Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Air Quality Satellite Monitoring by TROPOMI on Sentinel-5P

The recently launched Sentinel satellite mission, the Sentinel-5 Precursor (Sentinel-5P), is one of the European Space Agency's (ESA) new mission family – Sentinels. The sole payload on Sentinel-5P is the TROPOspheric Monitoring Instrument (TROPOMI), a nadir-viewing 108⁰ field-of-view push-broom grating hyperspectral spectrometer, covering the wavelengths of ultraviolet-visible (270 nm - 495 nm), near infrared (675 nm - 775 nm), and shortwave infrared (2305 nm - 2385 nm). Sentinel-5P is the first of the Atmospheric Composition Sentinels, and is providing measurements of atmospheric chemistry, aerosols, and clouds at high spatial, temporal, and spectral resolution. The NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) supports over a thousand data collections in the focus areas of Atmospheric Composition, Water & Energy Cycles, and Climate Variability. Sentinel-5P TROPOMI Level-1B (L1B) and Level-2 (L2) products are curated at the GES DISC. Sentinel-5P data are provided by the European Union and the European Space Agency (ESA) through an agreement between ESA and NASA. Through its convenient and enhanced tools/services, such as OPeNDAP and L2 Subsetting, GES DISC offers the air quality remote sensing user community facile solutions for using complex Earth science data and applications. This presentation will demonstrate up-to-date TROPOMI products including EarthView (EV) radiance, solar irradiance, Aerosol Index, Carbon Monoxide, Total column Ozone, Nitrogen Dioxide, and cloud, as well as easy ways to access, visualize and subset TROPOMI data.

TROPOMI↗

Design of a Lunar Plume-Surface Interaction Measurement System

Plume-surface interactions between a rocket plume and the lunar surface will be studied in-situ during two of NASA’s upcoming Commercial Lunar Payload Services Program missions. The payload, Stereo Cameras for Lunar Plume-Surface Studies (SCALPSS), will employ a multiple-camera photogrammetry system to obtain stereo images of the lunar regolith before, during, and after significant erosion and subsequent crater formation. The evaluation of measurement system capabilities and design process of the payload is informed by computational fluid dynamics predictions, accuracy modeling based on experimental data, camera simulation, and lander design, all of which are combined in the Virtual Diagnostic Interface. The second SCALPSS mission, traveling to the moon on Firefly Aerospace’s Blue Ghost lander in early 2023, aims to build on the design and complexity of the first payload, which is launching in early 2022 on Intuitive Machines’ Nova-C lander. The Blue Ghost SCALPSS mission will include two additional cameras and a total of three different lens focal lengths which will target specific points in the vehicle’s descent to obtain quantitative and accurate 3D reconstruction of the lunar surface both prior to and after crater formation.

photogrammetry↗

Operations Analysis of the 2nd Generation Reusable Launch Vehicle

The Space Launch Initiative (SLI) program is developing a second-generation reusable launch vehicle. The program goals include lowering the risk of loss of crew to 1 in 10,000 and reducing annual operations cost to one third of the cost of the Space Shuttle. The SLI missions include NASA, military and commercial satellite launches and crew and cargo launches to the space station. The SLI operations analyses provide an assessment of the operational support and infrastructure needed to operate candidate system architectures. Measures of the operability are estimated (i.e. system dependability, responsiveness, and efficiency). Operations analysis is used to determine the impact of specific technologies on operations. A conceptual path to reducing annual operations costs by two thirds is based on key design characteristics, such as reusability, and improved processes lowering labor costs. New operations risks can be expected to emerge. They can be mitigated with effective risk management with careful identification, assignment, tracking, and closure. SLI design characteristics such as nearly full reusability, high reliability, advanced automation, and lowered maintenance and servicing coupled with improved processes are contributors to operability and large operating cost reductions.

Noneman, Steven R.↗

NASA Near Earth Network (NEN), Deep Space Network (DSN) and Space Network (SN) Support of CubeSat Communications

There has been a historical trend to increase capability and drive down the Size, Weight and Power (SWAP) of satellites and that trend continues today. Small satellites, including systems conforming to the CubeSat specification, because of their low launch and development costs, are enabling new concepts and capabilities for science investigations across multiple fields of interest to NASA. NASA scientists and engineers across many of NASAs Mission Directorates and Centers are developing exciting CubeSat concepts and welcome potential partnerships for CubeSat endeavors. From a communications and tracking point of view, small satellites including CubeSats are a challenge to coordinate because of existing small spacecraft constraints, such as limited SWAP and attitude control, low power, and the potential for high numbers of operational spacecraft. The NASA Space Communications and Navigation (SCaN) Programs Near Earth Network (NEN), Deep Space Network (DSN) and the Space Network (SN) are customer driven organizations that provide comprehensive communications services for space assets including data transport between a missions orbiting satellite and its Mission Operations Center (MOC). The NASA NEN consists of multiple ground antennas. The SN consists of a constellation of geosynchronous (Earth orbiting) relay satellites, named the Tracking and Data Relay Satellite System (TDRSS). The DSN currently makes available 13 antennas at its three tracking stations located around the world for interplanetary communication. The presentation will analyze how well these space communication networks are positioned to support the emerging small satellite and CubeSat market. Recognizing the potential support, the presentation will review the basic capabilities of the NEN, DSN and SN in the context of small satellites and will present information about NEN, DSN and SN-compatible flight radios and antenna development activities at the Goddard Space Flight Center (GSFC) and across industry. The presentation will review concepts on how the SN multiple access capability could help locate CubeSats and provide a low-latency early warning system. The presentation will also present how the DSN is evolving to maximize use of its assets for interplanetary CubeSats. The critical spectrum-related topics of available and appropriate frequency bands, licensing, and coordination will be reviewed. Other key considerations, such as standardization of radio frequency interfaces and flight and ground communications hardware systems, will be addressed as such standardization may reduce the amount of time and cost required to obtain frequency authorization and perform compatibility and end-to-end testing. Examples of standardization that exist today are the NASA NEN, DSN and SN systems which have published users guides and defined frequency bands for high data rate communication, as well as conformance to CCSDS standards. The workshop session will also seek input from the workshop participants to better understand the needs of small satellite systems and to identify key development activities and operational approaches necessary to enhance communication and navigation support using NASA's NEN, DSN and SN.

Telecommunication↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗

Recent Progress at the International Laser Ranging Service (ILRS)

The International Laser Ranging Service (ILRS) is experiencing significant growth. New stations are being built and brought into operation, expanding the spatial and temporal coverage of the Satellite Laser Ranging (SLR) observations. Some of these stations are multi-technique Core Sites that allow us to exploit the combined strengths of different geodetic space techniques. New satellites are strengthening the ILRS contribution to the International Terrestrial Reference Frame (ITRF), and expanding the spectrum of satellite applications supported by the ILRS. New analysis, modeling, and data processing techniques continue to improve the science products. New campaigns are continuing to expand SLR applications into relativity and the study of non-gravitational forces. The ILRS is currently participating in the Galileo for Science campaign (G4S_2.0 project), funded by the Italian Space Agency (ASI), which aims to perform a set of measurements in the field of gravitation with the Galileo satellites, taking advantage of the accuracy of the on-board atomic clocks and, in particular, of GSAT0201and GSAT0202 by exploiting their relatively high eccentricity (~0.16). New activities underway in Lunar Laser Ranging (LLR), with the imminent launch and deployment of the upcoming Next Generation Lunar Retroreflector - 1 (NGLR-1) to the lunar surface. Some new satellites supported by the ILRS are now exploring means of capturing Space Debris, while some ILRS stations run local laser ranging projects to track space debris, contributing to the maintenance of various data catalogs. Time transfer experiments are also expanding the application of laser ranging, linking two fully characterized optical clocks at different locations with SLR (Einstein Synchronization) providing measurements of height differences, demonstrating the feasibility of a physical height system. Two-way and one-way transponders activity has been underway since the LASSO experiment in the 1990’s. More experiments are underway or planned. Applications include time and frequency transfer and clock synchronization between ground and space, interplanetary laser ranging, and fundamental physics. This presentation will give an update on ILRS activities and the impact that these activities have had and will have on ILRS data products.

Lunar Laser Ranging↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

The Space Superhighway: Systems Analysis of an In-Space Logistics Delivery Network

The number of assets in cislunar space is anticipated to dramatically increase in the coming decades. Many of these newer spacecraft are being designed to take advantage of capabilities currently in development like In-Space Servicing Assembly and Manufacturing (ISAM). Additionally, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a human-lunar presence that will then serve as a steppingstone for human missions to Mars. With continued growth in space operations, the combined demand for payload and propellant delivery in cislunar space could exceed 1,000 t annually in the next decade. The Space Superhighway principally consists of a logistics network and is intended to both use and proliferate ISAM in order to meet projected payload demands. Several architecture and vehicle-level trade studies are explored in order to better understand what in-space logistics networks may be feasible. The network consists of commercial launch vehicles, resupply tankers, orbital depots, and in-space tugs. This work specifically analyzes high-level trades such as: launch and in-space vehicle propulsion systems, vehicle size, staging orbit, level of vehicle reuse, reuse method, and propellant management strategy. Each of the trades are analyzed across several destination orbits such as Low-Earth Orbit (LEO) and Near-Rectilinear Halo Orbit (NRHO). Several payload types are also considered such as storable and cryogenic chemical propellants, electric propellants, crew logistics, spares, smallsats, and satellite piece parts.

Daniel J Tiffin↗

Space Resources Development: The Link Between Human Exploration and the Long-Term Commercialization of Space

In a letter to the NASA Administrator, Dan Goldin, in January of 1999, the Office of Management and Budget (OMB) stated the following . OMB recommends that NASA consider commercialization in a broader context than the more focused efforts to date on space station and space shuttle commercialization. We suggest that NASA examine architectures that take advantage of a potentially robust future commercial infrastructure that could dramatically lower the cost of future human exploration." In response to this letter, the NASA Human Exploration and Development of Space (HEDS) Enterprise launched the BEDS Technology & Commercialization Initiative (HTCI) to link technology and system development for human exploration with the commercial development of space to emphasize the "D" (Development) in BEDS. The development of technologies and capabilities to utilize space resources is the first of six primary focus areas in this program. It is clear that Space Resources Development (SRD) is key for both long-term human exploration of our solar system and to the long-term commercialization of space since: a) it provides the technologies, products, and raw materials to support efficient space transportation and in-space construction and manufacturing, and b) it provides the capabilities and infrastructure to allow outpost growth, self-sufficiency, and commercial space service and utility industry activities.

Sanders, Gerald B.↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Feasibility study of an orbiting laboratory for testing CSI technology

A concept for an orbiting laboratory for testing Controls-Structures Integration (CSI) technology is described. The CSI-Star concept reflects a lower cost, higher risk approach. The concept supports demonstration and validation testing for critical CSI technologies at a cost of $20M to $26M with a 1-year reliability of approximately 0.9. The Ball Aerospace QuickStar bus is the carrier for the CSI test article. QuickStar is launched as a secondary payload on the McDonnell Douglas Delta 2. The QuickStar/Delta 2 approach is flight proven. The CSI test article is a 20 foot, 1 Hz, truss beam which is deployed from the QuickStar bus. The test article is well instrumented for quality system identification. The laboratory provides three layers of active control consisting of global vibration suppression along the truss beam, vibration isolation between the beam and instrument platforms, and vibration compensation through the use of gimbaled platforms which point lasers relative to optical sensor targets. The configuration simulates the dynamics of multi-instrument science platforms such as those of the Earth Observation System (EOS) while maintaining strong ties to astrophysics missions such as the Optical Interferometer. Uplink/downlink services and a reprogrammable computer provide flexibility for long-term investigations by members of the CSI community (NASA, DoD, academia, and industry). CSI-Star fills the gap between short-term experiments, which have been conducted primarily on the Shuttle, and future science missions which require the technology. The on-orbit maturity of CSI technology must be established to obtain acceptance by project managers and to promote injection of the technology into future science missions.

Bicos, Andrew S.↗

Establishing a Near Term Lunar Farside Gravity Model via Inexpensive Add-on Navigation Payload

The Space Communications and Navigation, Constellation Integration Project (SCIP) is tasked with defining, developing, deploying and operating an evolving multi-decade communications and navigation (C/N) infrastructure including services and subsystems that will support both robotic and human exploration activities at the Moon. This paper discusses an early far side gravitational mapping service and related telecom subsystem that uses an existing spacecraft (WIND) and the Lunar Reconnaissance Orbiter (LRO) to collect data that would address several needs of the SCIP. An important aspect of such an endeavor is to vastly improve the current lunar gravity model while demonstrating the navigation and stationkeeping of a relay spacecraft. We describe a gravity data acquisition activity and the trajectory design of the relay orbit in an Earth-Moon L2 co-linear libration orbit. Several phases of the transfer from an Earth-Sun to the Earth-Moon region are discussed along with transfers within the Earth-Moon system. We describe a proposed, but not integrated, add-on to LRO scheduled to be launched in October of 2008. LRO provided a real host spacecraft against which we designed the science payload and mission activities. From a strategic standpoint, LRO was a very exciting first flight opportunity for gravity science data collection. Gravity Science data collection requires the use of one or more low altitude lunar polar orbiters. Variations in the lunar gravity field will cause measurable variations in the orbit of a low altitude lunar orbiter. The primary means to capture these induced motions is to monitor the Doppler shift of a radio signal to or from the low altitude spacecraft, given that the signal is referenced to a stable frequency reference. For the lunar far side, a secondary orbiting radio signal platform is required. We provide an in-depth look at link margins, trajectory design, and hardware implications. Our approach posed minimum risk to a host mission while maintaining a very low implementation and operations cost.

Folta, David↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗

NASA astrophysics - Optical systems to explore the universe

Major and minor NASA astrophysical research efforts in the near-term are outlined, together with projections of direction for future projects. The Space Telescope is being readied for a 1986 launch and will feature an f/24, 2.4 m aperture, an MgF2 mirror with better than 1/60 wavelength accuracy and will be diffraction-limited in the UV. Pointing accuracy is designed to be 0.007 arcsec for 24 hr. Optical, spectrometric, and photometric equipment will be included. Around 1990, Shuttle-based missions will include an IR telescope and a subarcsec solar surface imaging device. A free-flying X-ray observatory (AXAF) is planned and will include a sensitivity that exceeds that of the HEAO-2 spacecraft by two orders of magnitude. Instruments are under development for higher resolution UV, gamma-ray, and IR studies. In-orbit interferometry is being studied and will depend on in-orbit assembly and servicing of stable structures with segmented optics.

Pellerin, C. J., Jr.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Mass Spectrometer Observing Lunar Operations (MSoLo)

Introduction: In 2019, the National Aeronautics and Space Administration (NASA) announced that it would seek to have humans return to the moon by 2024 in the hopes of establishing a more sustainable lunar presence by 2028. This goal comes with many challenges, one of upmost importance will be to utilize resources that can be found on the moon. Water, which has been identified in the lunar Polar Regions, will be a key resource for in-situ resource utilization (ISRU), as it is capable of being processed for vehicular fuel, as well as life support systems materials such as oxygen. Upcoming Commercial Lunar Payload Services (CLPS) missions will be critical for these resource assessments. Methods: A modified commercial off-the-shelf (COTS) mass spectrometer developed at Kennedy Space Center known as MSolo, consisting of a quadrupole mass filter and space rated electronics undergoes testing and modifications in order to study operational parameters to unconventional approaches needed in flight situations. In general, MSolo operates in the 0-100 m/z range with the ability to detect with a faraday cup (FC) or an electron multiplier (EM) for enhanced detection. A crossbeam (XB) ionization source is used. Preliminary Data: Prior to construction, little information was available on how the MSolo system would perform at lunar like environments, factors such as temperatures (possible fluctuations from 70 to -45 °C), vibrations from launch and their side effects, the general ability to operate while the entire system (hardware and electronic components) were in a vacuum environment, were factors that while know to flight instruments, were something new to a modified COTS system. As components start to warm up, temperature becomes a key factor (ie. heat can no longer escape the electronics as no atmosphere is present), therefore it becomes crucial to find new ways to maintain stable signals and keep the instrument tuned. Calibration itself becomes an important parameter that needs to be performed while maintaining all flight like characteristics. Even the structure itself of MSolo’s sensor needed to be changed to survive the verification parameters needed to be approved for flight. Most important, all the modifications made to the COTS system have to keep the instrument working at the same specifications of the standard commercial systems. Novel Aspect: Results gathered provide key parameters that will assist to the unconventional mass spectrometry approaches of the upcoming CLPS missions to which MSolo has been selected to.

MSolo↗

Trajectory Design Analysis over the Lunar Nodal Cycle for the Multi-Purpose Crew Vehicle (MPCV) Exploration Mission 2 (EM-2)

The first crewed mission, Exploration Mission 2 (EM-2), for the MPCV Orion spacecraft is scheduled for August 2021, and its current mission is to orbit the Moon in a highly elliptical lunar orbit for 3 days. A 21-year scan was performed to identify feasible missions that satisfy the propulsive capabilities of the Interim Cryogenic Propulsion Stage (ICPS) and MPCV Service Module (SM). The mission is divided into 4 phases: (1) a lunar free return trajectory, (2) a hybrid maneuver, during the translunar coast, to lower the approach perilune altitude to 100 km, (3) lunar orbit insertion into a 100 x 10,000 km orbit, and (4) lunar orbit loiter and Earth return to a splashdown off the coast of Southern California. Trajectory data was collected for all feasible missions and converted to information that influence different subsystems including propulsion, power, thermal, communications, and mission operations. The complete 21-year scan data shows seasonal effects that are due to the Earth-Moon geometry and the initial Earth parking orbit. The data and information is also useful to identify mission opportunities around the current planned launch date for EM-2.

Gutkowski, Jeffrey P.↗

Recovering Nimbus Era Observations at the NASA GES DISC

Between 1964 and 1978, NASA launched a series of seven Nimbus meteorological satellites which provided Earth observations for 30 years. These satellites, carrying a total of 33 instruments to observe the Earth at visible, infrared, ultraviolet, and microwave wavelengths, revolutionized weather forecasting, provided early observations of ocean color and atmospheric ozone, and prototyped location-based search and rescue capabilities. The Nimbus series paved the way for a number of currently operational systems such as the EOS (Earth Observation System) Terra, Aqua, and Aura platforms. The original data archive includes both magnetic tapes and film media. These media are well past their expected end of life, placing at risk valuable data that are critical to extending the history of Earth observations back in time. GES DISC (Goddard Earth Sciences Data and Information Services Center) has been incorporating these data into a modern online archive by recovering the digital data files from the tapes, and scanning images of the data from film strips. The digital data products were written on obsolete hardware systems in outdated file formats, and in the absence of metadata standards at that time, were often written in proprietary file structures. Through a tedious and laborious process, oft-corrupted data are recovered, and incomplete metadata and documentation are reconstructed.

data recovery↗