Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TANKS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Pichia sp. KDB-2024a strain:UFMG-CM-Y531 Genome sequencing

Pichia senei was isolated from necrotic cactus tissues of Cereus saddianus and Micranthocereus dolichospermaticus, and from water tank (phytotelmata) of the bromeliad species Bromelia karatas, collected in the state of Tocantins, Brazil.

bromeliads↗

Electrochemical Deposition of Aluminum-Based Coatings From Aqueous Systems

The electroplating of aluminum has represented a challenge for the coatings industry for decades. The reactivity of aluminum metal leads to a very negative reduction potential. This leads to abundant gas evolution instead of aluminum reduction in water. Current aluminum deposition technology overcomes this limitation by excluding oxygen and water from the process with rigorously dry solvent and airtight plating tanks. These adaptations yield metallic aluminum depositions with significant impurities affecting its properties. In addition, this approach requires a great capital investment and cost of process maintenance. An alternative approach to Al electrodeposition has been developed based on the the use of organic ligands to stabilize the Al3+ ion in water-based solutions. By using a ligation approach, we can create aluminum species that remain stable in water while lowering the reduction potential of the aluminum complex by 0.5V. This improvement in reduction potential gives the possibility for the deposition of aluminum without significant competition from hydrogen evolution. With this platform we can deposit highly adherent aluminum-based layers on metal surfaces. The aluminum/aluminum oxide layers appear as thin, coherent and highly adherent coatings. This aluminum/alumina layer can then be chemically treated to achieve desirable surface properties which were previously inaccessible. For example, the coating can be made hydrophobic, highly adherent to different polymer coatings or even dyed using common anodizing dyes.

36 MATERIALS SCIENCE↗

ELECTROCHEMICAL DEPOSITION OF ALUMINUM-BASED COATINGS FROM AQUEOUS SYSTEMS

The electroplating of aluminum has represented a challenge for the coatings industry for decades. The reactivity of aluminum metal leads to a very negative reduction potential. This leads to abundant gas evolution instead of aluminum reduction in water. Current aluminum deposition technology overcomes this limitation by excluding oxygen and water from the process with rigorously dry solvent and airtight plating tanks. These adaptations yield metallic aluminum depositions with significant impurities affecting its properties. In addition, this approach requires a great capital investment and cost of process maintenance. An alternative approach to Al electrodeposition has been developed based on the the use of organic ligands to stabilize the Al3+ ion in water-based solutions. By using a ligation approach, we can create aluminum species that remain stable in water while lowering the reduction potential of the aluminum complex by 0.5V. This improvement in reduction potential gives the possibility for the deposition of aluminum without significant competition from hydrogen evolution. With this platform we can deposit highly adherent aluminum-based layers on metal surfaces. The aluminum/aluminum oxide layers appear as thin, coherent and highly adherent coatings. This aluminum/alumina layer can then be chemically treated to achieve desirable surface properties which were previously inaccessible. For example, the coating can be made hydrophobic, highly adherent to different polymer coatings or even dyed using common anodizing dyes.

36 MATERIALS SCIENCE↗

Pre-Excavation Activities for the Long Baseline Neutrino Facility Far Site

The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located deep underground. Construction of the supporting infrastructure required for this project is already underway including installation of a waste rock conveyance system including, but not limited to, a grizzly, skip loader, crusher, belt conveyor, and rehab of existing mine drifts and ore passes. This paper will discuss the design and construction of these pre-excavation works, and the overall project schedule as it closes in on commencement of mass excavation activities.

Pollock, Seth↗

Transactive Electric Water Heater Agent: Design and Performance Evaluation

Electric water heaters (EWHs) are usually equipped with inbuilt thermostats to measure water temperature near the installed positions. Most of the existing EWHs have only two thermostats and often do not have water flow sensor installed. Estimation of state of heat energy (SOHE) inside the hot water tank, which is crucial for efficient control and operation of the EWH, under such imperfect system conditions is very challenging. This paper, therefore, designs a transactive EWH agent (TEWHA) to better estimate SOHE in presence of measurement errors and imperfect system knowledge. The TEWHA, built-in Python, approximates the EWH physics using limited measurements obtained from the ground truth GridLABD model. The performance of the TEWHA is validated against ground truth system for three scenarios: a) ideal condition where TEWHA has complete knowledge of the system, b) imperfect condition where TEWHA has incomplete system information, and c) noised condition where TEWHA measurements contain random errors. Finally, an optimization problem is formulated and solved to demonstrate how TEWHA could use the estimated and measured parameters for a transactive control of EWH. Index Terms—Demand flexibility

demand flexibility, distribution system, electric ↗

Dynamic Modelling and Performance Evaluation of a Chemisorption Heat Pump for Cold Climate

Space heating is a significant contributor to the energy consumption in residential buildings, especially in cold climates where electric-driven heat pumps lose the advantage of high efficiency and conventional gas-combustion furnaces have limited efficiency. Chemical adsorption (chemisorption) heat pumps (CSHP) have the potential for producing heating with high energy efficiency under cold operating conditions. A CSHP operates intermittently between desorption and adsorption modes, and their performance is affected by system design and transient system control. This study developed a dynamic model and used it to evaluate the daily system performance under different designs and controls, particularly the buffer tank size and the controlled minimum heating power. The simulation results revealed the effects of these parameters on the system performance and helped identify the optimal design and control for the highest coefficient of performance and heating capacity.

Yang, Zhiyao↗

Model, Design, and Control for Power Conversion in Wave Energy Converter System

Wave energy, if all been harvested along the U.S. coastline, can power around 65% of the energy consumption in U.S.. Comparing to other renewable energy sources like solar or wind, ocean wave can provide up to 90% of steady uptime. With the high energy density (2-3 kW/m 2 ), it can produce more energy with the same amount of installation area comparing to the energy density of wind turbine (0.6 kW/m 2 ) and solar panel(0.2 kW/m 2 ). The predictability of wave provides advantages like planning installation, power dispatching, and maintenance activities. Although with all these advantages, wave energy converter system is still in the research stage due to its high system cost per electricity production. One of the challenges that need to be solved is the irregularity from the wave motion that leads to high instantaneous peak power into the wave energy converter, which usually reaches up to 10 - 20 times of the average power. The high peak power will not only bring high mechanical/electrical stress but also result in an overrating design of the components in the system. Another obstacle that prevents the wave energy system from moving forward is the high testing cost from the validations in wave-energy-test sites or tank-test sites. A high-fidelity multi-disciplinary system model, including hydrodynamics, mechanical dynamics, electromagnetics, and power electronics, is needed to predict the behavior of the system and reduce the cost of design validation.

16 TIDAL AND WAVE POWER↗

IMPACT OF SOIL TEMPERATURE VARIATION ON PERFORMANCE MODELING OF A NOVEL SHALLOW BORE GROUND HEAT EXCHANGER

A novel shallow bore (< 6 m deep) ground heat exchanger is proposed to substitute the conventional vertical bore ground heat exchanger (> 60 m deep) for ground source heat pump systems. A series of simulations were carried out to evaluate the impacts of the vertical soil temperature profile on the performance of the shallow bore ground heat exchanger in response to thermal loads of a ground source heat pump system, with various lengths of the shallow bore ground heat exchanger and ground thermal properties. The results indicate that the vertical soil temperature profile has a noticeable influence on the thermal response of the shallow bore ground heat exchanger. Moreover, for shallow bore ground heat exchangers with the same volume and buried depth, the one with greater length and narrower diameter has lower tank water temperature fluctuations over the year due to relatively more stable soil temperature, and the larger surface to volume ratio.

Shi, Liang↗

PWR decay heat removal system in which steam from the pressurizer drives a turbine which drives a pump to inject water into the reactor pressure vessel

In conjunction with a pressurized water reactor (PWR) and a pressurizer configured to control pressure in the reactor pressure vessel, a decay heat removal system comprises a pressurized passive condenser, a turbine-driven pump connected to suction water from at least one water source into the reactor pressure vessel; and steam piping configured to deliver steam from the pressurizer to the turbine to operate the pump and to discharge the delivered steam into the pressurized passive condenser. The pump and turbine may be mounted on a common shaft via which the turbine drives the pump. The at least one water source may include a refueling water storage tank (RWST) and/or the pressurized passive condenser. A pressurizer power operated relief valve may control discharge of a portion of the delivered steam bypassing the turbine into the pressurized passive condenser to control pressure in the pressurizer.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Efficient and Reliable Power Takeoff for Ocean Wave Energy Harvesting

The project goal is to significantly improve the current ocean wave energy harvesting through innovative Power Take-off (PTO) design, advanced power electronics, and novel wave capture structures. The objective of the project is to design and demonstrate system-agnostic components for application across multiple MHK systems, and complete component designs, build scaled prototypes, and perform testing and analysis for metric validation of 25% increase in component rating/per unit cost and 50% reduction in failure rate. The major innovation of the PTO is the Mechanical Motion Rectifier (MMR) mechanism that rectifies the bi-directional oscillatory motion of the input from waves into a steady unidirectional rotation output to directly drive the electrical generator. Through this mechanism, the efficiency and the fatigue life of the PTO can be significantly improved to benefit the energy absorption and lifespan of the wave energy converters (WEC). During the period of performance, the component and system design are completed, the scaled prototypes are developed and performed testing. It is validated that the 25% increase in a component rating/per unit cost. The 50% reduction in failure rate is not directly validated by experiments, however, it can be explained qualitatively with analysis. Besides, 8 journal articles, 13 conference proceedings, 1 patent, 3 Master thesis and two Ph.D. dissertations are published based on the work related to this project. The list of all the publications can be found at the end of the project as an appendix. Over 30 students and postdocs were trained through this project. Three prototypes of 100W and 500W WECs and 10KW PTO were designed, built, and tested in ocean wave tank and using the NREL dynamometer. This project demonstrated 50-80% PTO efficiency, 90-98% power electronics efficiency, up to 66% capture width ratio in irregular waves, and 34% overall efficiency in regular waves.

16 TIDAL AND WAVE POWER↗

Modeling of HTTF test PG-26 using RELAP5-3D and SAM

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a scaled integral effects experiment designed to investigate transient behavior in high-temperature gas-cooled nuclear reactors (HTGR) with prismatic fuel and reflector blocks [1]. Several tests have been completed at the HTTF including depressurized conduction cooldown (DCC) and pressurized conduction cooldown (PCC) transients. This summary reports on the analysis of test PG-26 using the INL system code REALP5-3D [2] as well as the ANL system code SAM [3]. Test PG-26 is a progression of the Double Ended Inlet-Outlet Crossover Duct Break transient that is referred to as a DCC [4]. Core initial conditions (i.e., before the DCC started) have been met using low power (<100 kW) and two of ten available electric heater banks. The DCC transient was initiated during the 50th hour of the test. The break valves were opened, and hot helium from the core and cold helium from the reactor cavity simulation tank (RCST) started mixing. The gases flowed in a countercurrent fashion, where the top half of the hot duct contained hot helium that flowed in one direction and cold helium that flowed in the other direction in the bottom half of the duct. After the pressure and density reached equilibrium, the event entered a diffusion mode. The onset of a reverse natural circulation was not observed during the DCC period of the test.

97 MATHEMATICS AND COMPUTING↗

Fiscal Year 2020 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

U.S. Department of Energy Standard DOE-STD-5002-2017, “Disposal Authorization Statement and Tank Closure Documentation,” requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2020 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Corrosion Studies Of Pine Derived Bio-Oil And Blends With Heavy Fuel Oil

Biomass derived liquid fuels offer a means to reduce greenhouse gas emissions compared to those produced by combustion of petroleum derived liquid fuels. However, the corrosivity of bio-oils toward the less expensive structural materials creates a material selection problem for designers of storage tanks and combustion systems. Samples of candidate structural materials are being exposed for thousands of hours in multiple fast pyrolysis bio-oils and conditions to evaluate the corrosion resistance of these materials. One method to mitigate the corrosivity of bio-oils and speed their adoption, while also decreasing the pollution issues associated with low quality petroleum derived fuels, is to utilize blends of bio-oil and heavy fuel oil in engines currently solely burning a petroleum-based fuel. In addition to the corrosion studies conducted in 100% bio-oil, studies were also conducted with blends of the fast pyrolysis bio-oil produced from pine tree components with a heavy fuel oil that is used in ocean-going ships. This bio-oil had a very high carboxylic acid content which made it very corrosive to carbon and 2¼ Cr-1 Mo steel and even 409 stainless steel. The heavy fuel oil was not corrosive to carbon steel, but its sulfur content makes it a significant pollution producer and particularly undesirable for use near coastlines. Corrosion tests were conducted with the individual components and with various blends of the two liquid fuels. Studies showed a significantly lower corrosivity of the blends than would be projected assuming linear mixing behavior. Adoption of such blends holds the potential to reduce production of sulfur-containing exhaust gases as well as carbon dioxide from non-renewable fuels.

Keiser, Jim↗

Long-Term Corrosion Studies of Pine Derived Bio-Oil and Blends with Heavy Fuel Oil

Biomass derived liquid fuels offer a means to reduce greenhouse gas emissions compared to those produced by combustion of petroleum derived liquid fuels. However, the corrosivity of bio-oils toward the less expensive structural materials creates a material selection problem for designers of storage tanks and combustion systems. Samples of candidate structural materials are being exposed for thousands of hours in multiple fast pyrolysis bio-oils and conditions to evaluate the corrosion resistance of these materials. One method to mitigate the corrosivity of bio-oils and speed their adoption, while also decreasing the pollution issues associated with low quality petroleum derived fuels, is to utilize blends of bio-oil and heavy fuel oil in engines currently solely burning a petroleum-based fuel. In addition to the corrosion studies conducted in 100% bio-oil, studies were also conducted with blends of the fast pyrolysis bio-oil produced from pine tree components with a heavy fuel oil that is used in ocean-going ships. This bio-oil had a very high carboxylic acid content which made it very corrosive to carbon and 2¼ Cr-1 Mo steel and even 409 stainless steel. The heavy fuel oil was not corrosive to carbon steel, but its sulfur content makes it a significant pollution producer and particularly undesirable for use near coastlines. Corrosion tests were conducted with the individual components and with various blends of the two liquid fuels. Studies showed a significantly lower corrosivity of the blends than would be projected assuming linear mixing behavior. Adoption of such blends holds the potential to reduce production of sulfur-containing exhaust gases as well as carbon dioxide from non-renewable fuels.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Petrophysical and geomechanical properties of gas hydrate-bearing sediments recovered from Alaska North Slope 2018 Hydrate-01 Stratigraphic Test Well

Knowledge of petrophysical and geomechanical properties of gas hydrate-bearing sediments are essential for predicting reservoir response due to gas production from gas hydrate reservoirs. That information will be critical parameters for designing production well completion such as specification of depressurization pump, water storage tank, and mesh size of sand screen. In December 2018, Stratigraphic Test Well Hydrate-01 was drilled in the western part of the Prudhoe Bay Unit, Alaska North Slope as part of the technical planning effort for a future long-term production test by collaborative team of DOE/NETL, USGS, and MH21-S (Boswell et al., 2020, Collett et al., 2020, Okinaka et al., 2020). Data set of logging-while-drilling (LWD) were acquired (Haines et al., 2020, Suzuki et al., 2019) and core sampling depth was determined on-site.Side-wall pressure coring was conducted to recover gas hydrate-bearing sediments from two reservoir sections named Unit-B and Unit-D. A total of 34 cores were successfully recovered by 5 runs of a wire-line deployed pressure corer (CoreVault® System - Halliburton). Core analysis scheme of this project are shown in Figure 1. All cores were quenched in liquid nitrogen while at high pressure in the laboratory of Stratum Reservoir, LLC. at Anchorage (Figure 1, a)). And the cores were removed from the pressure corer autoclave with temperature support of dry ice and stored under liquid nitrogen at atmospheric pressure. 19 damaged cores were processed to index property measurements directly such as grain size, grain density. 4 of another 17 cores were depressurized and trimmed for making a plug to analyze petrophysical properties of host sediments. Unsteady-state permeability test was conducted to obtain relative water permeability to gas and core scale NMR T2 distribution measurement was performed for evaluating pore size distribution at Houston (Figure 1, b)). Remained high quality 13 cores were preserved with gas hydrate for advanced laboratory analysis. National Institute of Advanced Industrial Science and Technology, as a part of the Japanese National Hydrate Research Program (MH21-S, funded by Ministry of Economy, Trade and Industry), received the samples at Sapporo, Japan for advanced core analysis. High-resolution X-ray CT was used to analyze the quality of the samples, which showed undisturbed lithological layers. Cores were lathed into cylindrical shape and distributed for multi property measurements (Figure 1, c)).<p>As a result, sediment from Unit-D is categorized as silty sand at ~37% porosity with ~80% gas hydrate saturation. An average hydration number n = 6.16 was measured by Raman spectroscopy. An average intrinsic permeability of ~400 mD and in situ effective permeability (with hydrate) on the order of ~10 mD. The Unit B recovered cores consisted of well sorted sand at ~40% porosity with ~95% gas hydrate saturation. An average intrinsic permeability of ~1 Darcy and in situ effective permeability on the order of ~30 mD was measured for the Unit B cores. There was a small permeability reduction due to porosity loss with increasing effective stress that simulated consolidation behavior along with depressurization in the highly permeable sandy sediment. The apparent minimum change in porosity and permeability may be caused by the low compressibility of quartz sand grains in the recovered cores. XRD and thermal conductivity analysis also suggested high quartz content. Triaxial compression tests established internal friction angles based on the Mohr-Coulomb's failure criterion, which are 40° for hydrate-bearing sediment and 29.8° for hydrate free sediment.</p>

Yoneda, Jun↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Biological and algae harvesting and cultivation systems and methods

Algae harvesting and cultivating systems and methods for producing high concentrations of algae product with minimal energy. In an embodiment, an algae harvesting method is provided for performing dead-end filtration in an algae harvesting system having at least one treatment tank defining a plurality of filtration stages including at least a first filtration stage and a second filtration stage. An algae medium is pulled through the hollow fiber membranes such that a retentate and a permeate are produced.

Hazlebeck, David A.↗

PWR decay heat removal system in which steam from the pressurizer drives a turbine which drives a pump to inject water into the reactor pressure vessel

In conjunction with a pressurized water reactor (PWR) and a pressurizer configured to control pressure in the reactor pressure vessel, a decay heat removal system comprises a pressurized passive condenser, a turbine-driven pump connected to suction water from at least one water source into the reactor pressure vessel; and steam piping configured to deliver steam from the pressurizer to the turbine to operate the pump and to discharge the delivered steam into the pressurized passive condenser. The pump and turbine may be mounted on a common shaft via which the turbine drives the pump. The at least one water source may include a refueling water storage tank (RWST) and/or the pressurized passive condenser. A pressurizer power operated relief valve may control discharge of a portion of the delivered steam bypassing the turbine into the pressurized passive condenser to control pressure in the pressurizer.

Graham, Thomas G.↗