Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Propulsion/ASME Rocket-Based Combined Cycle Activities in the Advanced Space Transportation Program Office

NASA's Office Of Aeronautics and Space Transportation Technology (OASTT) has establish three major coals. "The Three Pillars for Success". The Advanced Space Transportation Program Office (ASTP) at the NASA's Marshall Space Flight Center in Huntsville,Ala. focuses on future space transportation technologies under the "Access to Space" pillar. The Advanced Reusable Technologies (ART) Project, part of ASTP, focuses on the reusable technologies beyond those being pursued by X-33. The main activity over the past two and a half years has been on advancing the rocket-based combined cycle (RBCC) technologies. In June of last year, activities for reusable launch vehicle (RLV) airframe and propulsion technologies were initiated. These activities focus primarily on those technologies that support the year 2000 decision to determine the path this country will take for Space Shuttle and RLV. In February of this year, additional technology efforts in the reusable technologies were awarded. The RBCC effort that was completed early this year was the initial step leading to flight demonstrations of the technology for space launch vehicle propulsion. Aerojet, Boeing-Rocketdyne and Pratt & Whitney were selected for a two-year period to design, build and ground test their RBCC engine concepts. In addition, ASTROX, Pennsylvania State University (PSU) and University of Alabama in Huntsville also conducted supporting activities. The activity included ground testing of components (e.g., injectors, thrusters, ejectors and inlets) and integrated flowpaths. An area that has caused a large amount of difficulty in the testing efforts is the means of initiating the rocket combustion process. All three of the prime contractors above were using silane (SiH4) for ignition of the thrusters. This follows from the successful use of silane in the NASP program for scramjet ignition. However, difficulties were immediately encountered when silane (an 80/20 mixture of hydrogen/silane) was used for rocket ignition.

Hueter, Uwe↗

Analyses of Transistor Punchthrough Failures

The failure of two transistors in the Altitude Switch Assembly for the Solid Rocket Booster followed by two additional failures a year later presented a challenge to failure analysts. These devices had successfully worked for many years on numerous missions. There was no history of failures with this type of device. Extensive checks of the test procedures gave no indication for a source of the cause. The devices were manufactured more than twenty years ago and failure information on this lot date code was not readily available. External visual exam, radiography, PEID, and leak testing were performed with nominal results Electrical testing indicated nearly identical base-emitter and base-collector characteristics (both forward and reverse) with a low resistance short emitter to collector. These characteristics are indicative of a classic failure mechanism called punchthrough. In failure analysis punchthrough refers to an condition where a relatively low voltage pulse causes the device to conduct very hard producing localized areas of thermal runaway or "hot spots". At one or more of these hot spots, the excessive currents melt the silicon. Heavily doped emitter material diffuses through the base region to the collector forming a diffusion pipe shorting the emitter to base to collector. Upon cooling, an alloy junction forms between the pipe and the base region. Generally, the hot spot (punch-through site) is under the bond and no surface artifact is visible. The devices were delidded and the internal structures were examined microscopically. The gold emitter lead was melted on one device, but others had anomalies in the metallization around the in-tact emitter bonds. The SEM examination confirmed some anomalies to be cosmetic defects while other anomalies were artifacts of the punchthrough site. Subsequent to these analyses, the contractor determined that some irregular testing procedures occurred at the time of the failures heretofore unreported. These testing irregularities involved the use of a breakout box and were the likely cause of the failures. There was no evidence to suggest a generic failure mechanism was responsible for the failure of these transistors.

Nicolas, David P.↗

Status of the Advanced Reusable Technologies Project

The Advanced Reusable Technologies (ART) Project, part of the Advanced Space Transportation Program Office at the NASA's Marshall Space Flight Center in Huntsville, Ala., focuses on future reusable technologies beyond those being pursued by X-33. The prime objective of the project is to dramatically reduce the cost of access to space. In April 1996, an NRA was issued soliciting proposals for tasks focusing on rocket-based combined cycle propulsion system (RBCC). In August of 1996, five contractors were selected for a two year period to design and ground test their RBCC engine concepts. The work on these contracts should be completed by the end of this year. In March of this year, another NRA was issued to solicit inputs for reusable vehicle and propulsion technologies applicable to earth-to-orbit and in-space transportation. The current RBCC effort is the first of three phases leading to a large scale flight demonstrations of the technology for space launch vehicle propulsion. This first phase will provide initial verification of proposed concepts through ground demonstration of combined rocket/air breathing propulsion technologies. Using the most promising concepts identified in the first phase, the second phase will design, manufacture and ground test flight-type engine(s) to demonstrate actual design weights and performance. In the third phase, the first flight of a sub-scale integrated X-vehicle is planned for 2002. This paper describes the current status, plans and progress of the ART Project.

Hueter, Ume↗

The International Space Station Assembly on Schedule

As engineers continue to prepare the International Space Station (ISS) for in-orbit assembly in the year 2002, ANSYS software has proven instrumental in resolving a structural problem in the project's two primary station modules -- Nodes 1 and 2. Proof pressure tests performed in May revealed "low temperature, post-yield creep" in some of the Nodes' gussets, which were designed to reinforce ports for loads from station keeping and reboost motion of the entire space station. An extensive effort was undertaken to characterize the creep behavior of the 2219-T851 aluminum forging material from which the gussets were made. Engineers at Sverdrup Technology, Inc. (Huntsville, AL) were responsible for conducting a combined elastic-plastic-creep analysis of the gussets to determine the amount of residual compressive stress which existed in the gussets following the proof pressure tests, and to determine the stress-strain history in the gussets while on-orbit. Boeing, NASA's Space Station prime contractor, supplied the Finite Element Analysis (FEA) model geometry and developed the creep equations from the experimental data taken by NASA's Marshall Space Flight Center and Langley Research Center. The goal of this effort was to implement the uniaxial creep equations into a three dimensional finite element program, and to determine analytically whether or not the creep was something that the space station program could live with. The objective was to show analytically that either the creep rate was at an acceptable level, or that the node module had to be modified to lower the stress levels to where creep did not occur. The elastic-plastic-creep analysis was performed using the ANSYS finite element program of ANSYS, Inc. (Houston, PA). The analysis revealed that the gussets encountered a compressive stress of approximately 30,000 pounds per square inch (psi) when unloaded. This compressive residual stress significantly lowered the maximum tension stress in the gussets which decreased the creep strain rate. The analysis also showed that the gussets would not experience a great deal of creep from future pressure tests if braces or struts proposed by Boeing were installed to redistribute stress away from them. Subsequent analysis of on-orbit station keeping and reboost loads convinced Boeing that the gussets should be removed altogether.

Source record↗

Design of a Low Cost Avionics System for Launch Vehicles

Marshall Space Flight Center has long been one of the leaders in development of propulsion systems. Due to current launch vehicle costs, Marshall Space Flight Centers (MSFC) Advanced Space Transportation Program (ASTP) office has emphasized the development of low cost launch vehicles. The Bantam launch vehicle is one of the primary programs that has low cost as a requirement. One of the driving factors for a low cost launch vehicle is a low cost avionics system. This paper will summarize MSFC's Astrionics Laboratories efforts in designing a low cost avionics system. MSFC has done Phase A avionics system design and has been working with various contractors on a Phase B preliminary avionics design. Deriving the major requirements, trade studies and cost drivers are some of the topics to be discussed.

Crawford, Kevin↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

Chronology of KSC and KSC Related Events for 1998

This document is intended to serve as a record of Kennedy Space Center (KSC) events and is a reference source for historians and other researchers. Arrangement is by day and month and individual articles are attributed to published sources. Materials were researched and described by the KSC Library Archivist for KSC Library Services Contractor Information Dynamics, Inc.

Liston, Elaine E.↗

Mission Plan for the Mars Surveyor 2001 Orbiter and Lander

The Mars Surveyor 2001 Project consists of two missions to Mars, an Orbiter and a Lander, both to be launched in the spring of 2001 for October 2001 (Orbiter) and January 2002 (Lander) arrival at Mars. The Orbiter will support the Lander mission primarily as a communications relay system; the Lander will not have direct-to-Earth communications capability. Science data collected from the Orbiter will also be used to aid in the geologic interpretation of the landing site, along with data from past missions. Combining the Orbiter and Lander missions into a single Project has enabled the streamlining of many activities and an efficient use of personnel and other resources at the Jet Propulsion Laboratory and at the spacecraft contractor, Lockheed Martin Astronautics.

Plaut, J. J.↗

[Component and System Level of the FASTRAC Engine]

The primary activities of Lee & Associates during the period 7/20/99 to 12/31/99 as specified in the referenced Purchase Order has been in direct support of the Advanced Space Technology Program OfFice's Core Propulsion Project. An independent review to assess the program readiness to conduct component and system level testing of the FASTRAC Engine and to proceed into Fabrication has been provided. This was accomplished through the identification of program weaknesses and potential failure areas and where applicable recommended solutions were suggested to the Program Office that would mitigate technical and program risk. The approach taken to satisfy the objectives has been for the contractor to provide a team of experts with relevant experience from past programs and a strong background of experience in the fields critical to the success of the program. The team participated in Test Planning, Test Readiness Reviews for system testing at Stennis Space Center, Anomaly Resolution Reviews, an Operations Audit, and data analysis. This approach worked well in satisfying the objectives and providing the Project Office with valuable information in real time and through monthly reports. During the month of December 1999 the primary effort involved the participation in anomaly resolution and the detailed review of the data from the final H3 and H4 test series performed on the FASTRAC engine in the b-2 Horizontal Test Facility at Stennis. The more significant findings and recommendations from this review are presented in this report.

Source record↗

Spinoff 1998

In 1958, a Congressional Mandate directed the National Aeronautics and Space Agency to ensure for the widest possible dissemination of its research and development results. Thus, the Scientific and Technical Information (STI) Program was born. While this program addressed mostly the timely dissemination of information to NASA, NASA contractors, other government agencies, and the public, technologies were identified that were clearly transferable and applicable to industry for additional use in the development of commercial products and services. Such considerations spun off the Technology Utilization Program. The very successful program went through several name changes and is today called the NASA Commercial Technology Program. The changes that have occurred over time are not only name changes, but program changes that have dramatically altered the philosophy, mission, and goal of the program. It has been identified that a more intense and proactive outreach effort within the program is necessary in order to make the newest and latest technologies available to industry now-at the time the technology is actually developed. The NASA Commercial Technology Network (NCTN), its interaction with industry at all levels through a large network of organizations and offices, is contributing to the success of small, medium, and large U.S. businesses to remain globally competitive. At the same time, new products and services derived from the transfer and application of NASA technology benefit everyone. This publication includes the following: Aerospace research and development - NASA headquarters and centers. Technology transfer and commercialization. Commercial benefits - spinoffs.NASA success and education. NASA commercial technology network.

Source record↗

The NPG 7120.5A Electronic Review Process

The use of electronics to review a document is well within the technical realm of today's state-of-the-art workplace. File servers and web site interaction are common tools for many NASA employees. The electronic comment processing described here was developed for the NPG 7120.5A review to augment the existing NASA Online Directives Information System (NODIS). The NODIS system is NASA's official system for formal review, approval and storage of NASA Directives. The electronic review process worked so well that NASA and other agencies may want to consider it as one of our "best practices." It was participatory decision making at its very best, a process that attracted dozens of very good ideas to improve the document as well as the way we can be managing projects far more effectively. The revision of NPG 7120.5A has significant implications for the way all elements of the Agency accomplish program and project management. Therefore, the review of NPG 7120.5A was an Agencywide effort with high visibility, heavy participation and a short schedule. The level of involvement created interest in supplementing the formal NODIS system with a system to collect comments efficiently and to allow the Centers and Codes to review and consolidate their comments into the official system in a short period of time. In addition, the Program Management Council Working Group (PMCWG), responsible for the revision of the document and the disposition of official comments, needed an electronic system to manage the disposition of comments, obtain PMCWG consensus on each disposition, and coordinate the disposition with the appropriate Headquarters Code that had submitted the official comment. The combined NASA and contractor talents and resources provided a system that supplemented the NODIS system and its operating personnel to produce a thorough review and approval of NPG 7120.5A on April 3, 1998, 7.5 months from the start of the process. The original six-month schedule is indicated. All milestones occurred on time, except for completion of comment disposition, which required an additional 30 days. Approval of the document occurred sixteen days after completion of the "Purple Package."

McBrayer, Robert↗

NASA Langley Scientific and Technical Information Output: 1999

This document is a compilation of the scientific and technical information that the Langley Research Center has produced during the calendar year 1999. Included are citations for Special Publications, Technical Publications, Conference Publications, Technical Memorandums, Contractor Reports, Journal Articles and Book Publications, Meeting Presentations, Technical Talks, Tech Briefs, and Patents.

Stewart, Susan H.↗

Goddard Space Flight Center Solar Array Missions, Requirements and Directions

The Goddard Space Flight Center (GSFC) develops and operates a wide variety of spacecraft for conducting NASA's communications, space science, and earth science missions. Some are "in house" spacecraft for which the GSFC builds the spacecraft and performs all solar array design, analysis, integration, and test. Others are "out of house" spacecraft for which an aerospace contractor builds the spacecraft and develops the solar array under direction from GSFC. The experience of developing flight solar arrays for numerous GSFC "in house" and "out of house" spacecraft has resulted in an understanding of solar array requirements for many different applications. This presentation will review those solar array requirements that are common to most GSFC spacecraft. Solar array technologies will be discussed that are currently under development and that could be useful to future GSFC spacecraft.

Gaddy, Edward↗

Scientific and Technical Reports, Articles, Papers, and Presentations

This document presents formal NASA technical reports, papers published in technical journals, and presentations by MSFC personnel in FY99. It also includes papers of MSFC contractors. All of the NASA series reports may be obtained from the NASA Center for AeroSpace Information (CASI), 7121 Standard Drive, Hanover, MD 21076-1320 The information in this report may be of value to the scientific and engineering community in determining what information has been published and what is available.

Turner, J. E.↗

ACIS Door Failure Investigation and Mitigation Procedures

NASA's Chandra X-ray Observatory (formerly AXAF) was launched on July 23, 1999 and is currently in orbit performing scientific studies. Chandra is the third of NASA's Great Observatories to be launched, following the Hubble Space Telescope and the Compton Gamma Ray Observatory. One of four primary science instruments on Chandra, and one of only two focal plane instruments, is the Advanced CCD Imaging Spectrometer, or ACIS. The ACIS focal plane and Optical Blocking Filter (OBF) must be launched under vacuum, so a tightly sealed, functioning door and venting subsystem were implemented. The door was opened two and one-half weeks after launch (after most out-gassing of composite materials) and allowed X-rays to be imaged by the ACIS CCD's in the focal plane. A failure of this door to open on-orbit would have eliminated all ACIS capabilities, severely degrading mission science. During the final pre-flight thermal-vacuum test of the fully integrated Chandra Observatory at TRW, the ACIS door failed to open when commanded to do so. This paper describes the efforts, under considerable time pressure, by NASA, its contractors and outside review teams to investigate the failure and to develop modified hardware and procedures which would correct the problem. Of interest is the fact that the root cause of the test failure was never clearly identified despite massive effort. We ultimately focussed on hardware and procedures designed to mitigate the effects of potential, but unproven, failure modes. We describe a frequent real-world engineering situation in which one must proceed on the best basis possible in the absence of the complete set of facts.

Podgorski, William A.↗

NASA Parts Selection List (NPSL) WWW Site http://nepp.nasa.gov/npsl

The NASA Parts Selection List (NPSL) is an on-line resource for electronic parts selection tailored for use by spaceflight projects. The NPSL provides a list of commonly used electronic parts that have a history of satisfactory use in spaceflight applications. The objective of this www site is to provide NASA projects, contractors, university experimenters, et al with an easy to use resource that provides a baseline of electronic parts from which designers are encouraged to select. The NPSL is an ongoing resource produced by Code 562 in support of the NASA HQ funded NASA Electronic Parts and Packaging (NEPP) Program. The NPSL is produced as an electronic format deliverable made available via the referenced www site administered by Code 562. The NPSL does not provide information pertaining to patented or proprietary information. All of the information contained in the NPSL is available through various other public domain resources such as US Military procurement specifications for electronic parts, NASA GSFC's Preferred Parts List (PPL-21), and NASA's Standard Parts List (MIL-STD975).

Brusse, Jay↗

Progress in Design and Construction of the Optical Communications Laser Laboratory

The deployment of advanced hyperspectral imaging and other Earth sensing instruments on board Earth observing satellites is driving the demand for high-data-rate communications. Optical communications meet the required data rates with small, low mass, and low-power communications packages. JPL, as NASA's lead center in optical communications, plans to construct a 1-m Optical Communications Telescope Laboratory (OCTL) at its Table Mountain Facility (TMF) complex in the San Gabriel Mountains of Southern California. The design of the building has been completed, and the construction contractor has been selected. Ground breaking is expected to start at the beginning of the 1999 TMF construction season. A request for proposal (RFP) has been issued for the procurement of the telescope system. Prior to letting the RFP we conducted a request for information with industry for the telescope system. Several vendors responded favorably and provided information on key elements of the proposed design. These inputs were considered in developing the final requirements in the RFP. Keywords: Free space optical communications, lasercom, telescopes, ground stations, adaptive optics, astrometry, Table Mountain Facility

Wilson, K. E.↗

Research and Technology 1999

This report selectively summarizes the NASA Glenn Research Center's research and technology accomplishments for the fiscal year 1999. It comprises 130 short articles submitted by the staff scientists and engineers. The report is organized into four major sections: Aeronautics. Research and Technology, Space, and Engineering and Technical Services. A table of contents and an author index have been developed to assist readers in finding articles of special interest. This report is not intended to be a comprehensive summary of all the research and technology work done over the past fiscal year. Most of the work is reported in Glenn-published technical reports, journal articles, and presentations prepared by Glenn staff and contractors. In addition, university grants have enabled faculty members and graduate students to engage in sponsored research that is reported at technical meetings or in journal articles. For each article in this report, a Glenn contact person has been identified, and where possible, reference documents are listed so that additional information can be easily obtained. The diversity of topics attests to the breadth of research and technology being pursued and to the skill mix of the staff that makes it possible. For more information about research at NASA Glenn, visit us on the World Wide Web (http://www.grc.nasa.gov). This document is available on the World Wide Web (http://www.grc.nasa.gov/WWW/RT/). For publicly available reports, visit the Glenn Technical Report Server (GLTRS) on the World Wide Web (http://gltrs.grc.nasa.gov/GLTRS/).

Source record↗