Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

EDOS Evolution to Support NASA Future Earth Sciences Missions

This paper presents a ground system architecture to service future NASA decadal missions and in particular, the high rate science data downlinks, by evolving EDOS current infrastructure and upgrading high rate network lines. The paper will also cover EDOS participation to date in formulation and operations concepts for the respective missions to understand the particular mission needs and derived requirements such as data volumes, downlink rates, data encoding, and data latencies. Future decadal requirements such as onboard data recorder management and file protocols drive the need to emulate these requirements within the ground system. The EDOS open system modular architecture is scalable to accommodate additional missions using the current sites antennas and future sites as well and meet the data security requirements and fulfill mission's objectives

Cordier, Guy R.↗

FJET Database Project: Extract, Transform, and Load

The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

excel vba↗

Increasing Diversity on Spacecraft Mission Teams Reduces Risk

Many of the NASA spacecraft sent into Earth orbit and throughout the Solar System are competitively selected and led by principal investigators (PIs). These senior scientists are responsible for directing research activities, managing the use of funds, and reporting to the funding agency. Additionally, the European Space Agency (ESA) has competitively selected missions that are led by ESA-nominated project scientists and include instruments that are overseen by PIs. Usually, the PIs and project scientists form a science working team that provides scientific leadership of the mission. These NASA and ESA PI roles require a deep understanding of the mission’s scientific goals and engineering design aspects. And, importantly, these roles also require skills in team management.

Kathleen E. Mandt↗

Manual control models of industrial management

The industrial engineer is often required to design and implement control systems and organization for manufacturing and service facilities, to optimize quality, delivery, and yield, and minimize cost. Despite progress in computer science most such systems still employ human operators and managers as real-time control elements. Manual control theory should therefore be applicable to at least some aspects of industrial system design and operations. Formulation of adequate model structures is an essential prerequisite to progress in this area; since real-world production systems invariably include multilevel and multiloop control, and are implemented by timeshared human effort. A modular structure incorporating certain new types of functional element, has been developed. This forms the basis for analysis of an industrial process operation. In this case it appears that managerial controllers operate in a discrete predictive mode based on fast time modelling, with sampling interval related to plant dynamics. Successive aggregation causes reduced response bandwidth and hence increased sampling interval as a function of level.

Crossman, E. R. F. W.↗

Towards Requirements in Systems Engineering for Aerospace IVHM Design

Health management (HM) technologies have been employed for safety critical system for decades, but a coherent systematic process to integrate HM into the system design is not yet clear. Consequently, in most cases, health management resorts to be an after-thought or 'band-aid' solution. Moreover, limited guidance exists for carrying out systems engineering (SE) on the subject of writing requirements for designs with integrated vehicle health management (IVHM). It is well accepted that requirements are key to developing a successful IVHM system right from the concept stage to development, verification, utilization, and support. However, writing requirements for systems with IVHM capability have unique challenges that require the designers to look beyond their own domains and consider the constraints and specifications of other interlinked systems. In this paper we look at various stages in the SE process and identify activities specific to IVHM design and development. More importantly, several relevant questions are posed that system engineers must address at various design and development stages. Addressing these questions should provide some guidance to systems engineers towards writing IVHM related requirements to ensure that appropriate IVHM functions are built into the system design.

Requirements↗

Federal Government Energy Management and Conservation Programs (Fiscal Year 2008)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2010)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2011)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2012)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2013)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Government Energy Management and Conservation Programs (Fiscal Year 2009)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Platform Management System (PMS) evolution

In fiscal year 1988 a study was begun to define the platform management system (PMS) functions required for the mature platform operations era. The objectives of the task include: (1) defining how to increase the operational productivity of the platform by providing enhanced capability for responding to changing events, (2) influencing the initial PMS design by identifying required 'hooks and scars', and (3) evaluation potential automation techniques that are appropriate given predicted onboard computing resources. Initial platform operations scenarios were defined. The focus was on PMS-related functions where operations enhancements are likely to occur. Operations productivity was defined in terms of scientific productivity of the platform as well as the level of automation of the ground system. The Platform Operations Productivity Enhancement Report was completed earlier this year documenting system enhancements to increase science productivity and ground system automation. Using the baseline PMS defined in the PMS Definition Document as a starting point, the resulting PMS-specific enhancements were molded into a sequence of progressively more sophisticated operations management capabilities. This sequence of upgrades to the PMS has been documented in a PMS Evolution Plan. The plan includes enhancements in the areas of resources scheduling, resource modeling, system and payload anomaly management, and transaction sequence interpretation. A plan for migration of functions from the ground portion of the PMS to the flight portion is also included. The impacts of this plan on the platform are now being documented to ensure that the required 'hooks and scars' are included in the baseline system. Future plans include a prototype of some of the PMS enhancements to address the feasibility of and techniques for implementing these enhancements in the onboard computing environment.

Tilley, Mike↗

Space Mission Utility and Requirements for a Heat Melt Compactor

Management of waste on long-duration space missions is both a problem and an opportunity. Uncontained or unprocessed waste is a crew health hazard and a habitat storage problem. A Heat Melt Compactor (HMC) such as NASA has been developing is capable of processing space mission trash and converting it to useful products. The HMC is intended to process space mission trash to achieve a number of objectives including: volume reduction, biological safening and stabilization, water recovery, radiation shielding, and planetary protection. This paper explores the utility of the HMC to future space missions and how this translates into HMC system requirements.

waste utilization↗

Accelerator Neutrinos

Neutrino beams from particle accelerators are vital for probing fundamental physics, enabling experiments like DUNE and NOvA to study neutrino oscillations and CP violation. These experiments push proton beam power to multi-MW levels and require precise beam instrumentation to manage flux and enhance precision. This talk will explore advancements in neutrino beam technology, highlighting the challenges and future prospects of high-intensity, well-collimated beams for next-generation accelerator facilities. Neutrino beams from particle accelerators are vital for probing fundamental physics, enabling experiments like DUNE and NOvA to study neutrino oscillations and CP violation. These experiments push proton beam power to multi-MW levels and require precise beam instrumentation to manage flux and enhance precision. This talk will explore advancements in neutrino beam technology, highlighting the challenges and future prospects of high-intensity, well-collimated beams for next-generation accelerator facilities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗

Natural language processing and advanced information management

Integrating diverse information sources and application software in a principled and general manner will require a very capable advanced information management (AIM) system. In particular, such a system will need a comprehensive addressing scheme to locate the material in its docuverse. It will also need a natural language processing (NLP) system of great sophistication. It seems that the NLP system must serve three functions. First, it provides an natural language interface (NLI) for the users. Second, it serves as the core component that understands and makes use of the real-world interpretations (RWIs) contained in the docuverse. Third, it enables the reasoning specialists (RSs) to arrive at conclusions that can be transformed into procedures that will satisfy the users' requests. The best candidate for an intelligent agent that can satisfactorily make use of RSs and transform documents (TDs) appears to be an object oriented data base (OODB). OODBs have, apparently, an inherent capacity to use the large numbers of RSs and TDs that will be required by an AIM system and an inherent capacity to use them in an effective way.

Hoard, James E.↗

Technology transfer

The requirements for a successful technology transfer program and what such a program would look like are discussed. In particular, the issues associated with technology transfer in general, and within the Jet Propulsion Laboratory (JPL) environment specifically are addressed. The section on background sets the stage, identifies the barriers to successful technology transfer, and suggests actions to address the barriers either generally or specifically. The section on technology transfer presents a process with its supporting management plan that is required to ensure a smooth transfer process. Viewgraphs are also included.

Handley, Thomas↗

A cell-centered AMR-ALE framework for 3D multi-material hydrodynamics. Part I: Lagrangian and indirect Euler AMR algorithms

Many applications of physics and engineering involve wide ranges of time and spatial scales. The numerical simulation of localized small scales such as shock waves and material interfaces requires a large number of computational cells in these regions. For these applications, Lagrangian and Arbitrary-Lagrangian-Eulerian (ALE) related methods are engaging since the moving mesh feature naturally brings mesh cells on shock discontinuities and material interfaces are carefully captured. In addition, Adaptive-Mesh-Refinement (AMR) strategies aim to optimize computational resources by concentrating finer mesh cells only in areas of interest while using coarser cells elsewhere. A key but challenging AMR requirement consists in efficiently distributing the computational effort to achieve high accuracy without the prohibitive computational costs associated with uniformly fine grids. Here, in this document, the coupling of the p4est AMR library with a cell-centered Lagrangian scheme is presented with the goal to perform reliable 3D Lagrangian-AMR and indirect Euler-AMR multi-material simulations. In particular, it is shown that starting from a 3D indirect ALE code, the memory management and load balancing requirements can be delegated to an external library (here the p4est library) to unlock ALE-AMR capabilities. First, we present a strategy to transcribe the octant-based connectivity of the 3D AMR framework with that of an unstructured mesh of polygonal cells used in Lagrangian hydrodynamics. Then, we show how refinement and coarsening operations must be adapted to the particular Lagrangian framework to ensure the conservation of volume during those steps. Finally, several numerical test cases are presented that demonstrate the capabilities of the Lagrangian-AMR and indirect Euler-AMR algorithms.

3D cell-centered Lagrangian numerical scheme↗