Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

TANK FARM CLOSURE - A NEW TWIST ON REGULATORY STRATEGIES FOR CLOSURE OF WASTE TANK RESIDUALS FOLLOWING NUREG

Waste from a number of single-shell tanks (SST) at the U.S. Department of Energy's (DOE) Hanford Site has been retrieved by CH2M HILL Hanford Group to fulfill the requirements of the 'Hanford Federal Facility Agreement and Consent Order (HFFACO) [1]. Laboratory analyses of the Hanford tank residual wastes have provided concentration data which will be used to determine waste classification and disposal options for tank residuals. The closure of tank farm facilities remains one of the most challenging activities faced by the DOE. This is due in part to the complicated regulatory structures that have developed. These regulatory structures are different at each of the DOE sites, making it difficult to apply lessons learned from one site to the next. During the past two years with the passage of the Section 3116 of the 'Ronald Reagan Defense Authorization Act of 2005' (NDAA) [2] some standardization has emerged for Savannah River Site and the Idaho National Laboratory tank residuals. Recently, with the issuance of 'NRC Staff Guidance for Activities Related to US. Department of Energy Waste Determinations' (NUREG-1854) [3] more explicit options may be considered for Hanford tank residuals than are presently available under DOE Orders. NUREG-1854, issued in August 2007, contains several key pieces of information that if utilized by the DOE in the tank closure process, could simplify waste classification and streamline the NRC review process by providing information to the NRC in their preferred format. Other provisions of this NUREG allow different methods to be applied in determining when waste retrieval is complete by incorporating actual project costs and health risks into the calculation of 'technically and economically practical'. Additionally, the NUREG requires a strong understanding of the uncertainties of the analyses, which given the desire of some NRC/DOE staff may increase the likelihood of using probabilistic approaches to uncertainty analysis. The purpose of this paper is to discuss implications of NUREG-1854 and to examine the feasibility and potential benefits of applying these provisions to waste determinations and supporting documents such as future performance assessments for tank residuals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty analyses of CO2 plume expansion subsequent to wellbore CO2 leakage into aquifers

In this study, we apply an uncertainty quantification (UQ) framework to CO2 sequestration problems. In one scenario, we look at the risk of wellbore leakage of CO2 into a shallow unconfined aquifer in an urban area; in another scenario, we study the effects of reservoir heterogeneity on CO2 migration. We combine various sampling approaches (quasi-Monte Carlo, probabilistic collocation, and adaptive sampling) in order to reduce the number of forward calculations while trying to fully explore the input parameter space and quantify the input uncertainty. The CO2 migration is simulated using the PNNL-developed simulator STOMP-CO2e (the water-salt-CO2 module). For computationally demanding simulations with 3D heterogeneity fields, we combined the framework with a scalable version module, eSTOMP, as the forward modeling simulator. We built response curves and response surfaces of model outputs with respect to input parameters, to look at the individual and combined effects, and identify and rank the significance of the input parameters.

Carbon sequestration, uncertainty quantification, ↗

Impact of representative ground motion level on seismic PSA with the boundary between overestimation and underestimation

One commonly used approach in seismic probabilistic safety assessment (PSA) is the discrete method. This method follows the standard PSA framework and can be applied to various models, such as multi-unit models, while reducing computational costs using standard software. However, due to the inability to subdivide intervals infinitely, the discrete method approximates with a finite number of subintervals. In practice, different numbers of subintervals are applied, and the representative ground motion level is selected based on expert judgment. When employing a smaller number of subintervals, it is important to take caution to prevent underestimation. This study analyzes the impact of the representative ground motion level on seismic risk. It confirms that underestimation can occur with a small number of subintervals depending on the representative ground motion level. This study also proposes a method for determining the boundary of underestimation and overestimation. The method is demonstrated through examples, providing a mathematical foundation for selecting appropriate representative ground motion levels. By avoiding underestimation, this research helps prevent the oversight of significant risk contributors and enhances the understanding of seismic risk.

99 - GENERAL AND MISCELLANEOUS↗

Advanced probabilistic methods for quantifying the effects of various uncertainties in structural response

The effects of actual variations, also called uncertainties, in geometry and material properties on the structural response of a space shuttle main engine turbopump blade are evaluated. A normal distribution was assumed to represent the uncertainties statistically. Uncertainties were assumed to be totally random, partially correlated, and fully correlated. The magnitude of these uncertainties were represented in terms of mean and variance. Blade responses, recorded in terms of displacements, natural frequencies, and maximum stress, was evaluated and plotted in the form of probabilistic distributions under combined uncertainties. These distributions provide an estimate of the range of magnitudes of the response and probability of occurrence of a given response. Most importantly, these distributions provide the information needed to estimate quantitatively the risk in a structural design.

Nagpal, Vinod K.↗

Data & model conditioning for multivariate systematic uncertainty in model calibration, validation, and extrapolation.

This paper discusses implications and appropriate treatment of systematic uncertainty in experiments and modeling. Systematic uncertainty exists when experimental conditions, and/or measurement bias errors, and/or bias contributed by post-processing the data, are constant over the set of experiments but the particular values of the conditions and/or biases are unknown to within some specified uncertainty. Systematic uncertainties in experiments do not automatically show up in the output data, unlike random uncertainty which is revealed when multiple experiments are performed. Therefore, the output data must be properly 'conditioned' to reflect important sources of systematic uncertainty in the experiments. In industrial scale experiments the systematic uncertainty in experimental conditions (especially boundary conditions) is often large enough that the inference error on how the experimental system maps inputs to outputs is often quite substantial. Any such inference error and uncertainty thereof also has implications in model validation and calibration/conditioning; ignoring systematic uncertainty in experiments can lead to 'Type X' error in these procedures. Apart from any considerations of modeling and simulation, reporting of uncertainty associated with experimental results should include the effects of any significant systematic uncertainties in the experiments. This paper describes and illustrates the treatment of multivariate systematic uncertainties of interval and/or probabilistic natures, and combined cases. The paper also outlines a practical and versatile 'real-space' framework and methodology within which experimental and modeling uncertainties (correlated and uncorrelated, systematic and random, aleatory and epistemic) are treated to mitigate risk in model validation, calibration/conditioning, hierarchical modeling, and extrapolative prediction.

97 MATHEMATICS AND COMPUTING↗

Continuous-time probabilistic models for longitudinal electronic health records

Analysis of longitudinal Electronic Health Record (EHR) data is an important goal for precision medicine. Difficulty in applying Machine Learning (ML) methods, either predictive or unsupervised, stems in part from the heterogeneity and irregular sampling of EHR data. Here, we present an unsupervised probabilistic model that captures nonlinear relationships between variables over continuous-time. This method works with arbitrary sampling patterns and captures the joint probability distribution between variable measurements and the time intervals between them. Inference algorithms are derived that can be used to evaluate the likelihood of future using under a trained model. As an example, we consider data from the United States Veterans Health Administration (VHA) in the areas of diabetes and depression. Likelihood ratio maps are produced showing the likelihood of risk for moderate-severe vs minimal depression as measured by the Patient Health Questionnaire-9 (PHQ-9).

59 BASIC BIOLOGICAL SCIENCES↗

User’s Manual for RESRAD-BUILD Code V.4: Vol. 1 – Methodology and Models Used in RESRAD-BUILD Code

The RESRAD-BUILD computer code models radionuclide release and transport in indoor environments and performs pathway analyses to evaluate the potential radiological dose and risk incurred by an individual who works or lives in a building contaminated with radioactive material or housing radioactively contaminated furniture or equipment. The code provides four geometries to characterize a radiation source: point, line, area, and volume, in which radionuclides are homogeneously distributed. Radionuclides contained in a source are considered to be released to the indoor air due to various processes including erosion (mechanically or weathering), diffusion (for tritium and radon in a volume source), or emanation (radon in a point, line, or area source). The release can proceed through different time phases with different rates. In RESRAD-BUILD Version 4.0, a dynamic ventilation model is implemented to simulate the fate and transport of source material particles and radionuclides after their releases. This dynamic ventilation model considers (1) air exchange between rooms in the building and between the rooms and the outdoor environment, (2) deposition from air to floor, (3) resuspension from the floor to the air, and (4) periodical vacuuming that reduces the floor deposition. The fate and transport modeling provides estimates of radionuclide concentrations in the source, in the air, and on the floor at different times, which are then integrated over the exposure duration for the calculation of radiation doses and cancer risks. A single run of the RESRAD-BUILD code can model a building with up to 9 rooms, 10 sources, and 10 receptors. The potential radiation dose and cancer risk incurred by each receptor are calculated for seven exposure pathways: (1) external radiation directly from the sources (accounting for shielding), (2) external radiation from radioactive particles deposited on the floors, (3) external radiation from airborne radionuclides, (4) inhalation of airborne radionuclides, (5) inhalation of radon and radon progenies, (6) inadvertent ingestion of radioactive particles directly from the source, and (7) ingestion of radioactive particles deposited on the floors. Various exposure scenarios can be modeled with RESRAD-BUILD, including but are not limited to, office worker, renovation worker, decontamination worker, building visitor, and resident. Both deterministic and probabilistic analyses can be performed to obtain results in both text reports and graphic displays.

61 RADIATION PROTECTION AND DOSIMETRY↗

Agent-based simulation and child protection systems: Rationale, implementation, and verification

Simulation models are an important tool used in health care and other disciplines to support operational research and decision-making. In the child protection literature, simulation models are an under-utilized source of research evidence. Here, in this paper, we describe the rationale for and the development of an agent-based simulation of a child protection system in the US. Using the investigation, prevention service, and placement histories of 600,000 children served in an urban child welfare system, we walk the reader through the development of a prototype known as OSPEDALE. The governing equations built into OSPEDALE probabilistically simulate the onset of investigations. Then, drawing from empirical survival distributions, the governing equations trace the probability of subsequent interactions with the system (recurrence of maltreatment, service referrals, and placement) conditional on the characteristics of children, their assessed risk level, and prior child protection system involvement. As an initial test of OSPEDALE's utility, we compare empirical admission counts with counts generated from OSPEDALE. Though the verification step is admittedly simple, the comparison shows that OSPEDALE replicates the empirical count of new admissions closely enough to justify further investment in OSPEDALE. Management of public child protection systems is increasingly research evidence-dependent. The emphasis on research evidence as a decision-support tool has elevated evidence acquired through randomized clinical trials. Though important, the evidence from clinical trials represents only one type of research evidence. Properly specified, simulation models are another source of evidence with real-world relevance.

60 APPLIED LIFE SCIENCES↗

Establishing Cost-Effective Allocation of Proton Therapy for Breast Irradiation

Purpose: Cardiac toxicity due to conventional breast radiation therapy (RT) has been extensively reported, and it affects both the life expectancy and quality of life of affected women. Given the favorable oncologic outcomes in most women irradiated for breast cancer, it is increasingly paramount to minimize treatment side effects and improve survivorship for these patients. Proton RT offers promise in limiting heart dose, but the modality is costly and access is limited. Using cost-effectiveness analysis, we provide a decision-making tool to help determine which breast cancer patients may benefit from proton RT referral. Methods and Materials: A Markov cohort model was constructed to compare the cost-effectiveness of proton versus photon RT for breast cancer management. The model was analyzed for different strata of women based on age (40 years, 50 years, and 60 years) and the presence or lack of cardiac risk factors (CRFs). Model entrants could have 1 of 3 health states: healthy, alive with coronary heart disease (CHD), or dead. Base-case analysis assumed CHD was managed medically. No difference in tumor control was assumed between arms. Probabilistic sensitivity analysis was performed to test model robustness and the influence of including catheterization as a downstream possibility within the health state of CHD. Results: Proton RT was not cost-effective in women without CRFs or a mean heart dose (MHD) <5 Gy. Base-case analysis noted cost-effectiveness for proton RT in women with ≥1 CRF at an approximate minimum MHD of 6 Gy with a willingness-to-pay threshold of $100,000/quality-adjusted life-year. For women with ≥1 CRF, probabilistic sensitivity analysis noted the preference of proton RT for an MHD ≥5 Gy with a similar willingness-to-pay threshold. Conclusions: Despite the cost of treatment, scenarios do exist whereby proton therapy is cost-effective. Referral for proton therapy may be cost-effective for patients with ≥1 CRF in cases for which photon plans are unable to achieve an MHD <5 Gy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Resource Adequacy Suite (PRAS) v0.8 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system's risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.8 of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Comparison of Risk Sensitive Path Planning Methods for Aircraft Emergency Landing

Determining the best site to land a damaged aircraft presents some interesting challenges for standard path planning techniques. There are multiple possible locations to consider, the space is 3-dimensional with dynamics, the criteria for a good path is determined by overall risk rather than distance or time, and optimization really matters, since an improved path corresponds to greater expected survival rate. We have investigated a number of different path planning methods for solving this problem, including cell decomposition, visibility graphs, probabilistic road maps (PRMs), and local search techniques. In their pure form, none of these techniques have proven to be entirely satisfactory - some are too slow or unpredictable, some produce highly non-optimal paths or do not find certain types of paths, and some do not cope well with the dynamic constraints when controllability is limited. In the end, we are converging towards a hybrid technique that involves seeding a roadmap with a layered visibility graph, using PRM to extend that roadmap, and using local search to further optimize the resulting paths. We describe the techniques we have investigated, report on our experiments with these techniques, and discuss when and why various techniques were unsatisfactory.

Meuleau, Nicolas↗

Proposed Risk-Informed Seismic Hazard Periodic Reevaluation Methodology for Complying with DOE Order 420.1C

Department of Energy (DOE) nuclear facilities must comply with DOE Order 420.1C Facility Safety, which requires that all such facilities review their natural phenomena hazards (NPH) assessments no less frequently than every ten years. The Order points the reader to Standard DOE-STD-1020-2012. In addition to providing a discussion of the applicable evaluation criteria, the Standard references other documents, including ANSI/ANS-2.29-2008 and NUREG-2117. These documents provide supporting criteria and approaches for evaluating the need to update an existing probabilistic seismic hazard analysis (PSHA). All of the documents are consistent at a high level regarding the general conceptual criteria that should be considered. However, none of the documents provides step-by-step detailed guidance on the required or recommended approach for evaluating the significance of new information and determining whether or not an existing PSHA should be updated. Further, all of the conceptual approaches and criteria given in these documents deal with changes that may have occurred in the knowledge base that might impact the inputs to the PSHA, the calculated hazard itself, or the technical basis for the hazard inputs. Given that the DOE Order is aimed at achieving and assuring the safety of nuclear facilities—which is a function not only of the level of the seismic hazard but also the capacity of the facility to withstand vibratory ground motions—the inclusion of risk information in the evaluation process would appear to be both prudent and in line with the objectives of the Order. The purpose of this white paper is to describe a risk-informed methodology for evaluating the need for an update of an existing PSHA consistent with the DOE Order. While the development of the proposed methodology was undertaken as a result of assessments for specific SDC-3 facilities at Idaho National Laboratory (INL), and it is expected that the application at INL will provide a demonstration of the methodology, there is potential for general applicability to other facilities across the DOE complex. As such, both a general methodology and a specific approach intended for INL are described in this document. The general methodology proposed in this white paper is referred to as the “seismic hazard periodic review methodology,” or SHPRM. It presents a graded approach for SDC-3, SDC-4 and SDC-5 facilities that can be applied in any risk-informed regulatory environment by once risk-objectives appropriate for the framework are developed. While the methodology was developed for seismic hazard considerations, it can also be directly applied to other types of natural hazards.

58 GEOSCIENCES↗

The Use of Collective Dose for Optimization of a Low-Level Waste Site Closure Cover

Low-level radioactive waste management regulations require that releases to the environment be as low as reasonably achievable. Collective dose’s use in quantitative cost benefit analysis is well accepted for optimization of operational radiation safety, but seldom applied to routine environmental releases. One concern is that collective dose for large areas and long time periods may obscure the spatial and temporal distribution of risk and the magnitude of individual doses. Use of collective dose for optimization also requires that the decision maker justify subjective inputs including truncation limits for the summation of collective dose in space and time, a monetary value for collective dose, and a discount rate for future health detriment. In this study, a probabilistic collective dose model is developed and used to optimize the closure of the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site. Collective dose’s shortcomings are addressed by preparing a dose matrix that disaggregates the collective dose in space and time and by reporting individual doses for exposed subgroups. Important subjective inputs are assigned discrete values reflecting differing opinions, and the consequence of the differences on the final decision is described. The resulting optimization process remains subjective, but clearly identifies subjective inputs, the values selected, and their impact on the decision. For the Area 5 RWMS, the value of the collective dose is small compared to closure cover cost options over a broad range of subjective values for the spatial and temporal limits for truncation of collective dose, monetary value of collective dose, and discount rates for future dose. The collective dose matrix and individual doses indicate that the societal and individual risks are greatest for future residents within the disposal site boundary, suggesting that options deterring intrusion have the greatest potential for cost-effectiveness. The cost of various closure options far exceeds the value of the collective dose averted, indicating that there are few opportunities for cost-effective improvements when closures meet the low dose constraints in waste management regulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Geomechanical Risks Associated with CO 2 Injection at the FutureGen 2.0 Site: Application of the State of Stress Assessment Tool (SOSAT)

This report presents the results of the application of the State of Stress Assessment Tool (SOSAT) on the FutureGen 2.0 data set. SOSAT was developed as part of the National Risk Assessment Partnership (NRAP) project and provides a unique integrated framework for estimating the state of stress probability distribution at a given depth in the subsurface and evaluating the risk of induced shear and tensile failure resulting from the injection of carbon dioxide (CO 2 ). The approach implemented by SOSAT is based on two deterministic and widely used methods of determining the state of stress (i.e., stress polygon and one-dimensional tectonic-elastic approach). These methods have been modified using a probabilistic approach to account for uncertainties in the input parameters. The methodology proposed in SOSAT was demonstrated using the data obtained for the FutureGen 2.0 project located in the Illinois Basin. Although the FutureGen 2.0 project was suspended by the U.S. Department of Energy prior to the start of injection operations, the extensive characterization efforts undertaken at the storage site have yielded a considerable amount of valuable data about this part of the sedimentary basin. The FutureGen 2.0 storage site was designed to accommodate the injection of 1.1 million metric tons of CO 2 per year over a 20-year period. The injection of CO 2 and the associated pressure buildup in the reservoir is expected to alter the state of stress over the course of the injection. These changes in the initial stress state may affect fault stability and potentially lead to the unintentional creation of hydraulic fractures, which could pose a leakage risk if not contained within the reservoir. Assessing these risks is critical to making informed decisions about the characterization, management of the injection operation, and monitoring of the storage site. The data required by SOSAT for the geomechanical assessment of the FutureGen 2.0 site were identified, and the methodology proposed in SOSAT was followed to evaluate the probability of reactivating critically oriented faults or potentially creating hydraulic fractures in the reservoir. The results of the geomechanical analysis performed using the SOSAT led to the following conclusions. 1. The probability distribution of the state of stress indicates significant uncertainties in the magnitude of the maximum horizontal stress S Hmax , while the minimum horizontal stress S hmin is well constrained by the stress measurements conducted during the characterization efforts at the storage site. This uncertainty in the magnitude of S Hmax is a common challenge and has significant implications for geomechanical risk at sites like FutureGen 2.0 where a strike-slip tectonic regime exists. 2. The probability that the Mount Simon reservoir was initially critically stressed is relatively high—25%. When the pore pressure increases to the maximum allowable pressure permitted under the Underground Injection Control Class VI regulation of the FutureGen 2.0 project, the risk of shear failure approaches a probability of 43%. These relatively high probabilities reflect the current state of information about the geomechanical conditions in this part of the Illinois Basin. For future operations in this basin this should be a high characterization priority because it could significantly lower the risk of operations. 3. Based on the maximum injection pressure allowed in the UIC Class VI, the risk of unintentional hydraulic fracturing is limited. The risk of shear failure as determined by SOSAT is based on a very conservative approach assuming that critically oriented faults exist in the subsurface. While no faults have been formally identified at the FutureGen 2.0 site, the results obtained with SOSAT using the FutureGen 2.0 data set highlight the importance of integrating uncertainties in critical parameters to quantify geomechanical risks in a defensible way. Should SOSAT have been available at the time the characterization activities were being planned, more characterization efforts would have been implemented to reduce the uncertainties on the magnitude of the maximum horizontal stress, and to dismiss with confidence the potential existence of a critically-oriented fault in the reservoir (e.g., 3D seismic survey).

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Forecast of Single–Phase Flow in Porous Media With Uncertain Properties

Uncertainty about geologic makeup and properties of the subsurface renders inadequate a unique quantitative prediction of flow and transport. Instead, multiple alternative scenarios have to be explored within the probabilistic framework, typically by means of Monte Carlo simulations (MCS). These can be computationally expensive, and often prohibitively so, especially when the goal is to compute the tails of a distribution, i.e., probabilities of rare events, which are necessary for risk assessment and decision making under uncertainty. We deploy the method of distributions to derive a deterministic equation for the cumulative distribution function (CDF) of hydraulic head in an aquifer with uncertain (random) hydraulic conductivity. The CDF equation relies on a self-consistent closure approximation, which ensures that the resulting CDF of hydraulic head has the same mean and variance as those computed with either statistical moment equation (the approach used herein) or MCS. We conduct a series of numerical experiments dealing with steady-state two-dimensional flow driven by either a natural hydraulic head gradient or a pumping well. Furthermore, these experiments reveal that the CDF method remains accurate and robust for highly heterogeneous formations with the variance of log conductivity as large as five. For the same accuracy, it is also up to four orders of magnitude faster than MCS in computing hydraulic head with a required degree of confidence (probability).

42 ENGINEERING↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗