Lessons Learned from ARCADE
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
There are several U.S. government-sponsored programs with significant experience engaging with foreign government and industry partners to support capacity-building in export controls. This work seeks to answer the question: How can the outreach experience of the U.S. government-sponsored export control capacity-building programs (ECCBP) inform best practices for engaging with advanced reactor vendors in the domain of international nuclear safeguards? To answer this question, we interviewed export control subject matter experts with experience working for the U.S. ECCBPs – the Bureau of Industry and Security (BIS), the Export Control and Related Border Security (EXBS) program, and the International Nonproliferation Export Control Program (INECP) – and developed a set of recommendations for industry engagement based on the collective experience of interviewees.
Blackbox modelling for SC analysis is a possible solution. Accuracy can be acceptable even without having vendor control diagrams. Blackbox modelling is not as user friendly as a generic model. Is an NDA required to share a vendor Blackbox model for SC analysis? Difference in VRT detection and injection logics. Angle rotation is not addressed. Current limitation logic during unbalanced faults is not clear.
As a national laboratory, Pacific Northwest National Laboratory (PNNL) seeks to be on the leading edge of public interest research and deliver innovation, a core value of the institution. Through the support of the U.S. Department of Energy’s Water Power Technologies Office, PNNL has convened a workshop entitled Advancing Energy Futures through Art in Seattle, Washington, on August 19th and 20th, 2024. An explicit focus on Artist in Residence (AiR) programs initiates the discussion, as this is one of the few clear places where public interest research, artistic engagement, and energy futures have aligned. The workshop proposes to hear from program managers of successful AiR programs, scientists, and artists who work in the energy futures space, to discuss AiR program models and successful modalities for art and storytelling. This paper is provided as background context for workshop participants.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Presentation given at the August 2024 Western Planner WyoPASS conference on the evolution of energy development in the state of Wyoming and opportunity for planning professionals to be aware of their role in development.
The history and limited use of the 9978 Type B package history represents a complex case story. Unprecedented delays (from Covid-19) caused the annual maintenance of nine loaded 9978 packages to expire before the actual shipments were initiated. Additionally, with the delays, the content amendment authorizing the Pu and Am standards as authorized content expired, hence additionally requiring a full SARP revision prior to making the shipments
CONCLUSION • The overall Salt Batch system has been honed through each iteration of the process • Increased communication across facilities and work groups has enabled the salt team to react swiftly to emergent items and identify improvement opportunities • Even the best plans require backup options – Emergent items can appear at any time during the process – Flexibility to adapt to the unexpected is a must-have team mindset • To date, every salt batch compiled has been qualified and approved as feed for SWPF – No feed break has occurred between the Tank Farm and SWPF
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.
The goal is to develop a technological process for converting U.S. coals into high-value solid carbon products such as graphene and high-quality graphite.
Explore the source record for details and available documents.
Explore the source record for details and available documents.