Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

The Decline of Jupiter's 13-cm Synchrotron Radio Emission During the Year Following the SL-9 Impacts

Measurements of Jupiter's microwave radio emission from 1990 through August 1995 are reported and analyzed to study the rate of decay in the synchrotron radiation following the dramatic increase observed in July 1994 during the week of impacts by fragments of Comet Shoemaker-Levy 9. The observations were made at 2295 MHz as part of the NASA-JPL Jupiter Patrol, a long-term radio astronomy monitoring program begun in 1971. Data from 34-meter and 70-meter antennas at the NASA's Deep Space Communication Complex at Goldstone, CA are used to estimate slope and curvature of plausible 'baselines' for Jupiter's non-thermal flux density over the five-year interval. These 'baseline' estimates are then used to derive decay times for the outburst emission related to the SL-9 impacts.

Jupiter SL-9↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Mars Soil-Based Resource Processing and Planetary Protection

The ability to extract and process resources at the site of exploration into products and services, commonly referred to as In Situ Resource Utilization (ISRU), can have significant benefits for robotic and human exploration missions. In particular, the ability to use in situ resources to make propellants, fuel cell reactants, and life support consumables has been shown in studies to significantly reduce mission mass, cost, and risk, while enhancing or enabling missions not possible without the incorporation of ISRU. In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study. For the first time in a large scale Mars architecture study, water from Mars soil was considered as a potential resource. At the time of the study, knowledge of water resources (their form, concentration, and distribution) was extremely limited. Also, due to lack of understanding of how to apply planetary protection rules and requirements to ISRU soil-based excavation and processing, an extremely conservative approach was incorporated where only the top several centimeters of ultraviolet (UV) radiated soil could be processed (assumed to be 3% water by mass). While results of the Mars DRA 5.0 study showed that combining atmosphere processing to make oxygen and methane with soil processing to extract water provided the lowest mission mass, atmosphere processing to convert carbon dioxide (CO2) into oxygen was baselined for the mission since it was the lowest power and risk option. With increased knowledge and further clarification of Mars planetary protection rules, and the recent release of the Mars Exploration Program Analysis Group (MEPAG) report on "Special Regions and the Human Exploration of Mars", it is time to reexamine potential water resources on Mars, options for soil processing to extract water, and the implications with respect to planetary protection and Special Regions on Mars.

Sanders, G. B.↗

Architecture for Mitigating Short-Term Warning Cosmic Threats: READI Project

Earth is being constantly bombarded by a large variety of celestial bodies and has been since its formation 4.5 billion years ago. Among those bodies, mainly asteroids and comets, there are those that have the potential to create large scale destruction upon impact. The only extinction-level impact recorded to date was 65 million years ago, during the era of dinosaurs. The probability of another extinction-level, or even city-killer, impact may be negligible, but the consequences can be severe for the biosphere and for our species. Therefore it is highly imperative for us to be prepared for such a devastating impact in the near future, especially since humanity is at the threshold of wielding technologies that allow us to do so. Majority of scientists, engineers, and policymakers have focused on long-term strategies and warning periods for Earth orbit crossing Near-Earth Objects (NEOs), and have suggested methods and policies to tackle such problems. However, less attention has been paid to short warning period NEO threats. Such NEOs test current technological and international cooperation capabilities in protecting ourselves, and can create unpredictable devastation ranging from local to global scale. The most recent example is the Chelyabinsk incident in Russia. This event has provided a wakeup call for space agencies and governments around the world towards establishing a Planetary Defense Program. The Roadmap for EArth Defense Initiative (READI) is a project by a team of international, intercultural, and interdisciplinary participants of the International Space University's Space Studies Program 2015 hosted by Ohio University, Athens, OH proposing a roadmap for space agencies, governments, and the general public to tackle NEOs with a short warning before impact. Taking READI as a baseline, this paper presents a technical description of methodologies proposed for detection and impact mitigation of a medium-sized comet (up to 800m across) with a short-warning period of two years on a collision course with Earth. The hypothetical comet is on a highly-inclined orbit having a high probability for Earth impact after its perihelion. For detection, we propose a space-based infrared detection system consisting of two satellites located at the Earth-Moon Lagrange points L1 and L2 coupled with space observatories, like the James Webb telescope and the Centennial telescope. These telescopes are supported by ground-based telescopes, like the Arecibo and Green Bank telescope, in the search for NEOs. Upon detection, the comet is tracked constantly using space- and ground-based telescopes. The deflection system is two-pronged, firstly involving the use of a high energy Directed Energy Laser Terminals (DELT) placed at Sun-Earth Lagrange points L4 and L5 so as to initiate and increase the ablation rate of the comet and deviate it from its collision trajectory, and secondly by the Hypervelocity Comet Intercept Vehicle (HCIV), a space-borne system combining a kinetic impactor with a thermonuclear device. The policy and international collaboration aspects to implement these methods are also outlined in the paper. The techniques mentioned could also be applied to mitigate medium-to-large sized asteroids (up to 2km across).

Laser Applications↗

Planetary Defense Architecture for Mitigating Short-Term Warning Cosmic Threats: READI Project

Earth is being constantly bombarded by a large variety of celestial bodies and has been since its formation 4.5 billion years ago. Among those bodies, mainly asteroids and comets, there are those that have the potential to create large scale destruction upon impact. The only extinction-level impact recorded to date was 65 million years ago, during the era of dinosaurs. The probability of another extinction-level, or even city-killer, impact may be negligible, but the consequences can be severe for the biosphere and for our species. Therefore it is highly imperative for us to be prepared for such a devastating impact in the near future, especially since humanity is at the threshold of wielding technologies that allow us to do so. Majority of scientists, engineers, and policymakers have focused on long-term strategies and warning periods for Earth orbit crossing Near-Earth Objects (NEOs), and have suggested methods and policies to tackle such problems. However, less attention has been paid to short warning period NEO threats. Such NEOs test current technological and international cooperation capabilities in protecting ourselves, and can create unpredictable devastation ranging from local to global scale. The most recent example is the Chelyabinsk incident in Russia. This event has provided a wakeup call for space agencies and governments around the world towards establishing a Planetary Defense Program. The Roadmap for EArth Defense Initiative (READI) is a project by a team of international, intercultural, and interdisciplinary participants of the International Space University's Space Studies Program 2015 hosted by Ohio University, Athens, OH proposing a roadmap for space agencies, governments, and the general public to tackle NEOs with a short warning before impact. Taking READI as a baseline, this paper presents a technical description of methodologies proposed for detection and impact mitigation of a medium-sized comet (up to 800m across) with a short-warning period of two years on a collision course with Earth. The hypothetical comet is on a highly-inclined orbit having a high probability for Earth impact after its perihelion. For detection, we propose a space-based infrared detection system consisting of two satellites located at the Earth-Moon Lagrange points L1 and L2 coupled with space observatories, like the James Webb telescope and the Centennial telescope. These telescopes are supported by ground-based telescopes, like the Arecibo and Green Bank telescope, in the search for NEOs. Upon detection, the comet is tracked constantly using space- and ground-based telescopes. The deflection system is two-pronged, firstly involving the use of a high energy Directed Energy Laser Terminals (DELT) placed at Sun-Earth Lagrange points L4 and L5 so as to initiate and increase the ablation rate of the comet and deviate it from its collision trajectory, and secondly by the Hypervelocity Comet Intercept Vehicle (HCIV), a space-borne system combining a kinetic impactor with a thermonuclear device. The policy and international collaboration aspects to implement these methods are also outlined in the paper. The techniques mentioned could also be applied to mitigate medium-to-large sized asteroids (up to 2km across).

Laser Applications↗

Core/Combustor-Noise Baseline Measurements for the DGEN Aeropropulsion Research Turbofan

Contributions from the combustor to the overall propulsion noise of civilian transport aircraft are starting to become important due to turbofan design trends and advances in mitigation of other noise sources. Future propulsion systems for ultra-efficient commercial air vehicles are projected to be of increasingly higher bypass ratio from larger fans combined with much smaller cores, with ultra-clean burning fuel-flexible combustors. Unless effective noise-reduction strategies are developed, combustor noise is likely to become a prominent contributor to overall airport community noise in the future. The new NASA DGEN Aeropropulsion Research Turbofan (DART) is a cost-efficient testbed for the study of core-noise physics and mitigation. This paper describes the recently completed DART core/combustor-noise baseline test in the NASA GRC Aero-Acoustic Propulsion Laboratory (AAPL). Acoustic data were simultaneously acquired using the AAPL overhead microphone array in the engine aft quadrant farfield, a single midfield microphone, and two semi-infinite-tube unsteady pressure sensors at the core-nozzle exit. Combustor-noise components of measured total-noise signatures were educed using a two-signal source-separation method and are found to occur in the expected frequency range. The acoustic data compare well with results from a limited 2014 feasibility test and will serve as a high-quality baseline for future research using the DART. The research described herein is aligned with the NASA Ultra-Efficient Commercial Transport strategic thrust and is supported by the NASA Advanced Air Vehicle Program, Advanced Air Transport Technology Project, under the Aircraft Noise Reduction Subproject.

Turbomachinery Noise↗

Core/Combustor-Noise Baseline Measurements for the DGEN Aeropropulsion Research Turbofan

Contributions from the combustor to the overall propulsion noise of civilian transport aircraft are starting to become important due to turbofan design trends and advances in mitigation of other noise sources. Future propulsion systems for ultra-efficient commercial air vehicles are projected to be of increasingly higher bypass ratio from larger fans combined with much smaller cores, with ultra-clean burning fuel-flexible combustors. Unless effective noise-eduction strategies are developed, combustor noise is likely to become a prominent contributor to overall airport community noise in the future. The new NASA DGEN Aeropropulsion Research Turbofan (DART) is a cost-efficient testbed for the study of core-noise physics and mitigation. This paper describes the recently completed DART core/combustor-noise baseline test in the NASA GRC Aero-Acoustic Propulsion Laboratory (AAPL). Acoustic data was simultaneously acquired using the AAPL overhead microphone array in the engine aft quadrant far field, a single midfield microphone, and two semi-infinite-tube unsteady pressure sensors at the core-nozzle exit. Combustor-noise components of measured total-noise signatures were educed using a two-signal source-separation method and are found to occur in the expected frequency range. The acoustic data compares well with results from a limited 2014 feasibility test and will serve as a high-quality baseline for future research using the DART. The research described herein is aligned with the NASA Ultra-Efficient Commercial Transport strategic thrust and is supported by the NASA Advanced Air Vehicle Program, Advanced Air Transport Technology Project, under the Aircraft Noise Reduction Subproject.

Aeroacoustics↗

Optimization of the Lucy Interplanetary Trajectory via Two-Point Direct Shooting

Lucy is NASA’s next Discovery-class mission and will explore the Trojan asteroids in the Sun-Jupiter L4 and L5 regions. This paper details the design of Lucy’s interplanetary trajectory using a two-point direct shooting transcription, nonlinear programming, and monotonic basin hopping. These techniques are implemented in the Evolutionary Mission Trajectory Generator (EMTG), a trajectory optimization tool developed at NASA Goddard Space Flight Center. We present applications to the baseline trajectory design, Monte Carlo analysis, and operations.

Lucy↗

Enabling Global Lunar Access for Human Landing Systems Staged at Earth-Moon L2 Southern Near Rectilinear Halo and Butterfly Orbits

NASA’s Artemis program will return astronauts to the lunar surface using a Human Landing System staged at Gateway’s 9:2 L2 southern NRHO. The current study explores global lunar access for Gateway’s baseline NRHO and a comparable butterfly orbit. Additionally, increasing transfer time and loitering in low lunar orbit are analyzed to reduce lunar surface access costs. The results show selecting the optimal staging orbit for a landing site, increasing transfer times, and leveraging low lunar orbit loiter greatly reduce performance requirements.

Zachary D May↗

Advancement of the General Aviation Synthesis Program Using Python to Enable Optimization-Based Hybrid-Propulsion Aircraft Design

In support of Electrified Powertrain Flight Demonstrator and Advanced Air Transport Technologies programs at NASA, engineers at NASA Ames and NASA Glenn Research Centers have developed a new tool for coupled engine and airframe optimization and analysis. The new tool combines the engineering-level analysis methods of the FORTRAN General Aviation Synthesis Program (GASP) with the OpenMDAO framework to handle highly coupled problems that legacy tools struggle to optimize. The tool has been verified to match GASP with good agreement on a 737 MAX8 baseline vehicle closure problem, and preliminary efforts have been made to integrate the pyCycle thermodynamic cycle analysis tool for electrified engine optimization in the context of a vehicle optimization problem.

Kenneth R. Lyons↗

Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced launch system. Advanced development oxidizer turbopump program

On May 19, 1989, Pratt & Whitney was awarded contract NAS8-37595 by the National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville Alabama for an Advanced Development Program (ADP) to design, develop and demonstrate a highly reliable low cost, liquid oxygen turbopump for the Advanced Launch System (ALS). The ALS had an overall goal of reducing the cost of placing payloads in orbit by an order of magnitude. This goal would require a substantial reduction in life cycle costs, with emphasis on recurring costs, compared to current launch vehicles. Engine studies supporting these efforts were made for the Space Transportation Main Engine (STME). The emphasis on low cost required design simplification of components and subsystems such that the ground maintenance and test operations was minimized. The results of the Oxygen Turbopump ADP technology effort would provide data to be used in the STME. Initially the STME baseline was a gas generator cycle engine with a vacuum thrust level of 580,000 lbf. This was later increased to 650,000 lbf and the oxygen turbopump design approach was changed to reflect the new thrust level. It was intended that this ADP program be conducted in two phases. Phase 1, a basic phase, would encompass the preliminary design effort, and Phase II, an optional contract phase to cover design, fabrication and test evaluation of an oxygen turbopump at a component test facility at the NASA John C. Stennis Space Center in Mississippi. The basic phase included preliminary design and analysis, evaluation of low cost concepts, and evaluation of fabrication techniques. The option phase included design of the pump and support hardware, analysis of the final configuration to ensure design integrity, fabrication of hardware to demonstrate low cost, DVS Testing of hardware to verify the design, assembly of the turbopump and full scale turbopump testing. In December 1990, the intent of this ADP to support the design and development was changed. The design effort for the oxygen turbopump became part of the STME Phase B contract. The status of the pump design funded through this ADP was presented at the Preliminary Design Review (PDR) at the MSFC on October 24, 1990. Advancements in the design of the pump were subsequently continued under the Phase B Contract. The emphasis of this ADP became the demonstration of individual technologies that would have the greatest potential for reducing the recurring cost and increasing reliability. In October of 1992, overall program funding was reduced and work on this ADP was terminated.

Source record↗

Mars Ascent Vehicle-Propellant Aging

This project is to develop and test a new propellant formulation specifically for the Mars Ascent Vehicle (MAV) for the robotic Mars Sample Return mission. The project was initiated under the Planetary Sciences Division In-Space Propulsion Technology (ISPT) program and is continuing under the Mars Exploration Program. The two-stage, solid motor-based MAV has been the leading MAV solution for more than a decade. Additional studies show promise for alternative technologies including hybrid and bipropellant options, but the solid motor design has significant propellant density advantages well suited for physical constraints imposed while using the SkyCrane descent stage. The solid motor concept has lower specific impulse (Isp) than alternatives, but if the first stage and payload remain sufficiently small, the two-stage solid MAV represents a potential low risk approach to meet the mission needs. As the need date for the MAV slips, opportunities exist to advance technology with high on-ramp potential. The baseline propellant for the MAV is currently the carboxyl terminated polybutadiene (CTPB) based formulation TP-H-3062 due to its advantageous low temperature mechanical properties and flight heritage. However, the flight heritage is limited and outside the environments, the MAV must endure. The ISPT program competed a propellant formulation project with industry and selected ATK to develop a new propellant formulation specifically for the MAV application. Working with ATK, a large number of propellant formulations were assessed to either increase performance of a CTPB propellant or improve the low temperature mechanical properties of a hydroxyl terminated polybutadiene (HTPB) propellant. Both propellants demonstrated potential to increase performance over heritage options, but an HTPB propellant formulation, TP-H-3544, was selected for production and testing. The test plan includes propellant aging first at high vacuum conditions, representative of the Mars transit, followed by an additional year at simulated Mars surface conditions. The actual Mars surface environment is based on the igloo design, actively maintains the propellant at or above -40 degC, 95% carbon dioxide at Mars surface pressure. The NASA Marshall Space Flight Center (MSFC) Mars environment test facility is shown in figure 1 and located in the East Test area of Redstone Arsenal due to storage of live propellants. The facility consists of a vacuum chamber placed inside a large freezer unit. The facility includes pressure and temperature monitoring equipment in addition to a vacuum quality monitoring system spectrometer to record any outgassing products.

Dankanich, John↗

Propulsion Induced Effects Test Program

The objective of this milestone is to assess the propulsion/airframe integration characteristics of the Technology Concept Airplane and design variations through computational analysis and experimental subsonic through supersonic wind tunnel testing. The Milestone will generate a comprehensive CFD and wind tunnel data base of the baseline, and design variations. Emphasis will be placed on establishing the propulsion induced effects on the flight performance of the Technology Concept Airplane with all appropriate wind tunnel corrections.

Cappuccio, Gelsomina↗

Space Transportation Engine Program (STEP), phase B

The Space Transportation Engine Program (STEP) Phase 2 effort includes preliminary design and activities plan preparation that will allow smooth and time transition into a Prototype Phase and then into Phases 3, 4, and 5. A Concurrent Engineering approach using Total Quality Management (TQM) techniques, is being applied to define an oxygen-hydrogen engine. The baseline from Phase 1/1' studies was used as a point of departure for trade studies and analyses. Existing STME system models are being enhanced as more detailed module/component characteristics are determined. Preliminary designs for the open expander, closed expander, and gas generator cycles were prepared, and recommendations for cycle selection made at the Design Concept Review (DCR). As a result of July '90 DCR, and information subsequently supplied to the Technical Review Team, a gas generator cycle was selected. Results of the various Advanced Development Programs (ADP's) for the Advanced Launch Systems (ALS) were contributive to this effort. An active vehicle integration effort is supplying the NASA, Air Force, and vehicle contractors with engine parameters and data, and flowing down appropriate vehicle requirements. Engine design and analysis trade studies are being documented in a data base that was developed and is being used to organize information. To date, seventy four trade studies were input to the data base.

Source record↗

NASA's satellite relay tracking and data acquisition program

The Tracking and Data Acquisition System (TDAS) is currently being planned to support NASA missions and the Space Station and will serve as a replacement to the present Tracking and Data Relay Satellite System (TDRSS). Its operational date is currently projected for the late 1990s. Near term objectives involve the definition of a TDAS architecture, the development of functional and performance specifications and implementation of a TDRSS-to-TDAS transition plan. The present paper provides an overview of the baseline TDAS architecture and summarizes key ingredients of system and technology studies in progress. In particular, this paper addresses a summary of projected mission requirements for the TDAS era; a characterization of the space segment constellation; use of lasers, 60 GHz, and multibeam 30/20 GHz technologies; ground architecture and operational interfaces; a distributed hardware/software processing concept for more flexible and reliable interfaces, signal processing and operations. Also included is a status summary of the TDAS program plan for the 1984-1990 time frame. Finally, an overview is presented of NASA's current plans to augment the TDRSS to meet the Space Station IOC requirements in the time period 1993-2000.

Schwartz, J. J.↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 1: Executive summary

The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.

Source record↗

NASA-UVA Light Aerospace Alloy and Structure Technology Program Supplement: Aluminum-Based Materials for High Speed Aircraft

This is the final report of the study "Aluminum-Based Materials for High Speed Aircraft" which had the objectives (1) to identify the most promising aluminum-based materials with respect to major structural use on the HSCT and to further develop those materials and (2) to assess the materials through detailed trade and evaluation studies with respect to their structural efficiency on the HSCT. The research team consisted of ALCOA, Allied-Signal, Boeing, McDonnell Douglas, Reynolds Metals and the University of Virginia. Four classes of aluminum alloys were investigated: (1) I/M 2XXX containing Li and I/M 2XXX without Li, (2) I/M 6XXX, (3) two P/M 2XXX alloys, and (4) two different aluminum-based metal matrix composites (MMC). The I/M alloys were targeted for a Mach 2.0 aircraft and the P/M and MMC alloys were targeted for a Mach 2.4 aircraft. Design studies were conducted using several different concepts including skin/stiffener (baseline), honeycomb sandwich, integrally stiffened and hybrid adaptations (conventionally stiffened thin-sandwich skins). Alloy development included fundamental studies of coarsening behavior, the effect of stress on nucleation and growth of precipitates, and fracture toughness as a function of temperature were an integral part of this program. The details of all phases of the research are described in this final report.

Starke, E. A., Jr.↗