Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Standards Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Development and evaluation of a set of group delay standards

A set of cable assemblies serving as group delay standards having nominal delays of 15, 30, and 60 nsec are described. Various types of measurements were performed on the cable standards, including impedance, microwave phase shift, RF pulse burst delay, modulation pulsed delay, and envelope phase shift measurements. The results of these tests are given, and various sources of error are discussed, in particular, dispersion and internal reflections.

Otoshi, T. Y.↗

An Accelerated Development, Reduced Cost Approach to Lunar/Mars Exploration Using a Modular NTR-Based Space Transportation System

The results of integrated systems and mission studies are presented which quantify the benefits and rationale for developing a common, modular lunar/Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. At present NASA's Exploration Program Office (ExPO) is considering chemical propulsion for an 'early return to the Moon' and NTR propulsion for the more demanding Mars missions to follow. The time and cost to develop these multiple systems are expected to be significant. The Nuclear Propulsion Office (NPO) has examined a variety of lunar and Mars missions and heavy lift launch vehicle (HLLV) options in an effort to determine a 'standardized' set of engine and stage components capable of satisfying a wide range of Space Exploration Initiative (SEI) missions. By using these components in a 'building block' fashion, a variety of single and multi-engine lunar and Mars vehicles can be configured. For NASA's 'First Lunar Outpost' (FLO) mission, an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to translunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.5 m length, and 66 t LH2 capacity. The NTR utilizes a UC-ZrC-graphite 'composite' fuel with a specific impulse (Isp) capability of approximately 900 s and an engine thrust-to-weight ratio of approximately 4.3. By extending the size and LH2 capacity of the lunar NTR stage to approximately 20 m and 96 t, respectively, a single launch Mars cargo vehicle capable of delivering approximately 50 t of surface payload is possible. Three 50 klbf NTR engines and the two standardized LH2 tank sizes developed for lunar and Mars cargo vehicle applications would be used to configure the Mars piloted vehicle for a mission as early as 2010. The paper describes the features of the 'common' NTR-based moon/Mars STS, examines performance sensitivities resulting from different 'mission mode' assumptions, and quantifies potential schedule and cost benefits resulting from this modular moon/Mars NTR vehicle approach.

Borowski, S.↗

Initial Response of the Aurora to the January 10, 1997 Magnetic Cloud

On January 10th, 1997, a magnetic cloud originating at the Sun was incident on the Earth. The initial disturbance to the magnetosphere, as reflected in the intensification of the aurora, was measured by the Ultraviolet Imager on the Polar Spacecraft. The first activation of the aurora at local noon occurred within minutes of the arrival of the shock. The subsequent evolution of the aurora over the next 18 minutes shows that the magnetic disturbance proceeds from local noon, symmetrically around the dawn and dusk flanks to local midnight. The substorm onset was observed to occur 174 minutes after the initial brightening of the aurora and 78 minutes after the southward turning of the IMF (Interplanetary Magnetic Field). During the intervening time, significant polar cap precipitation is observed. The polar cap precipitation begins at the poleward edge of the oval in the post midnight region and develops to form several complex transpolar structures. The polar cap precipitation subsides and quiet conditions are observed for 40 minutes prior to the onset of the substorm. During this event we have observed several unusual unique auroral forms develop that are different from the standard substorm models. We will present interpretation of the development of the pre-substorm events in light of the interplanetary conditions.

Spann, James F., Jr.↗

STS payloads mission control study continuation phase A-1. Volume 2-B: Task 2. Evaluation and refinement of implementation guidelines for the selected STS payload operator concept

The functions of Payload Operations Control Centers (POCC) at JSC, GSFC, JPL, and non-NASA locations are analyzed to establish guidelines for standardization, and facilitate the development of a fully integrated NASA-wide system of ground facilities for all classes of payloads. Operational interfaces between the space transportation system operator and the payload operator elements are defined. The advantages and disadvantages of standardization are discussed.

Source record↗

Quality assessment of plant transpiration water

It has been proposed to use plants as elements of biologically-based life support systems for long-term space missions. Three roles have been brought forth for plants in this application: recycling of water, regeneration of air and production of food. This report discusses recycling of water and presents data from investigations of plant transpiration water quality. Aqueous nutrient solution was applied to several plant species and transpired water collected. The findings indicated that this water typically contained 0.3-6 ppm of total organic carbon, which meets hygiene water standards for NASA's space applications. It suggests that this method could be developed to achieve potable water standards.

Macler, Bruce A.↗

Gateway Modeling and Simulation Plan

This plan institutes direction across the Gateway Program and the Element Projects to ensure that Cross Program M&S are produced in a manner that (1) generate the artifacts required for NASA-STD-7009 compliance, (2) ensures interoperability of M&S exchanged and integrated across the program and, (3) drives integrated development efforts to provide cross-domain integrated simulation of the Gateway elements, space environment, and operational scenarios. This direction is flowed down via contractual enforcement to prime contractors and includes both the GMS requirements specified in this plan and the NASASTD- 7009 derived requirements necessary for compliance. Grounding principles for management of Gateway Models and Simulations (M&S) are derived from the Columbia Accident Investigation Board (CAIB) report and the Diaz team report, “A Renewed Commitment to Excellence.” As an outcome of these reports, and in response to Action 4 of the Diaz team report, the NASA Standard for Models and Simulations, NASA-STD-7009 was developed. The standard establishes M&S requirements for development and use activities to ensure proper capture and communication of M&S pedigree and credibility information to Gateway program decision makers. Through the course of the Gateway program life cycle M&S will be heavily relied upon to conduct analysis, test products, support operations activities, enable informed decision making and ultimately to certify the Gateway with an acceptable level of risk to crew and mission. To reduce risk associated with M&S influenced decisions, this plan applies the NASA-STD-7009 requirements to produce the artifacts that support credibility assessments and ensure the information is communicated to program management.

NASA-STD-7009↗

The Pulse Width Modulator ASIC for Deep Space Missions

The Jet Propulsion Laboratory has started the development of a Pulse Width Modulator Application Specific Integrated Circuit (PWMA). This development is leveraging the previous development of the Switch Control ASIC (SCA). The purpose of the development is to provide the control for a selected range of power converter topologies and to meet the stringent environmental requirements of deep space missions. The PWMA will include several power control functions that are not normally included on the off-the-shelf components available today. One key functional requirement is the ability to implement an N + K redundant power converter with the ability to control the charging of a battery. Other applications will be the typical point of load isolated and non-isolated power converters. The purpose the development is not only to provide a much needed flight part, but also to accelerate the engineering process by using a standard cell library from previous ASIC developments. Under previous developments with Boeing and Lockheed Martin, JPL has produced three ASICs. Each ASIC has been implemented by using an analog standard cell library. One such development was the SCA, which is design to provide a floating power switch control. The functional verification of this ASIC has been completed and the cells used have been targeted for the new development of the PWMA. The primary function of the PWMA is to provide the control function of a point of load power converter. The design is an isolated 60 W converter with a 33 V output. In architecting the design, several functions were left up to the power converter design in order to make the ASIC more generic. The ASIC can be used for several power converter topologies and power levels. Some additional features have been added to the ASIC to provide the interfaces for multi-phase topologies and battery control functions. An N+K fault tolerant strategy has been implemented in order to provide the battery control functions. The PWMA has been developed to provide an ASIC with several functions not normally available in the off the shelf controllers. These functions have been added to enable the power converter designers to achieve fault tolerant designs and battery control functions.

Pulse Width Modulator Application Specific Integra↗

The NASA Radiation Hardness Assurance (RHA) Process Standard

This paper presents status on the upcoming NASA Agency-level RHA Process Standard. Based on recommendations provided by the NASA Engineering and Safety Center (NESC), the NASA Electronic Parts and Packaging (NEPP) Program has led development of an agency-level standard for space flight avionics and electronics RHA. The standard introduces a novel RHA taxonomy and prescribes the process required by NASA programs and projects to baseline their RHA programs consistent with the MEAL (Mission, Environment, Application, and Lifetime) criteria including the risk tolerance posture. The standard also provides requirements for the RHA schedule integration in the program or project lifecycle and requirements for data deliverables content. Additional non-prescriptive technical content is provided in the standard appendices to guide development of RHA programs for NASA missions.

Avionics↗

Defining the Core Archive Data Standards of the International Planetary Data Alliance (IPDA)

A goal of the International Planetary Data Alliance (lPDA) is to develop a set of archive data standards that enable the sharing of scientific data across international agencies and missions. To help achieve this goal, the IPDA steering committee initiated a six month proj ect to write requirements for and draft an information model based on the Planetary Data System (PDS) archive data standards. The project had a special emphasis on data formats. A set of use case scenarios were first developed from which a set of requirements were derived for the IPDA archive data standards. The special emphasis on data formats was addressed by identifying data formats that have been used by PDS nodes and other agencies in the creation of successful data sets for the Planetary Data System (PDS). The dependency of the IPDA information model on the PDS archive standards required the compilation of a formal specification of the archive standards currently in use by the PDS. An ontology modelling tool was chosen to capture the information model from various sources including the Planetary Science Data Dictionary [I] and the PDS Standards Reference [2]. Exports of the modelling information from the tool database were used to produce the information model document using an object-oriented notation for presenting the model. The tool exports can also be used for software development and are directly accessible by semantic web applications.

ontology↗

Advanced automation for in-space vehicle processing

The primary objective of this 3-year planned study is to assure that the fully evolved Space Station Freedom (SSF) can support automated processing of exploratory mission vehicles. Current study assessments show that required extravehicular activity (EVA) and to some extent intravehicular activity (IVA) manpower requirements for required processing tasks far exceeds the available manpower. Furthermore, many processing tasks are either hazardous operations or they exceed EVA capability. Thus, automation is essential for SSF transportation node functionality. Here, advanced automation represents the replacement of human performed tasks beyond the planned baseline automated tasks. Both physical tasks such as manipulation, assembly and actuation, and cognitive tasks such as visual inspection, monitoring and diagnosis, and task planning are considered. During this first year of activity both the Phobos/Gateway Mars Expedition and Lunar Evolution missions proposed by the Office of Exploration have been evaluated. A methodology for choosing optimal tasks to be automated has been developed. Processing tasks for both missions have been ranked on the basis of automation potential. The underlying concept in evaluating and describing processing tasks has been the use of a common set of 'Primitive' task descriptions. Primitive or standard tasks have been developed both for manual or crew processing and automated machine processing.

Sklar, Michael↗

Progress of the NASA/USGS Lunar Regolith Simulant Project

Beginning in 2004 personnel at MSFC began serious efforts to develop a new generation of lunar simulants. The first two products were a replication of the previous JSC-1 simulant under a contract to Orbitec and a major workshop in 2005 on future simulant development. Beginning in 2006 the project refocused its efforts and approached simulant development in a new and more comprehensive manner, examining new approaches in simulant development and ways to more accurately compare simulants to actual lunar materials. This led to a multi-year effort with five major tasks running in parallel. The five tasks are Requirements, Lunar Analysis, Process Development, Feed Stocks, and Standards. Major progress has been made in all five areas. A substantial draft of a formal requirements document now exists and has been largely stable since 2007. It does evolve as specific details of the standards and Lunar Analysis efforts proceed. Lunar Analysis has turned out to be vastly more difficult than anticipated. After great effort to mine existing published and gray literature, the team has realized the necessity of making new measurements of the Apollo samples, an effort that is currently in progress. Process development is substantially ahead of expectations in 2006. It is now practical to synthesize glasses of appropriate composition and purity. It is also possible to make agglutinate particles in significant quantities. A series of minerals commonly found on the Moon has been synthesized. Separation of mineral constituents from starting rock material is also proceeding. Customized grinding and mixing processes have been developed and tested are now being documented. Identification and development of appropriate feedstocks has been both easier and more difficult than anticipated. The Stillwater Mining Company, operating in the Stillwater layered mafic intrusive complex of Montana, has been an amazing resource for the project, but finding adequate sources for some of the components remains a difficult problem. For example the ratio of clino- to ortho-pyroxenes in the Stillwater is not an exact match for lunar materials. One of the sources being examined as an alternative pyroxene source is the Bushveld Complex in South Africa. Standards have been a major success for the project. The Figure of Merit algorithms have been created, tested, and are being considered for an ISO standard. Agreement has been reached in the community about how to make many of the critical measurements. There remains much work to do: (1) driving down the cost of simulants remains a major obstacle; (2) documentation and cost data analysis have not kept up with progress; (3) educating users in the complexity of the lunar regolith and the use of simulants remains a major task. In summary the project has made enormous progress and is successfully placing simulant development and use on a rigorous, scientifically defensible, engineering basis.

Rickman, Doug↗

Quantitative approaches for including equity in risk and resilience infrastructure planning analyses

Risk and resilience assessments for critical infrastructure focus on myriad objectives, from natural hazard evaluations to optimizing investments. Although research has started to characterize externalities associated with current or possible future states, incorporation of equity priorities at project inception is increasingly being recognized as critical for planning related activities. However, there is no standard methodology that guides development of equity-informed quantitative approaches for infrastructure planning activities. Here, to address this gap, we introduce a logic model that can be tailored to capture nuances about specific geographies and community priorities, effectively incorporating them into different mathematical approaches for quantitative risk assessments. Specifically, the logic model uses a graded, iterative approach to clarify specific equity objectives as well as inform the development of equations being used to support analysis. We demonstrate the utility of this framework using case studies spanning aviation fuel, produced water, and microgrid electricity infrastructures. For each case study, the use of the logic model helps clarify the ways that local priorities and infrastructure needs are used to drive the types of data and quantitative methodologies used in the respective analyses. The explicit consideration of methodological limitations (e.g., data mismatches) and stakeholder engagements serves to increase the transparency of the associated findings as well as effectively integrate community nuances (e.g., ownership of assets) into infrastructure assessments. Such integration will become increasingly important to ensure that planning activities (which occur throughout the lifecycle of the infrastructure projects) lead to long-lasting solutions to meet both energy and sustainable development goals for communities.

community-based↗

MODEST: A Tool for Geodesy and Astronomy

Features of the JPL VLBI modeling and estimation software "MODEST" are reviewed. Its main advantages include thoroughly documented model physics, portability, and detailed error modeling. Two unique models are included: modeling of source structure and modeling of both spatial and temporal correlations in tropospheric delay noise. History of the code parallels the development of the astrometric and geodetic VLBI technique and the software retains many of the models implemented during its advancement. The code has been traceably maintained since the early 1980s, and will continue to be updated with recent IERS standards. Scripts are being developed to facilitate user-friendly data processing in the era of e-VLBI.

Sovers, Ojars J.↗

A Generalized Nuclear Code of Accounts for Cost Estimation Standardization

This is a joint INL-EPRI study. Link to corresponding page at the Electric Power Research Institute (EPRI): https://www.epri.com/research/products/000000003002028937 Recent Advanced Reactor (AR) designs typically offer features and attributes that depart from traditional water-cooled reactors in terms of fuel forms, coolants, structural materials, size, safety margins, and other important design and operational aspects. These departures, relative to the industry experience, will likely present a challenge for potential owner-operators when evaluating one or more AR designs for commercial deployment on a like-for-like basis. This is further exacerbated with new classes of reactors gaining prominence (e.g., microreactors) and new emerging applications (e.g., floating barge reactors or space propulsion reactors). The differences in design-specific technologies are compounded by the differences in approach to cost estimation. The lack of consistency in build up toward cost estimates creates a challenge when comparing competing concepts and evaluating their associated cost drivers. The outcome of a 2019 Scoping Study conducted by the Electric Power Research Institute (EPRI) indicated the need for a cost modeling guide (CMG), which would be underpinned by a technology-neutral and inclusive Generalized Nuclear Code of Accounts (GN-COA). A code of accounts (COA) is a tool by which costs are identified in even more specific categories, providing clarity on what specific costs are included in an estimate. A parallel independent effort was meanwhile taking place at Idaho National Laboratory via funding by the Systems Analysis Integration (SA&I) campaign of the Office of Nuclear Energy under the U.S. Department of Energy (U.S. DOE-NE) to also update the COA structure to enable more flexibility and encompass a wider variety of reactor technologies. After being made aware of these synergistic efforts, the two parties decided to combine efforts and develop a joint new standard format for nuclear cost estimation that builds on previous structures. This document describes the development of this joint GN-COA and provides guidance on the implementation of the tool, which is provided as the associated GN-COA Excel document. The main attributes of this novel COA format are that all items are functionally defined (in order to be technology and application agnostic) and grouped into logical arrangements that facilitate the tabulation of costs for reactor constructions under consideration. The intent is for the GN-COA to form a standard that is endorsed by future vendors and customers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

Development of a Magneto-Resistive Angular Position Sensor for Space Mechanisms

Magnetic microsystems in the form of magneto-resistive (MR) sensors are firmly established in automobiles and industrial applications. They are used to measure travel, angle, electrical current, or magnetic fields. MR technology opens up new sensor possibilities in space applications and can be an enabling technology for optimal performance, high robustness and long lifetime at reasonable costs. In some science missions, the technology is already applied, however, the designs are proprietary and case specific, for instance in case of the angular sensors used for JPL/NASA's Mars rover Curiosity [1]. Since 2013 HTS GmbH and Sensitec GmbH have teamed up to develop and qualify a standardized yet flexible to use MR angular sensor for space mechanisms. Starting with a first assessment study and market survey performed under ESA contract, a very strong industry interest in novel, contactless position measurement means was found. Currently a detailed and comprehensive development program is being performed by HTS and Sensitec. The objective of this program is to advance the sensor design up to Engineering Qualification Model level and to perform qualification testing for a representative space application. The paper briefly reviews the basics of magneto-resistive effects and possible sensor applications and describes the key benefits of MR angular sensors with reference to currently operational industrial and space applications. The key applications and specification are presented and the preliminary baseline mechanical and electrical design will be discussed. An outlook on the upcoming development and test stages as well as the qualification program will be provided.

Hahn, Robert↗

Flight and Direct to Earth/Space Relay Communication System Architecture for GSFC CubeSat Missions

The CubeSat platform is finding increasing use in space science applications due to its low cost and comparative ease of launch. It is becoming a key scientific discovery tool in low Earth orbit (LEO) and beyond, including geosynchronous equatorial orbit (GEO), the Lagrange Points, Lunar missions, and more. The increasing complexity of these missions and their scientific goals must be supported by equal advancements in communications technology. Higher data rates and greater reliability are required every year. However, the reduced Size, Weight, and Power (SWaP) constraints of CubeSat platforms introduce unique challenges in the area of satellite communications. There is currently a lack of communication equipment tailored specifically to the CubeSat platform. This lack of standardized, tested equipment extends development time and reduces mission confidence. Furthermore, missions utilizing the CubeSat platform are often subject to more difficult design constraints. Antenna placement, size, and pointing are often subordinate to the requirements of the payload instruments and mission goals. Traditional link margin estimation techniques are insufficient in these cases, as they emphasize worst case scenarios. In reality the actual link parameters may vary widely even during a single pass. This presents new challenges in predicting communications performance and scheduling ground station contacts, but also new opportunities for improving efficiency. This paper presents the integration, testing, and validation process for a new software defined radio (SDR) designed for the CubeSat platform in conjunction with Vulcan Wireless, Inc. The SDR is planned for use on 5 upcoming CubeSat missions at NASAs Goddard Space Flight Center (GSFC) including a Geosynchronous Transfer Orbit (GTO) mission and it may also serve as a standard and well-tested option for future missions by enabling a standardized, rapid and low cost CubeSat communication system network integration process. Detailed simulations have been developed to estimate the communication performance of these missions, taking the unique antenna placements and attitude behavior of each satellite into account. These simulations allow a much more accurate analysis of the expected link margin, which varies considerably during each pass for the NASA Space Relay (SR) and Direct to Earth (DTE) network. The modelling procedures are outlined, and the results are used to predict communications performance of the missions.

Space Networks↗