Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Celebrating 10 Years of the Sub-Seasonal to Seasonal Prediction Project and Looking to the Future

The conference clearly demonstrated the increasing interest and growth of the scientific community working on the development and application of sub-seasonal to seasonal prediction since the start of the World Weather Research Programme (WWRP)/World Climate Research Programme (WCRP) sub-seasonal to seasonal (S2S) prediction project in 2013. The conference, which was held at the University of Reading (United Kingdom), was organized into three main themes as briefly summarized below, with eleven invited talks, 74 oral contributed talks, and 101 posters. The conference also included a two-hour breakout session, wherein eight groups discussed the current state and prospect for S2S prediction, and an early career researcher event. A summary of these discussions and recommendations is presented below. The conference web page (https://research.reading.ac.uk/s2s-summit2023/) is archived at the University of Reading. Introductory comments by representatives of the World Meteorological Organization (WMO) WWRP and WCRP emphasized the importance of the weather–climate linkage, targeted by S2S forecasts (from 2 weeks to a season ahead), addressing the challenges of creating “end-to-end” forecasts that encompass the entire climate-services chain from the prediction science and forecast, to the development and issuing of forecast products tailored to informing user-decisions. They also emphasized the efficacy of multi-model ensemble efforts and databases to foster collaborations internationally and between operational centres and academia. Although the WWRP/WCRP S2S project comes to an end in 2023, S2S prediction will remain an important focus for WWRP and WCRP. In WWRP, a new project called SAGE (Sub-seasonal to seasonal predictions for Agriculture and Environment) will start in 2024. Another important legacy of the S2S project will be the maintenance of the S2S database (Vitart et al. 2017) and the establishment of a WMO Lead Center for sub-seasonal prediction multi-model ensemble (LC-SSPMME) which will provide real-time multi-model S2S climate information. In two keynote presentations, Prof. Brian Hoskins (University of Reading) and Dr. Gilbert Brunet (Australian Bureau of Meteorology) discussed the potential of S2S predictability and the ongoing journey for understanding and improving these predictions. This conference was a sequel to the International Conference on Sub-seasonal to Seasonal Prediction (Robertson et al., 2014) which took place in College Park (Maryland, USA) in February 2014 to celebrate the start of the WWRP/WCRP S2S project, and to WCRP and WWRP conferences in Boulder, USA, in 2018 (Merryfield et al., 2020). A significant development compared to the previous S2S conferences was the large number of presentations on research to operation (R2O) and S2S applications and on the use of artificial intelligence and machine learning (AI/ML) methods for S2S prediction. Some of these methods provide empirical S2S forecasts which are competitive with state-of-the-art dynamical models. Other presentations demonstrated that AI/ML can provide alternative calibration of dynamical model outputs to traditional methods. Several talks and posters highlighted the increasing use of AI/ML, including deep learning, in S2S forecast post-processing and using AI to identify higher flow-dependent skill. Finally, some presentations demonstrated the value of AI/ML methods for a better understanding of S2S sources of predictability and attribution of extreme events.

S. J. Woolnough↗

NPCC4: New York City Climate Risk Information 2022—Observations and Projections

New York City (NYC) faces many challenges in the coming decades due to climate change and its interactions with social vulnerabilities and uneven urban development patterns and processes. This New York City Panel on Climate Change (NPCC) report contributes to the Panel’s mandate to advise the city on climate change and provide timely climate risk information that can inform flexible and equitable adaptation pathways that enhance resilience to climate change. This report presents up-to-date scientific information as well as updated sea level rise projections of record. We also present a new methodology related to climate extremes and describe new methods for developing the next generation of climate projections for the New York metropolitan region. Future work by the Panel should compare the temperature and precipitation projections presented in this report with a subset of models to determine the potential impact and relevance of the “hot model” problem. NPCC4 expects to establish new projections-of-record for precipitation and temperature in 2024 based on this comparison and additional analysis. Nevertheless, the temperature and precipitation projections presented in this report may be useful for NYC stakeholders in the interim as they rely on the newest generation of global climate models.

NPCC4↗

NPCC4: Tail Risk, Climate Drivers of Extreme Heat, and New Methods for Extreme Event Projections

We summarize historic New York City (NYC) climate change trends and provide the latest scientific analyses on projected future changes based on a range of global greenhouse gas emissions scenarios. Building on previous NPCC assessment reports, we describe new methods used to develop the projections of record for sea level rise, temperature, and precipitation for NYC, across multiple emissions pathways and analyze the issue of the “hot models” associated with the 6th phase of the Coupled Model Intercomparison Project (CMIP6) and their potential impact on NYC's climate projections. We describe the state of the science on temperature variability within NYC and explain both the large-scale and regional dynamics that lead to extreme heat events, as well as the local physical drivers that lead to inequitable distributions of exposure to extreme heat. We identify three areas of tail risk and potential for its mischaracterization, including the physical processes of extreme events and the effects of a changing climate. Finally, we review opportunities for future research, with a focus on the hot model problem and the intersection of spatial resolution of projections with gaps in knowledge in the impacts of the climate signal on intraurban heat and heat exposure.

NPCC4↗

Leakage risk assessment of the In Salah CO2 storage project: Applying the Certification Framework in a dynamic context.

The Certification Framework (CF) is a simple risk assessment approach for evaluating CO{sub 2} and brine leakage risk at geologic carbon sequestration (GCS) sites. In the In Salah CO{sub 2} storage project assessed here, five wells at Krechba produce natural gas from the Carboniferous C10.2 reservoir with 1.7-2% CO{sub 2} that is delivered to the Krechba gas processing plant, which also receives high-CO{sub 2} natural gas ({approx}10% by mole fraction) from additional deeper gas reservoirs and fields to the south. The gas processing plant strips CO{sub 2} from the natural gas that is then injected through three long horizontal wells into the water leg of the Carboniferous gas reservoir at a depth of approximately 1,800 m. This injection process has been going on successfully since 2004. The stored CO{sub 2} has been monitored over the last five years by a Joint Industry Project (JIP) - a collaboration of BP, Sonatrach, and Statoil with co-funding from US DOE and EU DG Research. Over the years the JIP has carried out extensive analyses of the Krechba system including two risk assessment efforts, one before injection started, and one carried out by URS Corporation in September 2008. The long history of injection at Krechba, and the accompanying characterization, modeling, and performance data provide a unique opportunity to test and evaluate risk assessment approaches. We apply the CF to the In Salah CO{sub 2} storage project at two different stages in the state of knowledge of the project: (1) at the pre-injection stage, using data available just prior to injection around mid-2004; and (2) after four years of injection (September 2008) to be comparable to the other risk assessments. The main risk drivers for the project are CO{sub 2} leakage into potable groundwater and into the natural gas cap. Both well leakage and fault/fracture leakage are likely under some conditions, but overall the risk is low due to ongoing mitigation and monitoring activities. Results of the application of the CF during these different state-of-knowledge periods show that the assessment of likelihood of various leakage scenarios increased as more information became available, while assessment of impact stayed the same. Ongoing mitigation, modeling, and monitoring of the injection process is recommended.

54 ENVIRONMENTAL SCIENCES↗

Microphonics control for Project X

The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

43 PARTICLE ACCELERATORS↗

Bayesian Analysis of Savings from Retrofit Projects

Estimates of savings from retrofit projects depend on statistical models, but because of the complicated analysis required to determine the uncertainty of the estimates, savings uncertainty is not often considered. Numerous simplified methods have been proposed to determine savings uncertainty, but in all but the simplest cases, these methods provide approximate results only. The objective of this paper is to show that Bayesian inference provides a consistent framework for estimating savings and savings uncertainty in retrofit projects. We review the mathematical background of Bayesian inference and Bayesian regression, and present two examples of estimating savings and savings uncertainty in retrofit projects. The first is a simple case where both baseline and post-retrofit monthly natural gas use can be modeled as a linear function of monthly heating degree days. The Efficiency Valuation Organization (EVO 2007) defines two methods of determining savings in such cases: reporting period savings, which is an estimate of the savings during the post-retrofit period; and normalized savings, which is an estimate of the savings that would be obtained during a typical year at the project site. For reporting period savings, classical statistical analysis provides exact analytic results for both savings and savings uncertainty in this case. We use Bayesian analysis to calculate reporting period savings and savings uncertainty and show that the results are identical to the analytical results. For normalized savings, the literature contains no exact expression for the uncertainty of normalized savings; we use Bayesian inference to calculate this quantity for the first time, and compare it with the result of an approximate formula that has been proposed. The second example concerns a problem where the baseline data exhibit nonlinearity and serial autocorrelation, both of which are common in real-world retrofit projects. No analytical solutions exist to determine savings or savings uncertainty in this situation, but several simplified formulas have been proposed. We model the data using a 5-parameter model with first-order autoregressive errors, and use Bayesian inference to develop distributions for the model parameters and for the reporting period savings, which allows us to determine the savings uncertainty. We find the energy savings to be about 5% lower than the result obtained by ignoring the autocorrelation. In addition, the Bayesian analysis finds the savings uncertainty to be narrower than the approximate uncertainty calculated using the simplified formula. These results show that Bayesian inference can be used to determine savings and savings uncertainty for a wide variety of real-world problems.

Im, Piljae↗

Radiation Embrittlement Archive Project

The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

Klasky, Hilda B↗

United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760°C). The steam turbine stop and control valve component has been designed to operate at full A-USC temperatures, and would be tested both in throttling operation and to accumulate accelerated, repetitive stroke cycles. A cycling header component has been designed to confirm the suitability of new high-temperature nickel alloys to cycling operation, expected of future coal-fired power plants. Current test plans would subject these components to A-USC operating conditions for at least 8,000 hours by September 2020. The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. This consortium is completing the Detailed Engineering phase of the project, with procurement scheduled to begin in late 2017. The effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory, along with the Ohio Development Services Agency. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides technical details on the design of the ComTest facility.

54 ENVIRONMENTAL SCIENCES↗

The FabrIc for Frontier Experiments Project at Fermilab: Computing for Experiments

The FabrIc for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientific Computing Division designed to steer the computing model for non-LHC experiments at Fermilab. The FIFE project enables close collaboration between experimenters and computing professionals to serve high-energy physics experiments of differing scope and physics area of study. The project also tracks and provides feedback on the development of common tools for job submission, identity management, software and data distribution, job monitoring, and databases for project tracking. The computing needs of the experiments under the FIFE umbrella continue to increase, and present a complex list of requirements to their service providers. To meet these requirements, recent advances in the FIFE toolset include a new identity management infrastructure, significantly upgraded job monitoring tools, and a workflow management system. We have also upgraded existing tools to access remote computing resources such as GPU clusters and sites outside the United States. We will present these recent advances, highlight the nature of collaboration between the diverse set of experimenters and service providers, and discuss the project's future directions.

43 PARTICLE ACCELERATORS↗

The Role of Numerical Simulation in the Design of Stimulation and Circulation Experiments for the EGS Collab Project

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO’s flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additional plays an essential role in designing these meso-scale experiments. This paper describes specific calculations and numerical simulation approaches conducted in support of the designs for the stimulation and circulation experiments, and their monitoring, including those for predicting seismic energies during stimulation, stimulation pressure requirements, impacts of borehole orientation on fracture development and trajectories, influence of notch shapes on hydraulic fracture initiation, and pressure limits on fluid circulation to avoid fracture growth.

Numerical Simulation, EGS Collab, EGS, Sanford Und↗

Project Methods to Enhance Wellbore Cement Integrity with Microbially-Induced Calcite Precipitation (MICP) (Final Scientific/Technical Report)

The goal of this project was to develop improved methods for sealing compromised wellbore cement in leaking oil and gas wells, thereby reducing the risk of unwanted upward fluid migration. Novel methods for improving wellbore integrity, such as microbially induced calcite precipitation (MICP), can reduce leakage potential, improve the safety of fossil fuel extraction, improve the public perception of hydraulic fracturing, and promote environmentally-prudent unconventional oil and gas development. Microbes, with the urease enzyme, can catalyze the chemical reaction of urea hydrolysis to induce the precipitation of calcium carbonate which can be used as a cementitious material to seal leakage pathways. In this project, methods to promote robust bio-composite cementitious materials were designed and tested in the laboratory. Scale-up of those methods were tested in meso-scale reactor systems and in field applications. In this report, in Section One, we describe laboratory efforts to develop injection strategies to promote precipitation in wellbore analogs and determine the strength of the bio-composite cements as compared to fine cement. In Section Two, we describe the efforts to scale up the work and study the use of materials that can be used in field application, for example exploring the use of calcium chloride ice melt or urea fertilizer as source chemicals. In Section Three, the three field trials (methods and results) performed as part of the project are described and summarized. At the end of the report is a comprehensive summary and conclusion section which highlights the key findings of the project. The work performed during this project significantly advanced the technology readiness level (TRL) of the MICP wellbore sealing strategy.

02 PETROLEUM↗

Pansophy data as used to develop metrics and evaluate trends across SRF projects and facilities to further quality improvement initiatives

Pansophy, a JLAB SRF engineering data management system (EDMS), is composed of a collection of technolo-gies that together provide for the collection, management and analysis of data for the production and testing of cavities and cryomodules. From its inception in 2000, when data collection was a priority for such projects as SNS, CEBAF 12GeV upgrade, LCLS-II, and in the future the SNS-PPU, the focus has turned to data analysis and reporting on quality metrics and key performance indica-tors (KPIs). Reporting enhancements include monthly quality metrics, project specific KPIs, and trending across projects. With the use of Pareto Charts to help analyze vendor quality and non-conformance, timelines of pro-ject and facility metrics, project managers and subject matter experts (SME) are able to look for trends and pre-pare further quality improvement initiatives for their projects.

McDonald, M. G.↗

Better bang for your buck? Comparing savings realization from ESPCs and direct-funded projects

Energy savings performance contracts (ESPCs) offer an opportunity to tremendously scale decarbonization projects, given their paid-from-savings premise. However, prospective customers still question whether ESPC is worth the effort and expense. This study evaluates the savings realization rates of ESPCs compared to direct-funded projects using ENERGY STAR Portfolio Manager (ESPM) benchmarking data. It compares normalized EUIs from ESPM before and after energy conservation projects implemented via ESPC or direct funding in roughly 450 federal buildings. This documented change, ideally a savings, can then be compared to the estimated savings from the energy conservation initiative in order to generate a rough realization rate. Preliminary results indicate a notably greater savings realization rate for the ESPC buildings (median = 105% of estimated savings) than those that underwent direct-funded projects (median = 46%). Because of a shortage of good quality data and the wide range in results, the difference is only significant at the p < 0.20 level. However, the higher savings realization of ESPCs corroborates the authors’ 2014 findings using a different comparison method. With continued soft government funding and regulatory impediments for climate change mitigation in the U.S., financed, paid-from-savings project models (e.g., ESPC, PACE, EaaS and others) certainly merit more attention. This study’s results are particularly compelling (and encouraging) given the country’s likely reliance on these vehicles to address existing building retrofits.

Earni, Shankar↗

Determining the Effects of Neutron Irradiation on the Structural Integrity of Additively Manufactured Heat Exchangers for Very Small Modular Reactor Applications, DOE Final Report (Project # 19-16980)

Auburn University (AU) teamed with the University of Missouri Research Reactor (MURR) and Kansas State University (KSU) to determine how to best use laser-powder bed fusion (L-PBF) additive manufacturing (AM) methods for generating radiation resistant nickel-based superalloys, Inconel alloy 625 and 718, for special purpose reactor (SPR) or very small modular reactor (vSMR) heat-exchangers (HeXs). Compact, conformal, and durable HeXs that are tolerant of extreme environments are needed for supporting the technical maturity of next-generation, portable compact reactors. AM is an enabler for realizing this new wave of HeXs – providing a means to make customizable hot and cold stream architectures with novel flow path geometries (e.g., tortuous channels with non-uniform, asymmetric cross-sections) and reduced layer-to-layer contact resistance (i.e., no separate bonding procedure required). AM further enables a more time/cost efficient means for fabricating SPRs by reducing the number of suppliers required for HeX assembly and allowing for on-site HeX fabrication. The project aim has been to better understand how neutron irradiation affects the microstructure and properties of additively manufactured nickel-based superalloys, to accelerate their safe, reliable use in the modular reactor industry. The major objective was to qualify/quantify the microstructure and microhardness of nickel-based superalloys (including Inconel 718 and 625) additively manufactured via the L-PBF process in the neutron-dosed (irradiated) and non-irradiated states over a course of 3 years. Effects of build orientation during L-PBF and post-AM heat treatments on neutron resistance, microstructure and mechanical properties were also investigated. Neutron damage mechanisms via hardening were characterized. This project combined subject-matter experts in AM, mechanical/microstructure metallic part characterization, and neutron irradiation, as well as unique assets and capabilities at AU and MURR at MU, to ensure project results translated to effectively addressing known gaps in nuclear science and engineering. Parts were fabricated using L-PBF systems readily available at AU. Specimens were then irradiated using MURR facilities; a manipulator equipped hot cell was also used to measure material hardness after dosing. MURR, a 10 MW, light-water nuclear reactor, is the largest, highest powered, highest-flux university owned research reactor in the U.S. The major findings in this project provide evidence that AM can serve as an alternative way to build structural components for future advanced small modular reactors using advanced materials like Inconel 625 (IN625) or Inconel 718 (IN718). After full spectrum neutron irradiation, vertically as-built AM IN625 samples were observed to display better resistance towards radiation-induced-hardening defects relative to traditionally machined metals. A Vickers microhardness tester, using settings of 1 kgf and dwell time of 15 seconds per indentation, was used to measure hardness in this study. The as-built, vertically printed samples experienced 1.2% of radiation hardening vs. 5.25% radiation hardening observed in wrought IN625. Another set of IN625 and IN718 samples were exposed to fast neutron irradiation. It was observed that IN718 showed more resistance towards radiation hardening compared to IN625 samples indicating IN718 had a better performance. Results showed that the IN718 samples experienced less change (-2.5 to 3.24 %) in microhardness. On the other hand, IN625 samples underwent more (0.9 to 7.21%) change in microhardness after fast neutron irradiation. AM IN625 samples were irradiated using an ion (proton) beam in cyclotron. The mechanical properties of AM samples post irradiation were compared with wrought samples. The irradiated region on the samples were tested using nano-hardness indention. It was observed that the beam current and time used in this study generated an annealing effect and thus reduced the hardness of the samples. The sum of the project results provide precious insight into how one may minimize radiation hardening in AM materials while maintaining material property constraints. Results should assist engineers in selecting an appropriate heat treatment for AM nickel-based superalloys for increased radiation resistance. Results should increase confidence levels for adopting AM for building nuclear reactor components which perform the same or better than conventionally manufactured components. Fast neutron irradiation testing provided an accelerated means of obtaining radiation effects without making materials radioactive and difficult to handle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

BOTTLE 7 - Industry Projects & Engagement

One of BOTTLE's primary goals is to work with industry to catalyze new technologies towards our overall vision and mission using a centralized industry engagement plan which aims to 1) solve real-world problems in plastics upcycling via targeted, company-funded projects; 2) promote industrial engagement via streamlined access to BOTTLE partners and technologies; and 3) collaborate with companies to scale and deploy BOTTLE technologies into the economy. Our approach follows a 5-stage model: prospecting, initial engagement, knowledge sharing, proposal and contracting, and opportunity won. Since FY21, BOTTLE has onboarded a full-time Chief Technology Officer to spearhead industry engagement and lead industrially-funded research projects. To date, BOTTLE has engaged with >150 companies, executed 6 industrial funds-in CRADAs, completed 2 industry projects successfully, extended 2 CRADAs with follow-on funds, and submitted over 30 patent applications. Industry projects span the Deconstruction, Upcycling, and Redesign tasks, harness the capabilities of the cross-cutting tasks, and take advantage of the broad IP portfolio developed through DOE funding. BOTTLE partners have an inventory of innovations that can inform the design of industry-specific collaborative projects with the highest probability of producing novel IP. Engaging with a diverse set of companies has also directly informed our R&D portfolio towards maximizing impact and utility of BOTTLE innovations.

BIOMASS FUELS↗

International Atomic Energy Agency support of research reactor highly enriched uranium to low enriched uranium fuel conversion projects

The IAEA has been involved for more than twenty years in supporting international nuclear non- proliferation efforts associated with reducing the amount of highly enriched uranium (HEU) in international commerce. IAEA projects and activities have directly supported the Reduced Enrichment for Research and Test Reactors (RERTR) programme, as well as directly assisted efforts to convert research reactors from HEU to LEU fuel. HEU to LEU fuel conversion projects differ significantly depending on several factors including the design of the reactor and fuel, technical needs of the member state, local nuclear infrastructure, and available resources. To support such diverse endeavours, the IAEA tailors each project to address the relevant constraints. This paper presents the different approaches taken by the IAEA to address the diverse challenges involved in research reactor HEU to LEU fuel conversion projects. Examples of conversion related projects in different Member States are fully detailed. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗