Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Development of a National Center for Hydrogen Technology. A Summary Report of Activities Completed at the National Center for Hydrogen Technology - Year 6

The Energy & Environmental Research Center (EERC) located in Grand Forks, North Dakota, has operated the National Center for Hydrogen Technology (NCHT) since 2005 under a Cooperative Agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). The EERC has a long history of hydrogen generation and utilization from fossil fuels, and under the NCHT Program, the EERC has accelerated its research on hydrogen generation and utilization topics. Since the NCHT's inception, the EERC has received more than $65 million in funding for hydrogen-related projects ($24 million for projects in the NCHT, which includes federal and corporate partner development funds) involving more than 85 partners (27 with the NCHT). The NCHT Program's nine activities span a broad range of technologies that align well with the Advanced Fuels Program goals and, specifically, those described in the Hydrogen from Coal Program research, development, and demonstration (RD&D) plan that refers to realistic testing of technologies at adequate scale, process intensification, and contaminant control. A number of projects have been completed that range from technical feasibility of several hydrogen generation and utilization technologies to public and technical education and outreach tools. Projects under the NCHT have produced hydrogen from natural gas, coal, liquid hydrocarbons, and biomass. The hydrogen or syngas generated by these processes has also been purified in many of these instances or burned directly for power generation. Also, several activities are still undergoing research, development, demonstration, and commercialization at the NCHT. This report provides a summary overview of the projects completed in Year 6 of the NCHT. Individual activity reports are referenced as a source of detailed information on each activity.

08 HYDROGEN↗

Center for Momentum Transport and Flow Organization (CMTFO) (Final Technical Report)

The Center for Momentum Transport and Flow Organization (CMTFO) is a DOE Plasma Science Center formed in late 2009 to focus on the general principles underlying momentum transport in magnetic fusion and astrophysical systems. It is composed of funded researchers from UCSD, UW Madison, U. Colorado, PPPL. As of 2011, UCSD supported postdocs are collaborating at MIT/Columbia and UC Santa Cruz and beginning in 2012, will also be based at PPPL. In the initial startup period, the Center supported the construction of two basic experiments at PPPL and UW Madison to focus on accretion disk hydrodynamic instabilities and solar physics issues. We now have computational efforts underway focused on understanding recent experimental tests of dynamos, solar tachocline physics, intrinsic rotation in tokamak plasmas and L-H transition physics in tokamak devices. In addition, we have the basic experiments discussed above complemented by work on a basic linear plasma device at UCSD and a collaboration at the LAPD located at UCLA. We are also performing experiments on intrinsic rotation and L-H transition physics in the DIII-D, NSTX, C-Mod, HBT EP, HL-2A, and EAST tokamaks in the US and China, and expect to begin collaborations on K-STAR in the coming year. Center funds provide support to over 10 postdocs and graduate students each year, who work with 8 senior faculty and researchers at their respective institutions. The Center has sponsored a mini-conference at the APS DPP 2010 meeting, and co-sponsored the recent Festival de Theorie (2011) with the CEA in Cadarache, and will co-sponsor a Winter School in January 2012 in collaboration with the CMSO-UW Madison. Center researchers have published over 50 papers in the peer reviewed literature, and given over 10 talks at major international meetings. In addition, the Center co-PI, Professor Patrick Diamond, shared the 2011 Alfven Prize at the EPS meeting. Key scientific results from this startup period include initial simulations of the effects of boundary conditions on turbulent dynamo experiments; simulations of intrinsic rotation showing the strong link between toroidal rotation and temperature gradients and elucidation of the turbulence symmetry breaking mechanisms that lead to this macroscopic behavior; first experiments in a large tokamak testing the roll of turbulent momentum transport in driving intrinsic rotation; experiments in tokamaks showing strong evidence that zonal flows, together with the more widely recognized mean sheared ExB flow, act to trigger the L-H transition in tokamak devices and the first experimental measurement of collisional viscosity in an unmagnetized plasma. In the coming three year period, we will continue these efforts by a combination of basic hydrodynamic, liquid metal and plasma experiments combined with experiments on numerous tokamak devices around the world. In addition, we will use MHD, gyrofluid and gyrokinetic codes combined with theory to address the problems of interest to the Center.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced Battery Manufacturing (VA)

LiFeBATT has concentrated its recent testing and evaluation on the safety of its batteries. There appears to be a good margin of safety with respect to overheating of the cells and the cases being utilized for the batteries are specifically designed to dissipate any heat built up during charging. This aspect of LiFeBATT’s products will be even more fully investigated, and assuming ongoing positive results, it will become a major component of marketing efforts for the batteries. LiFeBATT has continued to receive prismatic 20 Amp hour cells from Taiwan. Further testing continues to indicate significant advantages over the previously available 15 Ah cells. Battery packs are being assembled with battery management systems in the Danville facility. Comprehensive tests are underway at Sandia National Laboratory to provide further documentation of the advantages of these 20 Ah cells. The company is pursuing its work with Hybrid Vehicles of Danville to critically evaluate the 20 Ah cells in a hybrid, armored vehicle being developed for military and security applications. Results have been even more encouraging than they were initially. LiFeBATT is expanding its work with several OEM customers to build a worldwide distribution network. These customers include a major automotive consulting group in the U.K., an Australian maker of luxury off-road campers, and a number of makers of E-bikes and scooters. LiFeBATT continues to explore the possibility of working with nations that are woefully short of infrastructure. Negotiations are underway with Siemens to jointly develop a system for using photovoltaic generation and battery storage to supply electricity to communities that are not currently served adequately. The IDA has continued to monitor the progress of LiFeBATT’s work to ensure that all funds are being expended wisely and that matching funds will be generated as promised. The company has also remained current on all obligations for repayment of an IDA loan and lease payments for space to the IDA. A commercial venture is being formed to utilize the LiFeBATT product for consumer use in enabling photovoltaic powered boat lifts. Field tests of the system have proven to be very effective and commercially promising. This venture is expected to result in significant sales within the next six months.

25 ENERGY STORAGE↗

Assssment and Mapping of the Riverine Hydrokinetic Resource in the Continental United States

The U.S. Department of Energy (DOE) funded the Electric Power Research Institute and its collaborative partners, University of Alaska Anchorage, University of Alaska Fairbanks, and the National Renewable Energy Laboratory, to provide an assessment of the riverine hydrokinetic resource in the continental United States. The assessment benefited from input obtained during two workshops attended by individuals with relevant expertise and from a National Research Council panel commissioned by DOE to provide guidance to this and other concurrent, DOE-funded assessments of water based renewable energy.

13 HYDRO ENERGY↗

Mixing Appropriations and Private Financing to Meet Federal Energy Management Goals

This report compares several strategies for mixing appropriations and private financing in a typical federal agency that has identified $100 million in required energy conservation measures (ECMs) at its facilities. The analysis shows that in order to maximize savings and minimize overall life-cycle cost, the best strategy for the agency is to use private financing to fund as many of the ECMs as possible within the statutory maximum 25-year project term, beginning with the ECMs with the shortest paybacks. Available appropriations should either be applied to a privately financed project as a one-time payment from savings (i.e., as a buydown) or used to directly fund longer-payback ECMs that cannot be included in the privately financed project.

Energy Savings↗

DOE/NNSA Next‐Generation Safeguards Initiative: Presentations by MIIS-LLNL Safeguards Policy Interns

As part of its Next‐Generation Safeguards Initiative (NGSI), DOE/NNSA’s Office of Nuclear Safeguards and Security has funded each year since 2008 a summer internship program in International Safeguards Policy jointly organized by the James Martin Center for Nonproliferation Studies at the Monterey Institute of International Studies (MIIS) and the Lawrence Livermore National Laboratory (LLNL). Graduate students selected for the program first attend an intensive one‐week course in Monterey on International Safeguards Policy and then, with NNSA‐funded stipend support from MIIS, spend a 10‐week internship at LLNL learning more about international nuclear safeguards and interacting with LLNL mentors and other Laboratory staff. As one component of the internship experience, each intern undertakes a project designed to expand knowledge of international safeguards or other relevant nuclear nonproliferation topics, culminating in a final presentation and paper. Attached are slides from this year’s intern project presentations, held August 16, 2013 at LLNL and attended by LLNL staff and by Bryan Lee from CNS. In the course of their work at LLNL, students had access only to unclassified, open source information, and no classified or controlled information was used in their projects. The views and recommendations in the slides are strictly their own, and should not be construed to represent views or conclusions of Lawrence Livermore National Laboratory, the Department of Energy, the U.S. Government, or the MIIS James Martin Center for Nonproliferation Studies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Tank Elutriation Test Report And Independent Assessment

The Department of Energy (DOE) Office of Environmental Management (EM) funded Technology Development and Deployment (TDD) to solve technical problems associated with waste tank closure for sites such as Hanford Site and Savannah River Site (SRS). One of the tasks supported by this funding at Savannah River National Laboratory (SRNL) and Pacific Northwest Laboratory (PNNL) was In-Tank Elutriation. Elutriation is the process whereby physical separation occurs based on particle size and density. This report satisfies the first phase of Task WP_1.3.1.1 In-Tank Elutriation, which is to assess the feasibility of this method of separation in waste tanks at Hanford Site and SRS. This report includes an analysis of scoping tests performed in the Engineering Development Laboratory of SRNL, analysis of Hanford's inadvertent elutriation, the viability of separation methods such as elutriation and hydrocyclones and recommendations for a path forward.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2012 Market Report on U.S. Wind Technologies in Distributed Applications

At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $\$$2,540/kW for utility-scale wind turbines, $\$$2,810/kW for mid-sized wind turbines, and $\$$6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $\$$4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.

distributed wind↗

PROJECT FEVER – Fostering Electric Vehicle Expansion in the Rockies

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unification and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.

33 ADVANCED PROPULSION SYSTEMS↗

Modeling Interfacial Fracture in Sierra

This report summarizes computational efforts to model interfacial fracture using cohesive zone models in the SIERRA/SolidMechanics (SIERRA/SM) finite element code. Cohesive surface elements were used to model crack initiation and propagation along predefined paths. Mesh convergence was observed with SIERRA/SM for numerous geometries. As the funding for this project came from the Advanced Simulation and Computing Verification and Validation (ASC V&V) focus area, considerable effort was spent performing verification and validation. Code verification was performed to compare code predictions to analytical solutions for simple three-element simulations as well as a higher-fidelity simulation of a double-cantilever beam. Parameter identification was conducted with Dakota using experimental results on asymmetric double-cantilever beam (ADCB) and end-notched-flexure (ENF) experiments conducted under Campaign-6 funding. Discretization convergence studies were also performed with respect to mesh size and time step and an optimization study was completed for mode II delamination using the ENF geometry. Throughout this verification process, numerous SIERRA/SM bugs were found and reported, all of which have been fixed, leading to over a 10-fold increase in convergence rates. Finally, mixed-mode flexure experiments were performed for validation. One of the unexplained issues encountered was material property variability for ostensibly the same composite material. Since the variability is not fully understood, it is difficult to accurately assess uncertainty when performing predictions.

Brown, Arthur A.↗

Florida Hydrogen Initiative (FHI) (Final Report)

The Florida Hydrogen Initiative (FHI) was a research, development and demonstration (RD&D) hydrogen and fuel cell program funded by U.S. Department of Energy (DOE). The FHI program objectives were to develop Florida’s hydrogen and fuel cell infrastructure and to assist DOE in its hydrogen and fuel cell activities by creating partnerships for demonstration projects, sponsoring research and development programs, facilitating technology transfer between the public and private sectors, developing industry support and establishing unique hydrogen/fuel cell university-level education programs. The FHI program funded 12 RD&D projects. Each project was issued a sub-contract with specific tasks, deliverables and budget. The results of these projects are presented in this final report. In this Executive Summary, a one paragraph description is given for each of the 12 projects conducted with FHI support. The 12 projects are presented in numerical order by task (Task 1 to Task 14). These include five projects (Tasks 1, 5, 7, 10 and 13) in the hydrogen technology areas, five (Tasks 2, 8, 9, 11 and 14) fuel cell related activities and two covering education and public understanding and information exchange (Task 3 and 12). Note that Tasks 4 and 6 were administrative tasks.

08 HYDROGEN↗

Support of US CLIVAR Project Office 2012

Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

99 GENERAL AND MISCELLANEOUS↗

LLNL HEPA Filter Support of Nuclear Facility Safety R&D (FY12)

The ceramic HEPA filter project has been a successful and innovative project. This report contains information from the work from FY12 funding, as well as remaining FY11 funding. Of note, a total of 12 patents for the ceramic HEPA filter program have been filed, and an additional record of invention has been prepared with a provisional patent to follow. This project supports development of a ceramic HEPA filter technology to benefit DOE nuclear facilities by providing lower life-cycle costs and reducing or eliminating costs associated with Safety Class and Safety Significant systems in nuclear facilities. The satisfactory performance of ceramic filters in a fire could significantly reduce costs of support systems associated with mitigating a release, such as fire suppression, fire detection and alarm, and internal building structure. In nuclear safety, the best way to provide protection to public, workers and the environment is to provide a barrier between the hazard and the receptors. A passive engineered design feature is the best barrier for that purpose. Advanced ceramic HEPA filters provide an excellent barrier between radioactive material in a nuclear facility and everything downwind. Both university (Cal Poly) student teams did very well. As summarized in this report, they successfully added and upgraded instrumentation and controls to the High Temperature Test Unit (HTTU) for the ceramic filter project. They also succeeded in adding viewing ports, remotely controlled closed circuit television, a flame impingement system and a helium filter gasket leak detection system. Details can be found in Ref. 3 - 6. The HTTU has flexible capabilities and can also be used to test other types of filters or filter components in the future, if so desired. At LLNL, research to improve filter media coating (Fig. 1) is being conducted to maintain filtration efficiency while improving performance (reducing pressure drop). Improvements in the individual filter element are necessary to maintain filtration efficiency while decreasing pressure drop. The path forward for an optimal ceramic HEPA filter meeting DOE’s needs is to improve the filtration media. This task utilized the LLNL/DOE developed innovations along with progress in previous activities to prepare multiple ceramic filter elements and refine the technical details for depositing advanced filtration materials to the ceramic filter to meet desired filter performance. The ceramics filter elements were tested for pressure drop at the required air flow rate using an air flow test system. The filtration efficiency and pressure drop of the ceramic filter elements will be measured as part of the development process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CHP Integrated with Burners for Packaged Boilers (Final Report)

The objective of this project was to engineer, design, fabricate, and field demonstrate a Boiler Burner Energy System Technology (BBEST) that integrates a low-cost, clean burning, gas-fired simple-cycle (unrecuperated) 100 kWe (net) microturbine (SCMT) with a new ultra low-NOx gas-fired burner (ULNB) into one compact Combined Heat and Power (CHP) product that can be retrofit on new and existing industrial and commercial boilers in place of conventional burners. The Scope of Work for this project was segmented into two principal phases: (Phase I) Hardware development, assembly and pre-test and (Phase II) Field installation and demonstration testing. Phase I was divided into five technical tasks (Task 2 to 6). These tasks covered the engineering, design, fabrication, testing and optimization of each key component of the CHP system principally, ULNB, SCMT, assembly BBEST CHP package, and integrated controls. Phase I work culminated with the laboratory testing of the completed BBEST assembly prior to shipment for field installation and demonstration. Phase II consisted of two remaining technical tasks (Task 7 and 8), which focused on the installation, startup, and field verification tests at a pre-selected industrial plant to document performance and attainment of all project objectives. Technical direction and administration was under the management of CMCE, Inc. Altex Technologies Corporation lead the design, assembly and testing of the system. Field demonstration was supported by Leva Energy, the commercialization firm founded by executives at CMCE and Altex. Leva Energy has applied for patent protection on the BBEST process under the trade name of Power Burner and holds the license for the burner currently used in the product. The commercial term Power Burner is used throughout this report to refer to the BBEST technology proposed for this project. The project was co-funded by the California Energy Commission and the Southern California Gas Company (SCG), a division of Sempra Energy. These match funds were provided via concurrent contracts and investments available via CMCE, Altex, and Leva Energy The project attained all its objectives and is considered a success. CMCE secured the support of GI&E from Italy to supply 100 kW Turbec T-100 microturbines for the project. One was purchased by the project’s subcontractor, Altex, and a second spare was purchased by CMCE under this project. The microturbines were then modified to convert from their original recuperated design to a simple cycle configuration. Replacement low-NOx silo combustors were designed and bench tested in order to achieve compliance with the California Air Resources Board (CARB) 2007 emission limits for NOx and CO when in CHP operation. The converted microturbine was then mated with a low NOx burner provided by Altex via an integration section that allowed flow control and heat recovery to minimize combustion blower requirements; manage burner turndown; and recover waste heat. A new fully integrated control system was designed and developed that allowed one-touch system operation in all three available modes of operation: (1) CHP with both microturbine and burner firing for boiler heat input greater than 2 MMBtu/hr; (2) burner head only (BHO) when the microturbine is under service; and (3) microturbine only when boiler heat input requirements fall below 2 MMBtu/hr. This capability resulted in a burner turndown performance of nearly 10/1, a key advantage for this technology over conventional low NOx burners. Key components were then assembled into a cabinet with additional support systems for generator cooling and fuel supply. System checkout and performance tests were performed in the laboratory. The assembled system and its support equipment were then shipped and installed at a host facility where final performance tests were conducted following efforts to secure fabrication, air, and operating permits. The installed power burner is now in commercial operation and has achieved all the performance goals.

20 FOSSIL-FUELED POWER PLANTS↗

Energy Efficiency and Conservation Block Grant (EECBG) - Better Buildings Neighborhood Program at Greater Cincinnati Energy Alliance: Home Performance with Energy Star® and Better Buildings Performance

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR® Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organization’s investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliance’s two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Zones Study: A Comprehensive Web-Based Mapping Tool to Identify and Analyze Clean Energy Zones in the Eastern Interconnection

This report describes the work conducted in support of the Eastern Interconnection States’ Planning Council (EISPC) Energy Zones Study and the development of the Energy Zones Mapping Tool performed by a team of experts from three National Laboratories. The multi-laboratory effort was led by Argonne National Laboratory (Argonne), in collaboration with the National Renewable Energy Laboratory (NREL) and Oak Ridge National Laboratory (ORNL). In June 2009, the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory published Funding Opportunity Announcement FOA-0000068, which invited applications for interconnection-level analysis and planning. In December 2009, the Eastern Interconnection Planning Collaborative (EIPC) and the EISPC were selected as two award recipients for the Eastern Interconnection. Subsequently, in 2010, DOE issued Research Call RC-BM-2010 to DOE’s Federal Laboratories to provide research support and assistance to FOA-0000068 awardees on a variety of key subjects. Argonne was selected as the lead laboratory to provide support to EISPC in developing a methodology and a mapping tool for identifying potential clean energy zones in the Eastern Interconnection. In developing the EISPC Energy Zones Mapping Tool (EZ Mapping Tool), Argonne, NREL, and ORNL closely collaborated with the EISPC Energy Zones Work Group which coordinated the work on the Energy Zones Study. The main product of the Energy Zones Study is the EZ Mapping Tool, which is a web-based decision support system that allows users to locate areas with high suitability for clean power generation in the U.S. portion of the Eastern Interconnection. The mapping tool includes 9 clean (low- or no-carbon) energy resource categories and 29 types of clean energy technologies. The EZ Mapping Tool contains an extensive geographic information system database and allows the user to apply a flexible modeling approach for the identification and analysis of potential energy zones and is publicly available at http://eispctools.anl.gov. In addition to enabling EISPC members and other stakeholders to identify areas with a high concentration of clean energy resources that could provide significant power generation in the future, another objective of the study was to promote open and transparent collaboration among state-level energy planning and regulatory agencies and to foster consistent and coordinated direction for regional and interconnection-level electricity analyses and planning. Funding for the project was provided by DOE’s Office of Electricity Delivery and Energy Reliability (DOE/OE) under the American Recovery and Reinvestment Act. Page

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Current Density, Long Life Cathodes for High Power RF Sources

This program was tasked with improving the quality and expanding applications for Controlled Porosity Reservoir (CPR) cathodes. Calabazas Creek Research, Inc. (CCR) initially developed CPR cathodes on a DOE-funded SBIR program to improve cathodes for magnetron injection guns. Subsequent funding was received from the Defense Advanced Research Projects Agency. The program developed design requirements for implementation of the technology into high current density cathodes for high frequency applications. During Phase I of this program, CCR was awarded the prestigious 2011 R&D100 award for this technology. Subsequently, the technology was presented at numerous technical conferences. A patent was issued for the technology in 2009. These cathodes are now marketed by Semicon Associates, Inc. in Lexington, KY. They are the world’s largest producer of cathodes for vacuum electron devices. During this program, CCR teamed with Semicon Associates, Inc. and Ron Witherspoon, Inc. to improve the fabrication processes and expand applications for the cathodes. Specific fabrications issues included the quality of the wire winding that provides the basic structure and the sintering to bond the wires into a robust, cohesive structure. The program also developed improved techniques for integrating the resulting material into cathodes for electron guns.

43 PARTICLE ACCELERATORS↗