Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Minimizing the RMS surface distortions from gravity loadings of the 34-m HA-DEC antenna for deep space missions

The computer analysis of the 34-m HA-DEC antenna by the IDEAS program provided the rms distortions of the surface panels support points for full gravity loadings in the three directions of the basic coordinate system of the computer model. The rms distortions for the gravity vector not in line with any of the three basic directions were solved and contour plotted starting from three surface panels setting declination angle. By inspections of the plots, it was concluded that the setting or rigging angle of -15 degrees declination minimized the rms distortions for sky coverage of plus or minus 22 declination angles to 10 degrees of ground mask.

Katow, S. M.↗

Historical Review of Piloted Simulation at NASA Ames

This paper traces the conception and development of in-flight and ground based simulators at NASA Ames Research Center, starting in 1947 and continuing to the early 1990's. Problems with their development and operation and how limitations were handled are recounted. Advances needed in simulator equipment to improve performance and fidelity to gain pilot acceptance are discussed. The uses of these simulators in various aircraft research and development programs and their importance to aircraft design and flight testing are reviewed. Challenges remaining include a better understanding of the tradeoff between motion cues and visual cues, the importance of simulation sophistication when examining aircraft with marginal handling qualities characteristics, and the continuing need for upgrading simulation technology as more complex problems are encountered. Additional research is needed to understand the human behavior aspect in the pilot/simulator system.

Anderson, Seth B.↗

Dynamic Flow Management Problems in Air Transportation

In 1995, over six hundred thousand licensed pilots flew nearly thirty-five million flights into over eighteen thousand U.S. airports, logging more than 519 billion passenger miles. Since demand for air travel has increased by more than 50% in the last decade while capacity has stagnated, congestion is a problem of undeniable practical significance. In this thesis, we will develop optimization techniques that reduce the impact of congestion on the national airspace. We start by determining the optimal release times for flights into the airspace and the optimal speed adjustment while airborne taking into account the capacitated airspace. This is called the Air Traffic Flow Management Problem (TFMP). We address the complexity, showing that it is NP-hard. We build an integer programming formulation that is quite strong as some of the proposed inequalities are facet defining for the convex hull of solutions. For practical problems, the solutions of the LP relaxation of the TFMP are very often integral. In essence, we reduce the problem to efficiently solving large scale linear programming problems. Thus, the computation times are reasonably small for large scale, practical problems involving thousands of flights. Next, we address the problem of determining how to reroute aircraft in the airspace system when faced with dynamically changing weather conditions. This is called the Air Traffic Flow Management Rerouting Problem (TFMRP) We present an integrated mathematical programming approach for the TFMRP, which utilizes several methodologies, in order to minimize delay costs. In order to address the high dimensionality, we present an aggregate model, in which we formulate the TFMRP as a multicommodity, integer, dynamic network flow problem with certain side constraints. Using Lagrangian relaxation, we generate aggregate flows that are decomposed into a collection of flight paths using a randomized rounding heuristic. This collection of paths is used in a packing integer programming formulation, the solution of which generates feasible and near-optimal routes for individual flights. The algorithm, termed the Lagrangian Generation Algorithm, is used to solve practical problems in the southwestern portion of United States in which the solutions are within 1% of the corresponding lower bounds.

Patterson, Sarah Stock↗

System Accommodation of Propylene Loop Heat Pipes For The Geoscience Laser Altimeter System (GLAS) Instrument

Loop Heat Pipes (LHP) are used for precise temperature control for NASA Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) Instrument in a widely varying LEO thermal environment. Two propylene LHPs are utilized to provide separate thermal control for the Nd:YAG Lasers and the remaining avionics/detector components suite. Despite a rigorous engineering development and test plan to demonstrate the performance in the restrictive GLAS design, the flight units failed initial thermal vacuum acceptance testing at GSFC. Subsequent investigation revealed that compromises in the mechanical packaging of these systems resulted in inadequate charge levels for a concentric wick LHP. The redesign effort included larger compensation chambers that provide more fluid to the wick for start-up scenarios and highlighted the need to fully understand the limitations and accommodation requirements of new technologies in a system design application. Once again, seemingly minor departures from heritage configurations and limited resources led to performance and operational issues. This paper provides details into the GLAS LHP engineering development program and acceptance testing of the flight units, including the redesign effort.

Grob, Eric W.↗

Long Term Damage Testing (NREL)

DOE's Regional Test Center program has fielded several strings of PV modules as part of their Long Term Testing program. Some of these modules have been installed since 2016 and have been exposed to severe weather events. A key to developing long lifespans for PV modules (in excess of 30 years) is understanding how damage and defects develop, propagate and progress. Researchers at the NREL Regional Test Center have started developing testing procedures and analysis tools in order to characterize modules in a controlled manner with the goal of understanding how damage spreads under normal operations. Characterization methods include EL and IR imaging, outdoor and indoor IV curves, and long term exposure monitoring. Modules to be evaluated will be chosen based on severity of defect, ability to track changes in defect and space requirements. The samples will be loaded at maximum power using grid-tied inverters or other means. Gathering and reporting on this data may help engineers and scientists design for damage and improve long-term performance.

crack damage↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Training Software in Artificial-Intelligence Computing Techniques

The Artificial Intelligence (AI) Toolkit is a computer program for training scientists, engineers, and university students in three soft-computing techniques (fuzzy logic, neural networks, and genetic algorithms) used in artificial-intelligence applications. The program promotes an easily understandable tutorial interface, including an interactive graphical component through which the user can gain hands-on experience in soft-computing techniques applied to realistic example problems. The tutorial provides step-by-step instructions on the workings of soft-computing technology, whereas the hands-on examples allow interaction and reinforcement of the techniques explained throughout the tutorial. In the fuzzy-logic example, a user can interact with a robot and an obstacle course to verify how fuzzy logic is used to command a rover traverse from an arbitrary start to the goal location. For the genetic algorithm example, the problem is to determine the minimum-length path for visiting a user-chosen set of planets in the solar system. For the neural-network example, the problem is to decide, on the basis of input data on physical characteristics, whether a person is a man, woman, or child. The AI Toolkit is compatible with the Windows 95,98, ME, NT 4.0, 2000, and XP operating systems. A computer having a processor speed of at least 300 MHz, and random-access memory of at least 56MB is recommended for optimal performance. The program can be run on a slower computer having less memory, but some functions may not be executed properly.

Howard, Ayanna↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Inexact convex relaxations for AC optimal power flow: Towards AC feasibility

Convex relaxations of AC optimal power flow (AC-OPF) problems have attracted significant interest as in several instances they provably yield the global optimum to the original non-convex problem. If, however, the relaxation is inexact, the obtained solution is not AC-feasible. The quality of the obtained solution is essential for several practical applications of AC-OPF, but detailed analyses are lacking in existing literature. Here, this paper aims to cover this gap. We provide an in-depth investigation of the solution characteristics when convex relaxations are inexact, we assess the most promising AC feasibility recovery methods for large-scale systems, and we propose two new metrics that lead to a better understanding of the quality of the identified solutions. We perform a comprehensive assessment on 96 different test cases, ranging from 14 to 3120 buses, and we show the following: (i) Despite an optimality gap of less than 1%, several test cases still exhibit substantial distances to both AC feasibility and local optimality and the newly proposed metrics characterize these deviations. (ii) Penalization methods fail to recover an AC-feasible solution in 15 out of 45 test cases. (iii) The computational benefits of warm-starting non-convex solvers have significant variation, but a computational speedup exists in over 75% of cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Security & International Studies (Q1 FY2021 Newsletter)

Happy New Year to everyone. Activity in the office continues to be at a high pace with the addition of the Strategic Analyses and Assessments (SAA) Office from ALDX, and the Mission Integration (MI) Office (formerly known as Nuclear and Military [NMA] Office) from DDW. We are working closely to optimize the impact of our combined offices. In this issue of our newsletter, we will highlight programs from the SAA Office portfolio, delve into our interactions with the Project on Nuclear Issues (PONI) program from CSIS, introduce you to new staff in NSIS and review a new joint postdoc program with the UC Institute on Global Conflict and Cooperation and the Center for Global Security Research at LLNL. I also encourage you to take a look at the new NSIS website for more information on the office. Finally, the NSIS office will soon be kicking off a webinar series on starting with topics of interest to the Director’s Strategic Resilience Initiative and will grow beyond that. Stay tuned for more information. --John Scott, Acting Office Director, NSIS

99 GENERAL AND MISCELLANEOUS↗

The tribology of PS212 coatings and PM212 composites for the lubrication of titanium 6Al-4V components of a Stirling engine space power system

The Stirling space power machine incorporates a linear alternator to generate electrical power. The alternator is a reciprocating device that is driven by a solar or nuclear-powered Stirling engine. The power piston and cylinder are made of titanium 6Al-4V (Ti6-4) alloy, and are designed to be lubricated by a hydrodynamically-generated gas film. Rubbing occurs during starts and stops and there is the possibility of an occasional high speed rub. Since titanium is known to have a severe galling tendency in sliding contacts, a 'back-up', self-lubricating coating on the cylinder and/or the piston is needed. This report describes the results of a research program to study the lubrication of Ti6-4 with the following chromium carbide based materials: plasma-sprayed PS212 coatings and sintered PM212 counterfaces. Program objectives are to achieve adherent coatings on Ti6-4 and to measure the friction and wear characteristics of the following sliding combinations under conditions simulative of the Stirling-driven space power linear alternator: Ti6-4/Ti6-4 baseline, Ti6-4/PS212-coated Ti6-4, and PS212-coated Ti6-4/PM212.

Sliney, Harold E.↗

Improving The Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

Piland, William M.↗

Complementarity of NGST, ALMA, and Far IR Space Observatories

The Next Generation Space Telescope (NGST) and the Atacama Large Millimeter Array (ALMA) will both start operations long before a new far IR observatory to follow SIRTF into space can be launched. What will be unknown even after they are operational, and what will a far IR space observatory be able to add? I will compare the telescope design concepts and capabilities and the advertised scientific programs for the projects and attempt to forecast the research topics that will be at the forefront in 2010.

Mather, John C.↗

Space Shuttle 750 psi Helium Regulator Application on Mars Science Laboratory Propulsion

The Mars Science Laboratory (MSL) is NASA's next major mission to Mars, to be launched in September 2009. It is a nuclear powered rover designed for a long duration mission, with an extensive suite of science instruments. The descent and landing uses a unique 'skycrane' concept, where a rocket-powered descent stage decelerates the vehicle, hovers over the ground, lowers the rover to the ground on a bridle, then flies a safe distance away for disposal. This descent stage uses a regulated hydrazine propulsion system. Performance requirements for the pressure regulator were very demanding, with a wide range of flow rates and tight regulated pressure band. These indicated that a piloted regulator would be needed, which are notoriously complex, and time available for development was short. Coincidentally, it was found that the helium regulator used in the Space Shuttle Orbiter main propulsion system came very close to meeting MSL requirements. However, the type was out of production, and fabricating new units would incur long lead times and technical risk. Therefore, the Space Shuttle program graciously furnished three units for use by MSL. Minor modifications were made, and the units were carefully tuned to MSL requirements. Some of the personnel involved had built and tested the original shuttle units. Delta qualification for MSL application was successfully conducted on one of the units. A pyrovalve slam start and shock test was conducted. Dynamic performance analyses for the new application were conducted, using sophisticated tools developed for Shuttle. Because the MSL regulator is a refurbished Shuttle flight regulator, it will be the only part of MSL which has physically already been in space.

Mizukami, Masashi↗

Stirling Convertor Controller Development at NASA Glenn Research Center

Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of Radioisotope Power Systems (RPS). NASA desires higher conversion efficiency RPS options that are reliable and robust with long life design. Dynamic conversion, such as Stirling and Brayton, offer the potential for higher conversion efficiencies but have yet to be demonstrated in a flight application. The RPS program sent out a solicitation to investigate options for dynamic conversion technologies. As a result of this solicitation, four dynamic power convertor (DPC) technologies were selected for design and fabrication of a prototype dynamic convertor. One lesson learned from the Advanced Stirling Radioisotope Generator (ASRG) project is that controller development should start early in the development of a dynamic convertor. As a result of this, NASA GRC has been utilizing hardware from past Stirling convertor projects including that of the ASRG to support controller development for the DPC's. NASA GRC has developed a strong knowledge base on both analog and digital Stirling dynamic power convertor controllers and will continue to expand and apply that knowledge to the four DPC's. Over the past 15 years, controllers were developed in-house at GRC, at Lockheed Martin Coherent Technologies (LMCT) and by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL). Various generations of the controllers, have been developed as lessons were learned through various component and system level tests. Some of the tests performed were fault tolerance, qualification vibration level, electromagnetic interference, Radioisotope Power System Systems Integration (RSIL) tests, and extended operation. The fault tolerance test characterized the controller's ability to handle various fault conditions, including high or low bus power consumptions, total open load or short circuit, and replacing a failed controller card while the backup maintains control of the ASC. The vibration test confirms the controller's ability to control an ASC during launch. The EMI test characterized the AC and DC magnetic and electric fields emitted by the single ASC and if the controller has an impact on the radiated EMI. RSIL testing provided insight into the electrical interactions between the representative RPS, its associated control schemes, and realistic electric system loads. The extended operation test allows data to be collected over a period of thousands of hours to obtain long term performance data of the system. This paper describes the history of controller development at NASA GRC, tests performed on these controllers, and lessons learned.

Dugala, Gina M.↗

Space Launch System and Missions to Near Rectilinear Halo Orbits

The first major evolution of NASA’s Space Launch System (SLS) will begin its flights starting in the mid-2020’s. This new configuration, called Block 1B, replaces the Interim Cryogenic Propulsion Stage with a larger Exploration Upper Stage (EUS). The additional capability provided by the new upper stage will allow SLS to send heavier payloads into deep space. One destination of interest to the SLS program is called a Near Rectilinear Halo Orbit (NRHO). This is a type of lunar orbit with multiple advantages for deep space exploration. These benefits include Earth/lunar access, low station-keeping requirements, and high communication potential with Earth. Therefore, it is a leading candidate for the proposed Lunar Orbital Platform-Gateway (LOP-G). This paper will provide a detailed assessment of the SLS Block 1B requirements and capabilities for sending payloads to an NRHO. Analysts at Marshall Space Flight Center are producing a multi-year mission availability scan for the SLS Block 1B configuration to a predefined NRHO orbit. The analysis produces an optimized trajectory for each day of the scan window. A maximized payload and minimized propellant requirement are determined for each day. All maneuvers from launch to the end of the Trans-Lunar-Injection (TLI) are being modeled as finite burns. Injections into an NRHO are being modeled as impulsive maneuvers. The payload element is arbitrary, but includes sufficient mass to represent a large habitat or propulsion module. The resulting parameters of payload capability, delta-v requirements, and launch windows length vary over the course of the scan. Many launch days in the scan are eliminated in post-processing as they violate mission constraints such as payload mass and propellant usage to insert into an NRHO. Based off previous one-year scan results for the SLS Block 1B Design Analysis Cycle 2 (DAC-2), it is expected that there will be one to three days per week where the payload is able to insert into an NRHO within SLS constraints objectives. This scan provides results for longer than one-year, allowing analysts to better understand the launch availability and energy requirements of SLS Block 1B over time. The in-space mission design and scans utilize Copernicus, an n-body trajectory optimization tool originally developed out of the University of Texas at Austin with further development at Johnson Space Center in Houston, TX. To seed the in-space trajectory, Copernicus uses a plugin to call a database of SLS ascent trajectories optimized in the Program to Simulate Optimized Trajectories II (POST2). The ascent trajectories are developed using a framework that parametrizes payload mass and LEO inclination, and targets a 100 nmi (nautical mile) altitude circular parking orbit. Though this analysis is specific to the SLS program, it will provide a summary of mission design benefits and constraints associated with generic NRHO access, and may be applied to other programs or concepts that will utilize this orbit.

Statham, T. L.↗

Engineering Design Study of Laser Power Beaming for Applications on the Moon

Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanent-ly-shadowed regions (PSR) where solar power is not available, however detailed engineering design studies of the spacecraft for such applications has not previously been undertaken. In this work, we did an engineering design study of two applications of laser power beaming for near-term lunar ap-plications. In the first application studied, an application was studied to provide power during the lunar night for a global network of small landers spread across the lunar surface, at latitudes ranging from equatorial to near polar landing sites. We analyze a proposal to power such small landers from orbit, using a laser to beam power from an orbital power station to photovoltaic arrays on the landers that are tuned to the laser wavelength. A commercially-available high-power 1.07-µ diode-pumped fiber laser was chosen as the source. To minimize beam spread of the a spot at the required distance, a 1.5 meter optical element was provided, using a design based on the Kepler telescope. To provide power to landers at any location, three orbital stations (“beamcraft) are required, each carrying a 3-kW laser. (If the surface science platforms requiring power are only in polar locations, or converse-ly, only in near equatorial locations, only one orbital platform is needed.) The approach is seen to be feasible, and a systems analysis was completed, the concept of operations for the system out-lined and a design for the beamcraft put together. The second design study looked at surface-to-surface power beaming using the VSAT as the la-ser platform, for an application to provide power to the interior of a permanently shadowed lunar crater from a surface platform. To maximize the distance of beaming, taking into account possible surface irregularities and the short distance to the horizon of the moon, it is desirable to emplace the laser at an elevation above the surface. The Vertical Solar Array Technology (VSAT) is a NASA program developing a solar array mounted vertically on a 10-m tall mast, designed for emplacement on a Commercial Lunar Payload Services (CLPS) lander to provide 10-kW (BOL) power near the south polar region of the moon, with a target readiness date of 2028. We used this design as the starting platform and the power source for a laser power beaming station. By mounting the laser beam director at the top of the solar array mast, a viewing distance to power receivers up to 10 km is possible. Requirements for the system were to be able to provide 300 W of continuous usable power to users including CLPS landers, VIPER class rovers, or the proposed Lunar Terrain Vehicle. The specified requirement was to be able to transmit power to a distance of up to 10 km, over a design lifetime of 5 years, and fitting within a total system landed mass under 625 kg. Again, a 1.07-µ fiber laser is mounted on the deck of the lander, with laser output sent to the laser beam director by a fiber-optic cable. A 7 square meter deployable radiator keeps the laser within operating temperature limits. The beam director is based on the design of a prototype unit developed by the University of California Santa Barbara. The system beams power for 57% of the time, with 44% of the time idle (accounting for the time when the VSAT array is itself in shadow). 1595 Watts of optical power are output in the beam. Accounting for receiver efficiency and beam losses, this results in an output onto the 1.5-meter receiving photovoltaic array of 542 watts. Of this, 300 watts is directly available to the user, while 242 watts is directed to the batteries for use while the beam is not available.

laser power↗

Serpent transient analyses of GIACINT geometrical change experiments

This paper simulates seven transient experiments with geometrical movements performed at the GIACINT facility of Belarus. These experiments include three slow control rods insertion in more than 25 s, one fast control rod insertion in less than 1 s, and three water moderator draining transients. In the fast control rod insertion experiment, the control rods are first pushed by a mechanical spring and then let fall by gravity in the assembly. In this experiment, the control rods speed varies because of the initial spring force, the gravitational acceleration, and the water buoyancy force. In all other transient experiments, the geometry change occurs with a constant speed. The Serpent computer program was utilized to simulate these transient experiments with geometrical changes by performing two separate computations. One time-independent computation is performed in criticality mode and the other time-dependent computation is performed in dynamic-source mode. The first computation writes the neutron population and delayed neutron precursors for starting the transient simulation. The second computation divides the transient time into several time bins, reads the two files from the first computation, and updates them at the end of each time bin. The Serpent simulation results obtained for this set of experiments are in good agreement with the time dependent experimental measurements. In addition, Serpent and MCNP simulations results show an excellent agreement for the water moderator transient

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗