Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

SRF Systems for ASTA at Fermilab

The Advanced Superconducting Test Accelerator (ASTA) at Fermilab now being commissioned is comprised of a number of superconducting RF systems including single-cavity cryomodules and a TESLA/ILC style 8-cavity cryomodule. Two of them, 'Capture Cavity 2' and 'Cryomodule 2', have been cooled to 2 Kelvin and brought into operation. We provide an overview of the unique characteristics of each of the systems, commissioning experience, and latest results including their respective operating characteristics.

43 PARTICLE ACCELERATORS↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

FLUKA-MARS15 simulations to optimize the Fermilab PIP-II movable beam absorber

PIP-II is the Fermilab's flagship project to provide powerful, high-intensity proton beams to the laboratory's experiments. The heart of the PIP-II project is an H- 800 MeV superconducting linear accelerator. In order to commission the beam and operate safely the linac, several constraints were evaluated. The design of a movable 5 kW beam absorber was finalized to allow staged beam commissioning in different linac locations. Prompt and residual radiation levels were calculated, and radiation shields were optimized to keep those values within the acceptable levels in the areas surrounding beam absorber. Monte Carlo calculations with FLUKA and MARS15 codes are presented in the paper to support these studies.

43 PARTICLE ACCELERATORS↗

CEBAF Photo Gun RF System

During the CEBAF 12 GeV Upgrade at Jefferson Lab, a fourth experimental hall, ?D?, was added to the existing three halls. To produce four beams and deliver them to all halls concurrently requires new frequencies and a new timing pattern of the electron bunches. Since a photo-gun is used to produce electron bunches, the gun?s drive laser pulses need to be synchronized with the required bunch rate frequencies of 499 MHz or 249.5 MHz. To meet these new operational requirements, the new LLRF system has been proposed. Very specific requirements (dual frequency operation) on one side and the simple RF drive mode operation on the other imply the use of a commercial off-the-shelf digital platform rather than a system typical for RF cavity field control. We have chosen the Texas Instruments FPGA board along with a high-speed 8-Channel, 14-Bit board, and a 4-Channel, 16-Bit board. The DAC board includes the clock generator for clocking ADCs, DACs and the FPGA. The only custom design section of the system is the RF Front End board. The complete Gun Laser LLRF system has been designed, built, and recently commissioned in the CEBAF Injector. This paper will detail the design and report on commissioning activities.

Plawski, Tomasz↗

Accelerator Physics Lessons From CBETA, the First Multi-turn SRF ERL

The Cornell-BNL ERL Test Accelerator (CBETA) has been designed, constructed, and commissioned in a collaboration between Cornell and Brookhaven National Laboratory (BNL). It focuses on energy-saving measures in accelerators, including permanent magnets, energy recovery, and superconductors; it has thus been referred to as a green accelerator. CBETA has become the world's first Energy Recovery Linac (ERL) that accelerates through multiple turns and then recovers the energy in superconducting radiofrequency (SRF) cavities though multiple decelerating turns. The energy is then available to accelerate more beam. It has also become the first accelerator that operates 7 beams in the same large-energy aperture Fixed Field Alternating-gradient (FFA) lattice. The FFA is constructed of permanent combined function magnets and transports energies of 42, 78, 114, and 150 MeV simultaneously. Accelerator physics lessons from the commissioning period will be described and applications of such an accelerator from hadron cooling to EUV lithography and from nuclear physics to a compact Compton source will be discussed.

Deitrick, K. E.↗

High-Field Design Concept for Second Interaction Region of the Electron-Ion Collider

Efficient realization of the scientific potential of the Electron Ion Collider (EIC) calls for addition of a future second Interaction Region (2nd IR) and a detector in the RHIC IR8 region after the EIC project completion. The second IR and detector are needed to independently cross-check the results of the first detector, and to provide measurements with complementary acceptance. The available space in the existing RHIC IR8 and maximum fields achievable with NbTi superconducting magnet technology impose constraints on the 2nd IR performance. Since commissioning of the 2nd IR is envisioned in a few years after the first IR, such a long time frame allows for more R&D on the Nb₃Sn magnet technology. Thus, it could provide a potential alternative technology choice for the 2nd IR magnets. Presently, we are exploring its potential benefits for the 2nd IR performance, such as improvement of the luminosity and acceptance, and are also assessing the technical risks associated with use of Nb₃Sn magnets. In this paper, we present the current progress of this work.

43 PARTICLE ACCELERATORS↗

New Improved Horizontal Electropolishing System for SRF Cavities

The best performance of niobium SRF accelerating cavities is obtained with surfaces smoothed with electropolishing chemical finishing. Jefferson Lab has recently specified, procured, installed, and commissioned a new versatile production electropolishing (EP) tool. Experience with EP research and operations at JLab as well as vendor interactions and experience guided development of the system specification. Detailed design and fabrication was awarded by contract to Semiconductor Process Equipment Corporation (SPEC). The delivered system was integrated into the JLab chemroom infrastructure and commissioned in 2020. The new EP tool provides much improved heat exchange from the circulating H₂SO₄/HF electrolyte and also the cavity via variable temperature external cooling water flow, resulting in quite uniform cavity wall temperature control and thus improved removal uniformity. With the JLab infrastructure, stabilized process temperature as low as 5 C is available. We describe the system and illustrate operational modes in this contribution.

Reece, C. E.↗

FIRST RESULTS FROM Nb3Sn COATINGS OF 2.6 GHz Nb SRF CAVITIES USING DC CYLINDRICAL MAGNETRON SPUTTERING SYSTEM

A DC cylindrical magnetron sputtering system has been commissioned and operated to deposit Nb3Sn onto 2.6 GHz Nb SRF cavities. After optimizing the deposition conditions in a mock-up cavity, Nb-Sn films are deposited first on flat samples by multilayer sequential sputtering of Nb and Sn, and later annealed at 950 °C for 3 hours. X-ray diffraction of the films showed multiple peaks for the Nb3Sn phase and Nb (substrate). No peaks from any Nb-Sn compound other than Nb3Sn were detected. Later three 2.6 GHz Nb SRF cavities are coated with ~1 µm thick Nb3Sn. The first Nb3Sn coated cavity reached close to Eacc = 8 MV/m, demonstrating a quality factor Q0 of 3.2 × 108 at Tbath = 4.4 K and Eacc = 5 MV/m, about a factor of three higher than that of Nb at this temperature. Q0 was close to 1.1 × 109, dominated by the residual resistance, at 2 K and Eacc = 5 MV/m. The Nb3Sn coated cavities demonstrated Tc in the range of 17.9 ? 18 K. Here, we present the commissioning experience, system optimization, and the first results from the Nb3Sn fabrication on flat samples and SRF cavities.

Shakel, M.S.↗

HP-FLEX: Field demonstration of the semantics-driven configuration of a Model Predictive Control system to make heat pumps flexible

Model Predictive Control (MPC) has demonstrated significant potential for optimizing building operations and enabling demand flexibility. However, the widespread adoption of MPC is hindered by complex manual configuration and commissioning processes that must be conducted by control experts working alongside building operators. These challenges drive up costs and reduce scalability, particularly when technical human resources and building automation systems are limited, such as in small and medium commercial buildings (SMCBs). This paper demonstrates how semantic standards, specifically ASHRAE 223P, can accelerate the adoption of MPC applications for load flexibility in SMCBs. The authors present a replicable control framework, titled “HP-FLEX” that leverages a building’s semantic model to bootstrap the required data configuration for an MPC controller developed for optimizing heat pump systems as flexible grid resources. The semantic model helps streamline the deployment workflow, particularly for site setup, data/control commissioning, and model setup. This integration enhances portability, transferability, and scalability of the HP-FLEX MPC, which has been developed to support MPC-based supervisory HVAC controllers in SMCBs. Additionally, the paper details the required building and thermostat metadata information to enable the HP-FLEX MPC based on field demonstrations. The new workflow was tested in a small commercial building located in California, U.S., and demonstrated a load shifting performance of 9% based on a dynamic pricing signal that varies by the hour. This work provides a practical pathway for transitioning sophisticated building applications from custom to standardized semantic representations, supporting the broader adoption of advanced control strategies like MPC. The framework also establishes a foundation for evolving metadata requirements as applications mature while maintaining compatibility with industry standards.

Paul, Lazlo↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Storage

This paper presents a prototype methodology to assess the possible transition of Class II carbon dioxide-enhanced oil recovery (CO2-EOR) wells to Class VI wells. The focus is on wellbore construction materials—casing, cement, tubing, and the packer—and includes comprehensive workflows to evaluate these materials, with primary emphasis on compliance with Environmental Protection Agency (EPA) Class VI well construction and conversion guidelines. These workflows systematically assess material properties and performance criteria to ensure regulatory compliance and optimize long-term wellbore integrity and functionality. Utilizing Python scripts and JavaScript Object Notation (JSON) representations, the study automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on workflow criteria. By emphasizing critical factors such as casing integrity, cementing techniques, tubing compatibility, and packer selection, the methodology helps well owners and operators prioritize wells for potential reuse as CO2 injection wells. Given limitations in digitized data, manual user verification is required in some sections. Future improvements include integrating non-digitized data through web scraping and machine learning techniques. This research serves as a practical guide for stakeholders, supporting environmental compliance and sustainable well operations.

geologic carbon sequestration↗

Review of Quantitative Software Reliability Methods

The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems using dynamic PRA methods. These efforts, documented in NUREG/CR-6901, NUREG/CR-6942, and NUREG/CR-6985, included a functional representation of the system's software but did not explicitly address failure modes caused by software defects or by inadequate design requirements. An important identified research need is to establish a commonly accepted basis for incorporating the behavior of software into digital I&C system reliability models for use in PRAs. To address this need, BNL is exploring the inclusion of software failures into the reliability models of digital I&C systems, such that their contribution to the risk of the associated NPP can be assessed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HTGR Dust Safety Issues and Needs for Research and Development

This report presents a summary of high temperature gas-cooled reactor dust safety issues. It draws upon a literature review and the proceedings of the Very High Temperature Reactor Dust Assessment Meeting held in Rockville, MD in March 2011 to identify and prioritize the phenomena and issues that characterize the effect of carbonaceous dust on high temperature reactor safety. It reflects the work and input of approximately 40 participants from the U.S. Department of Energy and its National Labs, the U.S. Nuclear Regulatory Commission, industry, academia, and international nuclear research organizations on the topics of dust generation and characterization, transport, fission product interactions, and chemical reactions. The meeting was organized by the Idaho National Laboratory under the auspices of the Next Generation Nuclear Plant Project, with support from the U.S. Nuclear Regulatory Commission. Information gleaned from the report and related meetings will be used to enhance the fuel, graphite, and methods technical program plans that guide research and development under the Next Generation Nuclear Plant Project. Based on meeting discussions and presentations, major research and development needs include: generating adsorption isotherms for fission products that display an affinity for dust, investigating the formation and properties of carbonaceous crust on the inside of high temperature reactor coolant pipes, and confirming the predominant source of dust as abrasion between fuel spheres and the fuel handling system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FY11 annual Report: PHEV Engine Control and Energy Management Strategy

Objectives are to: (1) Investigate novel engine control strategies targeted at rapid engine/catalyst warming for the purpose of mitigating tailpipe emissions from plug-in hybrid electric vehicles (PHEV) exposed to multiple engine cold start events; and (2) Validate and optimize hybrid supervisory control techniques developed during previous and on-going research projects by integrating them into the vehicle level control system and complementing them with the modified engine control strategies in order to further reduce emissions during both cold start and engine re-starts. Approach used are: (1) Perform a literature search of engine control strategies used in conventional powertrains to reduce cold start emissions; (2) Develop an open source engine controller providing full access to engine control strategies in order to implement new engine/catalyst warm-up behaviors; (3) Modify engine cold start control algorithms and characterize impact on cold start behavior; and (4) Develop an experimental Engine-In-the-Loop test stand in order to validate control methodologies and verify transient thermal behavior and emissions of the real engine when combined with a virtual hybrid powertrain. Some major accomplishments are: (1) Commissioned a prototype engine controller on a GM Ecotec 2.4l direct injected gasoline engine on an engine test cell at the University of Tennessee. (2) Obtained from Bosch (with GM's approval) an open calibration engine controller for a GM Ecotec LNF 2.0l Gasoline Turbocharged Direct Injection engine. Bosch will support the bypass of cold start strategies if calibration access proves insufficient. The LNF engine and its open controller were commissioned on an engine test cell at ORNL. (3) Completed a literature search to identify key engine cold start control parameters and characterized their impact on the real engine using the Bosch engine controller to calibrate them. (4) Ported virtual hybrid vehicle model from offline simulation environment to real-time Hardware-In-the-Loop platform.

33 ADVANCED PROPULSION SYSTEMS↗

Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase (Final Scientific/Technical Report)

The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperature compensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations, and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and showcase events include San Antonio and Austin, Texas. In summary, the project objectives were achieved in the following ways: Through presentations and papers provided to a variety of audiences in multiple venues, the project team fulfilled its goal of providing education and outreach on hydrogen technology to statewide audiences. The project team generated interest that exists well beyond the completion of the project, and indeed, helped to generate financial support for a subsequent hydrogen vehicle project in Austin. The University of Texas, Center for ElectroMechanics operated the fuel cell-electric Ebus vehicle for over 13,000 miles in Austin, Texas in a variety of routes and loading configurations. The project took advantage of prior efforts that created a hydrogen fueling station and fuel cell electric-hybrid bus and continued to verify their technical foundation, while informing and educating potential future users of how these technologies work.

03 NATURAL GAS↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel

The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ ISFSIs are adequately managed for the period of extended operation. To date, all of the ISFSIs located across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years; three ISFSIs (Surry, H.B. Robinson and Oconee) have received their renewed licenses for 20 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. This report examines issues related to managing aging effects on the SSCs in DCSSs/ISFSIs for extended long-term storage and transportation of used fuels, following an approach similar to that of the Generic Aging Lessons Learned (GALL) report, NUREG-1801, for the aging management and license renewal of nuclear power plants. The report contains five chapters and an appendix on quality assurance for aging management programs for used-fuel dry storage systems. Chapter I of the report provides an overview of the ISFSI license renewal process based on 10 CFR 72 and the guidance provided in NUREG-1927. Chapter II contains definitions and terms for structures and components in DCSSs, materials, environments, aging effects, and aging mechanisms. Chapter III and Chapter IV contain generic TLAAs and AMPs, respectively, that have been developed for managing aging effects on the SSCs important to safety in the dry cask storage system designs described in Chapter V. The summary descriptions and tabulations of evaluations of AMPs and TLAAs for the SSCs that are important to safety in Chapter V include DCSS designs (i.e., NUHOMS{reg_sign}, HI-STORM 100, Transnuclear (TN) metal cask, NAC International S/T storage cask, ventilated storage cask (VSC-24), and the Westinghouse MC-10 metal dry storage cask) that have been and continue to be used by utilities across the country for dry storage of used fuel to date. The goal of this report is to help establish the technical basis for extended long-term storage and transportation of used fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluating utility owned electric energy storage systems: a perspective for state electric utility regulators

This report provides a perspective on issues pertaining to the deployment of utility owned electrical energy storage. The intended audience includes state electric utility regulatory authorities, their staffs and the planning personnel in the utilities they regulate. Its purpose is to inform the audience about the potential opportunities for energy storage technologies to play a greater role in the evolving electricity marketplace and grid. The surge of investments in renewable energy (RE) during the last decade, particularly wind and solar energy has stimulated interest in energy storage. These technologies have the capability to balance the variability inherent in many RE technologies. The state public utility commissions’ (PUC) responsibility for regulating utilities leads to a focus on aspects of grid operations and expansion including: voltage and frequency regulation; distributed generation; renewable energy, particularly the administration of Renewable Portfolio Standards (RPS) mandates; and grid capital investment. Energy storage systems can contribute in each of these areas. Given the potential of energy storage technologies to perform these functions, their access to the regulatory process must be improved together with removal of barriers and appropriate and consistent cost benefit analysis methodologies so that they are routinely included in the suite of options considered for providing key grid services. The solutions that deliver the services cost effectively will likely be the solutions put forth by utilities and approved by utility commissions. Two storage system case studies are presented as a means to illustrate some of the fundamental valuation principles particularly pertinent to energy storage systems.

Bhatnagar, Dhruv↗

Advanced Energy Retrofit Guide (AERG): Practical Ways to Improve Energy Performance; Healthcare Facilities (Book)

The Advanced Energy Retrofit Guide for Healthcare Facilities is part of a series of retrofit guides commissioned by the U.S. Department of Energy. By presenting general project planning guidance as well as detailed descriptions and financial payback metrics for the most important and relevant energy efficiency measures (EEMs), the guides provide a practical roadmap for effectively planning and implementing performance improvements in existing buildings. The Advanced Energy Retrofit Guides (AERGs) are intended to address key segments of the U.S. commercial building stock: retail stores, office buildings, K-12 schools, grocery stores, and healthcare facilities. The guides' general project planning considerations are applicable nationwide; the energy and cost savings estimates for recommended EEMs were developed based on energy simulations and cost estimates for an example hospital tailored to five distinct climate regions. These results can be extrapolated to other U.S. climate zones. Analysis is presented for individual EEMs, and for packages of recommended EEMs for two project types: existing building commissioning projects that apply low-cost and no-cost measures, and whole-building retrofits involving more capital-intensive measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel – Revision 1

Because there is currently no designated disposal site for used nuclear fuel in the United States, the nation faces the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation, and 2. A description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific.

Chopra, O. K.↗