Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

"250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Babcock & Wilcox Company and The Ohio State University are developing iron-based metal oxide chemical looping technology for power generation and conversion of fossil fuels to chemicals and liquid fuels. A 250 kWt pilot facility has been constructed at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support scale-up of the technology for implementation in a 10 MWe coal direct chemical looping large pilot plant at Dover Light & Power in Dover, Ohio. The paper discusses the results of the pilot test and the impact of the results on the design of the large pilot facility.

20 FOSSIL-FUELED POWER PLANTS↗

250 kWt Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Babcock & Wilcox Company and The Ohio State University have constructed a 250 kWt coal direct chemical looping pilot facility at the Babcock & Wilcox Research Center in Barberton, Ohio. Testing was conducted on the facility to support installation of a 10 MWe coal direct chemical looping large pilot facility at the Dover Light & Power Plant in Dover, Ohio. Results of the testing and their impact on the design of the large pilot facility are discussed.

20 FOSSIL-FUELED POWER PLANTS↗

A Feasibility Study of a Novel Variable-Aperture Full-Ring SPECT using Large-Area Pixelated CZT Modules: Simulation Results

Emerging single photon emission computed tomography (SPECT) scanner using cadmium zinc telluride (CZT) offers improved quantitative imaging capability over conventional NaI(Tl)-based SPECT scanner. In this study, on top of the previously-developed energy-optimized parallel collimator design [1], we further evaluated a full-ring SPECT system design with eight large-area CZT detectors. In order to evaluate the imaging performance of our proposed CZT-SPECT system, we employed analytical phantom and brain phantom, using a conventional NaI(Tl)-SPECT system as a reference.

36 MATERIALS SCIENCE↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

A FEASIBILITY STUDY ON CRACK REPAIR IN AUSTENITIC STAINLESS STEEL DRY STORAGE CANISTERS USING ISOTHERMAL FRICTION STIR WELDING

In recent time, solid state crack repair techniques in spent nuclear fuel dry storage canisters (SNF-DSC) have garnered significant interest. Plates of austenitic stainless steels are usually arc welded to fabricate the cylindrical canisters which are prone to chloride-induced stress corrosion cracking. Friction stir welding (FSW) is considered to be a potential candidate for damage repair. In this work, electrical discharge machining was used to simulate cracks in 304L stainless steel plates of 12.7 mm thickness. Subsequently, isothermal FSW was carried out at two different temperatures (725 and 825°C) in order to repair the simulated crack. Microstructure-mechanical property correlations in FSWed plates were studied in detail. Significant grain refinement observed in the stir zone (SZ) was attributed to dynamic recrystallization occurring during FSW. A comparison of Vickers microhardness showed higher hardness and homogeneity in the 725°C SZ than its 825°C counterpart. The fraction of S3 boundary is found to be low in the SZ as compared to base metal (BM). Yield strength of the joints was found to be approximately 100 MPa higher than that of the BM accompanied by a drop in ductility by a factor of 2. Residual stress profile across 825°C weld was measured using x-ray diffraction.

Bhattacharyya, Madhumanti↗

BETO 2021 Peer Review - Feasibility Study of Utilizing Electricity to Produce Intermediates from CO2 and Biomass

Capturing and converting CO2 generated from bioethanol facilities into valuable products, leveraging renewable electricity as the primary energy input, could increase overall biorefinery carbon utilization by as much as 40% and provide a means to decarbonize fuels and chemicals production. However, significant uncertainty exists around the costs, carbon intensity, risks, and technical challenges associated with electron-driven CO2 reduction. Thus, the overarching objective of this project is to guide existing and future research and development efforts by addressing these knowledge gaps for utilizing renewable electricity and CO2 to improve biorefinery economics and carbon utilization. By September 2023, this project will develop and publish a comprehensive design report for the integration of CO2 utilization into two existing conceptual biorefinery designs, which will include conceptual process models, pioneer and nth plant economics, identification and quantification of technological risks, and projections for future cost reductions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fast cycling HTS based superconducting accelerator magnets: Feasibility study and readiness demonstration program driven by neutrino physics and muon collider needs

Development of energy-efficient fast cycling accelerator magnets is critical for the next generation of proton rapid cycling synchrotrons (RCS) for neutrino research and booster accelerators of future muon colliders. We see a unique opportunity for having such magnets to be built on base of High Temperature Superconductors (HTS). Besides being superconducting at relatively high temperatures, rare-earth HTS tapes have shown very small AC losses compared to low-temperature NbTi superconductor cables. Recent tests of the HTS-based 0.5 m long two-bore superconducting accelerator magnet have shown record high dB/dt ramping rates of about 300 T/s at 10 Hz repetition rate and 0.5 T B-field span. No temperature rise in 6 K cooling He was observed within the 0.003 K error setting the upper limit on the cryogenic power loss in the magnet conductor coil to be less than 0.2 W/m. Based on this result we outline a possible upgrade of this test magnet design to 2 T B-field in the 10 mm beam gap with the dB/dt ramping rates up to 1000 T/s. The power test results of this short sample magnet will be used to project both cryogenic and electrical power losses as a function of the magnet B-field and the dB/dt ramping rates. Then these projections will be scaled to the range of expected accelerator magnet beam gaps and B-fields for the proton and muon RCS accelerators. We invite collaborators to join these studies and call for support of the R&D program aimed at comprehensive demonstration of this approach that includes design, construction, and power tests of a long prototype of the HTS-based fast-cycling accelerator magnet by 2028.

43 PARTICLE ACCELERATORS↗