At least 1,279 records · Page 71

Quantifying and Qualifying Alloys Based on Level of Homogenization: A U-10Mo Alloy Case Study

Homogenization heat treatment is performed to attain uniformity in microstructure which is helpful to achieve the desired workability and microstructure in final products and, eventually, to gain predictive and consistent performance. Fabrication of low-enriched uranium alloys with 10 wt% molybdenum (U-10Mo) fuel plates involves multiple thermomechanical processing steps. It is well known that the molybdenum homogeneity in the final formed product affects the performance in the nuclear reactor. Here, to ensure uniform homogenization, a statistical method is proposed to quantify and characterize the molybdenum concentration variation in U-10Mo fuel plates by analyzing the molybdenum concentration measurement data from scanning electron microscopy energy dispersive spectroscopy line-scan. Statistical tolerance intervals (TI) are employed to determine the qualification of the U-10Mo fuel plate. We formulate an argument for the minimum number of independent samples to define fuel plate qualification if no molybdenum measurement data are available in advance and demonstrate that the given TI requirements can be equivalently reduced to a sample variance criterion in this application. The outcome of the statistical analysis can be used to optimize casting design and eventually increase productivity and reduce fabrication costs. The statistical strategy developed in this paper can be implemented for other applications especially in the field of material manufacturing to assess qualification requirements and monitor and improve the process design.

36 MATERIALS SCIENCE↗

Defining and Characterizing Methods, Tools, and Computing Resources to Support Pseudo Exhaustive Testability of Software Based I&C Devices

Under the Department of Energy’s Light Water Reactor Sustainability Program, within the Plant Modernization research pathway, the Digital I&C Qualification Project is identifying new methods that would be beneficial in qualifying digital I&C systems and devices for safety-related usage. One such method that would be useful in qualifying field components such as sensors and actuators is the concept of testability. The Nuclear Regulatory Commission (NRC) considers testability to be one of two design attributes sufficient to eliminate consideration of software-based or software logic-based common cause failure (the other being diversity). The NRC defines acceptable “testability” as follows: Testability – A system is sufficiently simple such that every possible combination of inputs and every possible sequence of device states are tested and all outputs are verified for every case (100% tested). [NUREG 0800, Chapter 7, Branch Technical Position (BTP) 7-19] This qualification method has never proven to be practical in view of the very large number of combinations of inputs and sequences of device states for a typical I&C device. However, many of these combinations are not unique in the sense that they represent the same state space or in that that they represent state space that would not affect the critical design basis functions of the device. Therefore, the state space of interest might possibly be reduced to a manageable dimension through such analysis. This project focuses on a representative I&C device similar in design, function, and complexity to the types of devices that would likely be deployed in nuclear power plants as digital or software based sensors and actuators (e.g. Smart Sensors). Analysis will be conducted to determine the feasibility of testing this device in a manner consistent with the NRC definition. This report describes acceptable test methods, needed tools (existing or new), and computing resources, all based on engineering and computer science principles. This information will then be used in a later phase of this project to develop a test specification for I&C device testability that can be used in a future phase of this project to demonstrate digital qualification with respect to common cause failure. Following that, testing will be conducted and the results analyzed to determine if the methods employed are sufficient to eliminate consideration of software common cause failure in accordance with the concept of testability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

REALIZATION OF A AUTOMATED T-WAY COMBINATORIAL TESTING APPROACH FOR A SOFTWARE BASED EMBEDDED DIGITAL DEVICE

Under the Department of Energy’s Light Water Reactor Sustainability Program, within the Plant Modernization research pathway, the Digital I&C Qualification Project is identifying new methods that would be beneficial in qualifying digital I&C systems and devices for safety-related usage. One such method that would be useful in qualifying field components such as sensors and actuators is the concept of testability. The Nuclear Regulatory Commission (NRC) considers testability to be one of two design attributes sufficient to eliminate consideration of software-based or software logic-based common cause failure (the other being diversity). The NRC defines acceptable “testability” as follows: Testability – A system is sufficiently simple such that every possible combination of inputs and every possible sequence of device states are tested and all outputs are verified for every case (100% tested). [NUREG 0800, Chapter 7, Branch Technical Position (BTP) 7-19] This qualification method has never proven to be practical in view of the very large number of combinations of inputs and sequences of device states for a typical I&C device. However, many of these combinations are not unique in the sense that they represent the same state space or in that that they represent state space that would not affect the critical design basis functions of the device. Therefore, the state space of interest might possibly be reduced to a manageable dimension through such analysis. This project will focus on a representative I&C device similar in design, function, and complexity to the types of devices that would likely be deployed in nuclear power plants as digital or software based sensors and actuators (e.g. Smart Sensors). Analysis will be conducted to determine the feasibility of testing this device in a manner consistent with the NRC definition. This report describes the development of test process for Bounded Exhaustive Testing with respect to Combinatorial Test (CT) methods. The report describes the candidate Device Under Test SW – the VCU smart sensor, conceptual experimental methods for stated test objectives, description of the process, tools, resources, and computing. This information will be used to fully develop a detailed test plan (based on statistical measure needs) and test environment for conducting an I&C device testability demonstration study. The future planed experimental study of this project is to demonstrate digital qualification via Bounded Exhaustive Testability with respect to Common Cause Failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Internal NASA Study: NASAs Protoflight Research Initiative

The NASA Protoflight Research Initiative is an internal NASA study conducted within the Office of the Chief Engineer to better understand the use of Protoflight within NASA. Extensive literature reviews and interviews with key NASA members with experience in both robotic and human spaceflight missions has resulted in three main conclusions and two observations. The first conclusion is that NASA's Protoflight method is not considered to be "prescriptive." The current policies and guidance allows each Program/Project to tailor the Protoflight approach to better meet their needs, goals and objectives. Second, Risk Management plays a key role in implementation of the Protoflight approach. Any deviations from full qualification will be based on the level of acceptable risk with guidance found in NPR 8705.4. Finally, over the past decade (2004 - 2014) only 6% of NASA's Protoflight missions and 6% of NASA's Full qualification missions experienced a publicly disclosed mission failure. In other words, the data indicates that the Protoflight approach, in and of it itself, does not increase the mission risk of in-flight failure. The first observation is that it would be beneficial to document the decision making process on the implementation and use of Protoflight. The second observation is that If a Project/Program chooses to use the Protoflight approach with relevant heritage, it is extremely important that the Program/Project Manager ensures that the current project's requirements falls within the heritage design, component, instrument and/or subsystem's requirements for both the planned and operational use, and that the documentation of the relevant heritage is comprehensive, sufficient and the decision well documented. To further benefit/inform this study, a recommendation to perform a deep dive into 30 missions with accessible data on their testing/verification methodology and decision process to research the differences between Protoflight and Full Qualification missions' Design Requirements and Verification & Validation (V&V) (without any impact or special request directly to the project).

Protoflight↗

Considerations for Qualifying Reliable Eddy Current Array Technique for Detection of Backwall Cracks

A reliable nondestructive evaluation (NDE) technique provides minimum 90% probability of detection(POD) with 95% confidence for detection of cracklike flaws of a qualified size. In this case, the flaws are on backside of material. Eddy current array (ECA) probe or a single sensor eddy current probe in c-scanning mode is used for the flaw detection. Here, two geometries are considered for the test specimens. The two geometries are, a flat plate, and tube or pipe. The probe is assumed to be on outer diameter (OD)surface and the flaw is assumed to be at the inner diameter (ID) surface for tube inspection. The flaw and probe are on opposite side of wall thickness for inspection of plate material. The application may be used for acreage inspection or just for inspection of butt weld and heat affected zone (HAZ) in a tube, cylinder, or plate. The proposed approach is based on developing an instrument standardization or calibration procedure. Decision threshold of inspection procedure is determined using empirical qualification and noise data. The work explores essential parameters that are required to meet certain conditions to ensure reliable flaw detection. Physics-based simulation of eddy current array flaw detection is used to understand effect of essential parameters on signal response (amplitude and phase),and therefore flaw detectability. Simulation data is used to justify choice of calibration reference standard requirements and the qualification approach. An ECA technique qualification model is provided. The paper gives brief description of tasks to be completed for qualifying ECA technique for reliable detection of cracklike flaws.

Eddy current array inspection, nondestructive eval↗

Standards for PV Modules and Components -- Recent Developments and Challenges: Preprint

International standards play an important role in the Photovoltaic industry. Since PV is such a global industry it is critical that PV products be measured and qualified the same way everywhere in the world. IEC TC82 has developed and published a number of module and component measurement and qualification standards. These are continually being updated to take advantage of new techniques and equipment as well as better understanding of test requirements. Standards presently being updated include the third edition of IEC 61215, Crystalline Silicon Qualification and the second edition of IEC 61730, PV Module Safety Requirements. New standards under development include qualification of junction boxes, connectors, PV cables, and module integrated electronics as well as for testing the packaging used during transport of modules. After many years of effort, a draft standard on Module Energy Rating should be circulated for review soon. New activities have been undertaken to develop standards for the materials within a module and to develop tests that evaluate modules for wear-out in the field (International PV Module QA Task Force). This paper will discuss these efforts and indicate how the audience can participate in development of international standards.

14 SOLAR ENERGY↗

Advancing reliability assessments of photovoltaic modules and materials using combined-accelerated stress testing

Previously undiscovered failure modes in photovoltaic (PV) modules continue to emerge in field installations despite passing protocols for design qualification and quality assurance. Failure to detect these modes prior to widespread use could be attributed to the limitations of present-day standard accelerated stress tests (ASTs), which are primarily designed to identify known degradation or failure modes at the time of development by applying simultaneous or sequential stress factors (usually two at most). Here, we introduce an accelerated testing method known as the combined-accelerated stress test (C-AST), which simultaneously combines multiple stress factors of the natural environment. Simultaneous combination of multiple stress factors allows for improved identification of failure modes with better ability to detect modes not known a priori. A demonstration experiment was conducted that reproduced the field-observed cracking of polyamide- (PA-) and polyvinylidene fluoride (PVDF)–based backsheet films, a failure mode that was not detected by current design qualification and quality assurance testing requirements. In this work, a two-phase testing protocol was implemented. The first cycle (“Tropical”) is a predominantly high-humidity and high-temperature test designed to replicate harsh tropical climates. The second cycle (“Multi-season”) was designed to replicate drier and more temperate conditions found in continental or desert climates. Testing was conducted on 2 × 2-cell crystalline-silicon cell miniature modules constructed with both ultraviolet (UV)–transmitting and UV-blocking encapsulants. Cracking failures were observed within a cumulative 120 days of the Tropical condition for one of the PA-based backsheets and after 84 days of Tropical cycle followed by 42 days of the Multi-season cycle for the PVDF-based backsheet, which are both consistent with failures seen in fielded modules. In addition to backsheet cracking, degradation modes were observed including solder/interconnect fatigue, various light-induced degradation modes, backsheet delamination, discoloration, corrosion, and cell cracking. The ability to simultaneously apply multiple stress factors may allow many of the test sequences within the standardized design qualification procedure to be performed using a single test setup.

14 SOLAR ENERGY↗

Recent 238 Pu Production Activities at Idaho National Laboratory

The Plutonium-238 ( 238 Pu) Production program at Idaho National Laboratory (INL) is actively qualifying irradiation targets containing 237 Np for the Advanced Test Reactor (ATR) to produce 238 Pu for future National Aeronautics and Space Administration missions. INL qualified and loaded seven targets in the ATR’s south flux trap for cycle 169A, which occurred in Spring 2021. The irradiation qualification program has expanded to additional ATR irradiation positions after two baseline production targets in three positions validated significant production of 238 Pu. The validation model was followed by the PFS-1 experimental test in the ATR Critical Facility that verified 238 Pu production cross sections. This paper outlines the progress and status of the 238 Pu production program at INL. The qualification effort, safety analysis, hardware status, and future activities for qualification of an updated target design for use in the ATR are discussed.

07 ISOTOPE AND RADIATION SOURCES↗

Considerations for Hydride Moderator Readiness in Microreactors

The emergence of microreactor technology has helped to drive supporting nuclear materials qualification and acceptance processes. One essential component in these small reactors is a solid moderator, which typically consists of metal hydride and cladding. While the behavior and performance of metal-hydride moderators go back to early advanced reactor development for nuclear-powered aviation and space propulsion, there remains a knowledge gap in the understanding of hydrogen transport–related phenomena and irradiation performance for hydride moderators. This impacts the acceptance/qualification of hydride moderators for microreactors. The goal of this technical note is to lay out a potential path forward for advanced moderator qualification and acceptance for designers and developers of microreactors. The proposed approach has benefited from a model microreactor core with the design parameters of a hydride moderator. Based on the model core and design parameters, a simple chart was developed for the major challenges of hydride moderators where potential incidents, causes, effects, and resolutions are described. The relation between the offered resolutions and the maturity of the metal-hydride moderator technology was emphasized using technological readiness. Technological readiness levels (TRLs) were clustered to three sets: physical phenomena related, reactor irradiations, and system demonstration. Some essential needs to fill the knowledge gaps are discussed for physical phenomena–related TRLs. For reactor irradiations, the importance of identifying goals and priorities is stressed to reach certain TRLs. For system demonstration, it is noted that metal-hydride moderator qualification must comply with the overall microreactor design.

36 MATERIALS SCIENCE↗

Degradation in PV Encapsulation Transmittance: An Interlaboratory Study Towards a Climate-Specific Test: Preprint

Reduced optical transmittance of encapsulants resulting from ultraviolet (UV) degradation has frequently been identified as a cause of decreased PV module performance through the life of service in the field. The present module safety and qualification standards, however, apply short UV doses only capable of examining design robustness or 'infant mortality' failures. Essential information that might be used to screen encapsulation through product lifetime remains unknown. For example, the relative efficacy of xenon-arc and UVA-340 fluorescent sources or the typical range of activation energy for degradation is not quantified. We have conducted an interlaboratory experiment to provide the understanding that will be used towards developing a climate- and configuration-specific (UV) weathering test. Five representative, known formulations of EVA were studied in addition to one TPU material. Replicate laminated silica/polymer/silica specimens are being examined at 14 institutions using a variety of indoor chambers (including Xenon, UVA-340, and metal-halide light sources) or field aging. The solar-weighted transmittance, yellowness index, and the UV cut-off wavelength, determined from the measured hemispherical transmittance, are examined to provide understanding and guidance for the UV light source (lamp type) and temperature used in accelerated UV aging tests.

14 SOLAR ENERGY↗

Evaluation of PV Module Field Performance

This paper describes an effort to inspect and evaluate PV modules in order to determine what failure or degradation modes are occurring in field installations. This paper will report on the results of six site visits, including the Sacramento Municipal Utility District (SMUD) Hedge Array, Tucson Electric Power (TEP) Springerville, Central Florida Utility, Florida Solar Energy Center (FSEC), the TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification.

14 SOLAR ENERGY↗

Overview of modelling and simulation of metal powder bed fusion process at Lawrence Livermore National Laboratory

The metal laser powder bed fusion additive manufacturing process uses high power lasers to build parts layer upon layer by melting fine metal powders. Qualification of parts produced using this technology is broadly recognised as a significant challenge. Physics based process models have been identified as being foundational to qualification of additively manufactured metal parts. In the present article, a multiscale modelling strategy is described that will serve as the foundation upon which process control and part qualification can be built. This includes a model at the scale of the powder that simulates single track/single multilayer builds and provides powder bed and melt pool thermal data. A second model computationally builds a complete part and predicts manufactured properties (residual stress, dimensional accuracy) in three dimensions. Finally, modelling is tied to experiment through data mining.

36 MATERIALS SCIENCE↗

Updated NGNP Fuel Acquisition Strategy

A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. • Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis of Harrell Monosodium Titanate Lot #03031

Monosodium titanate (MST) for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot 030311 qualification and 9 verification samples met all the requirements in the specification indicating the material is acceptable for use in the process. Harrell Industries is under contract with Savannah River Remediation to provide MST for use in the Actinide Removal Process (ARP). A 500-mL qualification sample for Lot 030311 was sent to the Savannah River National Laboratory (SRNL) to confirm the material meets the requirements specified in the purchase specification. The vendor is also obligated to send verification samples from {approx}10% or more of the pails of MST product for each lot (distributed roughly evenly through the entire lot of pails). For the verification of this lot, Harrell Industries sent 9 samples, one each from pails 1, 5, 15, 20, 25, 30, 40, 45, and 55 of 59 total pails.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the 3430 Building Filtered Exhaust Stack Sampling Probe Location

Pacific Northwest National Laboratory performed a demonstration to determine the acceptable location in which to place an air sampling probe for emissions monitoring for radionuclides in the exhaust air discharge from the new 3430 Building Filtered Exhaust Stack. The method was to adopt the results of a previously performed test series for a system of similar configuration, followed by a partial test on the actual system to verify the applicability of previously performed tests. The qualification criteria included 1) a uniform air velocity, 2) an average flow angle that does not deviate from the axis of the duct by more than 20°, 3) a uniform concentration of tracer gases, and 4) a uniform concentration of tracer particles. Section 1 provides background information for the demonstration, and Section 2 describes the test strategy, including the criteria for the applicability of model results and the test matrix. Section 3 describes the flow -angle test and the velocity uniformity test, Section 4 provides the test results, and Section 5 provides the conclusions. Appendix A includes the test data sheets, and Appendix B gives applicable qualification results from the previously tested model stack. The data from the previously tested and similarly designed stack was demonstrated to be applicable to the current design for the 3430 Building Filtered Exhaust Stack. The 3430 stack was tested in both January and May of 2010 to document the results of several changes that were made to the exhaust system after the January tests. The 3430 stack meets the qualification criteria given in the American National Standards Institute/Health Physics Society N13.1 standard. Changes to the system configuration or operations outside of the bounds of this report (e.g., exhaust velocity increases, relocation of sample probe) will require retesting/reevaluation to determine compliancewith the requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Harrell Monosodium Titanate Lot #050411

Harrell Industries is under contract with Savannah River Remediation to provide Monosodium titanate (MST) for use in the Actinide Removal Process (ARP). A 500-mL qualification sample for Lot 050411 was sent to the Savannah River National Laboratory (SRNL) to confirm the material meets the requirements specified in the purchase specification. The vendor is also obligated to send verification samples from {approx}10% or more of the pails of MST product for each lot (distributed roughly evenly through the entire lot of pails). For the verification of this lot, Harrell Industries sent 12 samples, one each from pails No.1, 10, 20, 30, 40, 60, 70, 80, 90, 100, 110, and 120 of 120 total pails. MST for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot 050411 qualification and 12 verification samples met all the requirements in the specification indicating the material is acceptable for use in the process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Harrell Monosodium Titanate Lot #081811

Monosodium titanate (MST) for use in the Actinide Removal Process (ARP) must be qualified and verified in advance. A single qualification sample for each batch of material is sent to SRNL for analysis, as well as a statistical sampling of verification samples. The Harrell Industries Lot No.081811 qualification and 12 verification samples met all the requirements in the specification, with the possible exception of the geometric standard deviation for particle size. Two subsamples from the qualification sample were analyzed, giving results of 3.82 and 3.28, respectively, for the geometric standard deviation. The specification is {le}3.5. The results for both samples met the remaining particle size specifications, i.e. <10 vol% below 0.8 {mu}m and <1 vol% above 37 {mu}m. Filtration behavior of the current batch is expected to be near that of recent batches. SRNL recommends acceptance of this material. SRNL also recommends performing a statistical review of particle size data for the MST lots from this vendor to assess whether an improved material specification is appropriate.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation Of Methods To Measure Hydrogen Generation Rate In A Shielded Cell Environment And A Method Recommendation

The purpose of this document is to describe the current state of the art for determination of hydrogen generation rates of radioactive slurries and solutions to provide a basis for design, fabrication, testing, and implementation of a measurement method for Hydrogen Generation Rate (HGR) during qualification of waste feeds for the Hanford Waste Treatment and Immobilization Plant (WTP). The HGR measurement will be performed on samples of the Low Activity Waste (LAW) and High Level Waste (HLW) staged waste feeds for the WTP as well as on samples from selected unit operations testing during the qualification program. SRNL has performed a review of techniques utilized to measure HGR of high level radioactive waste slurries, evaluated the Hanford 222-S Laboratory method for measurement of hydrogen, and reviewed the hydrogen generation rate models for Hanford waste.Based on the literature review, method evaluation, and SRNL experience with measuring hydrogen generation rate, SRNL recommends that a continuous flow system with online gas analysis be used as the HGR measurement method during waste qualification.