Mariner Venus 67 power subsystem modification - Test and flight operation
Mariner Venus 67 power subsystem changes in operation sequences and design tested for Venus flyby mission
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Mariner Venus 67 power subsystem changes in operation sequences and design tested for Venus flyby mission
Assembly drawings, logic schematics, and circuit schematics useful in maintaining the equipment of the DC/EC digital test system are reviewed. The drawings are organized in accordance with the reference designations of the hardware. The transmitter subsystem assembly drawings are emphasized.
The technical feasibility of accomplishing a variety of cost-effective missions to the satellites of Mars were investigated. Three mission options were studied: a basic satellite rendezvous and landing mission, a satellite sample return mission, and a combination Mars landing and Phobos/Deimos exploration mission. Nominal science payloads and supporting subsystems were defined for each mission design. Configuration layouts, program schedules, and cost estimates were also developed for each option. Environmental criteria unique to the mission were developed. Supporting studies, research, and technology requirements were identified.
Description of the mission, subsystems and communication capabilities of a joint Communications Technology Satellite (CTS) scheduled for launch in 1975 by the Canadian Department of Communications in cooperation with NASA. The principal objectives of the mission are TV transmission at 12 GHz to low-cost ground terminals, up-link TV transmission at 14 GHz transportable terminals, and flight tests of spacecraft subsystems and components for future communications satellites. The major advanced spacecraft subsystems are a novel superefficiency TWT design, a 0.4 mlb Mercury Bombardment ion engine for north-south station keeping, a 3-axis stabilization system to maintain a high antenna boresight pointing accuracy, a liquid metal slip ring experiment, and a lightweight extendible solar array with an initial power output greater than 1 kW.
An evaluation was made of the feasibility of utilizing a simplified man machine interface concept to manage and control a complex space system involving multiple redundant computers that control multiple redundant subsystems. The concept involves the use of a CRT for display and a simple keyboard for control, with a tree-type control logic for accessing and controlling mission, systems, and subsystem elements. The concept was evaluated in terms of the Phase B space shuttle orbiter, to utilize the wide scope of data management and subsystem control inherent in the central data management subsystem provided by the Phase B design philosophy. Results of these investigations are reported in four volumes.
A study was conducted to determine the configuration and tradeoffs of a tracking and data relay satellite. The study emphasized the design of a three axis stabilized satellite and a telecommunications system optimized for support of low and medium data rate user spacecraft. Telecommunications support to low and high, or low medium, and high data rate users, considering launches with the Delta 2914, the Atlas/Centaur, and the space shuttle was also considered. The following subjects are presented: (1) launch and deployment profile, (2) spacecraft mechanical and structural design, (3) attitude stabilization and control subsystem, and (4) reliability analysis.
The results are presented of a program to design, fabricate, test, and install a primary ATS-F millimeter wave ground receiving station. Propagation parameters at millimeter waves are discussed along with the objective of the overall experiment. A general description is given of the receiving system and its function in the experiment. Typical receiver characteristics are presented which show that the experiment is entirely feasible from a link SNR standpoint. The receiving system hardware designs are discussed with separate treatment given to the propagation and the radiometer receiver designs. The modification and relocation are described of an existing 15-ft antenna to meet the ATS-F requirements. The design of a dual frequency feed subsystem and self calibration equipment is included.
A review of the Apollo command and service module instrumentation subsystem is presented. The measurements provided, design aspects considered, problems encountered, and flight results obtained are discussed.
A special orbital radiation study was conducted in order to evaluate mission encountered energetic particle fluxes. This information is to be supplied to the project subsystem engineers for their guidance in designing flight hardware to withstand the expected radiation levels. Flux calculations were performed for a set of 20 nominal trajectories placed at several altitudes and inclinations. Temporal variations in the ambient electron environment were considered and partially accounted for. Magnetic field calculations were performed with a current field model, extrapolated to the tentative SATS launch epoch with linear time terms. Orbital flux integrations ware performed with the latest proton and electron environment models, using new computational methods. The results are presented in graphical and tabular form. Estimates of energetic solar proton fluxes are given for a one year mission at selected integral energies ranging from 10 to 100 Mev, calculated for a year of maximum solar activity during the next solar cycle.
Microwave subsystem considerations are discussed as a design example for a radar for earth resources applications to be used in conjunction with the shuttle spacelab. This system with a multiplicity of frequencies and polarizations - L-band (25-cm wavelength), S-band (10-cm wavelength), and X-band (3.2-cm wavelength) at two orthogonal linear polarizations - was tentatively selected. The space shuttle vehicle constrains the antenna to approximately 8 m in length and 3 m in width. The frequencies and antenna size comprise the major constraints on the system described, and determine the sensor altitude, coverage, and major hardware parameters.
The current predicted acoustic environment for the shuttle orbiter payload bay will produce random vibration environments for payload components and subsystems which potentially will result in design, weight and cost penalties if means of protecting the payloads are not developed. Results are presented of a study to develop, through design and cost effectiveness trade studies, conceptual noise suppression device designs for space shuttle payloads. The impact of noise suppression on environmental levels and associated test costs, and on test philosophy for the various payload classes is considered with the ultimate goal of reducing payload test costs. Conclusions and recommendations are presented.
An estimated 45 communications satellites will be in geostationary orbit in the 1980s. Based on past history, half of the subsystem failures will be due to design failures. Methods now used to achieve present availabilities are summarized in this paper. To increase the availability of a single satellite to 99.99%, new techniques are needed; several possibilities are suggested herein. New developments, including nickel-hydrogen batteries, magnetic bearings, and solid-state amplifiers, are possible solutions to long standing problem areas in communications satellites. Launching a satellite two or three years before the system is needed is one way to reduce design failures in subsequent satellites. Diversity of manufacture can be used to obtain the maximum advantage from redundant elements. Finally, unmanned module exchange at geostationary orbit has been shown to be technically feasible.
Portable, recirculating-water-flow, and temperature-control device is used with solar simulator and actual sunlight to test and evaluate several solar-collector panel coatings, panel designs, and scaled-down collector subsystems. System can be pressurized to prevent boiling and allows operation above 100 degrees Centigrade.
Development of the F/48, F/96 Planetary Camera for the Large Space Telescope is discussed. Instrument characteristics, optical design, and CCD camera submodule thermal design are considered along with structural subsystem and thermal control subsystem. Weight, electrical subsystem, and support equipment requirements are also included.
An experimental apparatus was constructed and utilized in conjunction with both a solar simulator and actual sunlight to test and evaluate various solar panel coatings, panel designs, and scaled-down collector subsystems. Data were taken by an automatic digital data acquisition system and reduced and printed by a computer system. The solar collector test setup, data acquisition system, and data reduction and printout systems were considered to have operated very satisfactorily. Test data indicated that there is a practical or useful limit in scaling down beyond which scaled-down testing cannot produce results comparable to results of larger scale tests. Test data are presented as are schematics and pictures of test equipment and test hardware.
The primary payload for this satellite is the Advanced Atmospheric Sounding and Imaging Radiometer which will perform precise infrared temperature sounding and visible/infrared imaging from geostationary orbit. A secondary payload instrument which may be utilized on STORMSAT is the Microwave Atmospheric Sounding Radiometer which provides an independent set of temperature and humidity sounding in cloudy, meteorologically active regions. The study provides satellite designs and identifies mission-unique subsystems using the Multimission Modular Spacecraft using a Shuttle/Interim Upper Stage launch vehicle.
A subsystem (air/liquid vacuum collector) was developed for use with solar combined heating and cooling subsystems. The collector is modular in design, is approximately twelve-feet-three-inches wide and is eight-feet-seven-inches high. The module contains 72 collector tube elements and weighs approximately 300 pounds.
Problems in spacecraft power system design, testing, integration, and operation are identified and solutions are defined. The specific technology development problems discussed include substorm and plasma design data, modeling of the power subsystem and components, power system monitoring and degraded system management, rotary joints for transmission of power and signals, nickel cadmium battery manufacturing and application, on-array power management, high voltage technology, and solar arrays.