Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Constraint programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

Birkenstock, Benjamin↗

Multidisciplinary Optimization of Urban-Air-Mobility Class Aircraft Trajectories with Acoustic Constraints

The design and analysis of on-demand mobility class vehicles will require thorough acoustic analysis to ensure that more numerous aircraft can operate in densely populated areas without causing excessive levels of noise. This work is a step towards a comprehensive ODM vehicle analysis capability. The authors use 6DOF equations of motion to model the electric quad-rotor concept developed by NASA's Revolutionary Vertical Lift Technologies program. As a first step towards acoustic analysis, this trajectory is coupled to an acoustic model that tracks the sound pressure level perceived by an acoustic observer on the ground. The results show that the approach is successful in finding trajectories that minimize total propulsive impulse while obeying limits imposed on the sound pressure level. Future work will involve adding acoustic analysis of increasing fidelity and tying the resulting trajectories to the performance of the electric propulsion system.

electric aircraft↗

Tonal Noise Prediction of a Distributed Propulsion Unmanned Aerial Vehicle

Noise is expected to be a major barrier of unmanned aerial vehicles (UAVs) to public acceptance. A noise prediction scheme is introduced in this paper and applied to a specific vehicle configuration, namely, the Greased Lightning-10. Results herein will be used to demonstrate the feasibility of incorporating a noise constraint within the flight control system of a distributed electric propulsion vehicle by modifying commands for low-noise operation over sensitive areas, e.g., communities, schools, etc. Steady loading and thickness noise signatures of single propellers are computed using the Propeller Analysis System of the NASA Aircraft NOise Prediction Program. The individual signatures are then superposed at far field observers after applying corrections for spherical spreading and phase delays based on straight ray propagation. Two-propeller source fields are verified using analytical directivity patterns of monopoles. Notional effects of rotation rate, rotation direction, and relative propeller phase are given. Under ideal circumstances and equivalent RPM, random phasing, which occurs in most small UAVs, can produce up to 20 decibels uncertainty in the tonal sound pressure level at a given ground observer. Additionally, directivity modification via relative propeller phase control is shown to have great potential as a noise reduction technique. This paper will focus on the forward flight mode but will also briefly discuss the vertical flight mode.

Pascioni, Kyle A.↗

Large Space Optics: From Hubble to JWST and Beyond

If necessity truly is the mother of invention, then advances in lightweight space mirror technology have been driven by launch vehicle mass and volume constraints. In the late 1970 s, at the start of Hubble development, the state of the art in ground based telescopes was 3 to 4 meter monolithic primary mirrors with masses of 6000 to 10,000 kg - clearly too massive for the planned space shuttle 25,000 kg capability to LEO. Necessity led Hubble to a different solution. Launch vehicle mass constraints (and cost) resulted in the development of a 2.4 meter lightweight eggcrate mirror. At 810 kg (180 kg/m2), this mirror was approximately 7.4% of HST s total 11,110 kg mass. And, the total observatory structure at 4.3 m x 13.2 m fit snuggly inside the space shuttle 4.6 m x 18.3 m payload bay. In the early 1990 s, at the start of JWST development, the state of the art in ground based telescopes was 8 meter class monolithic primary mirrors (16,000 to 23,000 kg) and 10 meter segmented mirrors (14,400 kg). Unfortunately, launch vehicles were still constrained to 4.5 meter payloads and 25,000 kg to LEO or 6,600 kg to L2. Furthermore, science now demanded a space telescope with 6 to 8 meter aperture operating at L2. Mirror technology was identified as a critical capability necessary to enable the next generation of large aperture space telescopes. Specific telescope architectures were explored via three independent design concept studies conducted during the summer of 1996 (1). These studies identified two significant architectural constraints: segmentation and areal density. Because the launch vehicle fairing payload dynamic envelop diameter is approximately 4.5 meters, the only way to launch an 8 meter class mirror is to segment it, fold it and deploy it on orbit - resulting in actuation and control requirements. And, because of launch vehicle mass limits, the primary mirror allocation was only 1000 kg - resulting in a maximum areal density of 20 kg/m2. At the inception of JWST in 1996, such a capability did not exist. A highly successful technology development program was initiated resulting in matured and demonstrated mirror technology for JWST (2, 3). Today, the JWST 6.5 meter primary mirror has an areal density of 25 kg/m2 for a total mass of 625 kg or 9.6% of the total JWST observatory mass of 6,500 kg. Looking into the future, science requires increasing larger collecting apertures. Ground based telescopes are already moving towards 30+ meter mirrors. The only way to meet this challenge for space telescopes is via even lower areal density mirrors or on-orbit assembly or larger launch vehicles (4). The planned NASA Ares V with its 10 meter fairing and 55,000 kg payload to L2 eliminates this constraint (5).

Stahl, H. Philip↗

An algorithm for converting a virtual-bond chain into a complete polypeptide backbone chain

A systematic analysis is presented of the algorithm for converting a virtual-bond chain, defined by the coordinates of the alpha-carbons of a given protein, into a complete polypeptide backbone. An alternative algorithm, based upon the same set of geometric parameters used in the Purisima-Scheraga algorithm but with a different "linkage map" of the algorithmic procedures, is proposed. The global virtual-bond chain geometric constraints are more easily separable from the loal peptide geometric and energetic constraints derived from, for example, the Ramachandran criterion, within the framework of this approach.

NASA Discipline Exobiology↗

Fundamental rocket injector/spray programs at the Phillips Laboratory

The performance and stability of liquid rocket engines is determined to a large degree by atomization, mixing, and combustion processes. Control over these processes is exerted through the design of the injector. Injectors in liquid rocket engines are called upon to perform many functions. They must first of all mix the propellants to provide suitable performance in the shortest possible length. For main injectors, this is driven by the tradeoff between the combustion chamber performance, stability, efficiency, and its weight and cost. In gas generators and preburners, however, it is also driven by the possibility of damage to downstream components, for example piping and turbine blades. This can occur if unburned fuel and oxidant later react to create hot spots. Weight and cost considerations require that the injector design be simple and lightweight. For reusable engines, the injectors must also be durable and easily maintained. Suitable atomization and mixing must be produced with as small a pressure drop as possible, so that the size and weight of pressure vessels and turbomachinery can be minimized. However, the pressure drop must not be so small as to promote feed system coupled instabilities. Another important function of the injectors is to ensure that the injector face plate and the chamber and nozzle walls are not damaged. Typically this requires reducing the heat transfer to an acceptable level and also keeping unburned oxygen from chemically attacking the walls, particularly in reusable engines. Therefore the mixing distribution is often tailored to be fuel-rich near the walls. Wall heat transfer can become catastrophically damaging in the presence of acoustic instabilities, so the injector must prevent these from occurring at all costs. In addition to acoustic stability (but coupled with it), injectors must also be kinetically stable. That is, the flame itself must maintain ignition in the combustion chamber. This is not typically a problem with main injectors, but can be a consideration in preburners, where the desire to keep turbine inlet temperatures as cool as possible can make it advantageous for the preburners to operate as far from stoichiometry as can be tolerated. For some missions such as single stage to orbit, all of the above requirements must be maintained over a throttleable range, for example 5:1 to 10:1. Finally, the injectors must be ignitable during startup where pressures and temperatures are far from design conditions, and ignition transients must be minimized in order to avoid damage to engine components. In order to satisfy these various constraints, the injector designer must be able to perform design tradeoff studies, and it is important that this be done with minimal time and costs. In fact, it can easily be argued that reducing engine development time and costs is essential to maintaining U.S. competitiveness in space. The Propulsion Directorate of the Phillips Laboratory has invested in a number of programs to advance liquid rocket engine technology, and several of these are directed at improving design tools for liquid rocket injectors. The purpose of the presentation will be to describe some of these latter programs.

Talley, D. G.↗

Applications of nuclear reactor power systems to electric propulsion missions.

The performance of nuclear electric propulsion systems (NEP) has been evaluated for a wide variety of missions in an attempt to establish the commonality of NEP system requirements. Emphasis was given to those requirements and system characteristics that serve as guidelines for current technology development programs. Various interactions and tradeoffs between NEP system and mission parameters are described. The results show that the most significant factors in selecting NEP system size are launch mode (direct or spiral escape) and, to a weaker extent, launch vehicle capability. Other factors such as mission, payload, and thrust time constraints, have little influence, thus allowing one NEP system to be used for many missions. The results indicated that a 100 kWe NEP would be suitable for most direct escape missions and a 250 kWe NEP system would be suitable for more demanding missions that use the spiral escape mode.

Schaupp, R. W.↗

ATS-1/ATS-3 dual satellite navigation study

A study which illustrated the feasibility of implementing an on-board aircraft navigation system based on using the ATS-1 and ATS-3 satellites, the modified Omega Position Location Equipment (OPLE) Control Center, and a suitable aircraft terminal was conducted. The report provides: (1) a consideration of the problems of satellite navigation and an objective definition of the optimum system under the constraints of its specified components, (2) a description of the necessary modifications to the OPLE Control Center, the design of an aircraft terminal, and the design of ground reference terminals, and (3) an outline of an experiment plan and an estimate of the cost to be expected in conducting the program.

Hoover, W. M.↗

MSFC Skylab contamination control systems mission evaluation

Cluster external contamination control evaluation was made throughout the Skylab Mission. This evaluation indicated that contamination control measures instigated during the design, development, and operational phases of this program were adequate to reduce the general contamination environment external to the Cluster below the threshold senstivity levels for experiments and affected subsystems. Launch and orbit contamination control features included eliminating certain vents, rerouting vents for minimum contamination impact, establishing filters, incorporating materials with minimum outgassing characteristics and developing operational constraints and mission rules to minimize contamination effects. Prior to the launch of Skylab, contamination control math models were developed which were used to predict Cluster surface deposition and background brightness levels throughout the mission. The report summarizes the Skylab system and experiment contamination control evaluation. The Cluster systems and experiments evaluated include Induced Atmosphere, Corollary and ATM Experiments, Thermal Control Surfaces, Solar Array Systems, Windows and Star Tracker.

Source record↗

Standardized development of computer software. Part 1: Methods

This work is a two-volume set on standards for modern software engineering methodology. This volume presents a tutorial and practical guide to the efficient development of reliable computer software, a unified and coordinated discipline for design, coding, testing, documentation, and project organization and management. The aim of the monograph is to provide formal disciplines for increasing the probability of securing software that is characterized by high degrees of initial correctness, readability, and maintainability, and to promote practices which aid in the consistent and orderly development of a total software system within schedule and budgetary constraints. These disciplines are set forth as a set of rules to be applied during software development to drastically reduce the time traditionally spent in debugging, to increase documentation quality, to foster understandability among those who must come in contact with it, and to facilitate operations and alterations of the program as requirements on the program environment change.

Tausworthe, R. C.↗

GaussFit - A system for least squares and robust estimation

GaussFit is a new computer program for solving least-squares and robust estimation problems. It has a number of unique features, including a complete programming language designed especially to formulate estimation problems, a built-in compiler and interpreter to support the programming language, and a built-in algebraic manipulator for calculating the required partial derivatives analytically. These features make GaussFit very easy to use, so that even complex problems can be set up and solved with minimal effort. GaussFit can correctly handle many cases of practical interest: nonlinear models, exact constraints, correlated observations, and models where the equations of condition contain more than one observed quantity. An experimental robust estimation capability is built into GaussFit so that data sets contaminated by outliers can be handled simply and efficiently.

Jefferys, W. H.↗

AM03-AM121-115 Hard X-Ray Optics Development at MSFC

We have developed the electroformed-nickel replication process to enable us to fabricate light-weight hard-x-ray region. Two projects currently utilizing this technology are the production of over 250 r from 5 to 10 cm, for our HERO balloon payload, and 15- and 23-cm-diameter shells for a prototype module. The challenge for the former is to fabricate, mount, align and fly a large number of high-r constraints of a modest budget. For the latter, the challenge is to maintain high angular resolution shell thicknesses (100 micron) which make the shells extremely sensitive to electroforming stresses process does not degrade the ultra-smooth surface finish (approx. 3 A required for eventual multilayer c on these two programs.

Ramsey, Brian↗

The Ganymede Interior Structure, and Magnetosphere Observer (GISMO) Mission Concept

The NASA Planetary Science Summer School (PSSS) at JPL offers graduate students and young professionals a unique opportunity to learn about the mission design process. Program participants select and design a mission based on a recent NASA Science Mission Directorate Announcement of Opportunity (AO). Starting with the AO, in this case the 2009 New Frontiers AO, participants generate a set of science goals and develop a early mission concept to accomplish those goals within the constraints provided. As part of the 2010 NASA PSSS, the Ganymede Interior, Surface, and Magnetosphere Observer (GISMO) team developed a preliminary satellite design for a science mission to Jupiter's moon Ganymede. The science goals for this design focused on studying the icy moon's magnetosphere, internal structure, surface composition, geological processes, and atmosphere. By the completion of the summer school an instrument payload was selected and the necessary mission requirements were developed to deliver a spacecraft to Ganymede that would accomplish the defined science goals. This poster will discuss those science goals, the proposed spacecraft and the proposed mission design of this New Frontiers class Ganymede observer.

radar sounder↗

On the Development and Application of High Data Rate Architecture (HiDRA) in Future Space Networks

Historically, space missions have been severely constrained by their ability to downlink the data they have collected. These constraints are a result of relatively low link rates on the spacecraft as well as limitations on the time during which data can be sent. As part of a coherent strategy to address existing limitations and get more data to the ground more quickly, the Space Communications and Navigation (SCaN) program has been developing an architecture for a future solar system Internet. The High Data Rate Architecture (HiDRA) project is designed to fit into such a future SCaN network. HiDRA's goal is to describe a general packet-based networking capability which can be used to provide assets with efficient networking capabilities while simultaneously reducing the capital costs and operational costs of developing and flying future space systems.Along these lines, this paper begins by reviewing various characteristics of modern satellite design as well as relevant characteristics of emerging technologies (such as free-space optical links capable of working at 100+ Gbps). Next, the paper describes HiDRA's design, and how the system is able to both integrate and support the operation of not only today's high-rate systems, but also the high-rate systems likely to be found in the future. This section also explores both existing and future networking technologies, such as Delay Tolerant Networking (DTN) protocol (RFC4838 citeRFC:1, RFC5050citeRFC:2), and explains how HiDRA supports them. Additionally, this section explores how HiDRA is used for scheduling data movement through both proactive and reactive link management. After this, the paper moves on to explore a reference implementation of HiDRA. This implementation is currently being realized based on a Field Programmable Gate Array (FPGA) memory and interface controller that is itself controlled by a local computer running DTN software. Next, this paper explores HiDRA's natural evolution, which includes an integration path for software-defined networking (SDN) switches. This section also describes considerations for both near-Earth and deep-space instantiations of HiDRA, describing how differences in latencies between the environments will necessarily influence how the system is configured and the networks operate. Finally, this paper describes future work. This section includes a description of a potential ISS implementation which will allow rapid advancement through the technology readiness levels (TRL). This section also explores work being done to support HiDRA's successful implementation and operation in a heterogeneous network: such a network could include communications equipment spanning many vintages and capabilities, and one significant aspect of HiDRA's future development involves balancing compatibility with capability.

DTN↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

On The Incorporation of Both Function-Driven Requirements and Topology Optimization in The Development of Lunar Launch & Landing Pads

In the design of additively manufactured structures, there can be a constant battle between focusing on function-driven design and topology optimization in an attempt to improve a products ability to meet all requirements. Function-driven optimization is defined as the process of identifying the best design parameters that satisfy project functionality requirements. Function-driven optimization is typically implemented by a designer(s) who, instead of computational limitations, has human bias for the input or inputs determined. On the other hand, topology optimization is defined as a mathematical method that optimizes material layout within a given design space, for a given set of loads, boundary conditions, and constraints with the goal of maximizing the performance of the system. In topology optimization, the work is defined by the limited mathematical inputs and computationally available goals/restraints. If not evaluated simultaneously, these two approaches can result in fundamentally different design concepts meant to address the same requirements. NASA’s Artemis program includes the development of a base camp near the lunar South Pole. After site selection is made, one of the first infrastructure elements needed will be a launch and landing pad (LLP). The construction of such a pad will prevent damage to nearby structures from plume-surface interaction (PSI) while also providing a stable platform for the lander. These benefits reduce the required distance between the established landing zones and other settlement infrastructure. In this paper, the authors evaluate the requirements associated with lunar LLP development, application of both functional and topological optimization techniques, methodologies to combine the two techniques, and potential impacts on final design of such a pad.

In-situ↗

Advanced beaded and tubular structural panels.

A review is presented of an NASA program to develop light-weight beaded and tubular structural panels which can be applied where beaded external surfaces are acceptable aerodynamically or where primary structure is protected by heat shields. The design shapes were obtained with an optimization computer code which iterates geometric parameters to satisfy strength, stability and weight constraints. Methods of fabricating these new configurations are discussed. Nondestructive testing produced extensive combined compression, shear and bending test data on local buckling specimens and large panels. The optimized design concepts offer 25 to 40% weight savings compared to conventional stiffened sheet construction.

Musgrove, M. D.↗