Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Principal Components as a Data Reduction and Noise Reduction Technique

The potential of principal components as a pipeline data reduction technique for thematic mapper data was assessed and principal components analysis and its transformation as a noise reduction technique was examined. Two primary factors were considered: (1) how might data reduction and noise reduction using the principal components transformation affect the extraction of accurate spectral classifications; and (2) what are the real savings in terms of computer processing and storage costs of using reduced data over the full 7-band TM complement. An area in central Pennsylvania was chosen for a study area. The image data for the project were collected using the Earth Resources Laboratory's thematic mapper simulator (TMS) instrument.

Imhoff, M. L.↗

Benchmarking Soft Costs for PV Systems in the United States (Presentation)

This paper presents results from the first U.S. based data collection effort to quantify non-hardware, business process costs for PV systems at the residential and commercial scales, using a bottom-up approach. Annual expenditure and labor hour productivity data are analyzed to benchmark business process costs in the specific areas of: (1) customer acquisition; (2) permitting, inspection, andinterconnection; (3) labor costs of third party financing; and (4) installation labor.

14 SOLAR ENERGY↗

Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience

The completion of Vogtle Units 3 and 4, despite significant cost and schedule overruns, a major bankruptcy, and a pandemic, demonstrates that the U.S. nuclear industry can still develop new supply chains, train a highly skilled workforce, and build large nuclear power plants. Vogtle, being a first-of-a-kind (FOAK) plant, faced overruns, but FOAK overruns can decrease with more deployments through a combination of design standardization and modularization, transferring and implementing lessons learned between consecutive projects, and innovation. This report quantifies the potential cost and schedule reductions in future AP1000 plants in the US and identifies the barriers in achieving those reductions. It starts with a summary and analysis of the cost and construction timeline data for AP1000 plants that started construction in the United States (Vogtle) and China. Motivated by the steep schedule reductions from the first to second series of AP1000 plants in China, a cost reduction model was developed to quantify potential reductions for future AP1000 builds in the US. Results show that within about 3 more builds, AP1000s can become economically attractive in large markets in the U.S., without leveraging the Investment Tax Credit (ITC) or Production Tax Credit (PTC), and much sooner if these tax credits are available. Importantly the financial risks for future AP1000 builds in the US might be much smaller than observed in the FOAK plants. The study also identifies various barriers for future builds including the availability of a supply chain and a skilled workforce, and emphasizes the importance of making investments to gather and implement lessons learned between consecutive projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Latency Analysis of the Nexus Digital Twin Framework

Real-time digital catalogs are increasingly relied upon to track metadata and connect disparate data sources for cloud-based data integration efforts. One such tool, Deeplynx Nexus is supporting real-time digital twin efforts through event-driven data integration and time-series queries. Nexus’s usefulness for these applications depends critically on how quickly individual records can be uploaded and downloaded, since delays directly affect the responsiveness of any system built on top of it. However, the actual latency a user should expect from Nexus has not been systematically measured before, particularly for the small, frequent transactions typical of live sensor feeds. Here we show that single-record round-trip latency is 61.1 ms on a local Nexus instance and 391.7 ms on the hosted production infrastructure, a roughly 6.4x difference driven primarily by fixed per-request overhead rather than data volume. This overhead dominates at small scale: comparing single-record and ten-record trials suggests approximately 56 ms of each single-record request is fixed connection and authentication cost rather than data-transfer time, meaning batching even a handful of records is substantially more efficient than transmitting them individually. At large batch sizes, this pattern reverses for uploads, which converge to near parity between local and hosted environments by 25,000-50,000 records, while download latency remains persistently 5.7-6.4x slower on hosted infrastructure even at scale. These results suggest that Nexus deployments intended for real-time digital twin applications should prioritize record batching over single-record transactions, and that download-path optimization on hosted infrastructure offers the largest remaining opportunity to reduce latency at scale. We anticipate these baseline measurements will serve as a reference point for future digital twin projects evaluating whether Nexus’s latency profile meets their real-time requirements, and as a benchmark for tracking the effect of future infrastructure or API changes.

99 - GENERAL AND MISCELLANEOUS↗

Technology Assessment: Strategic Energy Analysis Center (SEAC) 2012 Highlights (Fact Sheet)

This fact sheet lists key analysis products produced by NREL in 2012. Like all NREL analysis products, these aim to increase the understanding of the current and future interactions and roles of energy policies, markets, resources, technologies, environmental impacts, and infrastructure. NREL analysis, data, and tools inform decisions as energy-efficient and renewable energy technologies advance from concept to commercial application.

1603↗

Analytical theory for artificial satellites

A theory for generating segmented ephemerides is discussed as a means for fast generation and simple retrieval of nominal orbit data. Over a succession of finite intervals of time, the orbit is represented by a best approximation expressed by Chebyshev polynomials. Storage of coefficients tables for Chebyshev polynomials is seen as a method to reduce data and decrease transmission costs. A general algorithm was constructed and computer programs were designed. The possibility of storing an ephemeris for a few days in the on-board computer, or in microprocessors attached to the data collectors is suggested.

Deprit, A.↗

EMASS (trademark): An expandable solution for NASA space data storage needs

The data acquisition, distribution, processing, and archiving requirements of NASA and other U.S. Government data centers present significant data management challenges that must be met in the 1990's. The Earth Observing System (EOS) project alone is expected to generate daily data volumes greater than 2 Terabytes (2 x 10(exp 12) Bytes). As the scientific community makes use of this data, their work will result in larger, increasingly complex data sets to be further exploited and managed. The challenge for data storage systems is to satisfy the initial data management requirements with cost effective solutions that provide for planned growth. The expendable architecture of the E-Systems Modular Automated Storage System (EMASS(TM)), a mass storage system which is designed to support NASA's data capture, storage, distribution, and management requirements into the 21st century is described.

Peterson, Anthony L.↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

Scalable Predictive And Risk Technologies

The research involves developing scalable technologies for risk-informed predictive analytics to achieve condition-based monitoring and maintenance strategies to reduce overall maintenance costs. The research utilizes data (real-time data, periodic data, and institutional knowledge) related to a particular plant asset from a specific nuclear plant site to develop technologies to scale risk-informed predictive analytic algorithms across different plant assets at the plant site and across the nuclear fleet. The developed algorithms and codes are used to optimize the maintenance strategy and estimate/forecast generation costs based on the state of health of the plant asset. Developed codes specifically include 1. Parameter estimation using plant operation data 2. Federated and Transfer learning model 3. Feature group based Multi-kernel SVM 4. Three state markov model

Manjunatha, KoushikAraseethota↗

Study of systems and techniques for data base management

Data management areas were studied to identify pertinent problems and issues that will affect future NASA data users in terms of performance and cost. Specific topics discussed include the identifications of potential NASA data users other than those normally discussed, consideration affecting the clustering of minicomputers, low cost computer system for information retrieval and analysis, the testing of minicomputer based data base management systems, ongoing work related to the use of dedicated systems for data base management, and the problems of data interchange among a community of NASA data users.

Source record↗

An approach to software cost estimation

A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

Mcgarry, F.↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

ACE: A distributed system to manage large data archives

Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

Daily, Mike I.↗

NASA's X-Plane Database and Parametric Cost Model v 2.0

The NASA Armstrong Cost Engineering Team with technical assistance from NASA HQ (SID)has gone through the full process in developing new CERs from Version #1 to Version #2 CERs. We took a step backward and reexamined all of the data collected, such as dependent and independent variables, cost, dry weight, length, wingspan, manned versus unmanned, altitude, Mach number, thrust, and skin. We used a well- known statistical analysis tool called CO$TAT instead of using "R" multiple linear or the "Regression" tool found in Microsoft Excel(TradeMark). We setup an "array of data" by adding 21" dummy variables;" we analyzed the standard error (SE) and then determined the "best fit." We have parametrically priced-out several future X-planes and compared our results to those of other resources. More work needs to be done in getting "accurate and traceable cost data" from historical X-plane records!

life cycle cost↗

Microreactor Optimization Using Simulation And Economics (mouse)

Microreactor Optimization Using Simulation and Economics (MOUSE) is a tool that integrates both nuclear microreactor design and reactor economics to provide comprehensive evaluations and optimizations. This tool enables stakeholders to explore the interplay between technical and economic variables, guiding them towards effective and competitive microreactor solutions. For the reactor core simulations, MOUSE leverages the OpenMC Monte Carlo Particle Transport Code to perform detailed core simulations for various microreactor designs. The included OpenMC models are 2D core designs of a Liquid Metal Thermal Microreactor (LMTR), a Gas-Cooled TRISO-Fueled Microreactor (GCMR), and a Heat Pipe Microreactor. Beyond core design, MOUSE includes simplified calculations for: - Calculating the masses of heat exchangers within the system. - Mechanical power of pumps. - Estimating the area occupied by various buildings within the nuclear plant. For the economic analysis, MOUSE provides detailed bottom-up cost estimates, encompassing a wide range of costs including preconstruction costs, direct costs, indirect costs, training costs, financial costs, operation & maintenance (O&M) costs, and fuel costs. These cost estimations are developed using data from the MARVEL project and additional literature sources, enabling the calculation of total capital costs and levelized cost of energy for both first-of-a-kind and nth-of-a-kind microreactors. MOUSE also enables analysis of the cost drivers and competitiveness in the electricity market. MOUSE allows users to modify a wide array of technical and economic parameters to evaluate different scenarios and their impacts. Examples of these parameters include: Fuels, coolants, or reflector materials Enrichment levels Control drum materials and geometry Fuel pin geometry and materials Moderator pin geometry and materials Reactor core and reflector dimensions Packing factor for the TRISO particles Nuclear reactor power and reactor burnup Number of sensors Shielding thickness Reactor vessel and guard vessel dimensions Operational staff requirements Number of emergency shutdowns Levelization period Interest rate Construction duration Since MOUSE is powered by the WATTS toolkit, it supports optimization studies, parametric analyses, and uncertainty calculations/propagation. The optimization techniques enable users to identify optimal design and economic configurations. The parametric analysis tools allow users to explore the sensitivity of various parameters, while uncertainty propagation helps quantify the impact of uncertainties on overall performance and cost. User Interface and Workflow: Currently, MOUSE is a command-line-based tool. Users can input various reactor design or economic parameters, modify the designs, run simulations, and visualize results through comprehensive data visualization and reporting capabilities. The typical workflow involves setting up the reactor model, defining economic parameters, running simulations, and analyzing the results to make informed decisions. By combining advanced design calculations with detailed economic modeling, MOUSE provides a robust framework for optimizing nuclear microreactor technologies, enhancing their competitiveness, and guiding stakeholders towards innovative and cost-effective solutions.

Hanna, Botros [Idaho National Laboratory (INL), Id↗

The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Marine and Hydrokinetic Devices

Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale, and for commercial arrays. This work is carried out under the U.S. Department of Energy reference model project, with the costs for engineering, deployment strategies, mooring and anchoring configurations, and maintenance operations, being developed by a consortium of Department of Energy national laboratories and universities. The goal of the reference model is to assist the MHK industry to become a cost-competitive contributor of renewable energy, by identifying those aspects of MHK projects that contribute significantly to the cost of energy, and directing research funding towards lowering those costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Programming Model for Massive Data Parallelism with Data Dependencies

Accelerating processors can often be more cost and energy effective for a wide range of data-parallel computing problems than general-purpose processors. For graphics processor units (GPUs), this is particularly the case when program development is aided by environments such as NVIDIA s Compute Unified Device Architecture (CUDA), which dramatically reduces the gap between domain-specific architectures and general purpose programming. Nonetheless, general-purpose GPU (GPGPU) programming remains subject to several restrictions. Most significantly, the separation of host (CPU) and accelerator (GPU) address spaces requires explicit management of GPU memory resources, especially for massive data parallelism that well exceeds the memory capacity of GPUs. One solution to this problem is to transfer data between the GPU and host memories frequently. In this work, we investigate another approach. We run massively data-parallel applications on GPU clusters. We further propose a programming model for massive data parallelism with data dependencies for this scenario. Experience from micro benchmarks and real-world applications shows that our model provides not only ease of programming but also significant performance gains.

43 PARTICLE ACCELERATORS↗