Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerator and electrodynamics capability review

Los Alamos National Laboratory (LANL) uses capability reviews to assess the science, technology and engineering (STE) quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). Laboratory Management will use this report for STE assessment and planning. LANL has defined fifteen STE capabilities. Electrodynamics and Accelerators is one of the seven STE capabilities that LANL Management (Director, PADSTE, technical Associate Directors) has identified for review in Fiscal Year (FY) 2010. Accelerators and electrodynamics at LANL comprise a blend of large-scale facilities and innovative small-scale research with a growing focus on national security applications. This review is organized into five topical areas: (1) Free Electron Lasers; (2) Linear Accelerator Science and Technology; (3) Advanced Electromagnetics; (4) Next Generation Accelerator Concepts; and (5) National Security Accelerator Applications. The focus is on innovative technology with an emphasis on applications relevant to Laboratory mission. The role of Laboratory Directed Research and Development (LDRD) in support of accelerators/electrodynamics will be discussed. The review provides an opportunity for interaction with early career staff. Program sponsors and customers will provide their input on the value of the accelerator and electrodynamics capability to the Laboratory mission.

36 MATERIALS SCIENCE↗

Water Efficiency Improvements At Various Environmental Protection Agency Sites

The U.S. Environmental Protection Agency (EPA) built a successful water conservation program and reduced potable water use through a series of initiatives at EPA laboratories. The projects highlighted in this case study demonstrate EPA’s ability to reduce water use in laboratory and medical equipment by implementing vacuum pump and steam sterilizer replacements and retrofits. Due to the success of the initial vacuum pump and steam sterilizer projects described here, EPA is implementing similar projects at several laboratories throughout the nation.

DOE↗

Decommissioning of the 247-F Fuel Manufacturing Facility at the Savannah River Site (SRS)

Building 247-F at SRS was a roughly 110,000 ft{sup 2} two-story facility designed and constructed during the height of the cold war naval buildup to provide additional naval nuclear fuel manufacturing capacity in early 1980's. The manufacturing process employed a wide variety of acids, bases, and other hazardous materials. As the need for naval fuel declined, the facility was shut down and underwent initial deactivation, which was completed in 1990. All process systems were flushed with water and drained using the existing process drain valves. However, since these drains were not always installed at the lowest point in piping and equipment systems, a significant volume of liquid remained after initial deactivation. After initial deactivation, a non-destructive assay of the process area identified approximately 17 ({+-}100%) kg of uranium held up in equipment and piping. The facility was placed in Surveillance and Maintenance mode until 2003, when the decision was made to perform final deactivation, and then decommission the facility. The following lessons were learned as a result of the D and D of building 247-F. Successful D and D of a major radiochemical process building requires significant up-front planning by a team of knowledgeable personnel led by a strong project manager. The level of uncertainty and resultant risk to timely, cost effective project execution was found to be high. Examples of the types of problems encountered which had high potential to adversely impact cost and schedule performance are described below. Low level and sanitary waste acceptance criteria do not allow free liquids in waste containers. These liquids, which are often corrosive, must be safely removed from the equipment before it is loaded to waste containers. Drained liquids must be properly managed, often as hazardous or mixed waste. Tapping and draining of process lines is a dangerous operation, which must be performed carefully. The temptation to become complacent when breaking into lines is great. Incidents of personnel exposure to liquids during draining are likely. Records from the initial 1990 deactivation led early work planners to assume the facility was cold, dark and dry. This turned out to be a poor assumption. Work instructions had to be modified to require that engineers evaluate each of several hundred process lines to identify the low point, where a tap and drain system could be installed to allow positive verification that the line was empty before the line was cut for removal. During the period between facility shut down in 1990 and the start of final deactivation in 2003, roof leaks had developed, allowing rain water to enter building 247-F, which provided an environment for mold growth. Sampling confirmed the presence of Stachybotrys chartarum, a toxic indoor mold that grows on wet cellulosic material, such as drywall paper. D and D workers in areas where this hazard was identified were required to where proper personal protective equipment, which complicated work execution. Discovery of the potential presence of uniquely hazardous chemicals such as shock sensitive compounds and toxic uranium hexafluoride became issues which required investigation and special handling strategies. Team access to subject matter experts, who could quickly provide the required guidance for safe material handling, was critical to keeping the project on schedule. In old legacy facilities, it is possible that the D and D workers will be exposed to undocumented energy sources such as energized electrical conductors and pipes containing hazardous materials that originate outside the boundaries of the facility. Significant effort must be expended on adequate mechanical and electrical isolation. Subdividing the facility into well defined zones for which detailed zone-specific end points could be developed proved to be a highly effective project management strategy. Waste management must be carefully planned. The rate of waste generation as the facility is converted from a structure to waste can frequently exceed the D and D team's resources to characterize, package, store and transport the waste to a disposal facility in a timely manner. This can lead to schedule delays and/or increased project cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Feedstock Carbon Intensity Calculator (FD-CIC): Users’ Manual and Technical Documentation

The carbon intensities (CIs) of biofuels are determined with the life cycle analysis (LCA) technique, which accounts for the energy/material uses and emissions during the complete supply chain of biofuel including feedstock production and fuel conversion stages. Regulatory agencies such as California Air Resources Board (CARB) adopts LCA to calculate biofuel CIs. The Low Carbon Fuel Standard (LCFS) program developed by CARB allows individual biofuel conversion facilities to submit their own biofuel CIs with their facility input data and incentivizes the reduction in the CI specific to that particular facility compared to a reference fuel’s CI (Liu et al 2020). Such an incentive program has driven innovations in biorefineries to reduce their greenhouse gas (GHG) emissions by linking their revenue directly to its CI score through LCFS credit trading. Besides the biofuel conversion stage, different farming practices for feedstock growth can result in significant CI variations for feedstocks, thus for biofuels. To provide evidence-based research findings, the U.S. Department of Energy’s Advanced Research Projects Agency–Energy (ARPA-E) has supported the Systems Assessment Center of the Energy Systems and Infrastructure Analysis Division at Argonne National Laboratory to examine CI variations of different farming practices to grow agricultural crops for biofuel production. Meanwhile, the ARPA-E has launched the Systems for Monitoring and Analytics for Renewable Transportation Fuels from Agricultural Resources and Management (SMARTFARM) program to develop technologies and data platforms that enable an accurate measurement of key farming parameters that can help robust accounting of the GHG benefits of sustainable, low-carbon agronomic practices at farm level.

54 ENVIRONMENTAL SCIENCES↗

Accomplishments in Field Period Assembly for NCSX* This is how we did it

The National Compact Stellarator Experiment (NCSX) was a collaborative effort between ORNL and PPPL. PPPL provided the assembly techniques with guidance from ORNL to meet design criteria. The individual vacuum vessel segments, modular coils, trim coils, and toroidal field coils components were delivered to the Field Period Assembly (FPA) crew who then would complete the component assemblies and then assemble the final three field period assemblies, each consisting of two sets of three modular coils assembled over a 120o vacuum vessel segment with the trim coils and toroidal field coils providing the outer layer. The requirements for positioning the modular coils were found to be most demanding. The assembly tolerances required for accurate positioning of the field coil windings in order to generate sufficiently accurate magnetic fields strained state of the art techniques in metrology and alignment and required constant monitoring of assembly steps with laser trackers, measurement arms, and photogrammetry. The FPA activities were being performed concurrently while engineering challenges were being resolved. For example, it was determined that high friction electrically isolated shims were needed between the modular coil interface joints and low distortion welding was required in the nose region of those joints. This took months of analysis and development yet the assembly was not significantly impacted because other assembly tasks could be performed in parallel with ongoing assembly tasks as well as tasks such as advance tooling setup preparation for the eventual welding tasks. The crew technicians developed unique, accurate time saving techniques and tooling which provided significant cost and schedule savings. Project management displayed extraordinary foresight and every opportunity to gain advanced knowledge and develop techniques was taken advantage of. Despite many risk concerns, the cost and schedule performance index was maintained nearly 1.0 during the assembly phase until project cancellation. In this paper, the assembly logic, the engineering challenges, solutions to those challenges and some of the unique and clever assembly techniques, will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced licensing and safety engineering method - ADLAS{sup TM} - 377

Complex nuclear projects, with long supply chains require detailed understanding and management to succeed. One of the most important success factors is licensing, which has been very challenging in past years in many nuclear projects (both new build projects and modernization projects). To better understand the licensing aspects and the safety features that are behind the licensing requirements, the high level safety engineering method has been developed in Finnish energy company Fortum. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel

The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ ISFSIs are adequately managed for the period of extended operation. To date, all of the ISFSIs located across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years; three ISFSIs (Surry, H.B. Robinson and Oconee) have received their renewed licenses for 20 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. This report examines issues related to managing aging effects on the SSCs in DCSSs/ISFSIs for extended long-term storage and transportation of used fuels, following an approach similar to that of the Generic Aging Lessons Learned (GALL) report, NUREG-1801, for the aging management and license renewal of nuclear power plants. The report contains five chapters and an appendix on quality assurance for aging management programs for used-fuel dry storage systems. Chapter I of the report provides an overview of the ISFSI license renewal process based on 10 CFR 72 and the guidance provided in NUREG-1927. Chapter II contains definitions and terms for structures and components in DCSSs, materials, environments, aging effects, and aging mechanisms. Chapter III and Chapter IV contain generic TLAAs and AMPs, respectively, that have been developed for managing aging effects on the SSCs important to safety in the dry cask storage system designs described in Chapter V. The summary descriptions and tabulations of evaluations of AMPs and TLAAs for the SSCs that are important to safety in Chapter V include DCSS designs (i.e., NUHOMS{reg_sign}, HI-STORM 100, Transnuclear (TN) metal cask, NAC International S/T storage cask, ventilated storage cask (VSC-24), and the Westinghouse MC-10 metal dry storage cask) that have been and continue to be used by utilities across the country for dry storage of used fuel to date. The goal of this report is to help establish the technical basis for extended long-term storage and transportation of used fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Performance Computing Facility Operational Assessment, FY 2011 Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) continues to deliver the most powerful resources in the U.S. for open science. At 2.33 petaflops peak performance, the Cray XT Jaguar delivered more than 1.5 billion core hours in calendar year (CY) 2010 to researchers around the world for computational simulations relevant to national and energy security; advancing the frontiers of knowledge in physical sciences and areas of biological, medical, environmental, and computer sciences; and providing world-class research facilities for the nation's science enterprise. Scientific achievements by OLCF users range from collaboration with university experimentalists to produce a working supercapacitor that uses atom-thick sheets of carbon materials to finely determining the resolution requirements for simulations of coal gasifiers and their components, thus laying the foundation for development of commercial-scale gasifiers. OLCF users are pushing the boundaries with software applications sustaining more than one petaflop of performance in the quest to illuminate the fundamental nature of electronic devices. Other teams of researchers are working to resolve predictive capabilities of climate models, to refine and validate genome sequencing, and to explore the most fundamental materials in nature - quarks and gluons - and their unique properties. Details of these scientific endeavors - not possible without access to leadership-class computing resources - are detailed in Section 4 of this report and in the INCITE in Review. Effective operations of the OLCF play a key role in the scientific missions and accomplishments of its users. This Operational Assessment Report (OAR) will delineate the policies, procedures, and innovations implemented by the OLCF to continue delivering a petaflop-scale resource for cutting-edge research. The 2010 operational assessment of the OLCF yielded recommendations that have been addressed (Reference Section 1) and where appropriate, changes in Center metrics were introduced. This report covers CY 2010 and CY 2011 Year to Date (YTD) that unless otherwise specified, denotes January 1, 2011 through June 30, 2011. User Support remains an important element of the OLCF operations, with the philosophy 'whatever it takes' to enable successful research. Impact of this center-wide activity is reflected by the user survey results that show users are 'very satisfied.' The OLCF continues to aggressively pursue outreach and training activities to promote awareness - and effective use - of U.S. leadership-class resources (Reference Section 2). The OLCF continues to meet and in many cases exceed DOE metrics for capability usage (35% target in CY 2010, delivered 39%; 40% target in CY 2011, 54% January 1, 2011 through June 30, 2011). The Schedule Availability (SA) and Overall Availability (OA) for Jaguar were exceeded in CY2010. Given the solution to the VRM problem the SA and OA for Jaguar in CY 2011 are expected to exceed the target metrics of 95% and 90%, respectively (Reference Section 3). Numerous and wide-ranging research accomplishments, scientific support, and technological innovations are more fully described in Sections 4 and 6 and reflect OLCF leadership in enabling high-impact science solutions and vision in creating an exascale-ready center. Financial Management (Section 5) and Risk Management (Section 7) are carried out using best practices approved of by DOE. The OLCF has a valid cyber security plan and Authority to Operate (Section 8). The proposed metrics for 2012 are reflected in Section 9.

99 GENERAL AND MISCELLANEOUS↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Waste Management (IWM) program is examining a suite of IWM system options and conducting supporting analyses to enable future informed choices. The IWM program is currently organized into the following four major areas: (1) IWM facilities and equipment concepts and development, (2) transportation capability analysis and support, (3) information technology solutions and support, and (4) system integration analysis and support. This paper focuses on the activities ongoing in the IWM system integration analysis and support area. Two main research activities in this area are: data and tools development, validation, and maintenance; and special studies, analyses, and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management and Development of the Western Resources Project

The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

01 COAL, LIGNITE, AND PEAT↗

Social Networking for Emergency Management and Public Safety

On March 10, 2010 the workshop titled Social Networking for Emergency Management and Public Safety was held in Seattle, WA. The objective of this workshop was to showcase ways social media networking technologies can be used to support emergency management and public safety operations. The workshop highlighted the current state of social networking and where this dynamic engagement is heading, demonstrated some of the more commonly used technologies, highlighted case studies on how these tools have been used in a variety of jurisdictions and engaged the private sector on how these tools might serve as a conduit for two way communication between with the public sector to address regional recovery issues and decision making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building capacity for Health Impact Assessment: Training outcomes from the United States

Background: Despite the continued growth of Health Impact Assessment (HIA) in the US, there is little research on HIA capacity-building. A comprehensive study of longer-term training outcomes may reveal opportunities for improving capacity building activities and HIA practice. Methods: We conducted in-depth interviews with HIA trainees in the United States to assess their outcomes and needs. Using a training evaluation framework, we measured outcomes across a spectrum of reaction, learning, behavior and results. Results: From 2006 to 2012, four organizations trained over 2200 people in at least 75 in-person HIA trainings in 29 states. We interviewed 48 trainees, selected both randomly and purposefully. The mean duration between training and interview was 3.4 years. Trainees reported that their training objectives were met, especially when relevant case-studies were used. They established new collaborations at the trainings and maintained them. Training appeared to catalyze more holistic thinking and practice, including a range of HIA-related activities. Many trainees disseminated what they learned and engaged in components of HIA, even without dedicated funding. Going forward, trainees need assistance with quantitative methods, project management, community engagement, framing recommendations, and evaluation. Conclusions: The research revealed opportunities for a range of HIA stakeholders to refine and coordinate training resources, apply a competency framework and leverage complimentary workforce development efforts, and sensitize and build the capacity of communities. - Highlights: • We interviewed HIA trainees in the United States to assess longer-term outcomes. • Training appeared to catalyze a range of beneficial partnerships and activities. • Trainees reported outstanding needs for specific skills and competencies. • There are various opportunities to improve training and capacity-building.

54 ENVIRONMENTAL SCIENCES↗

DOE Voluntary Partnership Program with Utilities and Local Governments Supports the Design of New Data Access Solutions

The Better Buildings Energy Data Accelerator (BBEDA) is a unique effort that has supported 22 pairs of local governments and their utility companies to help building owners gain access to their whole-building energy data. Municipal and Utility BBEDA Partners committed to develop streamlined and easy-to-use solutions to provide whole-building energy data, especially for multitenant commercial buildings, by the end of 2015. As a result, building owners would be able to make data-driven decisions about their buildings by utilizing readily available energy consumption data for entire buildings. Traditionally, data access was difficult to implement due to technical barriers and the lack of clear value propositions for the utilities. During the past two years, BBEDA has taken a hands-on approach to overcome these barriers by offering a platform for the partners to discuss their challenges and solutions. Customized support was also provided to Partners building their local strategies. Based on the lessons learned from the partners, BBEDA developed a final toolkit with guiding documents that addressed key barriers and served as a resource for the other cities and utilities attempting to establish whole-building data access, including an exploration of opportunities to apply the whole-building data to various aspects of utility demand-side management (DSM) programs. BBEDA has been a catalyst for market transformation by addressing the upstream (to efficiency implementation) barrier of data access, demonstrated through the success of the BBEDA partners to address policy, engagement, and technical hurdles and arrive at replicable solutions to make data access a standard practice nationwide. As a result of best practices identified by the BBEDA, 18 utilities serving more than 2.6 million commercial customers nationwide will provide whole-building energy data access to building owners by 2017. This historic expansion of data accessibility will increase building energy benchmarking, the first step many building owners take to improve the energy efficiency of their buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EMSL Contribution Plan

This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSL’s detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

99 GENERAL AND MISCELLANEOUS↗

TRANSFORMING THE SRS ENVIRONMENTAL BUSINESS: COMMUNICATION AND APPLIED PROJECT MANAGEMENT PRINCIPLES

A process for communicating information relating to core business functions that also encourages improving internal communications has been established at SRS. This process continues to grow and strengthen as the multiple Contractors, Regulators and DOE-SR relationships mature. A number of management communication tools have been initiated, retooled, rebooted or continued with enhancements to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. The types of information that are the focus of this improved process are feedback from the customer and from informational exchange forums (i.e., Challenge Opportunity and Resolution (COR), SRS Regulatory Integration Team (SRIT), Environmental Quality Management Division (EQMD), Senior Environmental Managers Council (SEMC), etc.). These forums, SRS environmental functions centralization, and the creation of a Regulatory Integration process allows for cross-functional decision making, problem solving and information sharing that involves the field organizations, Environmental Compliance Authorities (ECA), Subject Matter Experts (SME), DOE and the Regulators. Numerous examples of effective decision-making and problem solving will be shared. Lessons Learned involving inadequate communications and the resulting impacts on the environment, customer satisfaction, and relationships will also be discussed. Additionally, the focus on improved communications also includes maintaining awareness of business activities. The tools being utilized to facilitate the continuing improvement of internal communications include weekly staff meetings for all individuals within the organization, quarterly ECA and SME meeting, quarterly Regulatory Integration & Environmental Services (RI&ES) All-Hands meetings hosted by the Director, bi-weekly EQMD and EQMD Lite meetings with the customer, bi-annual SRIT meetings, and COR meetings on an as need basis. In addition, an existing Required Reading Program is being formally utilized in RI&ES to ensure all individuals get formal notification of new/revised business documents. In all cases, the development of environmental communication topics that occur at SRS have a cost-scope-schedule basis that can be linked to delivery of environmental services.

99 GENERAL AND MISCELLANEOUS↗