Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Regional Geologic Cross Sections for Potential Storage and Containment Zones in the MRCSP Region

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO 2 ) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. Five geologic cross sections (labeled A through E) were constructed onshore across the parts of the MRCSP Region west of the Valley and Ridge Province, and one section (labeled F) was constructed beginning onshore in New Jersey and running eastward to offshore areas examined for carbon storage. Regional and local stratigraphic units were used in these cross sections to show current nomenclature as well as highlighting specific units/features pertinent to carbon capture, utilization and storage (CCUS) opportunities in the region. Each cross section uses 15 to 25 deep wells and other geologic information to illustrate the relative depth, thickness and location of rock units in the subsurface.

01 COAL, LIGNITE, AND PEAT↗

Assessment of Enhanced Oil Recovery Using Carbon Dioxide in Michigan Basin Silurian Pinnacle Reefs

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO 2 ) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The Michigan team at Western Michigan University has provided technical analysis and support of the enhanced oil recovery (EOR) using carbon dioxide (CO 2 ) in the Northern Michigan Silurian Pinnacle reefs. With Core Energy, LLC as the industry partner, this project has assessed the potential for EOR in known fields in the Michigan Pinnacle reefs and the capacity for CO2 storage in the reef reservoirs as they are depleted and after reservoir abandonment. This project managed by Core Energy, LLC, involves the only commercial CO 2 Enhanced Oil Recovery floods within the MRCSP region. The Silurian pinnacle reef trend shows significant potential for CO 2 -EOR: this play is relatively new, with approximately 60% of the wells in the largest Niagaran fields still accessible. Most wells have modern logs and there are many cores, core analyses, pressure tests and produced water analyses available for study from these fields. These carbonate reservoirs in Michigan have produced sufficient oil to warrant evaluation for additional recovery efforts. The role of the Michigan team was to collect and analyze all relevant data about reservoir properties, including lithologic and depositional characteristics of the reservoir formations and porosity and fluid flow properties through different compartments in the reservoir. The team has also developed models that represent the geological and physical characteristics of the reservoir and seal system.

01 COAL, LIGNITE, AND PEAT↗

Physics Opportunities at a Beam Dump Facility at PIP-II at Fermilab and Beyond

The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC is presently under construction and is expected to provide 800~MeV protons with 2~mA current. This white paper summarizes the outcome of the first workshop on May 10 through 13, 2023, to exploit this capability for new physics opportunities in the kinematic regime that are unavailable to other facilities, in particular a potential beam dump facility implemented at the end of the LINAC. Various new physics opportunities have been discussed in a wide range of kinematic regime, from eV scale to keV and MeV. We also emphasize that the timely establishment of the beam dump facility at Fermilab is essential to exploit these new physics opportunities.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluating a Transition-Jump System for the Fermilab Main Injector Using Xsuite

We describe an Xsuite simulation framework for the Fermilab Main Injector (MI) along with an evaluation of transition-crossing behaviors in the accelerator. In particular, we studied the introduction of quadrupole magnets into the lattice as part of a transition-jump system that will be implemented through the $2^{nd}$ Proton Improvement Plan (PIP-II). Simulated beam losses spurred by transition-induced instabilities were assessed under several systematic effects, including MI quad errors, magnet-to-magnet variability in the jump magnets, power-supply errors, and timing jitter.

Schreckenberger, Adam Paul [Fermilab] (ORCID:00000↗

Gilliam County Riparian Buffers 2007-2008 Annual Report.

During the contract year beginning July 1, 2007 and ending June 30, 2008, the CREP technician contacted 15 new landowners regarding an interest in either the CREP or the Continuous CRP programs. Most landowners requested a second meeting and most sites were visited to discuss possibilities of enrolling in a USDA riparian program. This year, a considerable amount of time was spent providing technical assistance to prior contracts as the practices are implemented. More time is being spent in planning site preparation so that NRCS and FSAs increasing concerns over plant survival are satisfied. A continued concern that the rate paid to the landowner for maintenance is not enough. Controlling competing vegetation is a major factor in increasing plant survival. Increasing costs in the methods used to control unwanted plants has made it difficult for contract holders to perform these methods as effectively as they would like. The projects that have continued maintenance are considerably more successful.

13 HYDRO ENERGY↗

Modeling Multi-Bunch X-band Photoinjector Challenges

An X-band test station is being developed at LLNL to investigate accelerator optimization for future upgrades to mono-energetic gamma-ray technology at LLNL. The test station will consist of a 5.5 cell X-band rf photoinjector, single accelerator section, and beam diagnostics. Of critical import to the functioning of the LLNL X-band system with multiple electron bunches is the performance of the photoinjector. In depth modeling of the Mark 1 LLNL/SLAC X-band rf photoinjector performance will be presented addressing important challenges that must be addressed in order to fabricate a multi-bunch Mark 2 photoinjector. Emittance performance is evaluated under different nominal electron bunch parameters using electrostatic codes such as PARMELA. Wake potential is analyzed using electromagnetic time domain simulations using the ACE3P code T3P. Plans for multi-bunch experiments and implementation of photoinjector advances for the Mark 2 design will also be discussed.

42 ENGINEERING↗

EnergyIQ

EnergyIQ-the first "action-oriented" benchmarking tool for non-residential buildings-provides a standardized opportunity assessment based on benchmarking results. along with decision-support information to help refine action plans. EnergyIQ offers a wide array of benchmark metrics, with visuall as well as tabular display. These include energy, costs, greenhouse-gas emissions, and a large array of characteristics (e.g. building components or operational strategies). The tool supports cross-sectional benchmarking for comparing the user's building to it's peers at one point in time, as well as longitudinal benchmarking for tracking the performance of an individual building or enterprise portfolio over time. Based on user inputs, the tool generates a list of opportunities and recommended actions. Users can then explore the "Decision Support" module for helpful information on how to refine action plans, create design-intent documentation, and implement improvements. This includes information on best practices, links to other energy analysis tools and more. The variety of databases are available within EnergyIQ from which users can specify peer groups for comparison. Using the tool, this data can be visually browsed and used as a backdrop against which to view a variety of energy benchmarking metrics for the user's own building. User can save their project information and return at a later date to continue their exploration. The initial database is the CA Commercial End-Use Survey (CEUS), which provides details on energy use and characteristics for about 2800 buildings (and 62 building types). CEUS is likely the most thorough survey of its kind every conducted. The tool is built as a web service. The EnergyIQ web application is written in JSP with pervasive us of JavaScript and CSS2. EnergyIQ also supports a SOAP based web service to allow the flow of queries and data to occur with non-browser implementations. Data are stored in an Oracle 10g database. References: Mills, Mathew, Brook and Piette. 2008. "Action Oriented Benchmarking: Concepts and Tools." Energy Engineering, Vol.105, No. 4, pp 21-40. LBNL-358E; Mathew, Mills, Bourassa, Brook. 2008. "Action-Oriented Benchmarking: Using the CEUS Database to Benchmark Commercial Buildings in California." Energy Engineering, Vol 105, No. 5, pp 6-18. LBNL-502E.

MILLS, EVAN↗

Challenges for Deep Vadose Zone Remediation at the Hanford Site

The 'deep vadose zone' is defined as the region below the practical depth of surface remedy influence (e.g., excavation or barrier). At the Hanford Site, this region of the Central Plateau poses unique challenges for characterization and remediation. Currently, deep vadose zone characterization efforts and remedy selection are spread over multiple waste site Operable Units and tank farm Waste Management Areas. A particular challenge for this effort is the situation in which past leaks from single-shell tanks have become commingled with discharges from nearby liquid disposal sites. In addition, tests of potentially viable remediation technologies will be initiated in the next few years. The Hanford Site is working with all affected parties, including the Washington State Department of Ecology, the Environmental Protection Agency, DOE-RL, DOE-ORP, and multiple contractor organizations to develop remediation approaches. This effort addresses the complex and challenging technical and is evaluating the best strategy or combination of strategies for focusing technical investigations, including treatability studies to facilitate deep vadose zone remediation at the Hanford Site. In summary: Hanford's two DOE offices, Richland Operations and the Office of River Protection, are engaging the Site's regulators, EPA and the Washington State Department of Ecology, in a collaborative process to resolve one of Hanford's most challenging technical issues - investigation and remedy selection for the deep vadose zone. While this process has not reached its conclusion, several important findings are apparent. All parties agree that the current approach of addressing this problem is not likely to be successful and an alternative is needed. An essential initial step is to develop and then implement a deep vadose zone treatability test plan that logically organizes the testing of candidate technologies for application to the variety of Hanford's deep vadose zone problems. This plan is currently under development. The deep vadose zone needs to be addressed through a 'project-like' focused and high priority effort. Currently, there is a very diffuse focus to this problem. There are roughly 30 to 50 waste sites, multiple operable units and seven tank farm WMAs that may have to address deep vadose zone issues. No single waste site or investigation can adequately take on this Plateau-wide problem. Investigations of regions with commingled plumes from tank farms and non-tank farm sources need to be integrated or closely coordinated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Results of ISCO for a Large TCE DNAPL Source Area

This paper will describe the results of an in situ chemical oxidation (ISCO) remedial action currently in progress to address subsurface contamination by trichloroethene (TCE) dense nonaqueous phase liquid (DNAPL). The U.S. Department of Energy is responsible for the cleanup of environmental media at the Portsmouth Gaseous Diffusion Plant (PORTS) in southern Ohio. The X-701B Solid Waste Management Unit is an unlined surface impoundment at PORTS which was operated from 1954 to 1988. A TCE plume in groundwater emanates from the unit and is approximately 2,200 feet in length. Metals, radioactive inorganics, and other organic chemicals are also present at lower concentrations in the groundwater. An ongoing 1.6-acre TCE DNAPL source area for the plume is believed to exist up-gradient in the vicinity of the X-701B pond. The extent of the source area is inferred from actual recovery of DNAPL in production wells and from detection of TCE concentrations between 100 and 1,000 mg/L in monitoring wells. Previous remedial activities at X-701B have included a Resource Conservation and Recovery Act (RCRA) closure and a technology demonstration that recirculated permanganate solutions between two horizontal wells. Results of sampling after these remedial activities showed that the permanganate effectively destroyed TCE in portions of the aquifer where adequate contact was achieved, but that uniform distribution by the recirculation system was problematic. As a result, the TCE concentration in the groundwater eventually rebounded after the treatment. To overcome distribution issues and to more aggressively remediate the source, a new remediation approach is being implemented for the unit. The new approach involves the injection of Modified Fenton's Reagent directly into the source area using temporary direct push injection points. This new approach provides the ability to overcome limitations imposed by heterogeneities in the subsurface by injecting relatively small quantities of reagent into a large number of temporary injection points across the source area. These injections are then repeated, as necessary, on a grid pattern until performance goals are achieved. The remediation is being implemented in four phases under a work plan approved by the Ohio Environmental Protection Agency. Phase I, the pilot test, was conducted over a small portion of the source area. Phase II currently involves full-scale treatment of the source area. In Phase III, the source area will be monitored for TCE rebound. Phase IV will involve limited treatment for the down-gradient portion of the plume. (authors)

54 ENVIRONMENTAL SCIENCES↗

Use of Remote Technology in the Surface Water Environmental Monitoring Program at SRS Reducing Measurements in the Field - 13336

There are a wide range of sensor and remote technology applications available for use in environmental monitoring programs. Each application has its own set of limitations and can be challenging when attempting to utilize it under diverse environmental field conditions. The Savannah River Site Environmental Monitoring Program has implemented several remote sensing and surface water flow technologies that have increased the quality of the data while reducing the number of field measurements. Implementation of this technology reduced the field time for personnel that commute across the Savannah River Site (SRS) over a span of 310 square miles. The wireless surface water flow technology allows for immediate notification of changing field conditions or equipment failure thus reducing data-loss or erroneous field data and improving data-quality. This wireless flow technology uses the stage-to-flow methodology coupled with implementation of a robust highly accurate Acoustic Doppler Profiler system for measuring discharge under various field conditions. Savings for implementation of the wireless flow application and Flowlink{sup R} technology equates to approximately 1175 hours annually for the radiological liquid effluent and surveillance programs. The SonTek River Suveyor and Flowtracker technologies are utilized for calibration of the wireless flow monitoring devices in the site streams and validation of effluent flows at the SRS. Implementation of similar wireless devices is also planned in the National Pollutant Discharge Elimination System (NPDES) Storm-water Monitoring Program. SRS personnel have been developing a unique flow actuator device. This device activates an ISCO{sup TM} automated sampler under flowing conditions at storm-water outfall locations across the site. This technology is unique in that it was designed to be used under field conditions with rapid changes in flow and sedimentation where traditional actuators have been unsuccessful in tripping the automated sampler. In addition, automated rain gauges will be tied into this technology for immediate notification of rain at storm-water locations further enhancing the automation of environmental data collection. These technological improvements at SRS have led to data-quality improvements while reducing the field technician time in the field and costs for maintaining the traditional environmental monitoring applications. (authors)

54 ENVIRONMENTAL SCIENCES↗

Towards Cooperative Control of Humanoid Robots for Handling High-Consequence Materials in Gloveboxes - 17291

In this paper, we describe our ongoing work with NASA's Valkyrie humanoid robot and present preliminary results on cooperative control of Valkyrie's hands for performing dexterous manipulation tasks inside gloveboxes commonly found in many nuclear facilities. First, we discuss our human-supervised robot control framework which is based on optimization-based whole-body motion and manipulation controllers. A key aspect of this approach is perception based grasping. We develop a grasping control module for realizing the grasps corresponding to sample tasks such as power, ball, key, pinch, and open palm grasps and their variations. Next, we introduce the notion of motion template library in order to develop generalizable robot grasping and manipulation. Motion template library stores the constraint setting information for the constrained motion planning methods and a framework which can implement the motion template library on different types of robots for accomplishing similar tasks. Motion templates are defined only based on the task requirements. As a result, they can be easily ported to different robot platforms. Lastly, we discuss our multi-modal interfaces designs which include a visual display for improved situational awareness as well as a tactile glove for robot hand control and feedback. Our goal is for the person tele-operating the Valkyrie robot to have better sensing and control than what he or she would have if actually standing at the glovebox doing the work. This improved sensing is comprised of the ability to 'see through' the robot's arms and hands in the gloves and to have an improved sense of touch. The paper concludes with a discussion of our validation strategy. Our success metrics are derived from the completion of a relatively complex experiment to be performed in the glovebox. We evaluate various realistic experiments and use them for task validation and demonstration with Valkyrie. We use speed, time of completion, accuracy, repeatability and reliability rates as success metrics by designing replicable experiments. (authors)

42 ENGINEERING↗

Preliminary Preclosure Accident Consequence Analysis for the APM Conceptual Design - 18090

The Nuclear Waste Management Organization (NWMO) is implementing Adaptive Phased Management (APM), Canada's plan for the long-term management of used nuclear fuel. The APM approach encompasses centralized containment and isolation of the used fuel in a Deep Geological Repository (DGR) in a suitable rock formation, such as crystalline rock or sedimentary rock, in an informed and willing host. This paper describes a preliminary analysis of the potential dose consequences to the public under accident conditions associated with the operation of a DGR and related surface processing facilities. These results are for a generic site and considers exposure to a person standing at a potential fenceline location under conservative atmospheric conditions. Radiological dose consequences to the public were calculated for accidents identified in the preliminary hazard identification. The presence or absence of ventilation system HEPA filters was also considered in combination with specific accident scenarios. A Gaussian dispersion model considering the most stable atmospheric condition (Pasquill stability category F) was used to estimate the exposure of a member of the public in the direct plume path at the location of maximum airborne radionuclide concentrations. The public dose was calculated via the inhalation, air immersion and ground exposure pathways. For all accidents considered, the calculated public dose was low, up to about 0.8 mSv for a fall of an UFTP with container breach. The total dose to the public was also calculated at various distances from the Used Fuel Packaging Plant, Ventilation Shaft, and Main Shaft. For all accidents considered, the calculated dose to the public was low, below 1 mSv even at the minimum 100 m distance evaluated. Sensitivity cases were also carried out to determine the effect of stack release height, the effluent exit velocity, and the release orientation on the calculated minimum site boundary distance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Consideration on Decommissioning Facilitation of Nuclear Power Plants In Korea

As the number of decommissioning NPPs worldwide increases, the necessity of decommissioning feasibility design at the initial design/construction stage of NPP is emphasized. Also as demand for NPP decommissioning increase, the generation of large amount of radioactive waste and environment contamination are expected. Based on the decommissioning experiences of nuclear facilities, it is recognized that the specific design and operational procedure are essentially required to minimize the radioactive waste generation and radiation exposure during decommissioning. Recently the legal framework of decommissioning in Korea was enhanced through the revision of Nuclear Safety Act (NSA) and its subordinate status in 2015. On the other hand, the Korean first NPP, Kori unit 1, will be scheduled permanently shut-down in mid-2017. The Korean regulatory body have experience for decommissioning of small-sized nuclear facilities like research reactors and nuclear fuel cycle facility. However we have no experience on decommissioning of NPP in Korea. Therefore the comprehensive and systematic technical standards and guidelines on safety review and inspection should be required for the Korean first case on decommissioning of NPP. According to the revised NSA, NPP operators in Korea should submit the decommissioning plan (DP) for the permanent shut-down NPP as well as the existing operating NPPs. The operator shall prepare and submit the design features and measures for decommissioning facilitation as one of DP items and regulatory body shall review the feasibility of decommissioning. Therefore the safety review guideline for those decommissioning facilitation should be required. In this paper, we studied the overseas safety requirements, design features and operational procedures for decommissioning facilitation. Through the overseas survey results, the regulatory position and major management plan were proposed for development of detailed implementation guideline on decommissioning facilitation of NPPs in Korea.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction of a Cosmic Ray Telescope for the hpDIRC Radiators at the Electron Ion Collider

Nuclear physics pertains to the understanding of the structure and dynamics of the nuclei of atoms, accounting for almost all of the visible matter in the universe. The future Electron-Ion Collider (EIC) will play a crucial role in discovering new laws of Nuclear physics. A pivotal aspect of the EIC is exceptional particle identification (PID). Identifying charged hadrons in their final state can be done with special types of Cherenkov Detectors. One type of detector utilizes the Detection of Internally Reflected Cherenkov radiation (DIRC) phenomena. Able to provide precise PID separation up to relatively high momenta, DIRC radiators, made of synthetic fused silica, produce Cherenkov radiation when hit by high energy electromagnetically charged particles. In this thesis we present details of the construction of a cosmic ray telescope (CRT) to utilize high energy muons from cosmic rays to test DIRC radiators. These types of radiators will be used for the high-performance DIRC (hpDIRC) to be used in the ePIC detector in the future EIC. We go into detail on the DIRC process and the individual pieces of hardware required to make the CRT. Lots of labor was used for certain parts of the CRT, specifically the construction of a dark box for the DIRC radiators. The CRT construction and implementation of all of its components are planned to be completed before 2025.

Shankman, Nathan↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Primary Frequency Response for Grid Studies

For the electric power grid, maintaining nearly constant frequency is important measure of system reliability and stability. Primary frequency response (PFR) is one of the important reserve services used by grid operators to uphold steady frequency. Modeling PFR is historically rare in grid integration and planning studies, but could become more importantly with greater deployment of non-synchronous generators. In this work, we illustrate how a PFR constraint can be implemented into production cost models, which are a key component of grid planning studies. We also discuss the complexities and nuances associated with PFR modeling and provide results of a case study implementing PFR in a section of the western U.S. power grid.

14 SOLAR ENERGY↗

Cooperative On-Ramp Merging with Time-Varying Vehicle-to-Vehicle Communication Delay Compensation via a Model-Free Approach

Cooperative merging strategies enabled by vehicle-to-vehicle (V2V) communication have shown promise in addressing congestion, fuel inefficiency, and collision risks. However, their performance can be severely degraded by time-varying and uncertain communication delays-an issue often overlooked in existing research, which primarily focuses on merging sequence determination and trajectory planning. Furthermore, practical considerations such as heterogeneous vehicle dynamics, varying road conditions, and real-time implementation complexities are frequently neglected. This paper presents a model-free, online planning framework for cooperative on-ramp merging of connected and automated vehicles (CAVs), explicitly accounting for time-varying V2V communication delays. Without relying on detailed vehicle dynamics, the proposed method introduces a data-driven delay compensation scheme. A co-simulation platform integrating high-fidelity vehicle dynamics, traffic simulation (SUMO), and V2V communication within MATLAB/Simulink is developed to evaluate the proposed method. Simulation results demonstrate that unaddressed V2V communication delays significantly impair merging performance. In contrast, the proposed framework enhances intervehicle distance tracking and maintains low CO2 emissions and fuel consumption, under communication delay across different communication frequencies. In conclusion, its lightweight design also facilitates real-time implementation, making it well-suited for deployment in practical CAV systems.

Accounting↗