Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Research in Support of the Use of Rankine Cycle Energy Conversion Systems for Space Power and Propulsion

This is the report of a Scientific Working Group (SWG) formed by NASA to determine the feasibility of using a liquid metal cooled nuclear reactor and Rankine energy conversion cycle for dual purpose power and propulsion in space. This is a high level technical report which is intended for use by NASA management in program planning. The SWG was composed of a team of specialists in nuclear energy and multiphase flow and heat transfer technology from academia, national laboratories, NASA and industry. The SWG has identified the key technology issues that need to be addressed and have recommended an integrated short term (approx. 2 years) and a long term (approx. 10 year) research and development (R&D) program to qualify a Rankine cycle power plant for use in space. This research is ultimately intended to give NASA and its contractors the ability to reliably predict both steady and transient multiphase flow and heat transfer phenomena at reduced gravity, so they can analyze and optimize designs and scale-up experimental data on Rankine cycle components and systems. In addition, some of these results should also be useful for the analysis and design of various multiphase life support and thermal management systems being considered by NASA.

Lahey, Richard T., Jr.↗

Thermoelectric Devices Advance Thermal Management

Thermoelectric (TE) devices heat, cool, and generate electricity when a temperature differential is provided between the two module faces. In cooperation with NASA, Chico, California-based United States Thermoelectric Consortium Inc. (USTC) built a gas emissions analyzer (GEA) for combustion research. The GEA precipitated hydrocarbon particles, preventing contamination that would hinder precise rocket fuel analysis. The USTC research and design team uses patent-pending dimple, pin-fin, microchannel and microjet structures to develop and design heat dissipation devices on the mini-scale level, which not only guarantee high performance of products, but also scale device size from 1 centimeter to 10 centimeters. USTC continues to integrate the benefits of TE devices in its current line of thermal management solutions and has found the accessibility of NASA technical research to be a valuable, sustainable resource that has continued to positively influence its product design and manufacturing

Source record↗

Development of Life Support System Technologies for Human Lunar Missions

With the Preliminary Design Review (PDR) for the Orion Crew Exploration Vehicle planned to be completed in 2009, Exploration Life Support (ELS), a technology development project under the National Aeronautics and Space Administration s (NASA) Exploration Technology Development Program, is focusing its efforts on needs for human lunar missions. The ELS Project s goal is to develop and mature a suite of Environmental Control and Life Support System (ECLSS) technologies for potential use on human spacecraft under development in support of U.S. Space Exploration Policy. ELS technology development is directed at three major vehicle projects within NASA s Constellation Program (CxP): the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems, including habitats and pressurized rovers. The ELS Project includes four technical elements: Atmosphere Revitalization Systems, Water Recovery Systems, Waste Management Systems and Habitation Engineering, and two cross cutting elements, Systems Integration, Modeling and Analysis, and Validation and Testing. This paper will provide an overview of the ELS Project, connectivity with its customers and an update to content within its technology development portfolio with focus on human lunar missions.

Barta, Daniel J.↗

NASA Missions Inspire Online Video Games

Fast forward to 2035. Imagine being part of a community of astronauts living and working on the Moon. Suddenly, in the middle of just another day in space, a meteorite crashes into the surface of the Moon, threatening life as you know it. The support equipment that provides oxygen for the entire community has been compromised. What would you do? While this situation is one that most people will never encounter, NASA hopes to place students in such situations - virtually - to inspire, engage, and educate about NASA technologies, job opportunities, and the future of space exploration. Specifically, NASA s Learning Technologies program, part of the Agency s Office of Education, aims to inspire and motivate students to pursue careers in the science, technology, engineering, and math (STEM) disciplines through interactive technologies. The ultimate goal of these educational programs is to support the growth of a pool of qualified scientific and technical candidates for future careers at places like NASA. STEM education has been an area of concern in the United States; according to the results of the 2009 Program for International Student Assessment, 23 countries had higher average scores in mathematics literacy than the United States. On the science literacy scale, 18 countries had higher average scores. "This is part of a much bigger picture of trying to grow skilled graduates for places like NASA that will want that technical expertise," says Daniel Laughlin, the Learning Technologies project manager at Goddard Space Flight Center. "NASA is trying to increase the number of students going into those fields, and so are other government agencies."

Source record↗

Software Engineering for Human Spaceflight

The Spacecraft Software Engineering Branch of NASA Johnson Space Center (JSC) provides world‐class products, leadership, and technical expertise in software engineering, processes, technology, and systems management for human spaceflight. The branch contributes to major NASA programs (e.g. ISS, MPCV/Orion) with in‐house software development and prime contractor oversight, and maintains the JSC Engineering Directorate CMMI rating for flight software development. Software engineering teams work with hardware developers, mission planners, and system operators to integrate flight vehicles, habitats, robotics, and other spacecraft elements. They seek to infuse automation and autonomy into missions, and apply new technologies to flight processor and computational architectures. This presentation will provide an overview of key software‐related projects, software methodologies and tools, and technology pursuits of interest to the JSC Spacecraft Software Engineering Branch.

Fredrickson, Steven E.↗

Underestimation of Project Costs

Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

Cost estimation↗

Weather Intelligent Navigation Data and Models for Aviation Planning (WINDMAP)

WINDMAP addresses the emerging needs in the aviation community of providing real-time weather forecasting to improve the safety of low altitude aircraft operations. This is accomplished through the integration of real-time observations from autonomous systems, such as drones and urban air taxis, with numerical weather prediction models and flight management and safety systems. To solve this problem, several technical challenges have been identified. These include (1) developing autonomous UAS capable of conducting observations accurately and reliably; (2) determining the number and frequency of required observations and the sensitivity of these observations in data sparse regions of the lower atmosphere;(3) assimilating dense observational data into models in real-time with sufficient resolution and accuracy; (4) developing novel physics-based reduced order models capable of incorporating diverse data sets; and (5)integrating real-time forecasting into UTM and DAA (detect-and-avoid) architectures for path planning and navigation. The goal of this proposed effort is to demonstrate the value of using small UAS to collect measurements of the dynamic and thermodynamic properties of the lower atmosphere at scales that match or exceed the spatio-temporal resolution of today’s best numerical weather prediction models

Koushik Datta↗

SpaceVPX Interoperability Assessment

The existing VMEbus (VersaModular Eurocard bus) International Trade Association (VITA)-78 industry standard, also known as SpaceVPX, is an avionics board- and chassis-level standard derived from the OpenVPX standard as defined in VITA-65. While VITA-65 defines backplane and board-level profiles from COTS vendors to ensure interoperability of products used in developing systems and subsystems, the VITA-78 standard defines SpaceVPX to incorporate fault tolerance features that are required by many spaceflight systems. However, VITA-78 allows so much flexibility that interoperability between modules cannot be assured. This assessment provides guidelines on the use of, and extensions to, the VITA-78 standard to enable avionics interoperability for future NASA missions. The assessment team was comprised of subject matter experts (SMEs) from Goddard Space Flight Center (GSFC), the Jet Propulsion Laboratory (JPL), Johnson Space Center (JSC), and Langley Research Center (LaRC). The team included valuable external consulting support from a SME who was a key participant in the development of the VITA-78 standard. The team had extensive collaboration with the NASA Space Technology Mission Directorate (STMD) High Performance Spaceflight Computing (HPSC) project, specifically in the development of SpaceVPX interconnect findings, observations, and NESC recommendations. To provide an understanding of the breadth of implementations that SpaceVPX must accommodate, multiple NASA use cases were analyzed to assess the requirements for SpaceVPX implementations across a wide range of NASA missions (Appendix C). Applications included crewed missions, science missions, and orbital and surface robotic systems. Product surveys were conducted to assess the level of industry support for SpaceVPX, applications, and the variations in their implementations (Appendix D). In-depth analysis was conducted in the areas of: (a) power management and distribution, (b) form factors and daughtercards, (c) interconnect, and (d) fault tolerance. Leveraging the use cases, product surveys, and SMEs from multiple NASA Centers, these areas were analyzed to determine the range of implementations permitted by the VITA-78 standard and potential interoperability issues. Applicable findings and NESC recommendations were provided for each area. During this assessment, there were multiple opportunities to engage with other agencies to learn about their interest in SpaceVPX, their strategies for implementing SpaceVPX-based systems, and their internal development efforts. These engagements also generated findings and NESC recommendations. Based on this assessment analysis, NESC recommendations were made regarding the feature set and module profiles to support NASA SpaceVPX implementations. This feature set includes restrictions on features in VITA-78, and extensions to the standard. Key recommendations in this area include the use of 10 Gigabit Ethernet and Peripheral Component Interconnect Express (PCIe) as high bandwidth interconnect on the backplane, the retention of SpaceWire interconnect for control functions, and support for 3U (unit) and 6U, form factors for NASA systems. Restrictions were proposed on the usage of user-defined signals to promote interoperability, and specific power managements and distribution schemes for 3U systems. Beyond the technical implementation of SpaceVPX, recommendations were made on areas that warrant further investigation. Primary among these is the recommendation for NASA to collaborate with other space-going agencies and industry to incorporate recommendations into a future ‘dot spec’ of VITA-78. This would ensure wide adoption and availability of the modules that comply with the specification. The assessment includes appendices with candidate module profiles that can be considered as a starting point for this activity, and example systems based on the recommendations. Follow-on studies are recommended for architectures beyond SpaceVPX to address potential enhancements including condensed set of interconnect, software required to implement protocol layers on the interconnect (and other features), alternative power architectures, and system-level testability.

SpaceVPX↗

Advanced Technology Infusion into Spacesuit Systems

Advancement in technology drives our future. The successful implementation of a technology drives its possibilities. The National Aeronautics and Space Administration (NASA) has invested in numerous technologies that have proved to be successful. The desire is to learn from those successes. For a technology to evolve, become a reality, and infuse into NASA’s missions, a compilation of success-oriented factors must exist for the technology to reach fruition. Understanding these factors could help decrease the complexity of technology infusion and bridge the gap between technology developers and system integrators. The knowledge gained could facilitate the design, development, test, and infusion of a technology to be more effective and efficient. Successful technology infusion is complex and can be even more daunting when advanced technologies are infused into complicated systems. NASA, industry, and academia desire to understand the infusion process, along with measuring the success of infusing an advanced technology into a complex system. This paper focuses on complicated systems that necessitate successful infusion of technologies. These systems include NASA’s spacesuits used for extravehicular activity, including the Apollo Extravehicular Mobility Unit (EMU), the Shuttle/International Space Station EMU, and the Exploration EMU (xEMU) architectures. Several life support technologies will be addressed in the xEMU. Those technologies will be discussed, along with a methodology for assessing infusion pathways. The infusion pathways of these life support technologies into spacesuit architectures can form the benchmark for technology infusion into other architectures for lunar and Martian surfaces. The spacesuit system architectures as case studies can provide the foundation of technical knowledge to help NASA and industry’s project managers and system managers integrate advanced technologies more effectively and efficiently.

Cinda Chullen↗

IMPLEMENTING CYBERSECURITY INTO AN EXISTING NATIONAL NUCLEAR NON-PROLIFERATION PROGRAMME – A CASE STUDY

Cyber threat profiling and risk mitigation is critical to any nuclear state organization and should be considered as part of any comprehensive nuclear security programme. Defining and evaluating the impact of the cyber threat to mission can be challenging. An existing national nuclear non-proliferation organization undertook an effort to incorporate computer security activities into its programme to address cyber risk. One of the primary goals of this endeavour was to develop a set of prioritised recommendations for organizational follow-through. The organization dedicated subject matter expert resources in the form of a cyber task force to support this goal. Opportunities were identified where computer security could be built into each programme including office-level strategies and tools. Of course, no new identified threat vector is easily considered and incorporated into existing programmes without impact. There are many obstacles to be overcome. Technically literate subject matter experts are difficult to find, management has comparatively less experience applying computer security into its programmes, and trying to change the culture to consider computer security risk at policy and programmatic levels takes time and management attention. As an outcome of this process, a roadmap for program integration was developed, including the establishment of a cyber support team. This paper will discuss the challenges and successes associated with establishing such a team.

Cyber Security, Nuclear, Non-proliferation↗

NREL Project CloudZero

The National Renewable Energy Laboratory's (NREL's) CloudZero project is evaluating the ability to reliably and securely manage complex energy systems from the cloud, identifying major technical and regulatory barriers to cloud adoption, suggesting new security controls and best practices for cloud applications, and empowering industry to embrace the cloud, where appropriate.

cloud↗

NGNP Risk Management through Assessing Technology Readiness

Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

42 ENGINEERING↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportunities for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Office of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamination, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR community will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Planetary Protection↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportunities for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Office of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamination, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR community will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Elaine Seasly↗

Investigation and Recovery Following the Drum Event at INL's ARP-V Facility - 19517

Contractors working under the Department of Energy's (DoE's) Idaho Field Office have been exhuming and processing buried legacy waste from early weapons development and productions operations since 1984. Since operations began, nearly 400,000 drums have passed through this process. On April 11, 2018, repackaged drums were staged in an airlock (radiological buffer area) awaiting transfer to another facility for characterization. Late in the evening after operations had ended, four of the drums over pressurized causing an energetic displacement of their lids. A significant fraction of drum contents was ejected and dispersed throughout the airlock. The event activated the fire detection system in the facility initiating an emergency response from the site fire department, radiological protection, and operations. Initial intervention by fire department personnel was unsuccessful at quenching the reaction, so the responders egressed to a safe distance and monitored the situation. After determining the event had terminated and it was safe to enter, the facility was assessed revealing significant contamination in the airlock from the ejected waste. The area surrounding the facility was surveyed and it was determined that no contamination was released outside the facility. The Fluor Idaho, LLC (Fluor Idaho) Program Manager commissioned an investigation and recovery effort, which focused on three aspects: (1) technical investigation, (2) event and causal analysis, and (3) facility recovery. A team of highly qualified individuals from around the DOE Complex was assembled to support the technical investigation. The team included representatives from several Fluor Idaho, Fluor Corporate, Battelle Energy Alliance, LLC (INL), LANL, SRNL, South West Research Institute, DOE Carlsbad Field Office, and Defense Nuclear Facility Safety Board, and DOE-Headquarters. This team addressed the reaction mechanism of the event by guiding the sampling activities and coordinating analysis and testing by the analytical laboratories. Independent and experienced investigators were brought in to conduct a rigorous event and cause analysis. The Causal Analysis Team pursued direct, root, and contributing causes. Interviews were conducted, and documents were reviewed to develop an event and causal analysis. The Accelerated Retrieval Project V Operations team mobilized to decontaminate and recover the facility. Significant progress has been made in this effort, area and airborne contamination levels have been significantly reduced allowing limited activities to resume. In addition, this group supported sample collection efforts as directed by the Technical Investigation Team. This paper reviews key findings and milestones from the technical investigation, the event and causal analysis, and facility recovery operations. From these elements of the investigation, lessons learned are identified that would benefit other organizations involved with legacy waste management and disposition. Waste management is common to all sites in the DOE Complex and the events and recovery efforts described in this paper may provide beneficial insights to these operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Flagship Missions to Reduce Cost and Schedule

Flagship missions are highly complex with highly nested systems. This level of complexity poses unique management problems as complexity influences risk which, in turn, affects cost and schedule. Establishing a strong technical and programmatic leadership team is critical to mission success. Developing and using a mission architecture is critical to informing the management organization, product ownership, interface and integration relationships, schedule organization, and integration and test paths. In highly nested systems, the mission phasing can be significantly out of sync with product phasing. Targeted technology development prior to Phase A is critical to reducing risk. Early architecture, concept design, and requirements development is critical to reducing risk. Modular design; pathfinders; parallel manufacturing and integration and test paths; and properly handling institutional requirements across interfaces are all management techniques that can be applied to reduce risk. NASA’s large strategic missions, sometimes referred to as flagship missions, are designed to provide answers to some of the most compelling scientific questions being asked. These types of missions are a series of highly nested subsystems that pose unique management problems when compared to more traditional instrument and spacecraft designs. They typically have an overall architecture that is very complex and nested; they typically require a tremendous amount of technology development; they typically involve many contractors and subcontractors with many associated contracts; and they typically involve staff from all over the world. Successful management of a flagship requires the balance between science requirements, engineering and technology capabilities, and resource constraints. Mismanaging these flagship missions can and will lead to significant cost and schedule growth, both of which are detrimental to NASA’s overall reputation which, in turn, is detrimental to the development of future flagship missions. While many of the same management principles used on smaller instruments and spacecraft are relevant, managing flagship missions requires an evolution of those current best practices to better address the specific needs and additional complexity and vastness of these missions. This paper explores how to leverage lessons learned from previous flagship missions to better manage flagship missions in the future.

Hylan, Jason↗

Tethys Knowledge Management System: Working to Advance the Marine Renewable Energy Industry

Purpose: This paper discusses an ongoing process to assist with the advancement of worldwide understanding of the environmental effects of marine renewable energy (MRE) through a public, online knowledge management system known as Tethys (https://tethys.pnnl.gov). Understanding potential environmental impacts can reduce expensive monitoring requirements and promote growth of this emerging industry. Approach: Tethys acts as the central repository for information in a landscape where literature and knowledge are scattered and difficult to find, providing access for an international audience of stakeholders and the public. An intuitive and flexible design has been developed over 8 years of operation, pairing content curation with synthesis and engagement to enhance the impact of knowledge management. Findings: Tethys has become internationally recognized and trusted as an honest broker of information. A community of participants that use Tethys resources and contributes content has grown to almost 50,000 people around the world, annually. Engineering and siting challenges continue to stall the deployment and establishment of the MRE industry, but progress has been made towards retiring environmental risks and facilitating progression in deploying and operating devices. Practical Implications: The need for knowledge management is particularly important when information is scattered, as is often the case with emerging industries. Tethys serves as an example of intentional design and intuitive organization for knowledge management. Value of Paper: This paper discusses focused knowledge management methods with international cooperation and public engagement to advance an emerging technical industry.

Whiting, Jonathan M.↗

Technical Risks Associated with Heat Melt Compaction Systems

The processing of trash and waste is a welcome and valuable addition to humans living and working in space. Besides the obvious desire to have a pleasant and productive habitation environment, trash management has many practicalbenefits for crew health, resource recovery, and volume reclamation through garbage compaction. The Trash Compaction and Processing System (TCPS), which is a NASA project to develop a trash processing system for long-duration spaceflight, is currently undergoing concept development with engineering prototype validation through two contracted efforts. The development efforts are being supported with activities associated with the NASA Generation 2 Heat Melt Compactor (HMC). The HMC is a facility that compacts trash, recovers water, heats the trash to eliminate biological activity, and manages gas and vapor effluents. The resulting residual processed trash is a compact tile that is free of biological growth and that can be used for augmenting radiation shields. The work being conducted with the HMC focuses on high risk technical areas with respect to operations, subsystem performance, and ISS effluent management interface requirements. This paper gives an overview of the technical risks and the current use of the HMC as a facility for reducing risk.

HMC↗