Lead Speciation in House Dust from Canadian Urban Homes Using EXAFS, Micro-XRF, and Micro-XRD
Abstract not provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
In 2012, the U.S.Department of Energy (DOE) began reassessing the former Riverton, Wyoming, Processing Site area for potential contaminant sources impacting groundwater. A flood in 2010 along the Little Wind River resulted in increases in groundwater contamination (DOE 2013).This investigation is a small part of continued efforts by DOE and other stakeholders to update human health and ecological risk assessments, to make a comprehensive examination of all exposure pathways to ensure that the site remains protective through established institutional controls. During field inspections at the Riverton Site in 2013, a white evaporitic mineral deposit was identified along the bank of the Little Wind River within the discharge zone of the groundwater contamination plume. In December 2013, Savannah River National Laboratory (SRNL) personnel collected a sample for analysis by X-ray fluorescence (Figure 1 shows the type of material sampled). The sample had a uranium concentration of approximately 64 to 73 parts per million. Although the uranium in this mineral deposit is within the expected range for evaporatic minerals in the western United States (SRNL 2014), DOE determined that additional assessment of the mineral deposit was warranted. In response to the initial collection and analysis of a sample of the mineral deposit, DOE developed a work plan (Work Plan to Sample Mineral Deposits Along the Little Wind River, Riverton, Wyoming, Processing Site [DOE 2014]) to further define the extent of these mineral deposits and the concentration of the associated contaminants (Appendix A). The work plan addressed field reconnaissance, mapping, sampling, and the assessment of risk associated with the mineral deposits adjacent to the Little Wind River.
Techniques and apparatuses are described for a cybersecurity risk management tool to assess cybersecurity risk and prioritize cybersecurity correction plans. The cybersecurity risk management tool categorizes cybersecurity framework security controls into maturity indicator levels, identifies implementation states achieved by an entity with respect to the cybersecurity framework security controls, and determines which of the maturity indicator levels represents the implementation state achieved by the entity with respect to each of the cybersecurity framework security controls. A cost-benefit analysis for modifying from the implementation state achieved by the entity to a next implementation state to be achieved by the entity with respect to the cybersecurity framework security controls is also enabled. The cost-benefit analysis leverages factored weights including aspects indicative of security perspectives, Gaussian distributions, and the maturity indicator levels.
The present volume is a collection of 227 abstracts of radiation research sponsored by the NASA Space Radiation Health Program for the period 1991-1992. Each abstract has been categorized within one of three discipline areas: Physics, Biology and Risk Assessment. Topic areas within each discipline have been assigned as follows: Physics - Atomic Physics, Theory, Cosmic Ray and Astrophysics, Experimental, Environments and Environmental Models, Solar Activity and Prediction, Experiments, Radiation Transport and Shielding, Theory and Model Development, Experimental Studies, and Instrumentation. Biology - Biology, Molecular Biology, Cellular Radiation Biology, Transformation, Mutation, Lethality, Survival, DNA Damage and Repair, Tissue, Organs, and Organisms, In Vivo/In Vitro Systems, Carcinogenesis and Life Shortening, Cataractogenesis, Genetics/Developmental, Radioprotectants, Plants, and Other Effects. Risk Assessment - Risk Assessment, Radiation Health and Epidemiology, Space Flight Radiation Health Physics, Inter- and Intraspecies Extrapolation and Radiation Limits and Standards. Section I contains refereed journals; Section II contains reports/meetings. Keywords and author indices are provided. A collection of abstracts spanning the period 1986-1990 was previously issued as NASA Technical Memorandum 4270.
Regulatory agencies are considering alternative approaches to assessing inhalation toxicity that utilizes in vitro studies with human cells and in silico modeling in lieu of additional animal studies. In support of this goal, computational fluid-particle dynamics models were developed to estimate site-specific deposition of inhaled aerosols containing the fungicide, chlorothalonil, in the rat and human for comparisons to prior rat inhalation studies and new human in vitro studies. Under bioassay conditions, the deposition was predicted to be greatest at the front of the rat nose followed by the anterior transitional epithelium and larynx corresponding to regions most sensitive to local contact irritation and cytotoxicity. For humans, simulations of aerosol deposition covering potential occupational or residential exposures (1–50 µm diameter) were conducted using nasal and oral breathing. Aerosols in the 1–5 µm range readily penetrated the deep region of the human lung following both oral and nasal breathing. Under actual use conditions (aerosol formulations >10 µm), the majority of deposited doses were in the upper conducting airways. Beyond the nose or mouth, the greatest deposition in the pharynx, larynx, trachea, and bronchi was predicted for aerosols in the 10–20 µm size range. Only small amounts of aerosols >20 µm penetrated past the pharyngeal region. Using the ICRP clearance model, local retained tissue dose metrics including maximal concentrations and areas under the curve were calculated for each airway region following repeated occupational exposures. These results are directly comparable with benchmark doses from in vitro toxicity studies in human cells leading to estimated human equivalent concentrations that reduce the reliance on animals for risk assessments.
Human and ecological risk assessments utilize concentration ratios and transfer factors to calculate contaminant concentrations in plant and animal tissues in equilibrium with soil or water (concentration ratios) or based on an animal's contaminant intake from various media (transfer factors). These ratios and factors are used to evaluate human dose via food ingestion pathways and to evaluate ecological dose to an organism. In a probabilistic performance assessment, concentration ratio and transfer factor distributions are developed for every element, and these distributions are applied across the spatial and temporal domain of the assessment. As a result, it is necessary to scale the underlying data distributions by applying the central limit theorem to develop appropriate distributions of the mean for the temporal and spatial scale of the model. Herein we discuss the methodologies for identifying and ranking references, and how to develop statistical distributions of concentration ratios and transfer factors for probabilistic performance assessment models. We also discuss factors that could be pertinent to differences when selecting references and developing distributions for human versus ecological risk assessment scenarios. (authors)
Human reliability analysis (HRA) is a method for evaluating human errors in a variety of complex systems such as nuclear power plants, military systems, aircraft, and chemical plants. Most HRA methods currently used by regulatory institutes or utilities are called static HRA and are carried out by simple worksheets or simple calculators. To date, there are many unsolved or intrinsic challenges in static HRA. For example, existing static HRA does not realistically model and evaluate human actions as they would be performed at actual systems. There is no method with HRA to objectively estimate the time required for human actions despite being essential to HRA processes. In addition, many HRA methods still rely on a dataset generated prior to the 1980s, from unrelated industry experience or simply from expert judgment. Accordingly, this study attempted to research how to overcome the challenges of existing HRA via dynamic risk assessment (a.k.a., simulation-based or computation-based risk assessment) techniques. First, this study developed a dynamic HRA method, named as PRocedure-based Investigation Method of EMRALD Risk Assessment – HRA (PRIMERA-HRA). The PRIMERA-HRA mainly concentrates on providing HRA analysts with specific guidelines on how to reasonably model human actions, assign human reliability data and evaluate output of simulation within a dynamic probabilistic risk assessment tool, called as Event Modeling Risk Assessment using Linked Diagrams (EMRALD). Second, this study also developed a module for performance shaping factors (i.e., the key concept in HRA quantification) applicable to dynamic HRA, then implemented it based on PRIMERA-HRA within the EMRALD tool. Third, this study developed an HRA data collection framework to support dynamic HRA, called as Simplified Human Error Experimental Program (SHEEP). Originally, the SHEEP study aimed to support static HRA and its data collection, but recently extended the scope to the new technologies such as dynamic HRA or HRA for advanced reactors. SHEEP focuses on the use of data collected from simplified simulators to complement—but not replace—data collection studies using full-scope simulators and actual operators. To date, many experiments were conducted under the SHEEP framework. Multiple analyses, such as human performance analysis, human error analysis, task complexity analysis, learning effect analysis and time distribution analysis, were also carried out using the collected data. Then, based on the major insights, an approach to inferring full-scope data based on simplified simulator data was proposed. The PRIMERA-HRA and SHEEP research are expected to evaluate human actions more realistically than existing static HRA, provide an opportunity to collect more HRA data with reasonable cost and labor, then contribute to enhance the quality of HRA.
Human reliability analysis (HRA) is a method for evaluating human errors in a variety of complex systems such as nuclear power plants, military systems, aircraft, and chemical plants. Most HRA methods currently used by regulatory institutes or utilities are called static HRA and are carried out by simple worksheets or simple calculators. To date, there are many unsolved or intrinsic challenges in static HRA. For example, existing static HRA does not realistically model and evaluate human actions as they would be performed at actual systems. There is no method with HRA to objectively estimate the time required for human actions despite being essential to HRA processes. In addition, many HRA methods still rely on a dataset generated prior to the 1980s, from unrelated industry experience or simply from expert judgment. Accordingly, this study attempted to research how to overcome the challenges of existing HRA via dynamic risk assessment (a.k.a., simulation-based or computation-based risk assessment) techniques. First, this study developed a dynamic HRA method, named as PRocedure-based Investigation Method of EMRALD Risk Assessment – HRA (PRIMERA-HRA). The PRIMERA-HRA mainly concentrates on providing HRA analysts with specific guidelines on how to reasonably model human actions, assign human reliability data and evaluate output of simulation within a dynamic probabilistic risk assessment tool, called as Event Modeling Risk Assessment using Linked Diagrams (EMRALD). Second, this study also developed a module for performance shaping factors (i.e., the key concept in HRA quantification) applicable to dynamic HRA, then implemented it based on PRIMERA-HRA within the EMRALD tool. Third, this study developed an HRA data collection framework to support dynamic HRA, called as Simplified Human Error Experimental Program (SHEEP). Originally, the SHEEP study aimed to support static HRA and its data collection, but recently extended the scope to the new technologies such as dynamic HRA or HRA for advanced reactors. SHEEP focuses on the use of data collected from simplified simulators to complement—but not replace—data collection studies using full-scope simulators and actual operators. To date, many experiments were conducted under the SHEEP framework. Multiple analyses, such as human performance analysis, human error analysis, task complexity analysis, learning effect analysis and time distribution analysis, were also carried out using the collected data. Then, based on the major insights, an approach to inferring full-scope data based on simplified simulator data was proposed. The PRIMERA-HRA and SHEEP research are expected to evaluate human actions more realistically than existing static HRA, provide an opportunity to collect more HRA data with reasonable cost and labor, then contribute to enhance the quality of HRA.
Nuclear Energy is one of the most possible alternative to fossil energy in large-scale. Nuclear safety is the lifeline of nuclear energy development, and has been an important part of national security, especially after the accident of Fukushima. On the basis of computer codes, reliability engineering and Probabilistic Risk Assessment (PSA) is effective methods to improve the safety of nuclear power plants. After many years of development, the methodologies, applications and relevant soft programs have been quite sufficient in the area of nuclear safety. However, it is still difficult for the current PSA technologies and software to meet the needs of dealing with the problems of quantitatively public risk assessment in the digital society. Especially, there are so many software that adopted different modeling and analyzing methods, which brings difficulties to the comparison, evaluation or verification for different software and models. By using its own academic advantages, the advanced nuclear energy research team, i.e., FDS Team has invested a few hundreds person-years of independent research and development of a reliability and probabilistic safety assessment software system RiskA. The system consists of three main functions: device reliability optimization management, probabilistic safety assessment and instantaneous risk monitoring, and the comprehensive public risk assessment in digital society. RiskA establishes an integrated risk evaluation system for the device reliability, nuclear power plant (NPP) risk monitoring and public risk assessment. Currently, RiskA has successfully been applied in more than 600 organizations and institutes from a variety of fields in 39 countries, involving nuclear, aerospace, defense and so on. For example, RiskA has been used in the safety analysis of International Thermonuclear Experimental Reactor (ITER), FDS series fusion reactor, and the Strategic Priority Research Program of Chinese Academy of Sciences 'the Future Advanced Nuclear Fission Energy - Accelerator Driven Sub-critical (ADS) transmutation system'. Also, RiskA has been used in public risk communication and risk assessment. Among them, Third Qinshan nuclear power plant Risk Monitor (TQRM), which is the China's first domestic nuclear safety analysis software used in the actual online operation, has been highly apprised by renowned experts in the field. Meanwhile, it has been identified as the first domestic nuclear power plant risk monitoring system with completely independent intellectual property rights, and has reached the international advanced level. (authors)
With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)
The Alternative Fuels Risk Assessment Models (A1tRAM) toolkit combines Quantitative Risk Assessment (QRA) with simulations of unignited dispersion, ignited turbulent diffusion flames, and indoor accumulation with delayed ignition of fuels. The models of the physical phenomena need to be validated for each of the fuels in the toolkit. This report shows the validation for methane which is being used as a surrogate for natural gas. For the unignited dispersion model, seven previously published experiments from credible sources were used to validate. The validation looked at gas concentrations with respect to the distance from the release point. Four of these were underexpanded jets (i.e. release velocity equal to or greater than local speed of sound) and the other three subsonic releases. The methane plume model in AltRAM matched both varieties well, with higher accuracy for the underexpanded releases. For the jet flame model, we compared the heat flux and thermal radiation data reported from five separate turbulent jet flame experiments to the quantities calculated by A1tRAM. Four of the five datasets were for underexpanded diffusion jets flames. While the results still match well enough to give a good estimate of what is occurring, the error is higher than what was seen with the plume model. For the underexpanded flames A1tRAM provided reasonable approximations, which would lead to conservative risk assessments. Some modeling errors can be attributed to environmental effects (i.e. wind) since most large scale flame experiments are conducted outdoors. A1tRAM has been shown to be a reasonably accurate tool for calculating the concentration or flame properties of natural gas releases. Improvements could still be made for the plume of subsonic releases and radiative heat fluxes to reduce the conservative nature of these predictions. These models can provide valuable information for the risk assessment of natural gas infrastructure.
The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. Failure Modes, Effects, and Criticality Analysis (FMECA) is conducted to systematically identify all potential failure modes and their effects on the system, and to analyze the criticality of each risk based on the likelihood of the event and the severity of the impact. Actions may then be recommended to mitigate the criticality of a risk, either by reducing the likelihood of the risk or the severity of its impact. Risk assessment is executed iteratively as an integral part of the design process. By incorporating risk assessment early in the development cycle, mitigation of risk can be achieved cost effectively. The actions recommended to mitigate risk may be subsequently executed, and as the design progresses the risk assessment is reviewed and revised. Review of the risk assessment is integrated into structured design reviews, ensuring that critical risks are comprehended and that the Project will not progress to e.g. fabrication while intolerable risks remain. The risk assessment process results in the population and maintenance of Risk Registers (RRs). Each major system (and as needed, subsystem) will have a distinct RR. This allows each system or subsystem to be assessed individually, rendering the RRs to a manageable size for review.
Global climate change (GCC) is likely to alter the degree of human exposure to pollutants and the response of human populations to these exposures, meaning that risks of pollutants could change in the future. The present study, therefore, explores how GCC might affect the different steps in the pathway from a chemical source in the environment through to impacts on human health and evaluates the implications for existing risk-assessment and management practices. In certain parts of the world, GCC is predicted to increase the level of exposure of many environmental pollutants due to direct and indirect effects on the use patterns and transport and fate of chemicals. Changes in human behavior will also affect how humans come into contact with contaminated air, water, and food. Dietary changes, psychosocial stress, and coexposure to stressors such as high temperatures are likely to increase the vulnerability of humans to chemicals. These changes are likely to have significant implications for current practices for chemical assessment. Assumptions used in current exposure-assessment models may no longer apply, and existing monitoring methods may not be robust enough to detect adverse episodic changes in exposures. Organizations responsible for the assessment and management of health risks of chemicals therefore need to be more proactive and consider the implications of GCC for their procedures and processes.
This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.
The Mission Operations Assurance (MOA) discipline actively participates as a project member to achieve their common objective of full mission success while also providing an independent risk assessment to the Project Manager and Office of Safety and Mission Success staff. The cornerstone element of MOA is the independent assessment of the risks the project faces in executing its mission. Especially as the project approaches critical mission events, it becomes imperative to clearly identify and assess the risks the project faces. Quite often there are competing options for the project to select from in deciding how to execute the event. An example includes choices between proven but aging hardware components and unused but unproven components. Timing of the event with respect to visual or telecommunications visibility can be a consideration in the case of Earth reentry or hazardous maneuver events. It is in such situations that MOA is called upon for a risk balance assessment or risk trade study to support their recommendation to the Project Manager for a specific option to select. In the following paragraphs we consider two such assessments, one for the Stardust capsule Earth return and the other for the choice of telecommunications system configuration for the EPOXI flyby of the comet Hartley 2. We discuss the development of the trade space for each project's scenario and characterize the risks of each possible option. The risk characterization we consider includes a determination of the severity or consequence of each risk if realized and the likelihood of its occurrence. We then examine the assessment process to arrive at a MOA recommendation. Finally we review each flight project's decision process and the outcome of their decisions.
The solar particle event (SPE) of September 29, 1989, produced an iron-rich spectrum with energies approaching 1 GeV/amu with an energy power index of 2.5. These high charge and energy (HZE) ions of the iron-rich SPEs challenge conventional methods of SPE shield design and assessment of astronaut risks. Shield and risk assessments are evaluated using the HZETRN code with computerized anatomical man (CAM) model for astronaut s body tissues. Since the HZE spectra decline rapidly with energy and HZE attenuation in materials is limited by their penetration power, details of the mass distributions about the sensitive tissues (shielding materials and the astronaut's body) are important determining factors of the exposure levels. Typical space suit and lightly shielded structures allow significant contributions from HZE components to some critical body tissues and have important implications on the models for risk assessment. Only a heavily shielded equipment room of a space vehicle or habitat provides sufficient shielding for the early response at sensitive organs from this event. The February 23, 1956 event of similar spectral characteristics and ten times this event may have important medical consequences without a well-shielded region.
The solar-particle event (SPE) of September 29, 1989, produced an iron-rich spectrum with energies approaching 1 A GeV with an approximate spectral slope parameter of 2.5. These high charge and energy (HZE) ions challenge conventional methods of shield design and assessment of astronaut risks. In the past, shield design and risk assessment have relied on proton shielding codes and biological response models derived from X-ray and neutron exposure data. Because the HZE spectra decline rapidly with energy and HZE attenuation in materials is limited by their penetration power, details of the mass distributions about the sensitive tissues (shielding materials and the astronaut's body) are important determining factors of the exposure levels and distributions of linear energy transfer. Local tissue environments during the SPE of September 29, 1989, with its f= components are examined to analyze the importance of these ions to human SPE exposure. Typical space suit and lightly shielded structures leave significant contributions from HZE components to certain critical body tissues and have important implications on the models for risk assessment. A heavily shielded equipment room of a space vehicle or habitat requires knowledge of the breakup of these ions into lighter components, including neutrons, for shield design specifications.
The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.