Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

NASA Passive Thermal Control Engineering Guidebook

The NASA Passive Thermal Control Engineering Guidebook provides recommendations, including best practices and lessons learned, related to the passive thermal control engineering discipline. Topics include analysis (including documentation and review), thermal hardware (design/selection, vendors, and integration), testing, and flight operations. The passive thermal discipline includes thermal control and thermal protection systems. The passive thermal control discipline, which is addressed in this Guidebook, is broad and covers internal and external systems, component passive thermal analysis, vehicle on-orbit attitude timeline analysis, integrated thermal analysis, various thermal control apparatus (heaters and controls, coatings, blankets and insulations, isolators, geometric design for view factors, materials emissivity/absorptivity properties), passive cooling of avionics, purge, vent, and drain for vehicle cavities and compartments, thermal model development and correlation, thermal cycle and thermal-vacuum testing. Topics related to thermal protection systems (TPS) are not within the scope of this document. The Guidebook provides a consolidated reference for early career as well as experienced engineers embarking on a new task. Leveraging the experience of the group minimizes the learning curve that exists at the start of new projects, reduces the risk of repeating mistakes, and improves the organization’s ability to deliver high-quality products efficiently. The intent of this document is to provide guidance based on collective experience, and is not intended impose constraints on project work. Best practices can vary substantially and it is important to apply judgment wisely based on careful consideration of the specific design and requirements. Implementation of the methods described will vary from project to project and should be applied in conjunction with the judgment of the thermal engineers performing and reviewing the work. The recommendations in this document are not intended to replace program, project, branch, Center, or NASA requirements and/or policies.

thermal↗

Testing and validation of the microbial environment of the NASA rodent spaceflight habitat water delivery system.

Sterilized, deionized water within a closed, self-sufficient system has been used in NASA spaceflight rodent studies for several decades. Within the specialized spaceflight rodent habitat, water is delivered through a compression spring-loaded bag system to maintain positive pressure. Refill of the drinking water occurs every 30 days by direct transfer of potable water from aboard the International Space Station (ISS). This enables long term use without a weekly water change out, which meets spaceflight requirements, but contrasts with the general guidelines for the sanitation of water delivery systems. Even though the water is iodinated to minimize microbial growth, rodents are fed a special diet of high moisture nutrient-rich food bars based on the AIN-93 diet that may contribute to microbial growth in this water system. We designed a ground study to assess the quality of drinking water that is given to rodents throughout a mission. We conducted the ground test using 20 female C57BL/6J mice housed in this specialized habitat to mimic the timeline of a 90-day mission as well as the environmental conditions (temperature, humidity, and pCO2) within the ISS. We used a novel sampling method to test water at 2-week intervals for the 90-days, and also after each 30-day refill of the water delivery system. Mice in standard vivarium cages with water bottles were also included for comparison to the habitat. The results showed that overall microbial load remained close to zero for the duration, while total organic compound concentrations increased from 1370g/L to 10650g/L over the course of 90 days but remained below the level of concern. Inorganic ions and pH were also found to be at acceptable levels. Overall, we conclude that this system is effective in delivering clean, potable water to rodents for the 90-day duration of current missions to the ISS.

water↗

Rapid Development of Instrument Thermal Models: Perspectives and Guidelines from NASA Goddard’s Instrument Design Laboratory

- The design and development of robotic spaceflight instruments is a critical part of NASA’s vision to discover and expand knowledge for the benefit of humanity - For typical flight instrument projects, thermal engineers will develop initial instrument thermal models over weeks or months, then iterate them over a project’s lifespan – In each iteration, the engineer will: - Refine their thermal models and thermal designs in accordance with updates from other subsystems - Perform trade studies - Solve very detailed and complex analysis problems, including worst-cases and contingencies - Pick hardware and plan for testing and integration - However, prior to a project being established, or for proposal development at an early conceptual stage, the luxury of multiple instrument design iterations may be limited or nonexistent – Within a short timeline, how do you complete a thermal model or explore multiple possible instrument configurations? – What are the critical parameters for your model? Which details do you include or leave out?

Kan Yang↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗

Ultraviolet Astronomy in the XXI Century

The US 2020 Astrophysics Decadal Survey (Astro2020) has recommended NASA develop the first observatory designed to search for signs of life on exoplanets and enable transformative astrophysics. These ambitious goals demand a large and highly capable space telescope with broad wavelength coverage from the far-UV to the near-IR, in the tradition of the Hubble Space Telescope. Realizing this vision will require aggressive technology development — as well as respect for and careful balancing of the needs of many scientific communities. In this talk, I will review the Decadal recommendations, including the development approach and timeline envisioned for the recommended UV/O/IR flagship. The LUVOIR and HabEx pre-Decadal mission concepts that fed into that flagship will also be reviewed. Finally, I’ll highlight some key technical considerations for the future UV/O/IR Great Observatory.

Aki Roberge↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy↗

Promoting Crew Autonomy in a Human Spaceflight Earth Analog Mission through Self-Scheduling

Deep space exploration missions face the challenge of communication transmission latencies between ground stations and astronaut crews due to increasing distance between the Earth and spacecraft in transit. To address this, research at NASA has aimed toward supporting crew autonomy by enabling astronauts to schedule their own timelines with minimal oversight from Mission Control. While self-scheduling has been shown to be feasible, it is yet to be studied as an integral part of autonomous crew operations. The current paper reviews the operationalization of self-scheduling and a number of related objectives during Campaign 6 of HERA, a Human Exploration Research Analog. Research objectives include studying the effects of phasic autonomy over the course of a 45-day mission, evaluating differences in scheduling performance produced by software interface aids, and deploying a novel measure of crew attitudes toward self-scheduling and plan execution.

crew autonomy↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

The Big Plunge at Venus: The DAVINCI Descent Phase

DAVINCI (Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging) was selected as one of two new Discovery missions in summer of 2021 with the primary goals to study how the Venus atmosphere formed and changed over time. DAVINCI does this by making in situ measurements of the atmosphere, taking images below the cloud layer during the descent phase, and imaging the surface and clouds during two flyby science opportunities. The Descent Sphere is neither designed nor required to land on the surface so all critical science data must be taken and transmitted to a relay spacecraft prior to impact. This architecture drives the mission to a carefully-crafted concept of operations; deployments, instrument operations, and communications are choreographed to ensure the right data is gathered at the right altitude given the uncertainties in the trajectory and timeline. A complex flow of analyses and tests throughout development will validate the system’s ability to execute the mission goals. In the end DAVINCI will be ready for its one hour of descent time to meet its driving science goals.

DAVINCI↗

Innovative IO Psychology Research for Future Space Exploration

Crewed space exploration is evolving. The commercialization of space includes Private Astronauts who interact with NASA astronauts on the International Space Station. Astronauts are scheduled to complete a variety of tasks within a fast paced timeline. Future exploration missions to Mars will include challenges such as a small crew living and working in an isolated and confined environment for up to 2 ½ years, with significant communication delays from Earth. This symposium brings together four innovative studies designed to mitigate the risks associated with space flight.

Suzanne Tamara Bell↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity

The transition between gravity environments will involve one of the most complex, high-risk phases of any mission. For example, the reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk scenarios may be required to be performed soon after gravity transitions: • Nominal and/or emergency unassisted capsule egress task after return to Earth • Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study is broken down into two phases. Phase 1: A feasibility study that will assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing. Phase 2: the full Egress Fitness study, which is part of the CIPHER complement. This study uses a task-based approach to characterize functional performance of these high-risk scenarios in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and a mobility assessment to confirm completion of the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth-based emergency egress out of a functional capsule mockup and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing will occur at any time point prior to flight. Post-flight assessment is much more critical with the capsule egress test that will occur 1–4 hours after landing and the planetary EVA approximately 18–36 hours after landing. The CIPHER study will incorporate additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. Data collected for both tasks include task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed both baseline and post-flight testing on four astronaut subjects, with all four able to complete post-flight EVA testing and three able to complete postflight capsule egress testing. Preliminary results observe individual physiological variations, which were to be expected but also suggest the need to carefully track the timeline from undock to landing to testing. Furthermore, some task performance instructions and equipment may need to be adjusted to ensure results are primarily physiological. These and other lessons learned will be addressed with minor protocol changes in the full CIPHER Egress Fitness study.

J R Norcross↗

Structural Sizing of a Composite Transonic Truss-Braced Wing

Accurate finite element modeling (FEM) is a vital part of the modern aircraft design process. As aircraft become increasingly complex, the time-consuming nature of detailed FEM approaches comes at a significant cost to program timeline and budget. In an effort produce modeling efforts that are sufficiently accurate and minimally costly, a proposed FEM approach and optimization scheme for a composite aircraft is explored, including a discussion of the manufacturing constraints of a highly tailored composite panel design. A high-fidelity structural model of a transonic truss-braced wing (TTBW) is generated, and the components are sized by structural optimization to satisfy buckling and strength constraints while subjected to critical maneuver loads. The structural modeling approaches and sizing of a TTBW are discussed, including details for FEM approaches, verification of an approximated FEM approach, a sizing optimization using the optimization software LS-OPT, and a manufacturing trial of integrally stiffened composite panels conducted to explore the validity of highly tailored composites as a design consideration. The results of study discussed herein indicate that the proposed FEM approach is suitable for modeling composite-construction aircraft and for use in sizing optimization. Further efforts regarding integrally stiffened composite panels will indicate the suitability of this method for the integration of highly tailored composite panels into the design and optimization process, given the manufacturability of such panels as shown here.

Finite Element↗

Field Assessment of Sensorimotor Function Following Long-Duration Spaceflight

INTRODUCTION: Field assessments of functional task performance following long duration spaceflight are critical to characterize the risk associated with sensorimotor adaptation. A portable test battery involving sit-to-stand, prone-to-stand, walk and turn with obstacle, and tandem walking has been implemented during pre- and postflight testing to provide Sensorimotor Standard Measures that could be implemented in remote test locations. METHODS: To date, 19 astronauts (12 males, 7 females) participated in this study before and after 6–8-month expeditions to the International Space Station (198 ± 70 days, mean ±std). Ethics approvals were obtained, and all subjects provided informed consent. Tests were conducted preflight, within a few hours after landing, and then 1 day and 6–11 days later. Time to stability was the outcome measure for both standing tasks, time to completion and turn rate for the walk and turn task, and percent complete steps for the tandem walking (eyes open and closed). Statistical analyses included mixed effects (multi-level) generalized linear models. RESULTS: Consistent with previous Field Tests, significant effects of spaceflight were observed during the initial testing including longer times to stabilize posture when standing, longer times to complete the short obstacle walk, and fewer correct steps during tandem walking. The recovery timeline varied with task complexity, generally taking longer when either the basis of support was limited (e.g., tandem walk) and/or visual cues were deprived (eyes closed). DISCUSSION: These data suggest that additional sensorimotor-based countermeasures may be necessary to maintain functional performance during long-duration spaceflight. Maintaining core measures as new countermeasures are implemented during future missions will be instrumental in assessing their efficacy. This test battery will also serve as the basis for developing sensorimotor assessments during future space exploration.

Scott Jonathan Wood↗

Structural Sizing of a Transonic Truss-Braced Wing

Accurate finite element modeling (FEM) is a vital part of the modern aircraft design process. As aircraft become increasingly complex, the time-consuming nature of detailed FEM approaches comes at a significant cost to program timeline and budget. In an effort produce modeling efforts that are sufficiently accurate and minimally costly, a proposed FEM approach and optimization scheme for a composite aircraft is explored, including a discussion of the manufacturing constraints of a highly tailored composite panel design. A high-fidelity structural model of a transonic truss-braced wing (TTBW) is generated, and the components are sized by structural optimization to satisfy buckling and strength constraints while subjected to critical maneuver loads. The structural modeling approaches and sizing of a TTBW are discussed, including details for FEM approaches, verification of an approximated FEM approach, a sizing optimization using the optimization software LS-OPT, and a manufacturing trial of integrally stiffened composite panels conducted to explore the validity of highly tailored composites as a design consideration. The results of study discussed herein indicate that the proposed FEM approach is suitable for modeling composite-construction aircraft and for use in sizing optimization. Further efforts regarding integrally stiffened composite panels will indicate the suitability of this method for the integration of highly tailored composite panels into the design and optimization process, given the manufacturability of such panels as shown here.

Finite Element↗

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Astronauts, unlike Mission Control, are not expert planners, however, and determining simple strategies and heuristics that enable them to schedule successfully can increase the range of problems they can solve successfully. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedules, and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. Participants conducting naturally learn to schedule activities with the most constraints first, while participants vary in heuristics in the rescheduling task.

self-scheduling↗

Exploring Self-Scheduling Strategies and Heuristics in Novice Schedulers

Missions beyond low Earth orbit will require crews to act with greater autonomy. Increasing communication delays will require crews to take on tasks currently supported by Mission Control, including the involved process of scheduling and rescheduling their own complex spaceflight timelines to fit a variety of restrictions and constraints. Unlike Mission Control, astronauts are not expert planners, and determining strategies and heuristics that enable crews to schedule successfully may increase the range of problems they can solve. In two human-in-the-loop scheduling experiments, we analyzed 1) common strategies among novice schedulers and 2) the development of self-scheduling heuristics. We find that, even when participants are instructed to follow a given strategy, they rapidly develop their own self-scheduling heuristics as they learn to successfully complete the scheduling task. While scheduling, participants naturally learn to arrange activities with the most constraints first, whereas while rescheduling, they display greater variability in their heuristics.

self-scheduling↗