Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INTEGRALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Integrated Plastic Substrates for OLED Lighting

OLED lighting has immense potential as aesthetically pleasing, energy-efficient general illumination. Unlike other light sources, such as incandescents, fluorescents, and inorganic LEDs, OLEDs naturally emit over a large-area surface. They are glare free, do not need to be shaded, and are cool to the touch, requiring no heatsink. The best efficiencies and lifetimes reported are on par with or better than current forms of illumination. However, the cost for OLED lighting remains high – so much so that these products are not market competitive and there is very low consumer demand. We believe that flexible, plastic-based devices will highlight the advantages of aesthetically-pleasing OLED lighting systems while paving the way for lowering both materials and manufacturing costs. These flexible devices require new development in substrate and support technology, which was the focus of the work reported here. The project team, led by Sinovia Technologies, has developed integrated plastic substrates to serve as supports for flexible OLED lighting. The substrates created in this project would enable large-area, flexible devices and are specified to perform three functions. They include a barrier to protect the OLED from moisture and oxygen-related degradation, a smooth, highly conductive transparent electrode to enable large-area device operation, and a light scattering layer to improve emission efficiency. Through the course of this project, integrated substrates were fabricated, characterized, evaluated for manufacturing feasibility and cost, and used in white OLED demonstrations to test their impact on flexible OLED lighting. Our integrated substrates meet or exceed the DOE specifications for barrier performance in water vapor and oxygen transport rates, as well as the transparency and conductivity of the anode film. We find that these integrated substrates can be manufactured in a completely roll-to-roll, high throughput process and have developed and demonstrated manufacturing methods that can produce thousands of feet of material without defects. We have evaluated the materials and manufacturing costs of these films at scale and find that they meet the current and future cost targets for bringing down the cost of OLED lighting while enabling future roll-to-roll manufacturing of the complete device. And finally, we have demonstrated that the inherent light-scattering properties of our films enhance white OLED emission efficiency from 20% to 50% depending on the metric. This work has shown that these substrates can be created, manufactured, and will perform as needed to enable flexible OLED lighting to enter the marketplace.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Barriers and Opportunities to Broader Adoption of Integrated Demand Side Management at Electric Utilities: A Scoping Study

Integrated demand-side management (IDSM) is a strategic approach to designing and delivering a portfolio of demand side management (DSM) programs to customers. IDSM typically delivers customer centric strategies with the goal of increasing the amount of DSM in the field, but doing so in a way that integrates various measures and technologies to improve their collective performance and/or penetration. Specifically, IDSM can be defined as the integrated or coordinated delivery of three or more of: (1) energy efficiency (EE), (2) demand response (DR), (3) distributed generation (DG), (4) storage, (5) electric vehicle (EV) technologies, and (6) time-based rate programs to residential and commercial electric utility customers. The electric industry’s limited experience deploying IDSM to date suggests that significant barriers may exist. This report explores recent electric utility experience with IDSM to provide an assessment of the barriers and potential benefits perceived or experienced by program administrators in their attempts to implement integrated programs. The research draws on surveys and interviews with eleven staff from a sample of eight DSM program administrators and program implementers who were currently implementing or had previously attempted to implement an IDSM program or initiative. Respondents provided their perspectives on drivers for IDSM and barriers to broader deployment. They also reported on actions they had undertaken to promote expanded delivery of IDSM and provided their assessments of the most important under-tapped opportunities for expanding IDSM efforts, both for program administrator and regulatory organizations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Single-Shell Tank Structural Integrity Assessment Report

Integrity assessments are required to determine that the existing single-shell tanks (SST) located at the Hanford Site have structural integrity such that they will not collapse, rupture, or fail. This is a requirement of the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement (TPA)1 Change Request M-45-10-01 which established SST Integrity Project interim milestones and targets in January 2011. Interim Milestone M-045-91I established the requirement for this SST structural integrity assessment to be completed with an Independent Qualified Registered Professional Engineer (IQRPE) certification by September 30, 2018.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrity Levels: A New Paradigm for Protecting Computing Systems

As the field of determined and increasingly sophisticated adversaries multiplies, the risk to integrity of deployed computing devices magnifies. Given the ubiquitous connectivity, substantial storage, and accessibility, the increased reliance on computer platforms make them a significant target for attackers. Over the past decade, malware has transitioned from attacking a single program to subverting the operating system (OS) kernel by means of what is commonly known as a rootkit. While computer systems require patches to fix newly discovered vulnerabilities, undiscovered vulnerabilities remain Furthermore, typical solutions utilize mechanisms that operate within the OS. If the OS becomes compromised, these mechanisms may be vulnerable to being disabled or upon detection of the potential compromise, being "shut down" until patched or otherwise mitigated. We propose an innovative approach to designing computer systems that allows the behavior or functionality of the computer system to change based on the integrity of the system. Instead of attempting to prevent or detect all malware attacks, our proposed approach allows possible graceful degradation of functionality according to the security policy specification as anomalies of security concern are detected. We believe this innovative paradigm can determine the "integrity lever of the system. Based on the integrity level, the computer system may behave differently or limit access to data.

97 MATHEMATICS AND COMPUTING↗

Testing of an Integrated Iodine Scrubber and Polishing Bed System

In 2016 an initial engineering evaluation and design of the off-gas abatement systems required for a hypothetical 1000 t/yr used nuclear fuel (UNF) reprocessing facility treating 5 yr–cooled, 60 GWd/tIHM UNF was completed. In this study two types of silver-based iodine sorbents were considered. The first was a silver-exchanged mordenite (AgZ), and the second was a silver-functionalized silica aerogel. In the initial design of the dissolver off-gas (DOG) iodine capture beds, the sorbent capacity was assumed to be 40 mg I/g sorbent. The total iodine released from the fuel, used as input for the design of the DOG system, was 1.635 kg/day. Tramp halogens increased this to ~5.1 kg/day on an iodine equivalent basis. The daily consumption of iodine sorbent was ~166 kg (including the mass transfer zones that have lower iodine loading). The iodine capture system was designed to utilize five beds in parallel. In this design each bed was ~1 m in diameter and 1.5 m long. This design allowed the beds to remain on line for 20 days, but at that point all five beds would need to be replaced, resulting in considerable material handling. It was proposed that the bed life could be extended and the number of parallel beds reduced if an aqueous iodine scrubber preceded the solid sorbent iodine capture beds. The testing described in this report was intended to provide an evaluation of an integrated system in which bulk iodine would first be removed by an aqueous NaOH scrubber with a target iodine decontamination factor (DF) of 10 to 50. This would reduce the sorbent usage by 90 to 95% and significantly reduce the associated frequent remote handling of the iodine filter beds. The effluent from the scrubber would then be passed through an AgZ sorbent bed to remove residual iodine. The integration of these unit operations was intended to demonstrate an iodine DF of >1000, which would facilitate regulatory compliance with regards to total volatile radionuclide emission from a reprocessing facility. Initial baseline performance testing of the scrubber system includes the characterization of CO 2 removal by the aqueous NaOH scrubber as a function of temperature, caustic concentration, packing length, liquid-to-gas mass ratio, and liquid flow rate. It was found that when the column was well wetted, very high CO 2 DFs were achieved (>650 and potentially as high as 15,000), preventing the ability to elucidate the effects of each specific variable tested. The L/G ratio in this system was not representative of typical L/G ratios found in industrial-scale scrubber systems. By significantly lowering the liquid recirculation rate to the point that column wetting was marginal, some significant variations in the CO 2 DF or CO 2 effluent concentrations could be observed. The additional tests conducted under these more adverse conditions still showed CO 2 DFs >100. The only operational parameter with significant effects was determined to be column length, with increased column length resulting in higher CO 2 DFs. Following these CO 2 tests, a single iodine scrubber test was performed deliberately at a condition indicated by the CO 2 demonstration to result in poor column performance. This was intended to establish a lower performance bound for iodine removal by the aqueous scrubber. The result showed that even under the adverse operating conditions, an iodine DF of >100 could be achieved. Finally, the aqueous scrubber and a AgZ polishing bed were integrated. This simple caustic scrubber system achieved an iodine DF of >12,000 for just the scrubber portion. Using this iodine DF, the iodine loading on the polishing bed was reduced by 99.993%. The performance of that integrated system was compared to a system including only a AgZ sorbent bed. The system without the scrubber also showed iodine DFs >3000 until breakthrough was observed. The loading on the saturated portion of the bed averaged 87.2 mg I 2 /gm AgZ. Comparing the penetration of iodine into the sorbent beds for these two systems showed a marked difference; the penetration with the scrubber was only 0.65 cm at a maximum loading of 0.11 mg I 2 /gm AgZ, whereas for the case without the caustic scrubber, the bed was saturated for the first 7 cm and breakthrough of the 13.3 cm bed occurred.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Roll-to-Roll Integrated Substrates for OLED Lighting (Final Report)

OLED lighting has immense potential as aesthetically pleasing, energy-efficient general illumination. Unlike other light sources, such as incandescents, fluorescents, and inorganic LEDs, OLEDs naturally emit over a large-area surface. They are glare free, do not need to be shaded, and are cool to the touch, requiring no heatsink. The best efficiencies and lifetimes reported are on par with or better than current forms of illumination. However, the cost for OLED lighting remains high – so much so that these products are not market competitive and there is very low consumer demand. We believe that flexible, plastic-based devices will highlight the advantages of aesthetically-pleasing OLED lighting systems while paving the way for lowering both materials and manufacturing costs. These flexible devices require new development in substrate and support technology, which was the focus of the work reported here. Sinovia Technologies, as part of a collaborative team, has developed integrated plastic substrates to serve as supports for flexible OLED lighting. These substrates include a barrier to protect the OLED from moisture and oxygen-related degradation, a smooth, highly conductive transparent anode to define the OLED area, and a light scattering layer to improve emission efficiency. To ensure low cost, the anode pattern must be defined using high throughput, continuous processing, and any pattern shape should be possible. No current patterning technique meets all of these requirements. This SBIR work demonstrated the use of flexographic printing as an effective method of patterning for integrated substrates. Flexography is a letterpress process commonly used for many types of everyday items including boxes, retail bags, milk cartons, food packaging, disposable cups, adhesive tapes, envelopes, wallpaper, and newspaper. The printing process can go as fast as 600 meters per minute with feature resolution around 10 microns, showing promise for low-cost with high throughput. In this case, Sinovia has successfully used this technique to print transparent anode patterns roll-to-roll as part of our integrated substrate for OLED lighting. We have characterized the printed films and tailored the edges of the printed areas for OLED compatibility. We followed this by making white OLEDs using these anodes. To ensure that our anodes were compatible with different OLED stack structures, we fabricated solution-processed polymer white OLEDs, as well as collaborated with OLEDWorks to fabricate evaporated small-molecule devices. Comparing to results from our previous studies, we find that the flexography process does not have any detrimental effects to our overall substrate. We were able to show that our flexographically printed integrated substrate improves OLED efficiency by 24 – 35%, similar to previous results demonstrated using batch-patterning techniques. The success of this work represents two substantial opportunities for OLED lighting manufacturers. The first to first facilitate flexible lighting panels at scale, and the second to lower costs for by enabling roll-to-roll manufacture of the entire device stack. When realized, both of these will help OLED to become market competitive with other forms of general illumination.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DiaMonD: An Integrated Multifaceted Approach to Mathematics at the Interfaces of Data, Models, and Decisions

For many problems in computational science and engineering, the so-called forward problem-solution of the underlying mathematical model to yield output quantities of interest, given input parameters--is difficult enough for frontier complex models, which are often characterized by coupled multiphysics and possibly stochastic behavior over a wide range of length and time scales. However, we face the need to move beyond the forward problem, to address what is often the ultimate goal of CS&E: decision-making. This requires us to tackle a spectrum of mathematical problems that subsume, and are thus even more difficult than, the forward problem. First, given experimental data, we wish to estimate unknown parameters characterizing a model of a natural or engineered system by solving an inverse problem. Second, we seek the optimal con figuration of the system (or experiments) by solving an optimal design problem. Third, the optimal operation of the system must be determined by solving an optimal control problem. And fourth, we must quantify uncertainties as they propagate through all of the preceding problems, from data to model inference to prediction and finally to optimal design and control. Optimal mathematical methods and algorithms for such end-to-end, data-to-decisions modeling and simulation of complex problems--requiring integrated solution of forward, inverse, optimization, and UQ problems for large, multiphysics, multiscale models--entails challenges of the highest order, while also presenting great opportunities for applied mathematics research. Unfortunately, research on forward, inverse, optimization, and UQ problems has all-too-often progressed in isolation. This has led to mathematical methods that perform well when considering the forward simulation in isolation, but are prohibitive or suboptimal or unstable when combined with other methods within the framework of inversion, optimization, or UQ. The reverse is also true: general-purpose methods developed within the inversion, optimization, and UQ fields often become prohibitive when applied to complex CS&E problems since they do not exploit their structure. DiaMonD is a multi-institutional DOE MMICC effort that aims to address the challenges of end-to-end, data-to-decisions modeling and simulation for complex CS&E problems in a unifi ed, systematic, and integrated fashion. Institutions involved are Colorado State, Florida State, Los Alamos, MIT, Oak Ridge, Stanford, and UT-Austin. The goals of DiaMonD are (1) to develop advanced mathematical methods and analysis for multimodel, multiphysics, multiscale model problems driven by frontier DOE applications, including those in subsurface energy and environmental flows, materials for energy storage and conversion, and ice sheet dynamics; (2) to create theory and algorithms for integrated inversion, optimization, and uncertainty quantification for these complex problems; and (3) to disseminate the philosophy of an integrated end-to-end, data-to-decisions approach to modeling and simulation of complex problems to the broader applied math and computational science communities through workshops and other outreach.

97 MATHEMATICS AND COMPUTING↗

Development of a Reference Governor-based Control Scheme for Integrated Energy Systems

The concept of an Integrated Energy System (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. In practice what is achievable is limited by not only the inherent physical response characteristics of individual plant units but also by equipment operating limits. The inherent response characteristics are presently accounted for in the RAVEN-based HYBRID framework by dynamic models for plant units. The equipment operating limits, which are not yet addressed in HYBRID, are the subject of this report. These limits are set to achieve a design service life for a plant unit and are based on material degradation in the presence of mechanical fatigue induced by thermal cycling and by structure creep resulting from elevated temperature conditions. In general, the plant unit designer determines and specifies the allowable operating range of key process variables. It is then up to the integrated system design engineer to ensure those conditions are met. This can be accomplished through a combination of limiting the demand rates made on the plant unit and designing a control system that limits variations of key process variables. The typical control system design procedure, however, is not well suited for achieving this for complex dynamic systems such as encountered in integrated energy systems where multiple plant units must be simultaneously coordinated. This report describes how equipment operating limitations in an IES can be formally met through a control system design procedure know as the Reference Governor. The approach augments the existing controllers in a plant unit with an advance controller that modifies the issued setpoints so that selected process variables remain within limits. The design procedure is applied to the reference multi-unit system that has been the focus of Modeling and Simulation task in the Integrated Energy System program. Results describing application to the problem of limiting key process variables during operational transients for two of the plant units, the balance of plant and the gas turbine, are then presented. It is demonstrated that the Reference Governor method is an effective means for ensuring equipment operating constraints can be met in an IES. The software that implements the method has been made accessible to others on the Modeling and Simulation upload site.

42 ENGINEERING↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fast Dynamic Aperture Optimization with Reversal Integration

A fast method for dynamic aperture (DA) optimization of storage rings has been developed through the use of reversal integration. Even if dynamical systems have an exact reversal symme- try, a numerical forward integration di ers from its reversal. For chaotic trajectories, cumulative round-o errors are scaled, which results in an exponential growth in the di erence. The exponential e ect, intrinsically associated with the Lyapunov exponent, is a generic indicator of chaos because it represents the sensitivity of chaotic motion to an initial condition. A chaos indicator of the charged particle motion is then obtained by comparing the forward integrations of particle trajectories with corresponding reversals, a.k.a. \backward integrations." The indicator was con rmed to be ob- servable through short-term particle tracking simulations. Therefore, adopting it as an objective function could speed up optimization. The DA of the National Synchrotron Light Source II storage ring, and another test di raction-limited light source ring, were optimized using this method for the purpose of demonstration.

36 MATERIALS SCIENCE↗

An Integrated Two-Factor Authentication Solution Using Pulse Connect Secure and Apache HTTP Server

Complex system requirements can often lead to a situation wherein no single product or platform can provide a solution. In these cases, a solution integrating the features of multiple products and platforms is needed. Recently, a program sponsor required discontinued use of a third-party Security Assertion Markup Language Identity Provider that was being used to implement a two-factor authentication (2FA) solution that fully integrated with Pulse Connect Secure (PCS). PCS alone could not provide the features necessary to meet all the requirements of a new 2FA solution. The challenge was to leverage the features of additional platforms to design an integrated solution to meet all requirements. This paper presents a solution that integrates the features of PCS, Apache HyperText Transfer Protocol Server, and a custom application that meets all requirements, including a requirement to defend against Uniform Resource Locator manipulation as means to gain unauthorized access to backend applications.

97 MATHEMATICS AND COMPUTING↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

V&V Integrated Program Planning for Wind Plant Performance

The Department of Energy Atmosphere to Electrons (A2e) initiative has undertaken an experimental planning process for a validation directed program and an experimental planning process directed at improving simulations of wind plant performance. The validation process has been divided into two main sections: Integrated Program Planning, and Integrated Experiment and Model Planning and Execution. This document covers the Integrated Program Planning process in detail as it has been applied to the validation and assessment of models of various fidelity to predict wind plant performance. Three main parts of this process are presented in this document: the Phenomenon Identification and Ranking Table, the Validation Hierarchy, and the Prioritized Phenomenon and Experiment Mapping table. The document concludes with a description of validation program process next steps, which includes the planning and execution of integrated experiment and model campaigns

17 WIND ENERGY↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

NEAMS Workbench MOOSE Integration Update

The Nuclear Energy Advanced Modeling and Simulation (NEAMS) Workbench is a graphical user interface (GUI) that provides a common analysis environment for the accelerated use of the NEAMS toolkit. To improve design and analysis of current and future nuclear energy systems, the NEAMS Workbench provides an integrated development environment for model creation, review, execution, output review, and visualization for integrated tools. In addition to a GUI, the NEAMS Workbench provides the Workbench Analysis Sequence Processor, an open-source tool set that facilitates input-content assistance for supported domain-specific input languages and user-friendly syntaxes. These supported syntaxes enable accelerated development and deployment of enhanced user inputs and workflows. The Multiphysics Object-Oriented Simulation Environment (MOOSE) has been supported in the NEAMS Workbench since 2016 and receives continuous updates. Efforts to improve MOOSE-based tool integration in the NEAMS Workbench are ongoing. This document details the current and planned enhancements of the NEAMS Workbench and the MOOSE framework to improve integration and usability of MOOSE-based applications within the NEAMS Workbench.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

Development of Integrated Thermal Fluids Modeling Capability for MSRs

The DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS) program supports a full range of computational thermal fluids analysis capabilities and code developments for a broad class of light-water and advanced reactor concepts. The research and development approach under thermal fluids technical area synergistically combines three length and time scales in a hierarchal multi-scale approach. To demonstrate the feasibility and capabilities of a multi-scale thermal fluids capability using these codes, a key joint effort has been pursued to develop an integrated system-and engineering-scale thermal fluids analysis capability with the MOOSE-based codes, through integration of SAM and Pronghorn, both based on the MOOSE framework. This report summarizes the progress in developing an integrated system- and engineering-scale thermal fluids analysis capability based on SAM and Pronghorn for molten salt reactors (MSRs), which gained significant interest in recently years. Two coupling approaches were studied, i.e. separate domain or domain-segregated coupling approach and the domain-overlapping approach. A series of coupled multi-physics models have been developed for a common reference molten salt fast reactor (MSFR) concept, ranging from standalone SAM system model to integrated SAM-Pronghorn-Griffin models. Both the steady state and the transient simulations are performed to the state-of-the-art simulation capabilities of NEAMS software suite in MSFR system applications. This report also covers further development and testing of the gas transport model in SAM for MSR modeling support. The presence of noncondensable gas in MSR systems would have strong impacts on fission gas removal and transport of noble metals throughout the system. Fission products removed through the off-gas system can also impact reactivity and can act as an additional point of heat removal. To ensure that the gas transport model is adequately tested, the supported modeling capabilities and features of SAM were identified, and a suite of tests were developed to test the model for each identified feature. Validation and UQ testing were also performed for the model and demonstrated that the buoyancy term, which was originally developed using non-salt/helium gas experimental data, can capture the experimental gas bubble velocity and diameter to within experimental and code uncertainty. An existing MSRE model was also modified in this work to include the gas transport model and to demonstrate the gas model behavior for realistic conditions of interest.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗