the Born cross sections from the experimental data requires radiative corrections. Estimates of the instrumental uncertainties in those corrections have been made using the ESEPP event generator. The results depend in particular on the minimum lepton momentum that contributes to the experimental cross section and the fraction of events with hard initial-state radiation that is detected in the MUSE calorimeter and is excluded from the data. Furthermore, these results show that the angular-dependent instrumental uncertainties in radiative corrections to the electron cross section are less than 0.4% and are negligible for the muon cross section.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Novel approach for evaluating detector-related uncertainties in a LArTPC using MicroBooNE data

Primary challenges for current and future precision neutrino experiments using liquid argon time projection chambers (LArTPCs) include understanding detector effects and quantifying the associated systematic uncertainties. This paper presents a novel technique for assessing and propagating LArTPC detector-related systematic uncertainties. The technique makes modifications to simulation waveforms based on a parameterization of observed differences in ionization signals from the TPC between data and simulation, while remaining insensitive to the details of the detector model. The modifications are then used to quantify the systematic differences in low- and high-level reconstructed quantities. This approach could be applied to future LArTPC detectors, such as those used in SBN and DUNE.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Review of uncertainties in the cosmic supernova relic neutrino background

We review the computation of and associated uncertainties in the current understanding of the relic neutrino background due to core-collapse supernovae, black hole formation and neutron star merger events. We consider the current status of uncertainties due to the nuclear equation of state (EoS), the progenitor masses, the source supernova neutrino spectrum, the cosmological star formation rate, the stellar initial mass function, neutrino oscillations, and neutrino self-interactions. We summarize the current viability of future neutrino detectors to distinguish the nuclear EoS and the temperature of supernova neutrinos via the detected relic supernova neutrino spectrum.

Astronomy & Astrophysics↗

LTAU-FF: Loss Trajectory Analysis for Uncertainty in atomistic Force Fields

LTAU (Loss Trajectory Analysis for Uncertainty) is a technique for estimating the uncertainty in a model's predictions for any regression task by approximating the cumulative distribution function (CDF) of the model's errors over the course of training. The approximated CDF, combined with a similarity search algorithm in the model's descriptor space, can then be used to estimate the likelihood that the model's predictions on any given test point will fall below a chosen threshold. LTAU-FF (LTAU in atomistic Force Fields) is the application of LTAU specifically for use with atomistic force fields.

Vita, JoshuaA↗