Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Optimal Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Heavy Oil Polymer EOR in the Challenging Alaskan Arctic - It Works!

Under co-sponsorship of the US Department of Energy and Hilcorp Alaska LLC the first ever polymer field pilot commenced on 8/28/2018 in the Schrader Bluff heavy oil reservoir at the Milne Point Field on Alaska North Slope (ANS). The primary objective of the pilot is to prove the efficacy of polymer Enhanced Oil Recovery (EOR) to unlock the vast heavy oil resources on ANS. More than two and half years after startup, the polymer injection, supporting laboratory experiments and simulation studies steadily continue. The pilot started injecting hydrolyzed polyacrylamide (HPAM), at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP, into the two horizontal injectors in the flood pattern. Production is monitored in the two horizontal producers. Based on laboratory measurements of polymer viscosity at reservoir conditions, the team decided to reduce polymer concentration to 1,200 ppm since July 2020 in an effort to control injection pressure and optimize polymer utilization. Quality control (QC) on the field ensures uniform polymer solution properties. Representative rock and fluid systems and test conditions are utilized in the corefloods on polymer retention, effect of injection water salinity, polymer loading, and their combinations on oil recovery. A history matched reservoir simulation model for forecasting oil recovery was developed on the basis of all the available field data. Field concerns related to the post-polymer breakthrough impact on flow assurance is addressed via specialized laboratory tests. Notwithstanding early operational disruptions and hydration issues, continuous polymer injection in both injectors has been achieved. To date, 950,000 lbs of polymer or 2 million barrels of polymer solution, equating to 13% of total pore volume (PV), has been placed in the flood pattern, serving as an effective indicator of adequate polymer injectivity. So far, the success of polymer EOR is evident from drastically reduced water cut in the producers, an estimated incremental 1,000 bopd over waterflood, and a favorable polymer utilization of 1.7 lbs/barrel of incremental oil. Polymer breakthrough was observed 26 months after the start of polymer injection. Main observations from corefloods are unusually high polymer retention values in some cases and a positive response to low salinity water. Although the heterogeneity in the flood pattern and exceptionally low water cut pose some challenges, persistent novel and justifiable simulation approaches have resulted in a robust history matched model. Experimental results on produced fluids treatment provide operational guidance for improved oil-water separation and mitigation of heater tube fouling. The ongoing success of the pilot is a key indicator of bringing the team ever closer to meeting the project’s primary objective. The encouraging results of the pilot is one of the drivers that has provided the impetus to apply polymer EOR throughout the Milne Point Field, which would increase oil recovery and extend the economic life of the Trans Alaska Pipeline System. The scientific knowledge, including the many lessons learned from this pilot also has referential value for other potential heavy oil EOR projects throughout the world. The collected data, operational lessons learned, and the overall success of the pilot are summarized in the paper.

None, None↗

An Integrated Framework for Memory-Centric Analysis: From Trace Collection to Co-Design

The memory wall phenomenon—where advances in processor performance significantly outpace those in memory subsystems—poses a fundamental challenge for contemporary computing systems. In memory-bound applications, memory subsystem behavior dominates performance, yet existing analysis approaches present significant limitations: detailed microarchitectural simulators require days to weeks to simulate modest workloads; hardware performance counters provide only aggregate statistics that obscure temporal and spatial access patterns; and scaled simulation approaches face challenges in capturing certain behaviors that emerge at larger scales. These limitations reflect a processor-centric design philosophy increasingly misaligned with memory-bound workloads where detailed understanding of memory access patterns, cache hierarchy interactions, and contention is critical for effective optimization. This paper presents an integrated framework for memory-centric analysis that enables effective hardware-software co-design. We describe practical trace collection techniques, including hardware-assisted processor tracing with minimal overhead and portable software-based instrumentation with statistical sampling. We present multi-perspective analysis methods that examine memory behavior from temporal, sequential, spatial, and relational viewpoints, revealing distinct optimization opportunities invisible in aggregate metrics. We detail an architectural modeling framework that uses sampled traces with temporal interpolation and confidence-based filtering to evaluate cache and memory configurations. Evaluation on representative benchmarks demonstrates that this framework achieves practical accuracy (L2 cache errors of 2.64\%, confidence-filtered L3 errors of 9.92\%, bandwidth errors of 7.33\%) while providing substantial speedup (26.8×) over cycle-accurate simulation, enabling rapid design space exploration. We demonstrate how this integrated framework enables systematic identification of both hardware optimizations (memory controller tuning, bank partitioning, NUMA configuration) and software optimizations (data layout restructuring, prefetching strategies, memory-aware scheduling). Through this comprehensive treatment of the memory-centric analysis pipeline—from trace collection through architectural modeling to co-design application—we provide researchers and practitioners with practical techniques for addressing memory bottlenecks in contemporary computing systems.

Gajaria, Dhruv Mayur↗

An Optimized H5 Hysteresis Current Control with Clamped Diodes in Transformer-Less Grid-PV Inverter

With the rise of renewable energy penetration in the grid, photovoltaic (PV) panels are connected to the grid via inverters to supply solar energy. Transformer-less grid-tied PV inverters are gaining popularity because of their improved efficiency, reduced size, and lower costs. However, they can induce a path for leakage currents between the PV and the grid due to the absence of galvanic isolation. This leads to serious electromagnetic interference, loss in efficiency, and safety concerns. The leakage current is primarily influenced by the nature of the common mode voltage (CMV), which is determined by the switching techniques of the inverter. In this paper, a novel inverter topology of Hysteresis Controlled H5 with Two Clamping Diodes (HCH5-D2) is derived. The HCH5-D2 topology helps decouple the AC part (Grid) and DC part (PV) during the freewheeling period to make the CMV constant, thereby reducing the leakage current. Additionally, the extra diodes help reduce voltage spikes generated during the freewheeling period and maintain the CMV at a constant value. Finally, a 2.2 kW grid-connected single-phase HCH5-D2 PV inverter system’s MATLAB simulation is presented, showing better results compared to a traditional H4 inverter.

42 ENGINEERING↗

Impact of Blockchain Delay on Grid-Tied Solar Inverter Performance: Preprint

This paper investigates the impact of the delay resulting from a blockchain, a promising security measure, for a hierarchical control system of inverters connected to the grid. The blockchain communication network is designed at the secondary control layer for resilience against cyberattacks. To represent the latency in the communication channel, a model is developed based on the complexity of the blockchain framework. Taking this model into account, this work evaluates the plant’s performance subject to communication delays, introduced by the blockchain, among the hierarchical control agents. In addition, this article considers an optimal model-based control strategy that performs the system’s internal control loop. The work shows that the blockchain’s delay size influences the convergence of the power supplied by the inverter to the reference at the point of common coupling. In the results section, real-time simulations on OPAL-RT are performed to test the resilience of two parallel inverters with increasing blockchain complexity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Hardware-in-the-Loop Evaluation for Potential High Limit Estimation-Based PV Plant Active Control: Preprint

This paper validates the effectiveness of an Artificial Intelligence (AI)-driven PV plant control and optimization approach, namely, the Automated Learner for Intermittency Control by Extrapolation (ALICE), in empowering PV plant as a dependable grid reliability service provider. The validation is performed in a realistic laboratory controller-hardware-in-the-loop (CHIL) environment, leveraging accurate PV plant modeling and standard industrial communication protocol. Simulation results, considering both varying weather conditions and active control scenarios, demonstrate the superior performance of ALICE in improving the grid service delivery precision and reducing the over-curtailment compared to a state-of-the-art approach, i.e., reference-control grouping based approach. Such a work could help mitigate risks and provide practical guidance during the field deployment of ALICE, while establishing a standardized testing framework for evaluating various PV active control strategies.

hardware-in-the-loop↗

Data Transfer Advisor with Transport Profiling Optimization

The network infrastructures have been rapidly upgraded in many high-performance networks (HPNs). However, such infrastructure investment has not led to corresponding performance improvement in big data transfer, especially at the application layer, largely due to the complexity of optimizing transport control on end hosts. We design and implement ProbData, a PRofiling Optimization Based DAta Transfer Advisor, to help users determine the most effective data transfer method with the most appropriate control parameter values to achieve the best data transfer performance. ProbData employs a profiling optimization based approach to exploit the optimal operational zone of various data transfer methods in support of big data transfer in extreme scale scientific applications. We present a theoretical framework of the optimized profiling approach employed in ProbData as wellas its detailed design and implementation. The advising procedure and performance benefits of ProbData are illustrated and evaluated by proof-of-concept experiments in real-life networks.

Rao, Nageswara S.↗

Multi-objective Bayesian optimization of ferroelectric materials with interfacial control for memory and energy storage applications

Optimization of materials’ performance for specific applications often requires balancing multiple aspects of materials’ functionality. Even for the cases where a generative physical model of material behavior is known and reliable, this often requires search over multidimensional function space to identify low-dimensional manifold corresponding to the required Pareto front. In this work, we introduce the multi-objective Bayesian optimization (MOBO) workflow for the ferroelectric/antiferroelectric performance optimization for memory and energy storage applications based on the numerical solution of the Ginzburg–Landau equation with electrochemical or semiconducting boundary conditions. MOBO is a low computational cost optimization tool for expensive multi-objective functions, where we update posterior surrogate Gaussian process models from prior evaluations and then select future evaluations from maximizing an acquisition function. Using the parameters for a prototype bulk antiferroelectric (PbZrO 3 ), we first develop a physics-driven decision tree of target functions from the loop structures. We further develop a physics-driven MOBO architecture to explore multidimensional parameter space and build Pareto-frontiers by maximizing two target functions jointly—energy storage and loss. This approach allows for rapid initial materials and device parameter selection for a given application and can be further expanded toward the active experiment setting. The associated notebooks provide both the tutorial on MOBO and allow us to reproduce the reported analyses and apply them to other systems (https://github.com/arpanbiswas52/MOBO_AFI_Supplements).

36 MATERIALS SCIENCE↗

Optimization of Marine Energy Conversion Systems Through Modeling, Optimization, and CHIL Validation

The work aims to achieve optimal tidal energy conversion through a comprehensive approach of modeling, optimization, and control hardware-in-the-loop (CHIL) validation. By developing accurate models and employing optimization techniques, it seeks to identify efficient system configurations and control strategies. HIL validation will ensure the performance and reliability of the optimized tidal energy conversion system. The preparation of the present manual has been supported by the U.S. Department of Energy.

16 TIDAL AND WAVE POWER↗

A simulation environment for ITER PCS development

A simulation environment known as the Plasma Control System Simulation Platform (PCSSP), specifically designed to support development of the ITER Plasma Control System (PCS), is currently under construction by an international team encompassing a cross-section of expertise in simulation and exception handling for plasma control. The proposed design addresses the challenging requirements of supporting the PCS design. This work provides an overview of the PCSSP project and a discussion of some of the major features of its design. Plasma control for the ITER tokamak will be significantly more challenging than for existing fusion devices. An order of magnitude greater performance is needed for some types of control, which together with limited actuator authority, implies that optimized individual controllers and nonlinear saturation logic are required. At the same time, consequences of control failure are significantly more severe, which implies a conflicting requirement for robust control. It also implies a requirement for comprehensive and robust exception handling. Coordinated control of multiple competing objectives with significant interactions, together with many shared uses of actuators to control multiple variables, implies that highly integrated control logic and shared actuator management will be required. It remains a challenge for the integrated technologies to simultaneously address these multiple and often competing requirements to be demonstrated on existing fusion devices and adapted for ITER in time to support its operational schedule. We describe ways in which the PCSSP will help address these challenges to support design of both the ITER PCS itself and the algorithms that will be implemented therein. and at the same time greatly reduce the cost of that development. We summarize the current status of the PCSSP design task, including system requirements and preliminary design documents already delivered as well as features of the ongoing detailed architectural design. The methods being incorporated in the detailed design are based on prior experience with control simulation environments in fusion and on standard practices prevalent in development of control-intensive industrial product designs.

43 PARTICLE ACCELERATORS↗

Management and Operation of the Lawrence Livermore National Laboratory (Final Report)

Optimize existing characterization and control methods by developing methods for rapid synthesis of multi-qubit control for error mitigation and complex gate design using optimal control theory. The Subcontractor shall develop Hamiltonian learning methods that can be used for characterizing super-conducting quantum devices, in particular develop strategies for effective probing of such devices.

97 MATHEMATICS AND COMPUTING↗

Artificial Intelligence Techniques in Smart Grid: A Survey

The smart grid is enabling the collection of massive amounts of high-dimensional and multi-type data about the electric power grid operations, by integrating advanced metering infrastructure, control technologies, and communication technologies. However, the traditional modeling, optimization, and control technologies have many limitations in processing the data; thus, the applications of artificial intelligence (AI) techniques in the smart grid are becoming more apparent. This survey presents a structured review of the existing research into some common AI techniques applied to load forecasting, power grid stability assessment, faults detection, and security problems in the smart grid and power systems. It also provides further research challenges for applying AI technologies to realize truly smart grid systems. Finally, this survey presents opportunities of applying AI to smart grid problems. The paper concludes that the applications of AI techniques can enhance and improve the reliability and resilience of smart grid systems.

energy systems↗

An efficient optimization of well placement and control for a geothermal prospect under geological uncertainty

This work applies an efficient optimization technique based on a multivariate adaptive regression spline (MARS) technique to determine the optimal design and engineering of a potential geothermal production operation at a prospect near Superstition Mountain in Southern California, USA. The faster MARS-based statistical model is used as a surrogate for higher-fidelity physical models within the intensive optimization process. Its use allows for the exploration of the impacts of specific engineering design parameters in the context of geologic uncertainty as a means to both understand and maximize profitability of the production operation. The MARS model is initially developed from a training dataset generated by a finite set of computationally complex hydrothermal models applied to the prospect. Its application reveals that the optimal engineering design variables can differ considerably assuming different choices of hydrothermal flow properties, which, in turn, indicates the importance of reducing the uncertainty of key geologic properties. The major uncertainty sources in the natural-system are identified and ranked first by an efficient MARS-enabled total order sensitivity quantification, which is then used to assist evaluating the effect of geological uncertainties on optimized results. At the Southern California prospect, this parameter sensitivity analysis suggests that groundwater circulation through high permeable structures, rather than heat conduction through impermeable granite, is the primary heat transfer method during geothermal extraction. Reservoir histories simulated using optimal parameters with different constraints are analyzed and compared to investigate the longevity and maximum profit of the geothermal resources. The comparison shows that the longevity and profit are very likely to be overestimated by optimizations without appropriate constraints on natural conditions. In addition to geothermal energy production, this optimization approach can also be used to manage other geologic resource operations, such as hydrocarbon production or CO 2 sequestration, under uncertain reservoir conditions.

15 GEOTHERMAL ENERGY↗

Non-linear Model Predictive Control of Wave Energy Converters with Realistic Power Take-off Configurations and Loss Model

Model Predictive Control (MPC) has been recognized as a well-developed control strategy for optimizing the performance of wave energy converters (WECs). The standard problem involves maximizing the absorbed power from oncoming waves while respecting motion constraints of the device and force constraints of the power take-off (PTO). The generated electrical power is then calculated by assuming an ideal PTO with no power conversion losses or limitations to power flow. In this article, we remove the assumption of an ideal PTO and present four different control options that reflect unique combinations of PTO control and power flow constraints. We also recast the MPC problem to maximize the generated power instead of the absorbed power by accounting for the losses in the power train. Using a WEC with a hydraulic PTO, we develop a loss model suitable for controls optimization. Lastly, we illustrate the process of setting up the non-linear MPC problem and compare the performance of competing control strategies using a common benchmark based on annual energy captured at a reference site.

16 TIDAL AND WAVE POWER↗