Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “units”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performed to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion Report for Model Evaluation Well ER-11-2: Corrective Action Unit 98: Frenchman Flat

Model Evaluation Well ER-11-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of Nevada Environmental Management Operations at the Nevada National Security Site (formerly known as the Nevada Test Site). The well was drilled in August 2012 as part of a model evaluation program in the Frenchman Flat area of Nye County, Nevada. The primary purpose of the well was to provide detailed geologic, hydrogeologic, chemical, and radionuclide data that can be used to test and build confidence in the applicability of the Frenchman Flat Corrective Action Unit flow and transport models for their intended purpose. In particular, this well was designed to provide data to evaluate the uncertainty in model forecasts of contaminant migration from the upgradient underground nuclear test PIN STRIPE, conducted in borehole U-11b in 1966. Well ER-11-2 will provide information that can be used to refine the Phase II Frenchman Flat hydrostratigraphic framework model if necessary, as well as to support future groundwater flow and transport modeling. The main 31.1-centimeter (cm) hole was drilled to a total depth of 399.6 meters (m). A completion casing string was not set in Well ER-11-2. However, a piezometer string was installed in the 31.1-cm open hole. The piezometer is composed of 7.3-cm stainless-steel tubing hung on 6.0-cm carbon-steel tubing via a crossover sub. The piezometer string was landed at 394.5 m, for monitoring the lower tuff confining unit. Data collected during and shortly after hole construction include composite drill cuttings samples collected every 3.0 m, various geophysical logs, water quality (including tritium and other test-related radionuclides) measurements, and water level measurements. The well penetrated 42.7 m of Quaternary and Tertiary alluvium and 356.9 m of Tertiary volcanic rock. The water-level measured in the piezometer string on September 25, 2012, was 353.8 m below ground surface. No tritium above levels detectable by field methods were encountered in this hole. No well development or hydrologic testing was conducted in this well immediately after completion, and future well development, sampling, and hydrologic testing planned for this well will be limited due to the diameter of the piezometer string. The stratigraphy, general lithology, and the water level are as expected, but the section of geology encountered is higher than expected due to faulting. No tritium above the minimum detection limit of the field equipment was detected because the target aquifer (the Topopah Spring aquifer) at Well ER-11-2 is structurally higher than expected and thus unsaturated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mapping and Assessment of the United States Ocean Wave Energy Resource

This project estimates the naturally available and technically recoverable U.S. wave energy resources, using a 51-month Wavewatch III hindcast database developed especially for this study by National Oceanographic and Atmospheric Administration's (NOAA's) National Centers for Environmental Prediction. For total resource estimation, wave power density in terms of kilowatts per meter is aggregated across a unit diameter circle. This approach is fully consistent with accepted global practice and includes the resource made available by the lateral transfer of wave energy along wave crests, which enables wave diffraction to substantially reestablish wave power densities within a few kilometers of a linear array, even for fixed terminator devices. The total available wave energy resource along the U.S. continental shelf edge, based on accumulating unit circle wave power densities, is estimated to be 2,640 TWh/yr, broken down as follows: 590 TWh/yr for the West Coast, 240 TWh/yr for the East Coast, 80 TWh/yr for the Gulf of Mexico, 1570 TWh/yr for Alaska, 130 TWh/yr for Hawaii, and 30 TWh/yr for Puerto Rico. The total recoverable wave energy resource, as constrained by an array capacity packing density of 15 megawatts per kilometer of coastline, with a 100-fold operating range between threshold and maximum operating conditions in terms of input wave power density available to such arrays, yields a total recoverable resource along the U.S. continental shelf edge of 1,170 TWh/yr, broken down as follows: 250 TWh/yr for the West Coast, 160 TWh/yr for the East Coast, 60 TWh/yr for the Gulf of Mexico, 620 TWh/yr for Alaska, 80 TWh/yr for Hawaii, and 20 TWh/yr for Puerto Rico.

16 TIDAL AND WAVE POWER↗

Direct Evaporative Precooling Model and Analysis: Development and Simulations of an Improved Algorithm for Import into EnergyPlus and Applications to Commercial Buildings in the United States

Evaporative condenser pre-cooling expands the availability of energy saving, cost effective technology options (market engagement) and serves to broaden the range of options in upcoming codes and equipment standards (impacting regulation). Commercially available evaporative pre-coolers provide a low cost retrofit for existing packaged rooftop units, commercial unitary split systems, and air cooled chillers. We map the impact on energy savings and peak energy reduction in three building types (medium office, secondary school, and supermarket) in 16 locations with four levels of pad effectiveness and show the effect for HVAC systems using either refrigerants R22 or R410A (See Section 5.4). EnergyPlus simulations are conducted with an improved algorithm for estimating the condenser pre-cooling wet bulb efficiency. EnergyPlus version 5.0.0 provides an option for a curve-fit form of calculating evaporative cooling efficiency (currently available only for evaporative pads used for space cooling, not condenser precooling). This option requires a large body of empirical data to obtain the 11 parameters required in the polynomial equation and, being a general curve fit, it is also not physically meaningful. Our study departs from this approach by presenting an alternative mathematical model that is physically intuitive, simpler in form, and provides better agreement with manufacturer’s data. In this report, we describe the simpler algorithm and provide the metrics that show how it is an improvement over the algorithm used in EnergyPlus version 5.0.0. We then generate performance values that can be directly input into EnergyPlus for simulations. By this process, we examine the annual and peak energy reductions of three building types (medium office, secondary school and supermarket) in 16 locations within the U.S. These three building types were chosen because they have distinctive loads, zones, and equipment. In addition to performing the requisite calculations, computer algorithms were developed for use with EnergyPlus to simulate the performance of commercial units under a variety of operating parameters. Performance maps were generated and estimated energy savings and peak demand reductions were calculated. Performance curves that were used in these EnergyPlus simulations were shared with the National Renewable Energy Laboratory (NREL) and with the Florida Solar Energy Center (FSEC) for possible inclusion in the next update to EnergyPlus.

air conditioner↗

Corrective Action Units 101 and 102: Central and Western Pahute Mesa

Well ER-EC-14 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS; formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2012, as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. The primary purpose of the well was to provide detailed hydrogeologic information for the Fortymile Canyon composite hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute Mesa–Oasis Valley hydrostratigraphic framework model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LANL Response to SRS Requirement G-ESR-G-00035 Item 11 Bed Temperature Requirements, For the Addition of Direct Metal Oxidation Unit 3, Revision 0

Los Alamos National Laboratory has identified a number of plutonium-bearing materials that will be placed in storage in 3013 containers per requirements of DOE-STD-3013-2004, or DOE-STD-3013-2012 when it is implemented in the LANL contract. Before these items can be considered for storage at Savannah River Site, 20 points of agreement, described in Savannah River Site (SRS) document G-ESR-G-00035, Revision 1, must be documented and provided to SRS for review. These agreements include documentation that the requirements of the 3013 Standard are met and the storage facility’s safety envelope is not compromised. Point 11 of the 20 points is the requirement that material be stabilized at 950°C for a minimum of two hours prior to packaging. This report addresses the Point 11 requirement, describing the controls used during stabilization to ensure that the material is properly stabilized using a continuous process (Advanced Recovery and Integrated Extraction System [ARIES] direct metal oxidation [DMO] and recycle oxide calcination). These controls include verification of the furnace controller thermocouple profile and verification of the profiles for the calciner tube hot zone. This report is specific to Direct Metal Oxidation Unit 3 (DMO-3). The point 11 requirements for DMO-2 and muffle furnace oxidation are covered in reference. This report does not replace reference. The process and methodology used in this report are similar to that used for Direct Metal Oxidation Unit 2, or DMO-2, as documented in reference. This report documents the performance for ARIES DMO-3. The temperature on the outside of the calciner tube must be at least 1,032°C. The auger rotation rate set point will be dependent on the pitch of the installed auger. For an auger pitch of 1.297 in/rev the auger set point will be 0.0777 rpm or less, which allows for at least 132 minutes calcination time based on worst case conditions (i.e., lowest possible powder density at the lowest initial powder temperature, and under the least favorable heat transfer conditions, and with the least favorable auger pitch of the currently installed auger.) A new auger design may be used in future modifications of DMO-3 that has an auger pitch of 1.400 ± 0.025 inches which would change the required auger set point to 0.0707 rpm or less.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Energy Savings and Breakeven Cost for Residential Heat Pump Water Heaters in the United States

Heat pump water heaters (HPWHs) have recently reemerged in the U.S. residential water heating market and have the potential to provide homeowners with significant energy savings. However, there are questions as to the actual performance and energy savings potential of these units, in particular in regards to the heat pump's performance in unconditioned space and the impact of the heat pump on space heating and cooling loads when it is located in conditioned space. To help answer these questions, simulations were performed of a HPWH in both conditioned and unconditioned space at over 900 locations across the continental United States and Hawaii. Simulations included a Building America benchmark home so that any interaction between the HPWH and the home's HVAC equipment could be captured. Comparisons were performed to typical gas and electric water heaters to determine the energy savings potential and cost effectiveness of a HPWH relative to these technologies. HPWHs were found to have a significant source energy savings potential when replacing typical electric water heaters, but only saved source energy relative to gas water heater in the most favorable installation locations in the southern US. When replacing an electric water heater, the HPWH is likely to break even in California, the southern US, and parts of the northeast in most situations. However, the HPWH will only break even when replacing a gas water heater in a few southern states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Security Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Energy Production Potential from Ocean Currents along the United States Coastline

Increasing energy consumption and depleting reserves of fossil fuels have resulted in growing interest in alternative renewable energy from the ocean. Ocean currents are an alternative source of clean energy due to their inherent reliability, persistence and sustainability. General ocean circulations exist in the form of large rotating ocean gyres, and feature extremely rapid current flow in the western boundaries due to the Coriolis Effect. The Gulf Stream system is formed by the western boundary current of the North Atlantic Ocean that flows along the east coastline of the United States, and therefore is of particular interest as a potential energy resource for the United States.

16 TIDAL AND WAVE POWER↗

Phase I Flow and Transport Model Document for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nye County, Nevada, Revision 1 with ROTCs 1 and 2

The Underground Test Area (UGTA) Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, in the northeast part of the Nevada National Security Site (NNSS) requires environmental corrective action activities to assess contamination resulting from underground nuclear testing. These activities are necessary to comply with the UGTA corrective action strategy (referred to as the UGTA strategy). The corrective action investigation phase of the UGTA strategy requires the development of groundwater flow and contaminant transport models whose purpose is to identify the lateral and vertical extent of contaminant migration over the next 1,000 years. In particular, the goal is to calculate the contaminant boundary, which is defined as a probabilistic model-forecast perimeter and a lower hydrostratigraphic unit (HSU) boundary that delineate the possible extent of radionuclide-contaminated groundwater from underground nuclear testing. Because of structural uncertainty in the contaminant boundary, a range of potential contaminant boundaries was forecast, resulting in an ensemble of contaminant boundaries. The contaminant boundary extent is determined by the volume of groundwater that has at least a 5 percent chance of exceeding the radiological standards of the Safe Drinking Water Act (SDWA) (CFR, 2012).

54 ENVIRONMENTAL SCIENCES↗

Part-Load Performance Characterization and Energy Savings Potential of the RTU Challenge Unit: Daikin Rebel

In 2011, the U.S. Department of Energy’s Building Technology Office (DOE’s BTO), with help from the Better Buildings Alliance (BBA) members, developed a specification for high performance rooftop air-conditioning units (RTU Challenge) with capacity ranges between 10 and 20 tons (DOE 2013). Daikin’s Rebel for the first rooftop unit system that was recognized by DOE in May 2012 as meeting the RTU Challenge specifications. This report documents the development of part-load performance curves and its use with EnergyPlus simulation tool to estimate the potential savings from use of Rebel compared to other standard options.

Wang, Weimin↗

Modeling Adjustable Speed Pumped Storage Hydro Units Employing Doubly-Fed Induction Machines

This report is a part of a series of documents to be issued in the course of a U.S. Department of Energy (DOE) project titled “Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S.” The purpose of this report is to propose a model structure for an adjustable speed pumped storage hydro (PSH) unit employing a doubly-fed induction machine (DFIM). The use of a DFIM with its rotor windings controlled by a power converter is the present state-of-the-art design for adjustable speed hydro pumped storage units. Although the theoretical basis for the analysis of DFIMs was developed at least 70 years ago (a paper by Charles Concordia et al. in 1942 describes the mathematical modeling and dynamic response of DFIM and refers to even earlier publications), it seems appropriate to provide the fundamental equations governing their dynamic behavior so that the following discussions on modeling these devices for stability studies are more meaningful.

Koritarov, Vladimir↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

54 ENVIRONMENTAL SCIENCES↗

Joint United States: European Union Theoretical and Practical Course on Molecular Approaches for in situ Biogradation

The Joint United States - European Union Theoretical and Practical Course on Molecular Approaches for in situ Biodegradation was held May 24 through June 7 at The University of Oklahoma. Twenty-four graduate and postgraduate students from both the United States and the European Union attended the course. Nine states and ten European countries were represented. Students were assigned living quarters and laboratory partners to maximize interactions between US and EU participants as well as to mix people with different technical backgrounds together. The students used the latest methods in molecular biology to characterize beneficial microorganisms and genes involved in the biodegradation of pollutants at a nearby landfill as well as an active hydrocarbon-producing site, part of which is undergoing bioremediation. Seminars by distinguished scientists were organized to expose the students to the breadth of the environmental field, including field assay and engineering applications, laboratory scale bioreactors, microbiology, genetics, regulation, pathway analysis, design of recombinant bacteria, and application of the associated techniques to the field. Lectures were given by various OU faculty on the principles behind the techniques to be used in the laboratory. These lectures included troubleshooting hints and encouraged questions and comments from the audience. The laboratory experiments covered chemical, microbiological, and molecular genetic analyses of soils; bioavailability of contaminants; enrichment cultures; gene probing; PCR amplification of known genes and gene families; identification of microbes based traditional and nontraditional approaches, nutritional capabilities, and 16S rRNA sequence; mRNA detection; and enzyme assays. Field trips were made to the USGS landfill field sampling site, and to the Tall Grass Prairie Preserve, a Nature Conservancy site which also featured long-term studies of bioremediation of crude oil and brine spills by one of the Principal Investigators in collaboration with University of Tulsa faculty. The students are expected to bring the methods that they learned back to their laboratories to enrich their own and their colleagues' ability to perform state of the art environmental biotechnology research.

59 BASIC BIOLOGICAL SCIENCES↗

Conceptual Design for the Pilot-Scale Plutonium Oxide Processing Unit in the Radiochemical Processing Laboratory

This report describes a conceptual design for a pilot-scale capability to produce plutonium oxide for use as exercise and reference materials, and for use in identifying and validating nuclear forensics signatures associated with plutonium production. This capability is referred to as the Pilot-scale Plutonium oxide Processing Unit (P3U), and it will be located in the Radiochemical Processing Laboratory at the Pacific Northwest National Laboratory. The key unit operations are described, including plutonium dioxide (PuO2) dissolution, purification of the Pu by ion exchange, precipitation, and conversion to oxide by calcination.

plutonium oxide↗

High Reliability R-10 Windows Using Vacuum Insulating Glass Units

The objective of this effort was for EverSealed Windows (“EverSealed” or “ESW”) to design, assemble, thermally and environmentally test and demonstrate a Vacuum Insulating Glass Unit (“VIGU” or “VIG”) that would enable a whole window to meet or exceed the an R-10 insulating value (U-factor ≤ 0.1). To produce a VIGU that could withstand any North American environment, ESW believed it needed to design, produce and use a flexible edge seal system. This is because a rigid edge seal, used by all other know VIG producers and developers, limits the size and/or thermal environment of the VIG to where the unit is not practical for typical IG sizes and cannot withstand severe outdoor environments. The rigid-sealed VIG’s use would be limited to mild climates where it would not have a reasonable economic payback when compared to traditional double-pane or triple-pane IGs. ESW’s goals, in addition to achieving a sufficiently high R-value to enable a whole window to achieve R-10, included creating a VIG design that could be produced for a cost equal to or lower than a traditional triple-pane IG (low-e, argon filled). ESW achieved these goals. EverSealed produced, tested and demonstrated a flexible edge-seal VIG that had an R-13 insulating value and the edge-seal system durability to operate reliably for at least 40 years in the harshest climates of North America.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of the number of wild pigs found in the United States

Based on a compilation of three estimation approaches, the total nationwide population of wild pigs in the United States numbers approximately 6.3 million animals, with that total estimate ranging from 4.4 up to 11.3 million animals. The majority of these numbers (99 percent), which were encompassed by ten states (i.e., Alabama, Arkansas, California, Florida, Georgia, Louisiana, Mississippi, Oklahoma, South Carolina and Texas), were based on defined estimation methodologies (e.g., density estimates correlated to the total potential suitable wild pig habitat statewide, statewide harvest percentages, statewide agency surveys regarding wild pig distribution and numbers). In contrast to the pre-1990 estimates, none of these more recent efforts, collectively encompassing 99 percent of the total, were based solely on anecdotal information or speculation. To that end, one can defensibly state that the wild pigs found in the United States number in the millions of animals, with the nationwide population estimated to arguably vary from about four million up to about eleven million individuals.

59 BASIC BIOLOGICAL SCIENCES↗