Radioactive Cleaning Robot Presentation
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The recent spike in fuel prices has sharply focused attention on improving fuel economy of power plants for transportation, particularly for the gasoline passenger car engine. Shaped by a number of constraints, some engineering in nature, some economic, and some environmental, the spark ignition gasoline engine currently provides lower than optimal fuel economy. In view of the changed world situation it is imperative to consider all reasonable measures to go beyond the current efficiency levels. The programmatic needs of DOE EERE call for a 20-40% improvement in fuel economy in a light-duty vehicle with dramatically lower emissions. Achieving such breakthrough efficiencies in an engine system is a very challenging objective. The combination of lean burn, high pressure (resulting from a high compression ratio and/or boost), unthrottled operation in a stratified charge, highly dilute combustion system points to a promising pathway for attaining these objectives. The goal of the proposed work is to explore new areas and regimes of combustion that can enable future gasoline engines with 20-40% improved fuel economy.
The Eastern Band of Cherokee Indians (EBCI or Tribe) is a federally recognized Indian Tribe located on ancestral homelands in western North Carolina. The Tribe is comprised of just over 16,000 enrolled members, with an estimated 8,000 – 10,000 residing on tribal lands. The Qualla Boundary is comprised of over 56,000 acres of contiguous trust land adjacent to the Great Smoky Mountain National Park. The EBCI also possess an assortment of scattered parcels of varying sizes across western North Carolina, some in trust status and others in deeded or fee simple. This project was implemented on a trust parcel in Cherokee County, NC. The Tribe was awarded the maximum amount of $\$ $1,000,000 for the installation of a 705.6 kilowatt (kW) solar PV array to supplement the power consumed and reduce annual utility costs at the Harrah’s Cherokee Valley River (HCVR) casino and hotel in Murphy, NC. The casino is a tribal entity of the Tribe. The total cost of the project was $\$ $2.364 million. The system was officially commissioned on April 12, 2019. For the purpose of calculating the amount of power produced and reduction in utility costs, the time frame assessed is May 2019 through April 2020. All power generated was consumed onsite.Based on the first full year of data, the project achieved the estimated 8.3% reduction in utility costs. A total of six casino and tribal staff were trained and received a North American Board of Certified Energy Practitioners (NABCEP) certification, giving our staff the resources and skills to manage and operate the solar PV array. Based on the Tribal match of $\$ $1,377,797 and estimated net annual benefit of $89,000, the estimated return on investment (ROI) is 15.48 years.
The report highlights Co-Optimization of Fuels & Engines researchers’ answers to three vital questions: what fuels do engines want, what fuels should we make, and what will work in the real world?
To increase the cost-saving energy and carbon dioxide (CO 2 ) emissions reductions in buildings and portfolios at the scale and speed necessary to limit climate change, researchers at LBNL and Johnson Controls (JCI) developed the Building Efficiency Targeting Tool for Energy Retrofits (BETTER). BETTER is a software tool that consists of three components: (1) the BETTER analytical engine source code (which was developed with intellectual property provided by JCI under CRADA FP00007338); (2) the BETTER web application, developed by LBNL and McQuillen Interactive Pty. Ltd; and (3) the BETTER application programming interface (API), also developed by LBNL and McQuillen Interactive Pty. Ltd. BETTER enables building and portfolio owners, managers, and service providers worldwide to quickly, easily identify cost-saving energy efficiency retrofits in existing buildings and portfolios without expensive site visits or complex modeling. With minimal data input, the tool benchmarks a building’s electric and fossil energy usage against peers; quantifies energy, cost and greenhouse gas (GHG) emission reduction potentials at the building and portfolio levels; and recommends energy efficiency measures to decarbonize and electrify buildings and portfolios, targeting specific energy savings levels. No other tool so comprehensively analyzes buildings and portfolios with such ease. If fully implemented, it is estimated that BETTER could help reduce emissions equivalent to planting 1.3 billion trees globally by 2030. Moreover, an additional 50-75% of embodied GHG emissions could be avoided in each case where BETTER results in a building being retrofitted instead of demolished and replaced, providing substantial additional decarbonization benefits for the buildings sector. BETTER has garnered multiple awards and avid interest from investors. In 2020, it earned a R&D 100 Award for innovation and a LBNL Director’s Award for Technology Transfer. In 2021, BETTER was named an EarthX E-Capital Summit Climate Tech Prize semi-finalist
Vietnam is transforming its power system with an increasing share of variable renewable energy (VRE) in the generation mix and plans to achieve 27% VRE by capacity in 2030 and 42% by capacity in 2045, as indicated by the draft Eighth Power Development Plan for 2020–-2045 (PDP8). Further increase in VRE penetration is possible with data-driven analysis where availability of data, specifically VRE data, becomes critical. NREL has worked with various stakeholders in Vietnam to create high-resolution multi-year VRE data publicly available to all. This paper reviews this new VRE data for Vietnam and how different stakeholders can use this data to inform VRE deployment decisions.
This reports on a four-year effort to provide foundational research, analysis, strategies and assistance to help Florida, and other states that might learn from this work, to grow solar energy in conjunction with other distributed energy resources by addressing and overcoming existing barriers, and in way that delivers increased value. The start of this effort coincided with an inflection point of sorts into a new dawn for solar energy in Florida, where the Sunshine state’s national ranking in total installed solar, according to the Solar Energy Industries Association (SEIA), has rose from 13th to 4th. Florida has now become the national leader in annual utility-scale solar growth as dozens of large plants have come online. Also, during this time, Florida utilities have expressed a strong and growing interest in understanding the role of energy storage and how to best plan for and deploy this unique resource as part of strategies to grow solar. The utility-scale solar growth experienced has been fueled by the economics of solar cost-parity with natural gas combined cycle plants and Florida Public Service Commission’s (PSC) approval of cost-recovery for the Investor-Owned Utilities (IOU’s), primarily through the Solar Base Rate Adjustment (SoBRA) mechanism. This has led to gigawatts (GW’s) of rate-based solar capacity additions over several years, along with fairly significant amounts of energy storage. Meanwhile, municipal electric utilities, which, collectively, are the third largest source of power in the state, have been increasing solar considerably through power purchase agreements (PPA’s) and are on track to have close to 1 GW of grid-connected solar by 2024. Florida’s municipal utilities and the Florida Municipal Electric Association (FMEA) have been key partners in the Florida Alliance for Accelerating Solar and Storage Technology Readiness (FAASSTeR), formed to carry out this effort. The six largest of these have been Core Team utilities, engaging throughout the project in weekly calls, discussions, and project direction, participating in and hosting workshops and benefiting from technical assistance in several areas.
Chromium (Cr) poisoning remains a significant issue in long-term solid oxide fuel cell (SOFC) operation. While the addition of Cr in the interconnect and balance-of-plant (BOP) materials is effective in improving their resistance to oxidation, it also causes the deposition of resistive phases in the air electrode and thus cell performance loss. Previous work has investigated the mitigation of chromium deposition using getters, Cr diffusion resistant coatings, and more chromium-tolerant air electrode materials. However, these mitigation strategies merely postpone the degradation of performance due to Cr poisoning. Additionally, some strategies require the replacement of components, e.g., use of getters. Here we investigated a new, in-situ Cr poisoning mitigation strategy.
The primary purpose of this brief, and the full assessment from which its content is derived, is to assist USAID staff in identifying opportunities for designing new interventions that integrate climate finance into their existing/planned energy sector programming. USAID staff are encouraged to review the various examples presented to determine if any aspect of the proposed approaches are applicable to the countries/regions in which they operate.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.
Wind and solar power and battery energy storage are often referred to as inverter-based resources (IBRs), which means they rely on power electronics (inverters) to generate grid-compatible electricity. This is unlike the fossil, nuclear, and hydroelectric plants that use spinning synchronous generators that have provided nearly all U.S. electricity until recently. Synchronous generators can inherently provide several services used to maintain a safe and stable grid and as they are replaced with IBRs it becomes important to understand how these services can be provided. One of these services is fault current, or the ability to inject large amounts of current during a short circuit. This current can easily be detected with low-cost equipment such as circuit breakers. IBRs do not inherently produce large amounts of fault current, and this may eventually require finding alternative sources of fault current or new system protection schemes. This document describes several alternative approaches to maintaining fault current protection and provide a safe, reliable power grid.