Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reliablity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Optimal regime and conditioning time of transistors for equipment with increased reliability

It is shown that an economically justified choice of regime and conditioning time for transistors for equipment of increased reliability is impossible without analyzing the stabilization time of the transistor parameters. The optimal regime and conditioning time are well founded. A method is presented for evaluating the optimal conditioning time by technical economic indexes.

Breslavets, A. V.↗

Performance of a 15 cm ion thruster with reliable restart capability

Experimental evaluation of a modified SERT II thruster with dished grids capable of producing a 600 ma ion beam at 2690 sec specific impulse and achieving rapid, reliable startup is described. In addition to steady-state performance curves, thruster performance is examined over the duration of rapid startup and one hour operating sequence. Rapid startup utilizing high voltage spark ignition of the main and neutralizer cathodes is described. Minimal deterioration of the cathodes and the ignition system during 1000 neutralizer cathode startups and 2000 main cathode startups is demonstrated. The need for heaters and a vaporizer control system to facilitate more rapid startup is identified.

Wilbur, P. J.↗

Delta's inexpensive, reliable, and versatile third generation upper stage

The need for larger diameter fairings to encapsulate spacecraft designed to use Delta's increased lifting capabilities resulted in hammer-head design configurations that would have unaccepably degraded vehicle flight characteristics. This situation led to the development of the Straight Eight configuration. The towed mode arrangement for the second stage negated the requirement for the engine compartment structure, thus establishing the potential for an improved packaging of the hydraulic and pneumatic systems. Therefore, with cost reduction and reliability improvement objectives, a second stage propulsion system improvement program was initiated. The paper will describe these improvements and their system benefits.

Bonnett, E. W.↗

Alternating bending-steady torque fatigue reliability

Results generated by three unique fatigue reliability research machines which can apply alternating-bending loads combined with steady torque are presented. Six-inch long, AISI steel, grooved specimens with a stress concentration factor of 1.42 and Rockwell C 35/40 hardness were subjected to various combinations of these loads and cycled to failure. The generated cycles-to-failure and staircase-testing data are statistically analyzed to develop distributional S-N and Goodman diagrams. Various failure theories are investigated to determine which one best represents the data. The effect of the groove and of the various combined bending-torsion loads on the finite and endurance life strength of such components, as well as on the Goodman diagram, are determined. Design applications are presented.

Kececioglu, D.↗

Apogee motor rocketry reliability improvements

Since 1963, solid-propellant apogee motors have been placing satellites into geosynchronous orbits. Major technological breakthroughs are not required to satisfy future mission requirements; however, there is a need to improve reliability to enhance cost effectiveness. A summary of results and conclusions derived from a review of missions, where failure of a solid motor was inferred, and from a correlation of system factors with failures are reported. Highlights of a solid motor diagnostic instrumentation study are presented. Finally, recommendations are provided for areas of future apogee motor upgrade, which will increase project cost effectiveness by reducing the potential for future flight failures.

Behm, J.↗

Unpowered to powered failure rate ratio - A key reliability parameter

It is shown that the initial assumption of the ratio of unpowered to powered failure rates can have a strong influence on the design of a modular system intended for space missions. The analysis is performed for parallel systems and for triple modular redundant systems. Parallel systems are shown to be much more sensitive to the unpowered to powered failure rate ratio than the TMR/Spares systems, however, regardless of which standby redundancy technique is considered, the dependence of the system reliability on this ratio increases as the number of standby spares increases.

Taylor, D. S.↗

The reliability of the daily quick look solar wind velocities as indicators of interplanetary activity

It is shown that the daily quick look solar wind velocities based on the Ames Research Center solar wind plasma data obtained on the Pioneer spacecraft are surprisingly reliable indicators of interplanetary activity. These velocities can appropriately be used in correlation studies with an average accuracy of plus or minus 5%. This accuracy reflects the 'jitter' in the solar wind velocity during quiescent intervals and across high-speed streams.

Intriligator, D. S.↗

Reliability analysis of Skylab ATM solar cell modules

A detailed reliability analysis was performed on both types of Skylab Apollo telescope mount solar cell modules. Failure rates used were based on testing of several modules of each type for over 4000 thermal cycles. The analysis delineated several important differences between the failure modes of the two differently designed solar cell modules, and, more importantly, showed that the modules can be expected to meet all mission requirements.

Jones, G. M.↗

The reliability impact of mission abort strategies on redundant flight computer systems

This correspondence presents a reliability model for a redundant flight computer system with standby sparing, taking into account various mission abort strategies. A mission rule to initiate a mission abort after a predetermined number of detected computer failures and to return to earth with the remaining computers is shown to result in: (1) little improvement of crew safety unless computer error coverage is nearly perfect, and (2) significant degradation in mission success whenever coverage is high.

Filene, R. J.↗

Spaceflight tracking and data network operational reliability computer output for MTBF and availability. Appendix V to CSC-1-395

Tables of data are provided to show the availability of Skylab data to selected ground stations during the phases of Skylab preflight, Skylab unmanned condition, and Skylab manned condition. The mean time between failure (MTBF) of the same Skylab functions is tabulated for the selected ground stations. All reliability data are based on a 90 percent confidence interval.

Seneca, V. I.↗

Apogee motor rocketry reliability improvements

Since 1963, solid propellant apogee motors have been placing satellites into geosynchronous orbits. Major technological breakthroughs are not required to satisfy future mission requirements; however, there is a need to improve reliability to enhance cost effectiveness. Several management test options are discussed. A summary of results and conclusions derived from review of missions, where failure of a solid motor was inferred, and correlation of system factors with failures are reported. Highlights of a solid motor diagnostic instrumentation study are presented. Finally, recommendations are provided for areas of future apogee motor upgrade, which will increase project cost effectiveness by reducing the potential for future flight failures.

Behm, J.↗

Emotional-volitional components of operator reliability

Sensorimotor function testing in a tracking task under stressfull working conditions established a psychological characterization for a successful aviation pilot: Motivation significantly increased the reliability and effectiveness of their work. Their acitivities were aimed at suppressing weariness and the feeling of fear caused by the stress factors; they showed patience, endurance, persistence, and a capacity for lengthy volitional efforts.

Mileryan, Y. A.↗

Increasing the reliability of labor of railroad engineers

It has been shown that the group of problems related to temporary overloads still require serious development with respect to further automating the basic control operation - programmed selection of speed and braking. The problem of systems for warning the engineer about the condition of the unseen track segments remains a very serious one. Systems of hygenic support of the engineer also require constructive development. The problems of ensuring the reliability of work of engineers in periods of low information load, requiring motor acts, can basically be considered theoretically solved.

Genes, V. S.↗

Large-scale systems: Complexity, stability, reliability

After showing that a complex dynamic system with a competitive structure has highly reliable stability, a class of noncompetitive dynamic systems for which competitive models can be constructed is defined. It is shown that such a construction is possible in the context of the hierarchic stability analysis. The scheme is based on the comparison principle and vector Liapunov functions.

Siljak, D. D.↗

System reliability analysis through corona testing

A corona vacuum test facility for nondestructive testing of power system components was built in the Reliability and Quality Engineering Test Laboratories at the NASA Lewis Research Center. The facility was developed to simulate operating temperature and vacuum while monitoring corona discharges with residual gases. The facility is being used to test various high-voltage power system components.

Lalli, V. R.↗

The relationship between reliability and bonding techniques in hybrid microcircuits

Differential thermal expansion was shown to be responsible for many observed failures in ceramic chip capacitors mounted on alumina substrates. It is shown that the mounting techniques used in bonding the capacitors have a marked effect upon the thermally induced mechanical stress and thus the failure rate. A mathematical analysis was conducted of a composite model of the capacitor-substrate system to predict the magnitude of thermally induced stresses. It was experimentally observed that the stresses in more compliant bonding systems such as soft lead tin and indium solders are significantly lower than those in hard solder and epoxy systems. The marked dependence upon heating and cooling rate was proven to be a determining factor in the prediction of failure solder systems. It was found that the harder or higher melting solders are less susceptible to thermal cycling effects but that they are more likely to fail during initial processing operations. Strain gage techniques were used to determine thermally induced expansion stresses of the capacitors and the alumina substrates. The compliance of the different bonding mediums was determined. From the data obtained, several recommendations are made concerning the optimum bonding system for the achievement of maximum reliability.

Caruso, S. V.↗

Reliability-based optimum inspection and maintenance procedures

The development of reliability-based optimum inspection and maintenance schedules for engines needs an understanding of the fatigue behavior of the engines. Critical areas of the engine structure prone to fatigue damage are usually identified beforehand or after the fleet has been put into operation. In these areas, fatigue cracks initiate after several flight hours, and these cracks grow in length until failure takes place when these cracks attain the critical lengths. Crack initiation time and its growth rate are considered to be random variables. Usually, the inspection (fatigue) or test data from similar engines are used as prior distributions. The existing state-of-the-art is to ignore the different lengths of cracks obserbed at various inspections and to consider only the fact that a crack existed (or did not exist) at the time of inspection. In this paper, a procedure has been developed to obtain the probability of finding a crack of a given size at a certain time if the probability distributions for crack initiation and rates of growth are known. Application of the developed stochastic models to devise optimum procedures for inspection and maintenance are also discussed.

Nanagud, S.↗

The relationship between reliability and bonding techniques in hybrid systems

Differential thermal expansion has been shown to be responsible for many observed failures in ceramic chip capacitors mounted on alumina substrates. The present work has shown that the mounting techniques used in bonding the capacitors have a marked effect upon the thermally induced mechanical stress and thus the failure rate. A mathematical analysis of a composite model of the capacitor-substrate system to predict the magnitude of thermally induced stresses have been conducted. It has been experimentally observed that the stresses in more compliant bonding systems such as soft lead/tin and indium solders are significantly lower than those in hard solder and epoxy systems. From the data obtained, several recommendations are made concerning the optimum bonding system for the achievement of maximum reliability.

Kinser, D. L.↗