Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy

The Coastal Ohio Wind Project was created to establish the viability of wind turbines on the coastal and offshore regions of Northern Ohio. The project’s main goal was to improve operational unit strategies used for environmental impact assessment of offshore turbines on lake wildlife by optimizing and fusing data from the multi-instrument surveillance system and providing an engineering analysis of potential design/operational alternatives for offshore wind turbines. The project also developed a general economic model for offshore WTG deployment to quantify potential revenue losses due to wind turbine shutdown related to ice and avian issues. In a previous phase of this project (Award Number: DE-FG36-06GO86096), we developed a surveillance system that was used to collect different parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species, movements of birds and bats, and bird calls for assessing patterns and peak passage rates during migration. To derive such parameters we used thermal IR imaging cameras, acoustic recorders, and marine radar Furuno (XANK250), which was coupled with a XIR3000B digitizing card from Russell Technologies and open source radR processing software. The integration yielded a development of different computational techniques and methods, which we further developed and optimized as a combined surveillance system. To accomplish this task we implemented marine radar calibration, optimization of processing parameters, and fusion of the multi-sensor data in order to make inferences about the potential avian targets. The main goal of the data fusion from the multi-sensor environment was aimed at reduction of uncertainties while providing acceptable confidence levels with detailed information about the migration patterns. Another component comprised of an assessment of wind resources in a near lake environment and an investigation of the effectiveness of ice coating materials to mitigate adverse effects of ice formation on wind turbine structures. Firstly, a Zephir LiDAR system was acquired and installed at Woodlands School in Huron, Ohio, which is located near Lake Erie. Wind resource data were obtained at ten measurement heights, 200m, 150m, 100m, 80m, 60m, 40m, 38m, 30m, 20m, and 10m. The Woodlands School’s wind turbine anemometer also measured the wind speed at the hub height. These data were collected for approximately one year. The hub anemometer data correlated well with the LiDAR wind speed measurements at the same height. The data also showed that on several days different power levels were recorded by the turbine at the same wind speed as indicated by the hub anemometer. The corresponding LiDAR data showed that this difference can be attributed to variability in the wind over the turbine rotor swept area, which the hub anemometer could not detect. The observation suggests that single point hub wind velocity measurements are inadequate to accurately estimate the power generated by a turbine at all times since the hub wind speed is not a good indicator of the wind speed over the turbine rotor swept area when winds are changing rapidly. To assess the effectiveness of ice coatings to mitigate the impact of ice on turbine structures, a closed-loop icing research tunnel (IRT) was designed and constructed. By controlling the temperature, air speed, water content and liquid droplet size, the tunnel enabled consistent and repeatable ice accretion under a variety of conditions with temperatures between approximately 0°C and -20°C and wind speeds up to 40 miles per hour in the tunnel’s test section. The tunnel’s cooling unit maintained the tunnel temperature within ±0.2°C. The coatings evaluated in the study were Boyd Coatings Research Company’s CRC6040R3, MicroPhase Coatings Inc.’s PhaseBreak TP, ESL and Flex coatings. Similar overall performance was observed in all coatings tested in that water droplets form on the test articles beginning at the stagnation region and spreading in the downstream direction in time. When comparing ice accumulation characteristics for the four coatings tested, for ice thickness during accumulation the CRC6040R3 had the least, followed by the ESL, Flex, and TP. However, when comparing the coatings’ ability to reduce ice adhesion, the Flex showed the highest adhesion reduction, followed by the ESL, TP and CRC 6040R3 coatings. The ice accumulated on the Flex coated surface shed under gravity when rotated 90 degrees following the tests while the other coatings required application of varying degrees of force to remove the ice. In conclusion, the ice coatings tested were not sufficient in preventing ice accumulation on all surfaces. However, Flex coating shows promise in mitigating ice on the rotor blades under the gravitational and centrifugal forces. Only the effect of gravity in shedding the ice was considered in this study. Further research will be needed to evaluate this coating on rotating blades in the icing tunnel to characterize its effectiveness. Lastly, the development of economic feasibility models used existing approaches adapted for offshore deployment in marine settings to one more suitable for Lake Erie deployment. Two different wind turbine models were tested and dynamic return on investment (ROI) model scenarios were generated. For the purpose of estimating power generation three bladed wind turbines of 3 MW capacity were selected including Model1- Leitwind LTW101-3.000-kW and Model2-Vostro V90-3.0 MW. The analysis were based on the revenue aspect of decision making of deploying wind turbines in the Ohio coastal region. The installation cost, maintenance and operational aspects were disregarded due to unavailability of data. The adjusted varying price (residential and industrial sector) and projected future price of electricity in different years suggested that the Leitwind model could generate $\$ $32.4 million of revenue in 25 years if the supply electricity is in the residential sector, while it would be $\$ $14.7million if the supply is in the industrial sector. For the Vostro model these figures are $\$ $28.6 million for residential sector and $\$ $12.9 million for industrial sector for 25 years.

17 WIND ENERGY↗

Quantifying EGS Reservoir Complexity with an Integrated Geophysical Approach-Improved Resolution Ambient Seismic Noise Interferometry

The primary goal of the project was met, as improved resolution (from kilometers to tens/hundreds of meters and to a depth of at least 3 km) was added to the seismic interferometry-estimated parameters relative to the work reported in AltaRock Energy Inc. (2014) for the Dixie Valley Geothermal Wellfield. A procedure for initial fault identification, using seismic interferometry, was developed. The project team further improved, and applied a new, cost-effective, and non-invasive exploration method, developed and validated since 2010, during two previous experiments, at Dixie Valley and Soda Lake, Nevada. The method, initially designed for hydrothermal exploration, was adapted to EGS exploration conditions, which require deeper crustal information. Regions of elevated energy for both the 2-7 Hz and 5-15 Hz frequency bands are located above intersections of multiple faults. Thus, an unprecedented, innovative seismic field deployment and ambient seismic noise and signal processing were successfully used to estimate crustal structure and to identify fault locations at depths up to 3 km, at a cost per kilometer of survey that in some cases may be as much as ten times less than the cost of a controlled-source survey. Based on valid and useful seismic data collected and analyzed during Phase I, in Phase II the team has further quantified statistically the advantage of using seismic analysis, in combination with other geological and geophysical techniques, for EGS target identification. A power spectral density analysis of the passive-seismic empirical Green’s functions reveals significantly higher power recorded over the exploration area at the power plant, and in the drilling area, near the BB station 10201, especially on the horizontal components. In this study, the most important relationship observed during the prior report, namely the one between velocity and temperature was explored. The areas that show anomalously high predicted temperature in the geostatistics occur where multiple faults intersect. Not surprisingly, such areas span between the Dixie Valley range front fault and the basin-ward Piedmont faults, in the vicinity of numerous wells. These locations also fall in the area of high EGS favorability from the prior 2014 study. The anomalies also coincide with the high power spectral density values. The result of altering all favorability criteria for the new data reached a maximum of 1/8th of a point and were not large enough to change any favorability value reported in the 2014 study. The new data reinforce the results obtained from the previous 2014 study. The current high-resolution ambient seismic noise project provided excellent results in defining faults in the wellfield. As such the identification of known faults by the project demonstrated the utility of this method for identifying faults at an exploration stage in geothermal development. Such fault identification, while extremely useful in exploration investigation, has not added sufficient new data for the generation of significantly different DVGW favorability maps in the current project. We believe the cost savings of our passive-seismic technique for EGS, over common industry active-source survey techniques, may have a minimum of 30%, and a maximum of 90%. There are many significant non-cost benefits of passive seismic surveys. Our passive-source method provides an environmentally-friendly seismic survey with minimal to negligible impacts. The economic benefit is greater EGS project feasibility.

15 GEOTHERMAL ENERGY↗

Investigation of spectral analysis techniques for randomly sampled velocimetry data

It is well known that velocimetry (LV) generates individual realization velocity data that are randomly or unevenly sampled in time. Spectral analysis of such data to obtain the turbulence spectra, and hence turbulence scales information, requires special techniques. The 'slotting' technique of Mayo et al, also described by Roberts and Ajmani, and the 'Direct Transform' method of Gaster and Roberts are well known in the LV community. The slotting technique is faster than the direct transform method in computation. There are practical limitations, however, as to how a high frequency and accurate estimate can be made for a given mean sampling rate. These high frequency estimates are important in obtaining the microscale information of turbulence structure. It was found from previous studies that reliable spectral estimates can be made up to about the mean sampling frequency (mean data rate) or less. If the data were evenly samples, the frequency range would be half the sampling frequency (i.e. up to Nyquist frequency); otherwise, aliasing problem would occur. The mean data rate and the sample size (total number of points) basically limit the frequency range. Also, there are large variabilities or errors associated with the high frequency estimates from randomly sampled signals. Roberts and Ajmani proposed certain pre-filtering techniques to reduce these variabilities, but at the cost of low frequency estimates. The prefiltering acts as a high-pass filter. Further, Shapiro and Silverman showed theoretically that, for Poisson sampled signals, it is possible to obtain alias-free spectral estimates far beyond the mean sampling frequency. But the question is, how far? During his tenure under 1993 NASA-ASEE Summer Faculty Fellowship Program, the author investigated from his studies on the spectral analysis techniques for randomly sampled signals that the spectral estimates can be enhanced or improved up to about 4-5 times the mean sampling frequency by using a suitable prefiltering technique. But, this increased bandwidth comes at the cost of the lower frequency estimates. The studies further showed that large data sets of the order of 100,000 points, or more, high data rates, and Poisson sampling are very crucial for obtaining reliable spectral estimates from randomly sampled data, such as LV data. Some of the results of the current study are presented.

Sree, Dave↗

Optimization models for integrated biorefinery operations

Variations of physical and chemical characteristics of biomass lead to an uneven flow of biomass in a biorefinery, which reduces equipment utilization and increases operational costs. Uncertainty of biomass supply and high processing costs increase the risk of investing in the US’s cellulosic biofuel industry. We propose a stochastic programming model to streamline processes within a biorefinery. A chance constraint models system’s reliability requirement that the reactor is operating at a high utilization rate given uncertain biomass moisture content, particle size distribution, and equipment failure. The model identifies operating conditions of equipment and inventory level to maintain a continuous flow of biomass to the reactor. Furthermore, the sample average approximation method approximates the chance constraint and a bisection search-based heuristic solves this approximation. A case study is developed using real-life data collected at Idaho National Laboratory’s biomass processing facility. An extensive computational analysis indicates that sequencing of biomass bales based on moisture level, increasing storage capacity, and managing particle size distribution, increases utilization of the reactor and reduces operational costs.

09 BIOMASS FUELS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Molecular-based analysis of nanoparticle solvation: Classical density functional approach

Proper statistical mechanics understanding of nanoparticle solvation processes requires an accurate description of the molecular structure of the solvent. Achieving this goal with standard molecular dynamics (MD) simulation methods is challenging due to large length scales. An alternative approach to this problem can be formulated using classical density functional theory (cDFT), where a full configurational description of the positions of all the atoms is replaced by collective atomic site densities in the molecule. Using an example of the negatively charged silica-like system in an aqueous polar environment represented by a two-site water model, we demonstrate here that cDFT can reproduce MD data at a fraction of the computational cost. An important implication of this result is the ability to understand how the solvent molecular features may affect the system’s properties at the macroscopic scale. A concrete example highlighted in this work is the analysis of nanoparticle interactions with sizes of up to 100 nm in diameter.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Low Cost Entry, Descent, and Landing (EDL) Instrumentation for Planetary Missions

Missions that involve traversing through a planetary atmosphere are unique opportunities that require elements of entry, descent, and landing (EDL). Many aspects of the EDL sequence are qualified using analysis and simulation due to the inability to conduct appropriate ground tests, however validating flight data are often lacking, especially for missions not involving Earth re-entry. NASA has made strategic decisions to collect EDL flight data in order to improve future mission designs. For example, MEDLI1 and EFT-1 gathered hypersonic pressure and in-depth temperature data in the thermal protection system (TPS). However, the ability to collect EDL flight data from the smaller competed missions, such as Discovery and New Frontiers, has been limited in part due to the Principal Investigator-managed cost-caps (PIMCC). The recent NASA decision to consider EDL instrumentation earlier in the mission design cycle led to the inclusion of a requirement in the Discovery 2014 Announcement of Opportunity which requires all missions that involve EDL to include an Engineering Science Investigation (ESI).2 The ESI would involve sensors for aerothermal environment and TPS; atmosphere, aerodynamics, and flight dynamics; atmospheric decelerator; and/or vehicle structure.3 The ESI activity would be funded outside of the PIMCC.

and Landing↗

Tandem Photovoltaics Core Program Final Technical Report

The Tandem Photovoltaics Core Program was a multi-year initiative aimed at advancing hybrid tandem solar cell technologies to enhance solar module efficiency beyond the limits of single junction devices. This project focused on the development, testing, and scaling of prototype photovoltaic devices, with the goal of achieving commercial relevance and driving industry adoption. The work was divided into three tasks: 1) Comparative Analysis of Tandem Technologies: This task focused on quantifying energy yield under real-world conditions and assessing economic viability of tandems relative to silicon-based modules. The project's modeling framework incorporated performance data, cost of materials, and manufacturing process impacts to optimize tandem designs 2) Tandem Integration and Prototyping: In this task, we developed innovative tandem designs by combining metal halide perovskite (MHP) top cells and silicon (Si) bottom cells. The project focuses on both mechanical integration and direct deposition techniques to enable compatibility with commercially relevant Si technologies, such as passivated contact or PERC cells. 3) Scale-up and Reliability: This task addressed the challenges of large-area fabrication by developing scalable deposition methods and robust interconnection schemes for tandems. The project looked at different accelerated testing such as thermal cycling, damp heat exposure, and potential induced degradation, to ensure long-term stability of devices in field conditions. Tandem solar cells can greatly increase module efficiency beyond conventional single junction (SJ) devices, which are approaching their theoretical limit. There are many ways to fabricate a tandem cell or module in terms of materials used, configuration, and terminal connection. This SETO core project focused critical factors in enabling tandems to enter the market, including hardware integration, technoeconomic analysis (TEA), and energy yield analysis. We focused on MHP/Si hybrid tandem solar cells and modules as a model system for their versatility in module design comparisons, providing valuable insights for other tandem options. While champion cells with areas <1cm2 are regularly demonstrated by groups around the world, it is significantly more challenging to translate these advances into modules, and fewer institutions and companies are working at the module level. This project addressed questions about module fabrication, testing, and reliability that are hard to answer without actually fabricating prototypes. We also performed analysis and road-mapping activities to understand the potential for a wider variety of tandems, including all-perovskite tandems fabricated in collaboration with the Perovskite PV core program. Detailed technical results from this project are described for each task in Section 7.

14 SOLAR ENERGY↗

What is Team X?

Team X is a concurrent engineering team for rapid design and analysis of space mission concepts. It was developed in 1995 by JPL to reduce study time and cost. More than 1100 studies have been completed It is institutionally endorsed and it has been emulated by many institutions. In Concurrent Engineering (i.e., Parallel) diverse specialists work in real time, in the same place, with shared data, to yield an integrated design

Concurrent Engineering↗

Local Power: Comparing County-Level Renewable Energy Potential to Consumption Using the SLOPE Platform

Wide-scale deployment of renewable energy technologies has the potential to significantly reduce greenhouse gas emissions and mitigate the effects of climate change. Many communities have ambitious clean energy goals with targets for locally generated renewable energy. To inform state and local clean energy planning, analysts from the Joint Institute for Strategic Energy Analysis (JISEA) and National Renewable Energy Laboratory (NREL) used data from NREL's State and Local Planning for Energy (SLOPE) platform to compare annual technical generation potential of renewable energy technologies to modeled electricity consumption in every county of the contiguous United States. Annual costs were calculated to produce a 20% share of electricity consumed annually from each technology to examine localized cost effectiveness of a diversified mix of generation sources. For example, combining distributed and utility-scale wind and solar generation can offset the need for storage and nonintermittent fossil resources to achieve high deployment of renewables. This county-level analysis provides insight into where localized renewable energy generation could cost-effectively match annual electricity consumption.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IER 489: Critical Unresolved Region Integral Experiment (CURIE) CEDT Phase-2 Final Design

The final design for the CURIE integral benchmark experiment is presented in this report. Measurements will be performed on the Comet vertical assembly machine and include various critical configurations consisting of High Enriched Uranium (HEU) metal plates and Teflon moderator plates surrounded by a thick copper reflector. The various configurations with different Teflon plate thickness planned allow for complimentary measurements with differing nuclear data sensitivity in the Unresolved Resonance Region (URR). Similar to previously performed Zeus experiments, the proposed work will serve to validate vital nuclear data quantities and uncertainties and identify deficiencies in current radiation transport codes. Additionally, it will assess the applicability of optimization approaches to nuclear critical experiment design. The final experiment design is detailed in this report and includes design, optimization, uncertainty and continuous-energy nuclear data sensitivity analysis for the final experimental configurations that will provide the basis for a future benchmark evaluation intended for submission to the International Criticality Safety Benchmark Evaluation Project (ICSBEP) Handbook [1]. This document discusses the method, approach, considerations and final design chosen with conclusions. It also includes cost and schedule. The basis and principles of this document come from the preliminary design report [2]. Section 2 discusses the content and potential impact; section 3 gives an overview of the nuclear data and unresolved resonance region; section 4 gives a summary of the work done during the preliminary design; section 5 discusses the machine learning method and principles used for final design; section 6 summaries the results from final design; section 7 provides conclusions and the range of configurations chosen to carry forward to experiment execution; and section 8 includes a summary of costs.

42 ENGINEERING↗

Evaluation of In Silico Multifeature Libraries for Providing Evidence for the Presence of Small Molecules in Synthetic Blinded Samples

The current gold standard for unambiguous molecular identification in metabolomics analysis is comparing two or more orthogonal properties from the analysis of authentic reference materials (standards) to experimental data acquired in the same laboratory with the same analytical methods. This represents a significant limitation for comprehensive chemical identification of small molecules in complex samples. The process is time-consuming and costly, and the majority of molecules are not yet represented by standards. Thus, there is a need to assemble evidence for the presence of small molecules in complex samples through the use of libraries containing calculated chemical properties. To address this need, we developed a Multi-Attribute Matching Engine (MAME) and a library derived in-part from our in silico Chemical Library Engine (ISiCLE). Here, we describe an initial evaluation of these methods in a blinded analysis of synthetic chemical mixtures as part of the U.S. Environmental Protection Agency’s (EPA) Non-Targeted Analysis Collaborative Trial (ENTACT, Phase 1). For molecules in all mixtures, the initial blinded false negative rate (FNR), false discovery rate (FDR), and accuracy were 57%, 77%, and 91%, respectively. For high evidence scores, the FDR was 35%. After unblinding of the sample compositions, we optimized the scoring parameters to better exploit the available evidence, and increased the accuracy for molecules suspected as present. The final FNR, FDR, and accuracy were 67%, 53%, and 96%, respectively. For high evidence scores, the FDR was 10%. This study demonstrates that multi-attribute matching methods in conjunction with in silico libraries may one day enable reduced reliance on experimentally-derived libraries for building evidence for the presence of molecules in complex samples.

Nunez, Jamie↗

Modeling Mycorrhizal Carbon Costs in Temperate Forests: The Impacts of Functional Diversity and Global Change Factors

Mycorrhizal fungi form symbiotic relationships with most plant species, facilitating nutrient acquisition while consuming a significant fraction of the plant's photosynthetic carbon (C), which we define as the mycorrhizal C cost. Drivers of the mycorrhizal C cost, which is crucial for predicting environmental impacts on plant productivity, remain under-explored and difficult to quantify. Ecosystem models that incorporate mycorrhizae can offer insights into mycorrhizal C cost dynamics, but their predictions have rarely been validated against empirical data. Here, in this study, we used the Myco-CORPSE model, which explicitly simulates mycorrhizal processes alongside soil carbon and nitrogen cycling, to investigate the drivers of mycorrhizal C cost in temperate forests. Applying this model to over 1,800 forest inventory plots across the eastern United States, we found that the simulations matched published data, showing higher C allocation to ectomycorrhizal (ECM) fungi (16.0% of net primary production (NPP)) compared to arbuscular mycorrhizal (AM) fungi (5.8% of NPP). Further analysis showed that mixed forests, co-dominated by both AM and ECM trees, allocated less C to mycorrhizal fungi compared to forests dominated by either AM or ECM fungi alone, due to complementary nutrient acquisition strategies. Elevated Nitrogen (N) deposition and higher temperatures reduce mycorrhizal C costs, favoring AM strategies. Conversely, elevated CO 2 (eCO 2 ) increased plant N demand and mycorrhizal C costs, favoring ECM strategies that access organic N sources. These findings underscore the critical role of mycorrhizal functional diversity in plant nutrient acquisition and C dynamics, providing new insights into how mycorrhizal symbioses respond to global change.

Shao, Siya [Dartmouth College, Hanover, NH (United↗

Engineering a Multimission Approach to Navigation Ground Data System Operations

The Mission Design and Navigation (MDNAV) Section at the Jet Propulsion Laboratory (JPL) supports many deep space and earth orbiting missions from formulation to end of mission operations. The requirements of these missions are met with a multimission approach to MDNAV ground data system (GDS) infrastructure capable of being shared and allocated in a seamless and consistent manner across missions. The MDNAV computing infrastructure consists of compute clusters, network attached storage, mission support area facilities, and desktop hardware. The multimission architecture allows these assets, and even personnel, to be leveraged effectively across the project lifecycle and across multiple missions simultaneously. It provides a more robust and capable infrastructure to each mission than might be possible if each constructed its own. It also enables a consistent interface and environment within which teams can conduct all mission analysis and navigation functions including: trajectory design; ephemeris generation; orbit determination; maneuver design; and entry, descent, and landing analysis. The savings of these efficiencies more than offset the costs of increased complexity and other challenges that had to be addressed: configuration management, scheduling conflicts, and competition for resources. This paper examines the benefits of the multimission MDNAV ground data system infrastructure, focusing on the hardware and software architecture. The result is an efficient, robust, scalable MDNAV ground data system capable of supporting more than a dozen active missions at once.

Mission Design and Navigation (MDNAV)↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 1: Summary of Utah FORGE Wells 16A(78)-32, 56-32, 78B-32 and 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

A comparison of cost and quality of three methods for estimating density for wild pig (Sus scrofa)

A critical element in efective wildlife management is monitoring the status of wildlife populations; however, resources to monitor wildlife populations are typically limited. We compared cost efectiveness of three common population estimation methods (i.e. non-invasive DNA sampling, camera sampling, and sampling from trapping) by applying them to wild pigs (Sus scrofa) across three habitats in South Carolina, U.S.A where they are invasive. We used mark-recapture analyses for fecal DNA sampling data, spatially-explicit capture-recapture analyses for camera sampling data, and a removal analysis for removal sampling from trap data. Density estimates were similar across methods. Camera sampling was the least expensive, but had large variances. Fecal DNA sampling was the most expensive, although this technique generally performed well. We examined how reductions in efort by method related to increases in relative bias or imprecision. For removal sampling, the largest cost savings while maintaining unbiased density estimates was from reducing the number of traps. For fecal DNA sampling, a reduction in efort only minimally reduced costs due to the need for increased lab replicates while maintaining high quality estimates. For camera sampling, efort could only be marginally reduced before inducing bias. We provide a decision tree for researchers to help make monitoring decisions.

54 ENVIRONMENTAL SCIENCES↗

Thermal Testing Quality Assurance of 24LCC & 3LCC Electronic Packages

The purpose of this project is to experimentally validate the thermal fatigue life of solder interconnects for a variety of surface mount electronic packages. Over the years, there has been a significant amount of research and analysis in the fracture of solder joints on printed circuit boards. Solder is important in the mechanical and electronic functionality of the component. It is important throughout the life of the product that the solder remains crack and fracture free. The specific type of solder used in this experiment is a 63Sn37Pb eutectic alloy. Each package was manufactured with conformal coating along with and without an underfill material below the device. Conformal coating helps protect the board from environments such as electrostatic discharge and humidity. It is commonly used in broad types of engineering disciplines such as commercial, military, research and development, etc. Conformal coating can also pose a risk for the life of the board because of its high thermal expansion coefficient. This can greatly decrease the life of the product if it regularly sees high temperature variations. This leads to a shorter fatigue life of the solder. The fatigue life is a common mechanical problem in the field of electronic devices. Adding underfill can help increase the fatigue life of the solder. However, applying underfill adds time to manufacturing and production. This ultimately increases the cost per unit. The study of conformal coated printed circuit boards with and without underfill was done on two different surface mount electronic packages. The electronic packages studied were 24 and 3 contact Leadless Ceramic Chips packages. When the package was not underfilled, the coating was allowed to flow underneath. The assembly was analyzed and tested to obtain the best available combination of conformal coating, underfill, and potting to design the most robust and reliable circuit board while keeping in mind certain factors such as cost, manufacturing time, and need. Different types of conformal coatings were considered with and without underfill for each device. 29 of each component were manufactured to have a large sample size and for the sake of individual defects and imperfections. Finite Element Analysis (FEA) was performed by an engineer at Sandia National Laboratories for both Leadless Ceramic Chips. From the FEA results, a test acceleration profile was derived and the number of temperature cycles to fail the solder interconnects were found for three different cases. Experimentation was done as a secondary measure to validate this data to show confidence in the theoretical analysis. Accelerated testing functions as a quality check for the product. Accelerated testing is extremely useful in the research and development phase of engineering. It can save money from the potential of early life defects and the costs that come along with warranties. Accelerated testing makes a weaker design more robust and checks the reliability of a strong design in a shorter period of time. It is extremely helpful in a world where deliverables are in high demand and scheduling is tight. Accelerated testing helps the engineer gain an understanding of what needs to be improved and what works well. There are many different types of accelerated tests. Our circuit boards were accelerated inside a closed thermal chamber because of the high number of use cycles. The ultimate goal of this experimentation is to help identify what will prevent any premature cracking or fracturing in the solder alloy. It is important to understand that underfilling each component may or may not be needed. If underfill is not needed, there are several production benefits.

42 ENGINEERING↗

RDMA vs. RPC for Implementing Distributed Data Structures

Distributed data structures are key to implementing scalable applications for scientific simulations and data analysis. In this paper we look at two implementation styles for distributed data structures: remote direct memory access (RDMA) and remote procedure call (RPC). We focus on operations that require individual accesses to remote portions of a distributed data structure, e.g., accessing a hash table bucket or distributed queue, rather than global operations in which all processors collectively exchange information. We look at the trade-offs between the two styles through microbenchmarks and a performance model that approximates the cost of each. The RDMA operations have direct hardware support in the network and therefore lower latency and overhead, while the RPC operations are more expressive but higher cost and can suffer from lack of attentiveness from the remote side. We also run experiments to compare the real-world performance of RDMA- and RPC-based data structure operations with the predicted performance to evaluate the accuracy of our model, and show that while the model does not always precisely predict running time, it allows us to choose the best implementation in the examples shown. We believe this analysis will assist developers in designing data structures that will perform well on current network architectures, as well as network architects in providing better support for this class of distributed data structures.

distributed data structures↗