Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

End of Life Management: Solar Photovoltaic Panels

Technical potential of materials recovered from end-of-life solar PV panels could exceed $15 billion by 2050. The global solar photovoltaic (PV) boom currently underway will represent a significant untapped business opportunity as decommissioned solar panels enter the waste stream in the years ahead, according to a report released today by the International Renewable Energy Agency (IRENA) and the International Energy Agency's Photovoltaic Power Systems Programme (IEA-PVPS). The report, End-of-Life Management: Solar Photovoltaic Panels, is the first-ever projection of PV panel waste volumes to 2050 and highlights that recycling or repurposing solar PV panels at the end of their roughly 30-year lifetime can unlock a large stock of raw materials and other valuable components. It estimates that PV panel waste, comprised mostly of glass, could total 78 million tonnes globally by 2050. If fully injected back into the economy, the value of the recovered material could exceed USD 15 billion by 2050. This potential material influx could produce 2 billion new panels or be sold into global commodity markets, thus increasing the security of future PV supply or other raw material-dependent products. The report suggests that addressing growing solar PV waste, and spurring the establishment of an industry to handle it, would require: the adoption of effective, PV-specific waste regulation; the expansion of existing waste management infrastructure to include end-of-life treatment of PV panels, and; the promotion of ongoing innovation in panel waste management. In most countries, PV panels fall under the classification of 'general waste' but the European Union (EU) was the first to adopt PV-specific waste regulations, which include PV-specific collection, recovery, and recycling targets. EU's directive requires all panel producers that supply PV panels to the EU market (wherever they may be based) to finance the costs of collecting and recycling end-of-life PV panels put on the market in Europe. End-of-Life Management: Solar Photovoltaic Panels, is the second of several solar-focused publications IRENA is releasing this summer. Last week, IRENA released The Power to Change, which predicts average costs for electricity generated by solar and wind technologies could decrease by between 26 and 59 per cent by 2025. Later this week, IRENA will release Letting in the Light: How Solar Photovoltaics Will Revolutionize the Electricity System - which provides a comprehensive overview of solar PV across the globe and its prospects for the future.

14 SOLAR ENERGY↗

Smarter Grid Solutions | National Renewable Energy Laboratory: Active Management Integration: June 2015 - November 2016

This report presents the project results for the NREL INTEGRATE demonstration project: Active Network Management (ANM) Integration. Consistent with the INTEGRATE program's objective of increasing the grid's clean energy hosting capacity and providing grid services in a holistic manner, the project demonstrated the use of ANM to enable very high penetrations of solar PV and wind energy systems. Results obtained using a representative North American distribution system showed ANM's autonomous distributed control doubled the interconnected wind and solar systems by managing thermal and voltage constraints in real-time. These generators flexibly interconnected to the grid via ANM's end-to-end control architecture, and were managed and coordinated with other smart distributed energy resources (DER; e.g. EVs, battery ESS, controllable load) to unlock the grid's dynamic hosting capacity. As a smart grid application to standardize grid integration of diverse renewable generation sources, ANM provides the industry with a scalable, cost-effective alternative to traditional transmission and distribution (T&D) reinforcements. This project considered three use cases of the application of ANM: a Smart Home demonstration of ANM control of residential scale devices (PV, EV, and battery ESS); a Smart Campus demonstration of high penetration megawatt-scale DER (PV, EVs, battery ESS, and controllable load) behind a single point-of-common-coupling (PCC), and a Smart Distribution demonstration that combined prior use cases along with additional community/utility-scale DER at very high aggregate penetration levels. The Smart Distribution use case provided an integrated perspective of ANM across all distribution grid DER device scales (incorporating aggregated Smart Homes and the Smart Campus) in order to showcase how these devices can support smart grid services to manage DER related constraints in a safe and reliable manner; and likewise how ANM integrates with grid modernization initiatives. The ANM system was deployed in NREL's Energy Systems Integration Facility (ESIF), and project industry advisors attended an on-site demonstration and a set of workshops in order to review project outcomes and evaluate the relevance of ANM for increasing the grid hosting capacity. The outcomes of this effort include an assessment of opportunities for field deployment of ANM to address existing interconnection challenges, as well as consolidating project advisor suggestions for investment in ANM and potential future pilots for more advanced schemes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Safety Management System Description

Personnel at Sandia National Laboratories (hereinafter referred to as Sandia) comply with United States Department of Energy (DOE) Policy 450.4A, Chg 1, Integrated Safety Management Policy, and implement an Integrated Safety Management System (ISMS) to ensure safe operations. Safety is integrated into management and work practices at all levels so missions are accomplished while protecting Members of the Workforce, the public, and the environment. As a result, safety is effectively integrated into all facets of work planning and execution. Thus the management of safety functions becomes an integral part of mission accomplishment and meets the requirements outlined in the DOE Acquisition Regulation (DEAR) 970.5223-1, Integration of Environment, 4/.01, and Health into Work Planning and Execution, clause incorporated by reference into the Prime Contract.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preconceptual Design of Irradiated Fuel Salt Management System

The National Reactor Innovation Center was established by the U.S. Department of Energy to accelerate the demonstration and deployment of advanced nuclear reactors. To meet this mission, the National Reactor Innovation Center has developed the Laboratory for Operations and Testing in the U.S. (LOTUS) to support the first fast-spectrum molten salt reactor demonstration. The goal of this research is to understand the system requirements that may be applied to a molten salt reactor experiment in the LOTUS test bed and to perform systems analyses and preconceptual development of a storage container for the management of the irradiated molten salt fuel. This study proposes a set of irradiated fuel salt management processes for the molten salt reactor, from defueling to storage or disposal. For that, the historic Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory has served as a crucial source of data for a mock application. This paper proposes a potential geometry for storing irradiated fuel salt based on MSRE data and the Monte Carlo N-Particle radiation transport code. The geometry was analyzed for criticality safety under abnormal situations, such as water ingress and interaction between containers. Based on the determined configuration of the storage system, the decay heat produced from the irradiated fuel salts was calculated to provide a reasonable time scale of the dormancy period. Using the same geometry assumed above, the neutron and gamma dose rates from the irradiated fuel salt at the end of the dormancy period were estimated, which will be useful for understanding the handling and radiation protection requirements for handling the irradiated fuel salt. Lastly, a reactor in the LOTUS test bed could use chloride-based fuel as opposed to the fluoride-based fuel used in MSRE. Thus, a literature study provided data to understand the similarities and differences between the characteristics of fluoride- and chloride-based salts in terms of salt chemistry, material characteristics, postirradiation behavior, neutronics, thermal hydraulics, and heat removal. This study, together with the proposed irradiated fuel salt management processes, preliminary criticality calculations, decay heat, and dose rate estimates, provides a strong basis for future investigation into the management of irradiated fuel salts generated during molten salt reactor technology demonstrations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Guide to the Distributed Energy Resource Risk Management Framework

The emergence of distributed energy resources (DERs) has transformed the electric power sector and will likely have even more profound impacts on the future evolution of the United States energy sector as it modernizes and becomes more reliant upon complex informatics programming and systems to ensure that our power grid remains safe from malicious interference. To mitigate risks associated with the increased and diversified use of DERs, the Distributed Energy Resource Cybersecurity Framework (DER-CF) was developed in 2019. The National Renewable Energy Laboratory extended the scope of the DER-CF to include the RMF. To address the challenges faced by federal energy managers and energy system stakeholders in applying the RMF to DER systems, the Distributed Energy Resource Risk Manager (DER-RM) is a six-step process to proactively manage cybersecurity risk in a methodical manner. The DER-RM is independent of the DER-CF's existing assessment, allowing users to focus specifically on the RMF steps. The tools are targeted to different processes - DER-CF enables organizations to perform self-assessments to improve their cybersecurity posture, while DER-RM assists organizations in achieving compliance with specific requirements. This document provides an overview of the DER-RM. The RMF process outlined in this report serves as a guide to diagnose information and operational system threats, gather required materials to comply with industry standards, and document plans for achieving Authority to Operate. Using the DER-RM, federal agencies and other organizations can easily and intuitively follow the RMF process, manage the risks to their grid-edge infrastructure through the integration of their on-site DERs, and comply with appropriate requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

How does Mercury Methylation Respond to Intensive Forest Management and the Creation of Anoxia in Floodplain Soils

This research endeavor, entitled “How does Mercury Methylation Respond to Intensive Forest Management and the Creation of Anoxia in Floodplain Soils?” represents a collaborative effort undertaken by the University of North Carolina at Greensboro, led by Principal Investigator Dr. James S. Coleman, the United States Forest Service Santee Experimental Forest (SEF) Station Director Dr. Carl C. Trettin as Co-Principal Investigator, and The Chinese University of Hong Kong Dr. Martin Tsz-Ki Tsui and Dr. Alex T. Chow serving as Co-Principal Investigators. The overarching objective of this proposed project was to capture and elucidate the immediate and short-term effects of forest disturbances, namely clear-cutting and thinning, on the biogeochemical cycling of mercury (Hg) within the SEF in Huger, South Carolina. To accomplish this objective, a two-year exploratory study was proposed to conduct soil sampling and measurements of Hg and toxic methylmercury (MeHg), and soil physiochemical data within the experimental watershed (WS77) at SEF, following the clear-cutting process initiated for the preparation of the native longleaf pine restoration project by the USFS. Based on our mercury and hydrological data assessment, we concluded that the implementation of forest management practices, particularly mechanical thinning and clear-cutting, appears to enhance the potential for Hg methylation. Furthermore, these forest management practices may disrupt and alter the storage, mobility, and transformations of atmospherically deposited Hg in these lowland forests. We advocate for further research to comprehensively evaluate the impact of forest management on Hg cycling within forest ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

Radioactive Waste Management Basis (Rev.6)

This Radioactive Waste Management Basis (RWMB) documents radioactive waste management practices adopted at Lawrence Livermore National Laboratory (LLNL) pursuant to Department of Energy Order (DOE O) 435.1, Radioactive Waste Management. The purpose of this RWMB is to ensure that LLNL manages radioactive waste in a safe and environmentally-compliant manner, protective of worker and public safety.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Forward-Looking Dataset of EV Managed Charging Resource and Costs

This presentation summarizes a high-resolution, forward-looking dataset of EV adoption, EV charging, and managed charging resource. Vehicle-level data are grounded in current adoption and charging patterns, and ~200,000 real-world vehicle-weeks of travel data covering all on-road segments (i.e., light-duty, transit and school buses, local, regional and long-haul medium- and heavy-duty). The data, which include multiple charging profiles per vehicle to bound flexibility, are then processed and aggregated to describe baseline charging and charge management resource by county, hour, year, scenario, and vehicle type. Coupled with one of four scenarios of how EV managed charging costs might evolve over time, the dataset enables a power sector capacity expansion model to select cost-optimal quantities of EV managed charging and supply-side resources to reliably satisfy demand. Five integration strategies: Baseline, Daytime and Flat (passive), Flex (active), and Stress (anti-strategy), illustrate how baseline charging and flexibility potential changes with EVSE build-out and charging preferences.

33 ADVANCED PROPULSION SYSTEMS↗

Idaho National Laboratory Cultural Resource Management Annual Report FY 2007

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human land use in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources’ importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2007. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

54 ENVIRONMENTAL SCIENCES↗

Real Time Grid Reliability Management 2005

The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LLNL Site 200 Risk Management PlanAgust 2008

It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES&H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March 2008, has been included as an appendix to the RMP Supplemental Information document. LLNL Site 200 is a research and development laboratory with infrastructure necessary to support its operations and personnel. Research and development activities at LLNL are focused on stockpile stewardship; achieving robust and vital scientific, engineering, and manufacturing capability; inertial confinement fusion; laser technology; materials and process science; computational and information sciences; basic sciences; engineering sciences; and biological sciences. Based upon CalARP Program regulations, guidance found in California Accidental Release Prevention Program (CalARP) Administering Guidance, Chapter 1, a review of facility specific documents, accident analyses summarized in this document & detailed in the LLNL Site 200 RMP Supporting Information document, LLNL has determined that each process meeting the CalARP threshold criteria meets the requirements for CalARP Program Level 1. In accordance with CalARP regulations, LLNL considers the natural segmentation of processes at Site 200 to be on a building basis and therefore consideration of inventory should be on a building basis rather than a 'site-wide' basis. Only those materials identified as equal to as or greater than the threshold quantities for the CalARP program on a building (process) level are reflected in this document. As such, materials and quantities reported in this document on a building (process) level will vary from materials and quantities reported in the LLNL Hazardous Materials Business Plan, Acutely Hazardous Material Registration Form on a site-wide level. For each process involving regulated quantities of lithium hydride, worst case accident analysis shows that the toxic endpoint lies within the site boundaries. These analyses document that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more detailed explanation of the worst case accident analyses for these processes. For the process involving regulated quantities of nitric acid, worst case accident analysis predicts a hazard zone well within areas under the jurisdiction of the Department of Energy. This analysis documents that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more detailed explanation of the worst case accident analysis for this process. LLNL maintains an active program to protect workers, the public, and the environment from harm resulting from its activities. Its policies and technical directions for controlling all hazards that are present as a result of its operations are described in the LLNL Environment, Health, and Safety Manual (referenced above).

99 GENERAL AND MISCELLANEOUS↗

Risk Management on the National Compact Stellarator Project (NCSX)

In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a "first-of-a-kind" fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Idaho National Laboratory Cultural Resource Management Plan

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

99 GENERAL AND MISCELLANEOUS↗

Sandia National Laboratories, California Waste Management Program annual report.

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

54 ENVIRONMENTAL SCIENCES↗